Unincorporated Greene County, Alabama is recorded as not requiring a general county building permit, but the county does not publish an express exemption, so confirm with the Greene County Commission before work begins1. Greene County is recorded as having no county zoning, while municipal building-permit and zoning rules remain separate and unconfirmed2. Septic permits for properties without public sewer are administered by the Greene County Health Department in both incorporated and unincorporated areas unless a separate local rule applies34.
At a glance
- Building permit
- Recorded as not required in unincorporated Greene County; confirm with the County Commission before starting work1
- Building inspection
- A county inspection program could not be confirmed; ask the County Commission before construction1
- Zoning
- Recorded as no county zoning in unincorporated Greene County; municipal zoning is separate and unconfirmed2
- Septic permits
- Required through the Greene County Health Department for a new system or repairs where public sewer is unavailable, including municipal addresses unless a separate local rule applies543
- RV and tiny-home use
- No county zoning restriction on unincorporated land; wastewater and other statewide rules still apply67
- Minimum size and setbacks
- No county minimum dwelling size, minimum lot size or setback under the no-zoning answer6
- Owner-builder
- A qualifying owner may use Alabama's home-builder licensing exemption but must personally supervise; building and septic approvals remain separate8
- Manufactured home
- County zoning does not restrict placement, but Alabama installation and occupancy standards apply69
Who to call
Septic permits
Greene County Health Department
Septic-tank requests through the Environmental Office
412 Morrow Avenue, Eutaw, Alabama 35462-1109
Contact details are copied from each office’s official page and were checked against it on October 9, 2026.
Off-grid gear
Going off-grid in Greene County means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Greene County, Alabama?
Unincorporated Greene County is recorded as not requiring a general building permit, and the published county directory lists no building department or building inspector1. The directory does not expressly say that a building permit is unnecessary, so ask the Greene County Commission to confirm the current rule for the parcel and project before ordering materials. Alabama authorizes county commissions to adopt residential building codes in unincorporated areas, but that authority does not prove Greene County adopted one10. The Division of Construction Management's State Building Code covers specified state, school, hotel, motel and theater work, not ordinary residential property11. Alabama's residential-code framework changes on January 1, 2027, when builders must follow the applicable state or local residential code12. Greene County building inspections and certificates of occupancy remain unconfirmed; ask the Commission rather than treating the absence of a listed building office as an exemption.
Who issues building and septic permits in Greene County?
Greene County does not publish a building-permit office, so the Greene County Commission is the place to confirm whether a building permit or inspection applies in unincorporated territory1. Inside a municipality, ask that city or town about its own building permit and zoning approval; the local municipal rules could not be confirmed. Septic authority does not automatically move to a city: the Greene County Health Department administers septic permits in incorporated and unincorporated areas unless a separate local rule applies3. Call 205-372-9361 or visit 412 Morrow Avenue, Eutaw, Alabama 35462-1109, and ask for the Environmental Office about septic-tank requests13. A state-highway driveway permit is separate: submit form BM-111 to the ALDOT District Administrator14. County-road driveway requirements could not be confirmed, so ask the county highway office when access is not on a state route.
Does Greene County have zoning?
Unincorporated Greene County is recorded as having no county zoning, and the county directory lists no planning or zoning department2. Alabama counties generally lack broad land-use authority, although state law allows limited regulation in particular situations such as flood-prone areas and airport hazards15. For unincorporated Greene County, the resulting no-zoning answer sets no county minimum dwelling size, minimum lot size, setback, lot-coverage limit or building-height limit6. The same answer leaves accessory dwellings, RV occupancy, tiny-home occupancy, manufactured-home placement and temporary camping unrestricted by county zoning6. County zoning is only one layer: septic approval remains with the Greene County Health Department even for municipal addresses unless a separate local rule applies3. Zoning inside Eutaw, Boligee, Forkland and Union could not be confirmed, so contact the relevant municipality about zoning approval while separately contacting the Health Department about septic permits.
How do septic permits work in Greene County?
A Greene County home or business not connected to public sanitary sewer must obtain a septic permit from the local health department before installing a new onsite sewage system or repairing one16. The Greene County Health Department administers that process in incorporated and unincorporated areas unless a separate local rule applies3. Submit the Permit to Install application and complete plans to the Health Department; construction may begin only after issuance, and the installer must be licensed by the Alabama Onsite Wastewater Board17. Only 7.6% of Greene County soils are rated without severe limits for a conventional septic drain field, so obtain the soil evaluation before fixing the house location or budget18. The Health Department must have an opportunity to inspect, and the system cannot be used until it issues Approval for Use19. Composting toilets and graywater were not confirmed as substitutes, so ask the Environmental Office before relying on either7.
Can you live in an RV or tiny home on land in Greene County?
Unincorporated Greene County's no-zoning answer does not impose a county zoning restriction on RV occupancy, tiny-home occupancy, accessory dwellings, manufactured-home placement or temporary camping6. Wastewater approval remains separate: a residence without public sewer still needs an approved onsite sewage solution from the Greene County Health Department, and the available rule does not confirm every alternative sanitation method37. A manufactured home must be installed by an Alabama Manufactured Housing Commission-certified installer and comply with statewide installation and occupancy standards9. Municipal building-permit and zoning rules in Eutaw, Boligee, Forkland and Union could not be confirmed, so ask the municipality before placing or occupying an RV or small dwelling inside its limits; septic permits ordinarily remain with the Health Department unless a separate local rule applies3. For a site-built tiny home, ask the Commission about the current building-code and inspection status, especially as Alabama's residential-code framework changes on January 1, 202712.
Building a home in Greene County: the steps, in order
- Confirm whether the parcel is unincorporated; ask the Greene County Commission about the building permit, building inspection, floodplain permit and subdivision approval, because only the general building-permit answer is recorded and the directory does not state an express exemption120.
- For land inside a municipality, ask the city or town about its building permit and zoning approval; ask the Greene County Health Department separately about the septic permit3.
- If public sewer is unavailable, arrange soils work, submit the onsite sewage application and wait for the Permit to Install before construction17.
- Use a licensed onsite-wastewater installer and obtain Approval for Use before occupancy19.
- An owner-builder exemption removes qualifying state home-builder licensing, not any applicable building permit, septic permit or inspection; the owner must personally supervise8. Agricultural-building relief likewise concerns home-builder licensing and excludes a residence inside the building21.
- Before building access to a state highway, submit form BM-111 to the ALDOT District Administrator14.
What should you check before buying land in Greene County?
Start with wastewater feasibility because only 7.6% of Greene County soils are rated without severe limits for a conventional drain field18. Check whether a proposed homesite or access route lies in a Special Flood Hazard Area, where the applicable local community must require a development permit for development or land-disturbing activity22. Confirm legal road access and determine whether the connection is to a state highway, because a state-highway turnout requires ALDOT approval23. Greene County is 75.7% wooded and 91.5% of its land has a slope of 15% or less, so clearing, drainage and the exact buildable area matter more than countywide averages2425. Annual precipitation is about 55 inches, which makes site drainage worth evaluating alongside flood maps and soil results26. The effective property-tax rate is about 0.5%, with a median annual property-tax bill of about $4222728. Also review the deed, easements and any private restrictions before closing.
Watch-outs
- Greene County's directory does not expressly confirm a building-permit exemption, inspection process or certificate-of-occupancy rule; ask the County Commission before construction1.
- Municipal zoning in Eutaw, Boligee, Forkland and Union could not be confirmed; contact the relevant municipality for land inside or near its limits2.
- A septic system cannot be used until the local health department issues Approval for Use19.
- Alabama's residential-code framework changes on January 1, 2027, so reconfirm the code and enforcement path for projects extending into that year12.
Sources
- Greene County Commission - Directory (2026 county census)
- Greene County Commission - Directory (2026 county census)
- Soil and Onsite Sewage, quoted and re-checked
- Onsite Sewage, quoted and re-checked
- ADPH - Soil and Onsite Sewage (2026 county census)
- Alabama law on county zoning and building authority
- Onsite Sewage, quoted and re-checked
- Exemptions – Home Builders Licensure Board, quoted and re-checked
- Installers, quoted and re-checked
- Alabama County Commissioners Handbook, 13th Edition (Alabama statewide rule), quoted and re-checked
- State Building Code | Alabama Division of Construction Management, quoted and re-checked
- Home Builders Licensure Law and 2025 legislative changes (Alabama statewide rule), quoted and re-checked
- Greene County Health Department (alabamapublichealth.gov)
- Permits, quoted and re-checked
- Alabama County Commissioners Handbook, 13th Edition (Alabama statewide rule), quoted and re-checked
- Onsite Sewage, quoted and re-checked
- Can I Live On This Lot?, quoted and re-checked
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- Soil and Onsite Sewage, quoted and re-checked
- Handbook for Alabama County Commissioners, quoted and re-checked
- Home Builders Licensure Law, quoted and re-checked
- Floodplain Management in Alabama Quick Guide, quoted and re-checked
- Permits, quoted and re-checked
- Wooded share of land: Bolthole Index county data
- Share of land at 15% slope or less: Bolthole Index county data
- Annual precipitation: Bolthole Index county data
- Effective property tax rate: Bolthole Index county data
- Median property tax bill: Bolthole Index county data
Written October 9, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.