Bolthole Index

Coffee County, Alabama

Building permits, zoning and septic rules in Coffee County, Alabama

77Index Score / 100
#21 of 67 in Alabama

Unincorporated Coffee County, Alabama does not require a county building permit for ordinary construction outside subdivision, floodplain and possible Enterprise jurisdictional exceptions1. Coffee County has no county zoning or adopted building code in unincorporated areas; municipal rules differ, and Enterprise ordinances may reach beyond city limits23. Septic permits throughout Coffee County come from the Coffee County Health Department4.

At a glance

Building permit
No ordinary county building permit outside subdivision, floodplain and possible Enterprise jurisdictional exceptions1
Zoning
No county zoning in unincorporated areas; Enterprise and Elba have city zoning256
Septic permits
Coffee County Health Department (ADPH onsite sewage program); permit required before installation74
Floodplain permit
Required in a Special Flood Hazard Area; not required after county review finds the site outside that area89
Owner-builder
You may build your own home; state trade licensing and project-specific approvals still apply101
RV / tiny home on your own land
County zoning does not restrict a single private tract; septic and floodplain rules still apply, and parks follow separate development rules1112
RV parks & tiny-home communities
Separately regulated by county Community Development Regulations when built as a multi-lot park or community1314
Private wells
Notice of Intent before drilling; Certification of Completion within 30 days after work is completed15

Who to call

Septic permits

Coffee County Health Department, Environmental Services

Septic-tank (onsite sewage) permit requests and complaints for Coffee County, through the Environmental Office

334-347-9574

2841 Neal Metcalf Road, Enterprise, Alabama 36330

Floodplain permits

Coffee County Emergency Management Agency (Floodplain Administrator)

Floodplain requirements and Flood Damage Prevention Resolution questions for development in Coffee County

(334) 894-5415

Roads & driveways

Coffee County Engineer's Office

Subdivision regulations (streets and drainage) and driveway/pipe permits onto county-maintained roads in Coffee County

(334) 894-6112

Contact details are copied from each office’s official page and were checked against it on October 10, 2026.

Off-grid gear

Going off-grid in Coffee County means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Do you need a building permit in Coffee County, Alabama?

Ordinary construction in unincorporated Coffee County does not require a county building permit outside subdivision, floodplain and possible Enterprise jurisdictional exceptions1. Coffee County has no adopted general building code for unincorporated land3. Floodplain development requires a permit before work and a Certificate of Compliance before use or occupancy; the Floodplain Administrator performs applicable compliance inspections1617. In a subdivision, home construction cannot begin until the final plat is recorded in the Probate Judge’s office18. Inside Elba, the city requires building permits for new construction and other covered work; septic permitting stays with the Coffee County Health Department1920.

Who handles building approvals and inspections in Coffee County?

For unincorporated Coffee County, the County Engineer’s Office at (334) 894-6112 handles subdivision questions and county-road driveway approvals2122. Ordinary construction has no county building-permit requirement outside the stated exceptions1. For floodplain development permits and compliance inspections, call Coffee County Emergency Management Agency at (334) 894-54152317. Regulated manufactured/tiny-home communities require a developer-retained licensed professional engineer to inspect required improvements and certify construction24. For septic permits anywhere in Coffee County, call 334-347-9574 and ask for the Health Department’s Environmental Office at 2841 Neal Metcalf Road, Enterprise, Alabama 36330254.

Does Coffee County have zoning?

Coffee County has no county zoning in unincorporated areas, subject to subdivision, floodplain and possible Enterprise jurisdictional rules2. Coffee County sets no general minimum dwelling size, zoning-based lot coverage or building-height limit there, outside the stated exceptions262728. Residential subdivision lots must meet State or County Health Department lot-size requirements, with road-right-of-way setbacks of 50 feet on ditch-section roads and 35 feet on curb-and-gutter roads2930. Enterprise and Elba have their own city zoning; septic permits remain with the Coffee County Health Department564. Enterprise jurisdictional ordinances may also apply beyond city limits, so confirm the boundary with the city31.

How do septic permits work in Coffee County?

A Coffee County home or business not connected to public sewer needs Health Department approval before a new onsite sewage system is installed or an existing one is repaired7. The Coffee County Health Department handles septic applications and permits throughout the county; call its main office and ask for Environmental Services425. Only 42.4% of Coffee County soils are rated without severe limitations for a conventional drain field, so make the site and soil evaluation an early purchase contingency32. A buyer may request a Health Department evaluation of an existing system, but the department can require pumping records, a professional site evaluation or a repair application, and the evaluation is not a performance guarantee33. In county-regulated developments, septic installation requires local Health Department approval and an Alabama Onsite Wastewater Board-licensed installer34.

Can you live in an RV or tiny home on your land in Coffee County?

Coffee County zoning does not restrict accessory dwellings, manufactured-home occupancy or temporary camping on a single unincorporated tract; septic and floodplain requirements still apply11735. County-regulated RV parks require development approval and limit stays to 180 days in any 12-month period unless the County Commission approves specific seasonal purposes; permanent dwelling use is prohibited13. Regulated tiny-home communities require a Permit to Develop and a recorded final plan; tiny homes on wheels without permanent foundations and utilities follow RV-park rules14. Manufactured/tiny-home developments must use public water where available or a compliant well and document septic approval before final-plan approval or occupancy36. RV parks require potable water connections and sewage connections or a sanitary dump station; individual septic systems must be specifically approved for RV use3738.

How do you build a home in Coffee County, step by step?

  1. Establish the parcel’s municipal and Enterprise jurisdictional boundaries; Enterprise has adopted building codes, and Enterprise and Elba have city zoning, while septic permits remain with the Coffee County Health Department3931564.
  1. If subdividing, obtain County Commission proposed-plat approval and the County Engineer’s Permit to Develop; record the final plat before home construction18.
  1. Request Coffee County EMA’s flood-hazard determination; applicable floodplain work requires a development permit before starting and a Certificate of Compliance before occupancy16.
  1. Obtain the Health Department’s septic permit before installation or repair7.
  1. Submit the county-road driveway application and $100 fee, mark the center, and obtain location and pipe approval; arrange the Engineer’s inspection before covering the pipe, with 1 business day’s notice4041.
  1. If drilling a well, arrange the required pre-work notice and completion filing with the driller15.

What should you check before buying land in Coffee County?

Only 42.4% of Coffee County soils are rated without severe limitations for a conventional drain field, so make a septic site evaluation an early purchase contingency32. Obtain the county flood-hazard determination before planning improvements: no floodplain development permit is required when county review finds the site outside a Special Flood Hazard Area9. Check subdivision exclusions with the County Engineer: qualifying parcels must exceed 3 acres, have at least 360 feet of frontage on an existing state, city or county road, and need no public-utility extension4221. Private wells require a Notification of Intent before drilling and a Certification of Completion within 30 days after completion; ADEM’s lack of regulatory authority over individual private wells does not remove those statewide filings15.

Watch-outs

  • Coffee County’s RV-park stay limit of 180 days in any 12-month period governs regulated parks, with a County Commission seasonal exception; it does not answer occupancy on a single private tract13.
  • Enterprise ordinances may apply beyond city limits; confirm the jurisdictional boundary with Enterprise, while taking septic applications to the Coffee County Health Department314.
  • Coffee County's agricultural provision is only an exclusion from subdivision regulation; it does not waive septic permits, floodplain development permits, driveway permits or other applicable rules43.

Sources

  1. FAQs - Coffee County, Alabama, quoted and re-checked
  2. Coffee County FAQs, quoted and re-checked
  3. Frequently Asked Questions - Coffee County, quoted and re-checked
  4. alabamapublichealth.gov, quoted and re-checked
  5. Enterprise: Enterprise Code, Appendix A, Article 2, Sec. 2.03 General Definitions (Coffee County), quoted and re-checked
  6. Elba: Planning and Zoning (Coffee County), quoted and re-checked
  7. Onsite Sewage, quoted and re-checked
  8. COFFEE COUNTY DEVELOPMENT PERMIT APPLICATION (Flood Hazard Determination), quoted and re-checked
  9. Coffee County Development Permit Application (Flood Hazard Determination), quoted and re-checked
  10. Alabama law on county zoning and building authority
  11. Alabama law on county zoning and building authority
  12. Coffee County Community Development Regulations Overview, quoted and re-checked
  13. Community Development Regulations, quoted and re-checked
  14. Community Development Regulations, quoted and re-checked
  15. Alabama Water Well Standards Program, Division 335-9, quoted and re-checked
  16. Coffee County Development Permit Application (Flood Hazard Determination), quoted and re-checked
  17. Coffee County Development Permit Application (Flood Hazard Determination), quoted and re-checked
  18. 2022 Subdivision Regulations - Coffee County, Alabama, quoted and re-checked
  19. Elba: Obtain a Building Permit (Coffee County), quoted and re-checked
  20. Elba: Coffee County Health Department Services (Coffee County), quoted and re-checked
  21. Coffee County Engineer's Office (coffeecounty.us)
  22. Coffee County Driveway Permit Application, quoted and re-checked
  23. Coffee County Emergency Management Agency (Floodplain Administrator) (coffeecounty.us)
  24. Coffee County Community Development Regulations, quoted and re-checked
  25. Coffee County Health Department, Environmental Services (alabamapublichealth.gov)
  26. FAQs - Coffee County Commission, quoted and re-checked
  27. FAQs - Coffee County Commission, quoted and re-checked
  28. FAQs - Coffee County Commission, quoted and re-checked
  29. 2022 Subdivision Regulations, quoted and re-checked
  30. 2022 Subdivision Regulations, quoted and re-checked
  31. coffeecounty.us, quoted and re-checked
  32. Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
  33. Rule 420-3-1-.33 — Evaluation Of An Existing OSS/EDS, quoted and re-checked
  34. Coffee County Community Development Regulations, quoted and re-checked
  35. coffeecounty.us, quoted and re-checked
  36. Coffee County Community Development Regulations Overview, quoted and re-checked
  37. Coffee County Community Development Regulations Overview, quoted and re-checked
  38. Coffee County Community Development Regulations Overview, quoted and re-checked
  39. Enterprise Construction, quoted and re-checked
  40. Coffee County Driveway Permit Application, quoted and re-checked
  41. Coffee County Driveway Permit Application, quoted and re-checked
  42. 2022 Subdivision Regulations, Section 2-1-60, quoted and re-checked
  43. 2022 Subdivision Regulations, Section 2-1-60 Subdivision Exclusions, quoted and re-checked

Written October 10, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Found land here? Start a Property Hunt →

Compared with neighboring counties

Like all 5 of the neighbors with published rules, Coffee County has no countywide zoning.

RuleCoffee CountyGeneva CountyDale CountyCovington CountyCrenshaw CountyPike CountyHouston County
Building permitNot requiredNot requiredNot requiredNot requiredNot requiredNot requiredRequired
County zoningNoNoNoNoNoNoNot published
Septic permitsCounty Health Dept.County Health Dept.County Health Dept.County Health Dept.County Health Dept.County Health Dept.County Health Dept.

County locator

Coffee County in Alabama

77
County map
Coffee County highlighted among the Alabama counties · colored by Index score

How Coffee County scores

Seclusion65100% ev.
Self-Sufficiency70100% ev.
Admin Boringness91100% ev.
Durability52100% ev.
Property Autonomy39100% ev.
Carry Cost89100% ev.

Evidence strength: 100%. This reports direct-source completeness and fallback use; it is separate from the score and is not a confidence interval. How it works →

$188kTypical home
0.3%Property tax
$3,859Land / acre
57.9"Annual rain
13.5% of yrsSevere drought
12.1 / yr (+11.1)Mid-century 100°F days
16.6 daysMid-century dry spell
3.13" (+4.3%)Mid-century 1-day rain
1.24×Wildfire change factor
100%Forward climate coverage
$1,863Home insurance / yr
-0.1% / yrInsurance growth
0.39%Nonrenewal rate
county median (2+ published ZIPs)Insurance basis
18,549People within 30 min
1,282,322People within 2 hr
41,967Radius comparison (15 mi)
82People / sq mi
3.6%Federal land
81.8%Land at 15% slope or less
42.4%Soils rated "not limited" for septic (strict USDA rating)
184,122 acWorkable land screen
67%Wooded land
42 tonsBiomass / forest ac
65.7°FAvg temp

Scout Coffee County

Camp here before you commitBook a few nights nearby on Hipcamp →Already own land here?Earn money hosting campers — get $100 when you become a Hipcamp host →

Some links are affiliate or referral links — we may earn a commission, at no cost to you.

Property hunt

Find land. Bring the promising ones back.

Search live inventory elsewhere, then cost and vet each candidate here. No copied listings, account, or paid data feed.

Each button opens a current land search for Coffee County. Listing sites control their own results and filters.

Analyze a property
Add setup-cost allowances

Use rough quotes or placeholders. Blank fields count as $0.

Working estimate

—land + entered setup costs
Asking $ / acre
—
Setup allowance
—
All-in $ / acre
—

A planning estimate, not a valuation or contractor quote. The USDA benchmark includes farm land and buildings; it is context, not a parcel comp.

Before an offer

Parcel due diligence

0/8 checked

Saved properties and checklist progress stay on this device. Bolthole Index does not receive them.

Cities and towns in Coffee County

Inside a city or town, that city usually issues building permits and sets zoning; the county’s rules above cover unincorporated land. Septic, wells and floodplain rules usually stay with the county or state everywhere.

Not yet researched: Town of Kinston · Town of New Brockton

Answers from the rulebook for Coffee County

What the ordinances and state agencies actually say — one answer per question, each quoted from the official source and independently re-checked.

Coffee County rules

  • Building permitLimited

    Construction and development of subdivisions within Coffee County's subdivision jurisdiction, including residential home construction in a subdivision after the required plat and development approvals.

    • The proposed plat must first be approved by the Coffee County Commission.
    • The Coffee County Engineer issues the Permit to Develop after proposed-plat approval.
    • The Permit to Develop authorizes construction of the development only in compliance with the subdivision regulations.
    • The developer must begin substantial work within one (1) year after issuance of the Permit to Develop or the proposed plat must be resubmitted for approval.
    • Changes to approved development plans must be submitted to the County Engineer before construction or implementation, and County Engineer approval is required before changes are constructed.
    • No building development or home construction may take place until the final plat has been recorded in the Probate Judge's office.
    • This is a subdivision-development permit requirement, not an express countywide building permit requirement for ordinary single-parcel residential construction.
    • The county FAQ separately identifies floodplain requirements and possible City of Enterprise extraterritorial ordinances.

    substantial work commencement deadline: 1 year after Permit to Develop issuance (If work does not begin within this period, the proposed plat must be resubmitted for approval.)

    “Following the approval of the Proposed Plat by the County Commission, the County Engineer shall issue a Permit to Develop for the Proposed Plat. The Permit to Develop allows the developer to proceed with construction of the development in compliance with these regulations.”
    2 more reviewed findings on this topic
    • Not required — Ordinary building construction in unincorporated Coffee County, Alabama, outside the stated subdivision, floodplain, and City of Enterprise extraterritorial exceptions.
      “There are no zoning restrictions, ordinances, or building codes within the unincorporated areas of Coffee County, Alabama with the exception of the areas of concern listed below.”
    • Limited — Development subject to Coffee County's Flood Damage Prevention Resolution, including applicable structural and other development activities in flood-hazard areas.
      “No work may start until permit is issued.”
  • Owner-builder exemption · follows from the permit answerNot needed

    Unincorporated Coffee County: no county building permit is required, so there is no permit to be exempt from and you may build your own home. State licensing for electrical, plumbing and HVAC work may still apply.

    • Coffee County adopted subdivision regulations primarily related to streets and drainage.
    • Coffee County adopted a Flood Damage Prevention Resolution for development that may be located within a floodplain.
    “There are no zoning restrictions, ordinances, or building codes within the unincorporated areas of Coffee County, Alabama with the exception of the areas of concern listed below.”
  • Building code adoptedNot adopted (with conditions)

    County building-code adoption in the unincorporated areas of Coffee County, Alabama.

    • Coffee County subdivision regulations apply primarily to streets and drainage.
    • Coffee County's Flood Damage Prevention Resolution applies to development that may be located within a floodplain.
    • Possible City of Enterprise jurisdictional ordinances may apply beyond city limits.
    “There are no zoning restrictions, ordinances, or building codes within the unincorporated areas of Coffee County, Alabama with the exception of the areas of concern listed below.”
    2 more reviewed findings on this topic
    • Not adopted — County building-code adoption in unincorporated Coffee County.
      “There are no zoning restrictions, ordinances, or building codes within the unincorporated areas of Coffee County, Alabama with the exception of the areas of concern listed below.”
    • Not adopted — County building-code adoption in the unincorporated areas of Coffee County, Alabama.
      “There are no zoning restrictions, ordinances, or building codes within the unincorporated areas of Coffee County, Alabama with the exception of the areas of concern listed below.”
  • InspectionsLimited

    Inspections required to verify compliance with Coffee County flood-damage-prevention requirements for applicable development in unincorporated Coffee County.

    • The inspection authority is the County Floodplain Administrator or representative.
    • The application authorizes reasonable inspections required to verify compliance.
    • This claim does not establish a general county building-inspection program for ordinary construction outside applicable floodplain requirements.
    “The Coffee County Floodplain Administrator will complete this section, as applicable, based on inspection of the project to ensure compliance with the Coffee County Flood Damage Prevention Resolution.”
    2 more reviewed findings on this topic
    • Limited — Projects subject to Coffee County's Flood Damage Prevention Resolution.
      “The Coffee County Floodplain Administrator will complete this section, as applicable, based on inspection of the project”
    • Limited — Construction of required improvements in a Coffee County manufactured/tiny home community regulated by the 2026 Community Development Regulations.
      “Letter from the developer stating the name and contact information of the Licensed Professional Engineer, retained by the developer, who will be inspecting all construction of the required improvements and executing the "Engineer's Certificate of Construction" on the Final Community Development Plan.”
  • Certificate of occupancyLimited

    Development subject to Coffee County's Flood Damage Prevention Resolution; the county form requires a Certificate of Compliance before use or occupancy.

    • The source calls the required document a Certificate of Compliance, not a Certificate of Occupancy.
    • The certificate is completed by the County Floodplain Administrator.
    • The requirement applies within the floodplain-development permit process and is not evidence of a general countywide certificate-of-occupancy requirement.
    “Development shall not be used or occupied until a Certificate of Compliance is issued.”
  • County-wide zoningAbsent (with conditions)

    County zoning restrictions and ordinances in the unincorporated areas of Coffee County, Alabama.

    • Coffee County adopted subdivision regulations primarily related to streets and drainage.
    • Coffee County adopted a Flood Damage Prevention Resolution for development in areas that may be located within a floodplain.
    • The City of Enterprise has jurisdictional boundaries extending past the city limits, and jurisdictional ordinances may apply in those areas.
    “There are no zoning restrictions, ordinances, or building codes within the unincorporated areas of Coffee County, Alabama with the exception of the areas of concern listed below.”
    One more reviewed finding on this topic
    • Absent — Unincorporated areas of Coffee County, Alabama.
      “There are no zoning restrictions, ordinances, or building codes within the unincorporated areas of Coffee County, Alabama with the exception of the areas of concern listed below.”
  • Local zoningVaries (with conditions)

    Aggregate local zoning across Coffee County, including unincorporated areas and incorporated municipal jurisdictions; the county-level conclusion does not mean Coffee County administers each municipal ordinance.

    • Unincorporated areas have no county zoning restrictions or ordinances, subject to subdivision, floodplain, and possible City of Enterprise jurisdictional rules.
    • The City of Enterprise identifies planning and zoning as a primary service and provides zoning ordinance and zoning map materials.
    • The specific applicability of Enterprise jurisdictional ordinances beyond the city limits was not established from the opened sources.
    “There are no zoning restrictions, ordinances, or building codes within the unincorporated areas of Coffee County, Alabama with the exception of the areas of concern listed below.”
    3 more reviewed findings on this topic
    • Absent (with conditions) — Zoning restrictions and ordinances in the unincorporated areas of Coffee County, Alabama.
      “There are no zoning restrictions, ordinances, or building codes within the unincorporated areas of Coffee County, Alabama with the exception of the areas of concern listed below.”
    • Absent (with conditions) — Zoning restrictions and ordinances in the unincorporated areas of Coffee County, Alabama.
      “no zoning restrictions, ordinances, or building codes within the unincorporated areas of Coffee County, Alabama with the exception of the areas of concern listed below.”
    • Varies (with conditions) — Aggregate of municipal and unincorporated land-use controls within Coffee County; the county does not administer each municipal ordinance.
      “There are no zoning restrictions, ordinances, or building codes within the unincorporated areas of Coffee County, Alabama with the exception of the areas of concern listed below. [...] City of Enterprise has jurisdictional boundaries that extend past the city limits. There may be some jurisdictional ordinances that apply.”
  • Zoning districtsNot published

    Zoning districts and zoning-based controls in unincorporated Coffee County.

    • The county's no-zoning statement is limited to unincorporated areas.
    • Coffee County subdivision regulations, floodplain requirements, and City of Enterprise extraterritorial jurisdiction may still apply.
    • This claim does not determine zoning districts inside incorporated municipalities.
    “There are no zoning restrictions, ordinances, or building codes within the unincorporated areas of Coffee County, Alabama with the exception of the areas of concern listed below.”
  • Minimum dwelling sizeNone

    Residential dwelling size in unincorporated Coffee County.

    • The county FAQ states that subdivision regulations, floodplain requirements, and possible City of Enterprise extraterritorial ordinances are exceptions or areas of concern.
    • This conclusion does not address incorporated municipalities or any Enterprise extraterritorial jurisdiction.
    “There are no zoning restrictions, ordinances, or building codes within the unincorporated areas of Coffee County, Alabama with the exception of the areas of concern listed below.”
  • Minimum lot sizeSpecified

    Residential lots in subdivisions within Coffee County's subdivision jurisdiction.

    • The regulation does not state a numeric minimum lot area in this provision; it incorporates the requirements of the State and/or County Health Department.
    • The subdivision jurisdiction is defined in the regulations as all areas outside the corporate limits of any municipality in Coffee County.

    minimum lot size: as required by the State and/or County Health Department

    “The minimum lot size shall be as required by the State and/or County Health Department.”
  • SetbacksSpecified

    Residential lots in Coffee County subdivisions, based on the type of road fronting each lot.

    • Lots fronting on a Ditch Section road require a minimum setback from the right-of-way.
    • Lots fronting on a Curb and Gutter Section road require a minimum setback from the right-of-way.

    building setback from right-of-way: >= 50 feet (Lots fronting on a Ditch Section road) · building setback from right-of-way: >= 35 feet (Lots fronting on a Curb and Gutter Section road)

    “Lots fronting on a Ditch Section road shall have a minimum fifty (50) feet building setback from right-of-way. b. Lots fronting on a Curb and Gutter Section road shall have a minimum thirty-five (35) feet building setback from right-of-way.”
  • Lot coverageNone

    Lot-coverage restrictions arising from county zoning, ordinances, or building codes in unincorporated Coffee County.

    • The county FAQ identifies subdivision regulations, floodplain requirements, and possible City of Enterprise extraterritorial ordinances as exceptions or areas of concern.
    • This conclusion does not address incorporated municipalities or Enterprise extraterritorial jurisdiction.
    “There are no zoning restrictions, ordinances, or building codes within the unincorporated areas of Coffee County, Alabama with the exception of the areas of concern listed below.”
  • Building heightNone

    Building-height restrictions arising from county zoning, ordinances, or building codes in unincorporated Coffee County.

    • The county FAQ identifies subdivision regulations, floodplain requirements, and possible City of Enterprise extraterritorial ordinances as exceptions or areas of concern.
    • This conclusion does not address incorporated municipalities or Enterprise extraterritorial jurisdiction.
    “There are no zoning restrictions, ordinances, or building codes within the unincorporated areas of Coffee County, Alabama with the exception of the areas of concern listed below.”
  • Living in an RVTemporary only (with conditions)

    RV spaces within RV Parks governed by Coffee County Community Development Regulations.

    • A proposed RV Park Development plan must be submitted for County Commission approval.
    • A permit to develop must be obtained from the Coffee County Commission before construction or development.
    • A final plan must be recorded before occupancy.
    • RV occupancy is limited to temporary recreational, camping, travel, or seasonal use; permanent dwelling use is prohibited.
    • Maximum stay is 180 days in any 12-month period unless the County Commission approves specific seasonal purposes.
    • RV spaces are leasehold-only, and individual RV spaces or lots may not be sold; the park must remain under single ownership or unified control.

    maximum RV stay: 180 days in any 12-month period (unless otherwise approved by the County Commission for specific seasonal purposes)

    “No RV space shall be used as a permanent dwelling.”
  • Camping on your land · by state lawNo county rule

    Unincorporated Coffee County: no county rule sets this, because Coffee County has adopted no county zoning ordinance (Alabama law lets some counties zone, but this one has not). Coffee County's own reviewed answer confirms it has no county-wide zoning.

    • Septic, floodplain, subdivision and health rules still apply; cities and towns set their own rules inside their limits.
    • Alabama counties lack broad, general land-use regulatory authority under general Alabama law.
    • Limited authority may arise through county-specific local laws, including examples identified by the handbook for Baldwin, Russell, Shelby, and Jefferson Counties.
    “Counties in Alabama do not have broad and general land use regulatory authority under general Alabama law, although several counties have created some form of planning and zoning authority by local law. However, as set out below, the Legislature has granted limited authority to county governing bodies to address certain special circumstances related to use of land within the territorial jurisdiction of the county.”
  • Tiny homesAllowed (with conditions)

    Permanent tiny homes, and tiny homes on wheels treated as RVs, within developments governed by Coffee County Community Development Regulations.

    • A Permit to Develop from the Coffee County Engineer is required before construction or development of a manufactured/tiny home community; the permit expires after one year unless substantial work has begun.
    • A Final Community Development Plan must be signed and recorded before leasing lots or placing manufactured/tiny homes.
    • The community must have at least 3 contiguous acres; each lot must have at least 50 feet of frontage and 5,000 square feet; density may not exceed 6 homes per acre.
    • Public water is required where available, or a compliant community or individual well is required where unavailable.
    • Onsite septic systems must comply with Alabama Department of Public Health requirements, with proof of approval submitted before final plan approval or occupancy.
    • Tiny homes on wheels not permanently affixed to a foundation and not connected to permanent utilities are classified as RVs and are subject to RV Park rules.

    minimum community acreage: >= 3 acres · minimum lot frontage: >= 50 feet · minimum lot size: >= 5000 square feet · maximum density: <= 6 homes per acre

    “permanent residential manufactured/tiny home lots”
  • Manufactured homes · by state lawNo county rule

    Unincorporated Coffee County: no county rule sets this, because Coffee County has adopted no county zoning ordinance (Alabama law lets some counties zone, but this one has not). Coffee County's own reviewed answer confirms it has no county-wide zoning.

    • Septic, floodplain, subdivision and health rules still apply; cities and towns set their own rules inside their limits.
    • Alabama counties lack broad, general land-use regulatory authority under general Alabama law.
    • Limited authority may arise through county-specific local laws, including examples identified by the handbook for Baldwin, Russell, Shelby, and Jefferson Counties.
    “Counties in Alabama do not have broad and general land use regulatory authority under general Alabama law, although several counties have created some form of planning and zoning authority by local law. However, as set out below, the Legislature has granted limited authority to county governing bodies to address certain special circumstances related to use of land within the territorial jurisdiction of the county.”
  • Accessory dwellings · by state lawNo county rule

    Unincorporated Coffee County: no county rule sets this, because Coffee County has adopted no county zoning ordinance (Alabama law lets some counties zone, but this one has not). Coffee County's own reviewed answer confirms it has no county-wide zoning.

    • Septic, floodplain, subdivision and health rules still apply; cities and towns set their own rules inside their limits.
    • Alabama counties lack broad, general land-use regulatory authority under general Alabama law.
    • Limited authority may arise through county-specific local laws, including examples identified by the handbook for Baldwin, Russell, Shelby, and Jefferson Counties.
    “Counties in Alabama do not have broad and general land use regulatory authority under general Alabama law, although several counties have created some form of planning and zoning authority by local law. However, as set out below, the Legislature has granted limited authority to county governing bodies to address certain special circumstances related to use of land within the territorial jurisdiction of the county.”
  • Who permits septicCounty

    Onsite sewage, septic tank, grease trap, and holding tank applications and permits in Coffee County

    • The Coffee County Health Department administers the listed onsite sewage and septic services.
    “The Coffee County Health Department provides the following services to the public. [...] Onsite Sewage - Applications and Permits”
  • Septic permitRequired

    Onsite septic systems governed by Coffee County Community Development Regulations, including regulated community developments.

    • All onsite septic systems must meet the latest ADPH Onsite Sewage Treatment and Disposal Rules.
    • A permit must be submitted to and approved by the local Health Department before installation.
    • Installation must be performed by an individual or company licensed by the Alabama Onsite Wastewater Board.
    “A permit must be submitted to and approved by the local Health Department prior to installation”
  • Off-grid sanitationLimited

    Off-grid wastewater arrangements in Coffee County RV parks

    • Each RV space must connect to a sewage disposal system or have access to a sanitary dump station.
    • Individual septic systems are allowed only where specifically permitted for RV use and must comply with ADPH or another regulatory agency's rules.
    • A sanitary dump station is required when individual sewer connections are not provided.
    • Septic-system approval must be submitted to Coffee County before final plan approval or occupancy.
    “a connection to a sewage disposal system or access to a Sanitary Dump Station.”
    One more reviewed finding on this topic
  • Mandatory utility hookupWater and sewer (with conditions)

    RV parks regulated by Coffee County Community Development Regulations

    • Each RV space must have a connection to a potable water supply system.
    • Public water is preferred where available; if unavailable, a community well system meeting ADEM or another regulatory agency's requirements is required.
    • Each RV space must have a sewage-disposal connection or access to a sanitary dump station.
    • If individual sewer connections are not provided, a conveniently located sanitary dump station must be provided and maintained according to public-health standards.
    • Septic systems require approval from ADPH or another regulatory agency before final plan approval or occupancy.
    “connection to a potable water supply system.”
    One more reviewed finding on this topic
  • Agricultural exemptionAvailable (with conditions)

    Construction or development of roads or buildings on private property used for agricultural purposes within Coffee County’s subdivision jurisdiction.

    • The exclusion is limited to construction or development of roads or buildings on private property used for agricultural purposes.
    • The regulation cites Code of Alabama 1975, § 11-24-1(a)(4).
    • Other exclusions in the same definition include public acquisition of strips for street widening or opening, property divided between immediate family members under Code of Alabama 1975, § 11-24-2(d), certain parcels greater than three acres meeting 360-foot frontage and no-public-utility-extension criteria, qualifying State Board of Health exemptions that also meet those criteria, and lots leased only.
    • This exclusion from the county subdivision definition does not establish an exemption from separate health, wastewater, floodplain, utility, municipal, or state requirements.
    “EXCLUSIONS: A subdivision shall not include any of the following: a. The construction or development of roads or buildings on private property to be used for agricultural purposes. See, Code of Alabama 1975, § 11-24-1(a)(4);”
    2 more reviewed findings on this topic
    • Available (with conditions) — Construction or development of roads or buildings on private property used for agricultural purposes within the county's subdivision jurisdiction.
      “A subdivision shall not include any of the following: a. The construction or development of roads or buildings on private property to be used for agricultural purposes.”
    • Available — Construction or development of roads or buildings on private property used for agricultural purposes within Coffee County’s subdivision jurisdiction.
      “A subdivision shall not include [...] roads or buildings on private property to be used for agricultural purposes.”
  • Subdividing landNot regulated

    Land divisions or developments expressly excluded from the definition of subdivision in Coffee County’s 2022 Subdivision Regulations.

    • Agricultural roads or buildings must be on private property and used for agricultural purposes.
    • Immediate-family divisions are subject to the referenced Alabama Code provision.
    • Parcels greater than three acres must have at least 360 feet of frontage on an existing state, city, or county road for each parcel and must not require extension of public utilities.
    • State Board of Health exemption parcels must also satisfy both the greater-than-three-acre and 360-foot-frontage/no-utility-extension criteria.
    • The exclusion for leased lots applies only to development establishing or creating lots that are to be leased only.
    • Other applicable state, health, floodplain, municipal, or non-subdivision requirements may still apply.

    parcel area threshold: > 3 acres (each parcel must also have at least 360 feet of frontage and not require extension of public utilities) · road frontage: >= 360 feet per parcel (must front an existing state, city, or county road)

    “EXCLUSIONS: A subdivision shall not include any of the following:”
    One more reviewed finding on this topic
    • Limited — Subdivision and development of land outside the corporate limits of municipalities in Coffee County, Alabama, subject to the stated exclusions.
      “2-1-62 SUBDIVISION JURISDICTION: All areas outside the corporate limits of any municipality in Coffee County.”
  • Driveway accessRequired

    New or modified driveway access connecting to a Coffee County road.

    • The applicant must mark the proposed driveway center with white flagging or identification markers.
    • The Engineer's Office sizes the pipe and inspects the proposed location before approval.
    • The driveway installation must be inspected before fill is placed over the pipe.
    • A new permit is required for additions or modifications after completion.
    • The permit is void if the work is not completed within one year from the permit date.

    permit fee: 100 USD · minimum soil cover over pipes 48 inches or less in diameter: >= 12 inches (Larger diameter pipes require 24 inches or more of cover.)

    “Once the ditch has been graded and the pipe has been placed, Coffee County Engineer's Office must inspect the installation of the driveway prior to placement of fill material over the pipe.”
    2 more reviewed findings on this topic
    • Limited — Driveway access to Coffee County-maintained roads and county-road access in subdivisions.
      “Where a proposed or potential future major subdivision borders on or intersects an existing county road with an ADT greater than 2500 vehicles per day, access to such county road may be limited by one or more of the following means:”
    • Required — Driveway access points connecting to Coffee County-maintained roads.
      “The County is hereby authorized to remove any pipe on the County's right-of-way installed incorrectly or installed without approval of the County.”
  • Building in a floodplainRequired

    Development located in a Special Flood Hazard Area in Coffee County, including structural and other development activities identified on the county application.

    • No work may start until the permit is issued.
    • Development may not be used or occupied until a Certificate of Compliance is issued.
    • The permit expires if no work is commenced within six months of issuance.
    • The applicant must submit required site plans, development plans, elevation information, floodproofing details, and other documents identified by the Floodplain Administrator.
    • For development in a regulatory floodway, certification from a registered engineer that the activity will not increase the height of the 100-year flood, together with supporting data and calculations, must be submitted.
    • A Development Permit may be issued only after the Floodplain Administrator determines conformance with the Coffee County Flood Damage Prevention Resolution adopted April 13, 2009 and payment of the designated fee.
    • If the activity is not in conformance, the applicant receives a written summary of deficiencies and may correct and resubmit or request a hearing from the Coffee County Commission/Board of Appeals.
    • The county FAQ states that incorporated City of Enterprise jurisdictional boundaries extend beyond city limits and that municipal ordinances may apply.
    “COFFEE COUNTY DEVELOPMENT PERMIT APPLICATION (Flood Hazard Determination) [...] No work may start until permit is issued. [...] Is located in a Special Flood Hazard Area.”
    5 more reviewed findings on this topic
    • Required — Development in a Special Flood Hazard Area or floodway within unincorporated Coffee County, including structural development, fill, grading, excavation, watercourse alteration, drainage improvements, road or bridge construction, subdivision activity, and individual water or sewer systems.
      “No work may start until permit is issued. [...] The Proposed Development: [...] Is located in a Special Flood Hazard Area.”
    • Not required — Proposed development in unincorporated Coffee County that the Floodplain Administrator determines is not located in a Special Flood Hazard Area.
      “Is not located in a Special Flood Hazard Area (Notify the applicant that the application review is completed and no floodplain development permit is required.)”
    • Limited — Development in a Special Flood Hazard Area within unincorporated Coffee County, Alabama.
      “No work may start until permit is issued. [...] Is located in a Special Flood Hazard Area. [...] the Floodplain Administrator may issue a Development Permit”
    • Limited — Development in unincorporated Coffee County areas that may be located within a floodplain.
      “Here you will find information on Flood Hazard Determination as well as the Coffee County Development Permit Application. Please review all information on the application before submitting. ema@co.coffee.al.usThe determination will be made within five business days of receipt.”
    • Limited — Development on land within a floodplain in unincorporated Coffee County.
      “Development of any land within the floodplain shall be governed by the Coffee County Flood Damage Prevention Resolution.”
  • Permit feesPublished (with conditions)

    Driveway permits for access to Coffee County roads.

    • A completed permit application and the $100 fee are required before the proposed driveway location is inspected.
    • The permit expires one year from the date of approval.

    driveway permit fee: 100 USD · permit duration: one year from date of approval

    “After the Coffee County Engineer's office has received this completed permit application and a $100 permit fee, the applicant requesting the driveway must mark the location of the center of the proposed driveway location with white flagging ribbon or identification markers. The engineer’s office will size the pipe and inspect the proposed location.”
    One more reviewed finding on this topic
    • Published (with conditions) — Driveway permits for access to Coffee County-maintained roads in unincorporated Coffee County.
      “After the Coffee County Engineer's office has received this completed permit application and a $100 permit fee, the applicant requesting the driveway must mark the location of the center of the proposed driveway location with white flagging ribbon or identification markers.”
  • Permit processPublished (with conditions)

    Driveway permit process for access to Coffee County-maintained roads.

    • Submit the completed application and $100 fee.
    • Mark the driveway center with white flagging ribbon or identification markers.
    • The Engineer’s Office sizes the pipe, inspects the proposed location, and communicates the required pipe size and type after approval.
    • A licensed contractor may install the driveway after location approval.
    • The Engineer’s Office must inspect the installation before fill is placed over the pipe.
    • Inspection must be scheduled one business day in advance at (334) 894-6112.
    • The permit expires one year from the date of approval.

    inspection scheduling notice: 1 business day · permit validity: 1 year from approval

    “Once the ditch has been graded and the pipe has been placed, Coffee County Engineer's Office must inspect the installation of the driveway prior to placement of fill material over the pipe. Call (334) 894-6112, one business day prior, to schedule an inspection. Coffee County Engineer's office normal operating hours are Monday-Thursday 6:30am to 5:00pm. Permit expires one year from date of approval”
    One more reviewed finding on this topic
    • Partial — Development and construction in unincorporated Coffee County.
      “There are no zoning restrictions, ordinances, or building codes within the unincorporated areas of Coffee County, Alabama with the exception of the areas of concern listed below.”

Alabama rules that apply here

  • Septic inspectionLimited

    Evaluation or inspection of an existing onsite sewage system or effluent disposal system in Coffee County under Alabama statewide rules.

    • An evaluation may be performed by the local health department only when requested by a responsible person or a lending institution representing the seller or buyer.
    • The evaluation does not guarantee that the system will function satisfactorily.
    • The local health department may decline evaluation when an existing system was installed without a Permit to Install on or after March 18, 1982.
    • The local health department may require a professional site evaluation and an application for a Permit to Install (Repair), and may require compliance with current rules or a new onsite sewage system.
    • Before completing the evaluation, evidence is required that the septic tank was pumped within the last 3 years by an Alabama Onsite Wastewater Board licensed pumper.
    • Inspection services by a home inspector or AOWB licensee do not imply that the service was provided under the authority of these rules or that the system complies with the rules.

    septic tank pumping lookback: 3 years (Evidence must be provided before the evaluation is completed.) · installation date threshold: >= 1982-03-18 (An existing OSS installed without a Permit to Install may be declined for evaluation.)

    “(1) When requested by a responsible person or a lending institution [...] an evaluation of an existing OSS/ EDS may be performed by the LHD.”
  • Well permitLimited

    Water wells in Coffee County, including individual private wells, under Alabama's statewide Water Well Standards Program

    • A Notification of Intent to drill a well must be filed with the Board before work begins.
    • A Certification of Completion must be filed within 30 days after completion of work.
    • The person drilling the well must comply with Alabama water-well construction standards.
    • The Geological Survey of Alabama may request the driller to collect samples; the rule does not state that GSA requires a separate individual-well permit or notice.
    • ADEM states that it does not have regulatory authority over individual private wells, although the statewide Water Well Standards Program rule requires the notice and completion filing.
    • The cited rule states an effective date of September 20, 1971.

    water well driller annual license fee: 200 USD (The fee applies to the driller's annual license application, not to the individual private-well notification.) · certification of completion deadline: 30 days after completion of work · notification deadline: prior to commencement of work

    “Every person desiring to drill a water well shall file with the Board, on a form furnished by the Board, a Notification of Intent to drill a well. This form shall be filed prior to the commencement of work. [...] Every person who drills a well shall file a Certification of Completion on the form furnished by the Board within 30 days after completion of work.”
    One more reviewed finding on this topic
    • Limited — New groundwater wells and alterations to existing groundwater wells extracting at least 50 gallons per minute when the well is in Alabama's coastal area or its 50-year capture zone extends into the coastal area.
      “The installation of a new well, or alteration of an existing well, for the purposes of extracting groundwater”
  • county zoning authorityLimited

    County zoning and land-use authority over unincorporated Alabama land under general state law and identified special statutory circumstances.

    • General Alabama law does not grant counties broad and general land-use regulatory authority.
    • Several counties have planning and zoning authority created by local law, including examples identified in the official handbook: Baldwin, Russell, Shelby, and Jefferson County.
    • Special statutory authority includes subdivision regulation under Ala. Code § 11-24-1 et seq.; flood-prone-area land-use regulation under Ala. Code § 11-19-1 et seq.; and airport zoning under Ala. Code § 4-6-1 et seq.
    • Flood-prone-area authority concerns areas outside municipal corporate limits and covers areas with a frequency of inundation of once in 100 years; permitted controls include zoning ordinances, subdivision regulations, building codes, health regulations, and related police-power measures.
    • Airport zoning concerns airport hazards and is generally available in the county's unincorporated area, except within a municipality's police jurisdiction and within two miles of a municipality-owned or operated airport when the municipality exercises or declares its intention to exercise zoning control, unless local law provides otherwise.
    • The claim does not establish that every Alabama county has a general countywide zoning ordinance.

    flood-prone-area inundation frequency: 100 years (As defined by qualified hydrologists or engineers using generally accepted hydrology and engineering methods) · airport municipal control area: 2 miles (Applies when the municipality exercises or declares its intention to exercise zoning control, unless local law provides otherwise)

    “Counties in Alabama do not have broad and general land use regulatory authority under general Alabama law, although several counties have created some form of planning and zoning authority by local law. However, as set out below, the Legislature has granted limited authority to county governing bodies to address certain special circumstances related to use of land within the territorial jurisdiction of the county.”
    2 more reviewed findings on this topic
    • Limited — Alabama county authority to adopt zoning for unincorporated land.
      “Counties in Alabama do not have broad and general land use regulatory authority under general Alabama law, although several counties have created some form of planning and zoning authority by local law. However, as set out below, the Legislature has granted limited authority to county governing bodies to address certain special circumstances related to use of land within the territorial jurisdiction of the county.”
    • Limited — County authority over land use and zoning in unincorporated Alabama; general Alabama law does not grant counties broad general zoning authority, but limited authority exists through special local laws and specified statutory circumstances.
      “Counties in Alabama do not have broad and general land use regulatory authority under general Alabama law”
  • county building authorityGeneral

    Authority of Alabama county commissions to adopt and administer building laws and codes for residential construction in unincorporated areas.

    • A county commission may adopt building laws and codes by ordinance or, under the 2025 version of Section 34-14A-12, by resolution.
    • The ordinary county-code jurisdiction is the unincorporated area of the county.
    • County building laws and codes may not apply within a municipal police jurisdiction where the municipality is exercising its building laws or codes without the municipality's express consent.
    • County building laws and codes may apply within municipal corporate limits only with the express consent of the municipal governing body.
    • Under the 2025 statute, the county must provide the Board a copy of the resolution within 10 business days.
    • A local building law or code generally may not take effect until 120 days after adoption; for insurance-claim work requiring a license, the effective date is the date of adoption.
    • The county commission may employ building inspectors and exact fees from owners of inspected property.
    • The county may enter mutual agreements, compacts, or contracts with municipalities and other public entities for administration and enforcement.

    local-code notice deadline: 10 business days (Copy of resolution must be provided to the Home Builders Licensure Board) · local-code ordinary effective delay: 120 days (Insurance-claim work requiring a license may use the adoption date)

    “A county commission, by resolution, may adopt building laws and codes that shall apply in the unincorporated areas of the county. The county commission shall provide a copy of any resolution adopted pursuant to this subsection to the board withing 10 business days of adopting the resolution.”
    One more reviewed finding on this topic
    • General — Alabama county authority to adopt and enforce residential building laws and codes in unincorporated areas.
      “There are two general statutory provisions authorizing counties to adopt building codes: the Home Builders Licensure Law found at Ala. Code § 34-14A-1 et seq. and the law on the state minimum building standards code found at Ala. Code § 41-9-160 et seq.”

Inside cities and towns in Coffee County

Municipal rules found while researching the county. They apply inside that city or town, not to unincorporated land.

  • Building code adoptedAdopted (with conditions)

    Building-code standards administered by the City of Enterprise, Alabama.

    • The source states that the codes were adopted as the City's standard codes.
    • The source states the adoption was effective March 4, 2014.
    • The cited ordinances are City Ordinances 02-18-14 through 02-18-14-G.

    International Building Code edition: 2009 Edition · International Residential Code edition: 2009 Edition · effective date: 2014-03-04

    “Effective March 4, 2014, The City of Enterprise City Council adopted the International Building Code, 2009 Edition and the International Residential Code, 2009 Edition (City Ordinances 02-18-14 through 02-18-14-G) as our standard codes.”
    One more reviewed finding on this topic
    • Adopted (with conditions) — Construction subject to the City of Enterprise building-code jurisdiction in Enterprise, Alabama.
      “Effective March 7, 2023, The Enterprise City Council adopted the 2021 Edition of the following building codes as our standard codes: International Building Code, International Residential Code, International Fire Code, International Fuel Gas Code, International Existing Building Code, Swimming Pool & Spa Code, International Property Maintenance, Plumbing Code, International Mechanical Code, and the 2020 Edition of the National Electrical Code. City Ordinances 03-07-2023 through 03-07-2023-I.”
  • Local zoningPresent (with conditions)

    Property and land uses governed by the City of Enterprise Zoning Ordinance, including special exceptions administered by the Board of Adjustment.

    • Special-exception applications must be filed with the Zoning Official at least 30 days before the scheduled hearing.
    • Written notice must be given to adjacent property owners at least five days before the hearing.
    • The Board reviews compliance with the zoning ordinance and other applicable city codes and ordinances.
    • The Board may impose conditions concerning access, parking and loading, screening and buffering, noise, glare, odor, runoff, utilities, signs, lighting, bulk, density, lot coverage, yards, and open areas.
    • Manufactured-home special exceptions require written justification, adjacent-owner mailing information, and a scale site drawing; in a single-family residential district the owner must reside on the premises; extenuating circumstances must be shown; and the exception may last no more than five years.

    special exception filing lead time: >= 30 days before scheduled hearing · adjacent-owner notice lead time: >= 5 days before scheduled hearing · manufactured-home special exception maximum duration: <= 5 years

    “ARTICLE 12 OF THE CITY OF ENTERPRISE ZONING ORDINANCE Section 12.06. Special Exceptions”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission — ask the county directly.

  • Short-term rentals — Short-term rental use in Coffee County, including unincorporated areas and incorporated municipalities.

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Living off-grid in Coffee County, Alabama

Is Coffee County a good place to live off-grid or homestead?

Coffee County scores 77/100 on the Bolthole Index, a strong county profile. Its strengths: low administrative friction for a quiet rural property and manageable long-term carry cost. Watch-outs: a weaker property-autonomy legal backdrop.

Do you need a building permit in Coffee County, Alabama?

Coffee County does not require a county building permit for a home in unincorporated areas, and it has no county-wide zoning. Onsite septic is permitted by Coffee County Health Department (ADPH). Owner-builders may act as their own contractor to build their home. These answers are quoted from official sources and independently re-checked. Rules change and cities within the county differ — always confirm with the county before you buy or build.

Can you live in an RV or tiny home on your land in Coffee County?

Living in an RV on your own land in Coffee County is allowed on a temporary basis only: Statewide rule. Park models, defined by Alabama Manufactured Housing Commission Rule 535-X-11 as recreational park trailers, statewide. The rule states that a park model is not a permanent dwelling and is for recreational, camping, travel, or seasonal use. In an RV Park, park models may be installed or set up to the same standard as a travel trailer. A tiny home is allowed. Confirm with the county before relying on it.

How much does land cost in Coffee County, Alabama?

Land in Coffee County runs about $3,859 per acre, based on the latest county data.

What is the water situation in Coffee County?

Coffee County gets about 57.9" of rain a year, with severe drought in roughly 13.5% of years.

How remote is Coffee County?

A representative private-land location has about 18,549 people within a 30-minute drive and 1,282,322 within two hours. The road-network catchments count population across county lines and clusters of smaller cities; straight-line radius values remain available as a comparison.

How Coffee compares in Alabama

Compare side-by-side →See all 67 Alabama counties ranked →