North Slope Borough, Alaska requires a Borough land-use permit before most new residential construction in its Village Districts, including a new home, garage, storage structure or addition.1 Village applications use Form 700 and go to the Borough Planning Commission, while Utqiagvik uses Form 800 and the Utqiagvik Zoning Commission for zoning approval.23 Septic permits are separate: Alaska DEC, not the Borough, regulates onsite wastewater systems.4
At a glance
- Residential building permit
- Required for residential development under the applicable Borough form1
- Zoning
- Borough Title 19 applies; the reviewing commission and standards vary by location52
- Permit applications
- Electronic filing through the North Slope AK Portal6
- Septic
- Alaska DEC administers onsite-wastewater requirements47
- RV or tiny-home living
- Not confirmed; ask the Land Management Regulation Division about the specific parcel and district8
- Owner-builder
- State contractor-registration exemption is conditional; Borough permits still apply9
- Village lot standards
- No minimum lot size, setback, lot coverage or height standard in Village Districts; ask for Utqiagvik rules10111213
Who to call
Planning & zoning
North Slope Borough Land Management Regulation Division
Borough planning and zoning, land-use permits, subdivisions and electronic planning-permit applications
nsbpermitsubmittal@north-slope.org
P.O. Box 69, Utqiagvik, AK 99723
Septic permits
Alaska DEC Engineering Support and Plan Review
State onsite-wastewater plan review and construction notifications
610 University Ave., Fairbanks, AK 99709
Contact details are copied from each office’s official page and were checked against it on October 9, 2026.
Off-grid gear
Going off-grid in North Slope Borough means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in North Slope Borough, Alaska?
Yes. North Slope Borough requires a land-use permit before constructing a new home, garage or storage structure, adding to or moving a structure, placing driveway or parking-area gravel fill, or excavating for a foundation in a Form 700 Village District114. Repairs to an existing structure do not need that permit, and the Village District instructions exempt ice cellars, drying racks and subsistence hunting blinds1. Form 700 covers Anaktuvuk Pass, Atqasuk, Kaktovik, Nuiqsut, Point Hope, Point Lay and Wainwright; Utqiagvik uses Form 8003. Restricted property may be treated differently except where public health and safety are involved15.
Who is the North Slope Borough building department?
The practical first stop is the North Slope Borough Land Management Regulation Division, which administers Borough planning and zoning ordinances516. Borough planning applications must be filed electronically through the North Slope AK Portal616. For the Village District process, staff review completeness, conduct a 20-day public review and typically decide the permit in 40 days6. The office lists a permit-submittal email and telephone number for help16. Use the fee and penalty schedule effective in 2026 because it supersedes fee amounts printed in older instructions17.
Does North Slope Borough have zoning?
Yes. North Slope Borough administers zoning and land-use rules under Title 195. Form 700 Village District applications report to the Planning Commission, while Form 800 Utqiagvik applications report to the Utqiagvik Zoning Commission3. Borough and village zoning maps are published, and district rules may differ18. Village Districts have no minimum lot size, property-line setback, lot-coverage limit or building-height standard; dimensional standards apply in Utqiagvik, but we could not confirm the applicable numbers10111213. Minimum dwelling size, RV use and tiny-home occupancy remain unconfirmed, so ask the Land Management Regulation Division about the parcel and proposed use16. Creating or changing lot boundaries requires the Borough subdivision process19.
How do septic permits work in North Slope Borough?
Alaska DEC, rather than North Slope Borough, administers onsite-wastewater requirements4. Prior written approval is generally required, but a system that meets authorization-by-rule standards may proceed without prior approval after construction notification and later registration7. An engineered system that requires prior DEC approval must be observed during construction by a licensed engineer; the engineer then submits construction certification and record drawings before DEC approves operation20. Only about 4.9% of local soils are rated without severe limitations for a conventional septic drain field, so investigate wastewater feasibility before settling on a house site21.
Can you live in an RV or tiny home in North Slope Borough?
North Slope Borough has zoning, but we could not confirm a general rule allowing or prohibiting long-term RV occupancy, temporary camping on private land or tiny-home occupancy5. Ask the Land Management Regulation Division about the parcel's district, proposed duration and utility arrangement before moving a unit onto the site16. A tiny home proposed as a new dwelling in a Village District requires the applicable residential land-use permit1. For a small camp, state sanitation rules allow a qualifying pit privy, incinerating toilet or composting toilet, while a flush toilet connected to septic or a holding tank may require plan approval22.
Building a home in North Slope Borough: what are the steps?
- Ask the Land Management Regulation Division to identify the parcel's zoning district and whether Form 700 or Form 800 applies216.
- Check the current fee schedule because it supersedes amounts shown in older instructions17.
- Prepare the site information and file electronically through the North Slope AK Portal616.
- Include proposed driveway or parking-area gravel fill in a Village District application; the cited rule covers the fill, not every access question14.
- For a Form 700 application, allow for completeness review, a 20-day public review and a typical 40-day decision process6.
- Ask Alaska DEC whether the wastewater design qualifies for authorization by rule or requires prior written approval7.
What should you check before buying land in North Slope Borough?
Start with legal ownership and land status: about 68.7% of North Slope Borough is federal land, so verify a listing's access and development rights23. Check the published zoning maps, then confirm the district, allowed use and subdivision history with the Land Management Regulation Division241916. Investigate wastewater feasibility early because only about 4.9% of soils are rated without severe limitations for a conventional septic drain field21. Ask the relevant community which floodplain ordinance and permit office apply; we could not confirm one floodplain administrator for every North Slope parcel. Confirm access separately because the Village District permit requirement addresses driveway or parking-area gravel fill, not every access issue14.
Watch-outs
- Use the current Borough fee schedule: it supersedes fee amounts printed in older permit instructions17.
- Alaska has not adopted a statewide residential building code; local codes and permits can still apply, and we could not confirm a North Slope Borough structural code or general residential inspection schedule25.
- Village Districts have no minimum lot size, setback, lot-coverage or building-height standard, but dimensional standards apply in Utqiagvik10111213.
- Conventional septic feasibility is unusually constrained: only about 4.9% of North Slope Borough soils are rated without severe drain-field limitations21.
Sources
- Form 700 Village District Residential Permit Instructions, quoted and re-checked
- Portal & Instructions, quoted and re-checked
- Applications & Forms, quoted and re-checked
- 18 AAC 72 Wastewater Disposal, quoted and re-checked
- Land Management Regulation, quoted and re-checked
- Applications & Forms, quoted and re-checked
- Domestic Wastewater, quoted and re-checked
- Land Management Regulation, quoted and re-checked
- Statutes and Regulations Construction Contractors (Alaska statewide rule), quoted and re-checked
- Form 700 Village District Residential Permit Instructions, quoted and re-checked
- Form 700 Village District Residential Permit Instructions, quoted and re-checked
- Form 700 Village District Residential Permit Instructions, quoted and re-checked
- Form 700 Village District Residential Permit Instructions, quoted and re-checked
- Form 700 Village District Residential Permit Instructions, quoted and re-checked
- Form 700 Village District Residential Permit Application, quoted and re-checked
- North Slope Borough Land Management Regulation Division (north-slope.org)
- Portal & Instructions, quoted and re-checked
- Applications & Forms, quoted and re-checked
- Land Management Regulation, quoted and re-checked
- Engineered Wastewater Disposal Systems, quoted and re-checked
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- Small Camps, quoted and re-checked
- Federal land share: Bolthole Index county data
- Maps, quoted and re-checked
- State of Alaska Plan for Disaster Recovery, Substantial Amendment 3, quoted and re-checked
Written October 9, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.