Unincorporated Madera County, California requires building permits for specified work, issued by Building & Fire Safety under the California Building Code12. The county applies Title 18 zoning3. Inside Chowchilla, the city issues its own building permits and sets its own zoning45. Septic permits come from the county Environmental Health Division6, and only 2% of soils are rated without severe limits for a drain field7.

At a glance

Building permit
Required for specified work in unincorporated Madera County (buildings, electrical, mechanical, mobile homes, demolition, reroof); Chowchilla issues its own1284
Zoning
Yes, Title 18 applies in unincorporated Madera County39
Septic
County Environmental Health issues OWTS permits; no new septic where public sewer is within 200 feet; soils poor for conventional systems610711
Wells
County Environmental Health is the local well permitting agency12
Owner-builder
Allowed for your own labor; resale use capped at 4 structures/year with licensed subs1314
RV living
Temporary RV or travel trailer allowed for up to one year while a permanent home is under construction, with conditions; long-term RV living is not confirmed1516
Tiny home
Must qualify as one of a fixed list of structure types to be legally occupied17
Grading and driveways
Grading permit with a 100% stabilization bond; driveway grade capped at 16% below 3,000 feet and 12% above1819

Who to call

Building permits

Building & Fire Safety

Building permits, plan review and inspections for unincorporated Madera County (phone menu option 1)

559-675-7821

200 W 4th Street, Madera, CA 93637

Zoning

Planning Division

Zoning administration and land use review for unincorporated Madera County (phone menu option 2; fax 559-675-6573)

559-675-7821

200 W. 4th St., Suite 3100, Madera, CA 93637

Septic permits

Environmental Health Division

Septic (OWTS) and water well permits for unincorporated Madera County

559-675-7823

200 W 4th Street, 3rd Floor, Madera, CA 93637

Roads & driveways

Public Works Department

Roads, road closures and driveway/encroachment access onto county roads

559-675-7811

200 W. 4th Street, Madera, CA 93637

Contact details are copied from each office’s official page and were checked against it on October 16, 2026.

Off-grid gear

Going off-grid in Madera County means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Do you need a building permit in Madera County, California?

Yes, for specified work. Madera County's Building Division, part of Building & Fire Safety, regulates and permits buildings and structures in unincorporated Madera County1. Madera County has adopted the California Building Code, Title 24, and also enforces county ordinances and the Uniform Code for the Abatement of Dangerous Buildings in the unincorporated area2. Separate permits cover electrical, mechanical and reroof work, any mobile home or mobile office installed in the county needs a building permit, and demolishing a structure over 120 square feet needs a demolition permit issued with the San Joaquin Valley Air Pollution Control District8. The 2025 California Building Standards Code applies to projects with a permit application dated January 1, 2026 or later20. Local zoning still controls uses, setbacks, yards and property-line requirements21. A ground-mounted solar array needs a foundation inspection before footings are poured and a final inspection to confirm bonding22.

The county's rules apply to unincorporated Madera County. Inside Chowchilla, the city's building official issues building permits4. Septic and well permits for those addresses stay with county Environmental Health612.

Who is the Madera County building department, and how do you reach them?

Building & Fire Safety, part of the Community & Economic Development Department, is Madera County's building department23. Reach them at 559-675-7821 (phone menu option 1), at 200 W 4th Street, Madera, CA 9363723. The Planning Division shares the same building at 200 W. 4th St., Suite 3100, and can be reached at 559-675-7821 option 2 for zoning questions before you apply24. The Environmental Health Division, on the 3rd floor of the same address, issues septic and well permits at 559-675-782325, and Public Works, at 200 W. 4th Street and 559-675-7811, handles roads and driveway access onto county roads26.

Does Madera County have zoning?

Yes. Madera County administers Title 18 zoning in the unincorporated county, and grading-permit applications must conform to its land-use regulations39. California law allows counties to regulate land use, building height, lot coverage, setbacks and related zoning matters in unincorporated areas27. Inside Chowchilla, the city has its own Title 18 zoning code5; the county's cited rule does not settle zoning in the City of Madera, so ask the city directly9. Minimum parcel size in unincorporated agricultural districts depends on the district, as set out in the county's agricultural development standards table, and other districts have different minimums28. We could not confirm the zoning district or lot-coverage limit for a particular parcel, so get a parcel-specific answer from the Planning Division before buying24. A certified manufactured home on a foundation on a lot zoned for a conventional single-family dwelling is subject to the same development standards as a site-built home, including setbacks, yards, parking and minimum square footage29. Accessory dwelling units are allowed on qualifying parcels zoned residential, or in another district allowing residential uses, when the parcel has an existing or proposed single-family or multifamily development30.

How do septic and well permits work in Madera County?

Septic systems, called onsite wastewater treatment systems or OWTS, are permitted by the county Environmental Health Division under a Local Agency Management Program approved by the Central Valley Regional Water Board; this applies countywide, city or not631. California lets local agencies run OWTS programs consistent with statewide policy, under State Water Board and regional board oversight32. A permit is required to construct, modify, repair or abandon a system10. Where public sewer is available within 200 feet, the Division does not authorize a new or replacement septic system, with exceptions such as a sewer connection ban or a sewer system that will not agree to serve the property11. A septic permit expires 180 days after issuance, the Division must be notified at least 48 hours before backfilling, and new construction must show at least 100% reserve area10. Only 2% of Madera County soils are rated without severe limits for a conventional drain field, so establish septic feasibility before choosing a house site or closing on land7. Environmental Health is also the listed local agency for permits to construct, alter or destroy a well, and well drilling must be done by a licensed C-57 contractor12. Wells serving 15 or more connections face additional state drinking-water requirements33.

Can you live in an RV or tiny home on your land in Madera County?

In any zone district in unincorporated Madera County, a temporary travel trailer, recreational vehicle or manufactured home is permitted for one year while a permanent dwelling is under construction15. The conditions: the building permit for the permanent dwelling must be issued before the unit is installed, Environmental Health must confirm in writing that acceptable sewer and water service exist on the parcel, and the owner must sign a Planning form promising to stop occupying and connecting the unit when the home is finished15. The unit must be removed at completion or within one year of the building permit, whichever comes first, and an extension is considered only on written request showing substantial progress15. Outside that construction window, California generally requires a local ordinance that specifically allows RV occupancy outside a mobilehome park or special occupancy park, and we could not confirm that Madera County has adopted one, so ask the Planning Division before planning to live in an RV long term1624. A tiny home must qualify as an approved structure type and meet the standards for that type; a unit that fits none of the state's listed classifications and does not meet the California Building Standards Code cannot legally be occupied17. An ADU is one documented route to a small second dwelling on a qualifying residential parcel: detached units may be up to 850 square feet with one bedroom or 1,000 square feet with more than one, and new attached or detached ADUs generally need 4-foot side and rear setbacks3034. The ADU front setback matches the primary dwelling, and a converted structure in the same location and dimensions needs no setback34. Detached ADU height limits are 16, 18 or 20 feet depending on ordinance criteria, while attached ADUs may reach 25 feet35.

Building a home in Madera County: the steps, in order

  1. Confirm your parcel's zoning district and lot-specific constraints with the Planning Division before you buy or design; inside Chowchilla, start with the city instead424.
  2. Contact Environmental Health early about septic feasibility; only 2% of county soils are rated free of severe limits for a conventional drain field725.
  3. If you need a well, arrange a licensed C-57 contractor and get the permit through Environmental Health before drilling12.
  4. If you plan to live in an RV or trailer while you build, remember it can be installed only after the building permit is issued and Environmental Health confirms sewer and water service15.
  5. Submit plans to Building & Fire Safety under the California Building Standards Code that applies on your permit-application date2023.
  6. For an ADU, budget separately for application fees, permit fees calculated at issuance and any applicable impact fees; an ADU under 750 square feet is exempt from impact fees36.
  7. If acting as an owner-builder, complete the owner-builder declaration and notice before permit issuance13.
  8. Before grading a driveway or pad, get the grading permit and ask Public Works whether county-road access needs an encroachment permit1826, then schedule all required building inspections23.

What do driveway, grading and flood-zone rules require in Madera County?

Grading for a driveway, building pad or leveling goes through a grading and erosion-control permit under Chapter 14.50 of the County Code, and applications must conform to Title 18 zoning18. The county may require an onsite inspection of the private sewage disposal area before issuing the permit, and a cash deposit or bond of 100% of estimated soil-stabilization and revegetation cost is held until vegetation has been established for one full year18. The permit becomes void if work does not start within 180 days18. Access must come from a public road approved by Public Works, and encroachment permits from Public Works or Caltrans may be required before grading1826.

County driveway standards cap grade at 16% below 3,000 feet elevation and 12% above; a driveway over 150 feet but under 800 feet needs a midpoint turnout, and one over 800 feet needs turnouts at least every 400 feet19. Fill in flood zones must be compacted to 95%; that grading document is not a full floodplain ordinance, so ask the Planning Division what elevation rules apply to a flood-zone parcel3724.

What to check before you buy land in Madera County

The nearest city of 100,000 or more is about 30 miles from the county's center, while Madera County has about 76 people per square mile and 37.1% federal land383940. Only 30.2% of the county is at a slope of 15% or less, so compare a parcel's usable terrain with the proposed house site and access route41. Severe drought has occurred in about 39.7% of years on record, and average annual precipitation is about 22.4 inches, making water supply a key due-diligence item4243. Typical home value is about $429,474, while the effective property-tax rate is about 0.7% and the median annual bill is about $2,575444546. Ask Planning about zoning, Environmental Health about septic and wells, and Public Works about county-road access before closing242526.

If you plan to divide a parcel, California's Subdivision Map Act generally requires a parcel map unless local ordinance waives it47. In unincorporated Madera County, a land division on a county road below standard must upgrade that road when the parcel is 20 acres or less, and dead-end roads are capped at 800 feet for parcels zoned under 1 acre, 1,320 feet for 1 to 4.99 acres, 2,640 feet for 5 to 19.99 acres and 5,280 feet for 20 acres or more48.

Watch-outs

  • A temporary RV or travel trailer is allowed for only one year while a permanent home is under construction, and only after the building permit is issued and Environmental Health confirms sewer and water; we could not confirm whether Madera County allows long-term RV living on private land, so call the Planning Division first1524.
  • Only 2% of Madera County soils are rated without severe limits for a conventional septic drain field, and no new septic system is authorized where public sewer is within 200 feet, so establish septic feasibility before treating a parcel as buildable711.
  • A grading permit requires a deposit or bond of 100% of estimated stabilization and revegetation cost, held for a full year of established vegetation, and lapses if work does not start within 180 days18.
  • Madera County invoices ADU application fees before an application is complete, calculates separate permit fees at issuance and exempts ADUs under 750 square feet from impact fees36.

Sources

  1. County of Madera Department: Building and Fire Safety, Budget Unit Detail Inspections 2025-26 (2026 county census)
  2. CED - Building and Fire Safety, quoted and re-checked
  3. maderacounty.com, quoted and re-checked
  4. Chowchilla: Chowchilla Code § 15.04.040, Building permit required for designated work (Madera County), quoted and re-checked
  5. Chowchilla: Chowchilla Code § 18.10.030, Lot area (Madera County), quoted and re-checked
  6. Environmental Health Division, quoted and re-checked
  7. Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
  8. County of Madera Department: Building and Fire Safety, Budget Unit Detail Inspections 2025-26, quoted and re-checked
  9. maderacounty.com, quoted and re-checked
  10. Madera County Local Agency Management Program for On-Site Wastewater Treatment Systems, quoted and re-checked
  11. Resolution R5-2017-0044 approving the Madera County Local Agency Management Program, quoted and re-checked
  12. Wells, quoted and re-checked
  13. Owner Builder Permit Application Forms, quoted and re-checked
  14. OWNER BUILDER PERMIT APPLICATION FORMS, quoted and re-checked
  15. Madera County Code § 18.84.070 — Temporary unit during construction, quoted and re-checked
  16. hcd.ca.gov (California statewide rule), quoted and re-checked
  17. Information Bulletin 2016-01: Tiny Homes (California statewide rule), quoted and re-checked
  18. Grading and Erosion Control Permit Application, quoted and re-checked
  19. Madera County Standard Plans and Specifications, quoted and re-checked
  20. Approved Building Standards (California statewide rule), quoted and re-checked
  21. California Health and Safety Code § 17922, quoted and re-checked
  22. Photovoltaic Permit Application, quoted and re-checked
  23. Building & Fire Safety (maderacounty.com)
  24. Planning Division (maderacounty.com)
  25. Environmental Health Division (maderacounty.com)
  26. Public Works Department (maderacounty.com)
  27. California Government Code Section 65850 (California statewide rule), quoted and re-checked
  28. Madera County Code § 18.53.030 — Agricultural development standards, quoted and re-checked
  29. California Government Code Section 65852.3, quoted and re-checked
  30. Guide to Accessory Dwelling Units, quoted and re-checked
  31. Resolution R5-2017-0044 approving the Madera County Local Agency Management Program, quoted and re-checked
  32. Water Quality Control Policy for Siting, Design, Operation and Maintenance of Onsite Wastewater Treatment Systems (OWTS Policy) (California statewide rule), quoted and re-checked
  33. Well Standards (California statewide rule), quoted and re-checked
  34. Guide to Accessory Dwelling Units, quoted and re-checked
  35. Guide to Accessory Dwelling Units, quoted and re-checked
  36. ADU Building Permit Checklist, quoted and re-checked
  37. Grading and Erosion Control Permit Application, quoted and re-checked
  38. Straight-line distance from the county center to the nearest city of 100,000+ people: Bolthole Index county data
  39. Population density: Bolthole Index county data
  40. Federal land share: Bolthole Index county data
  41. Share of land at 15% slope or less: Bolthole Index county data
  42. Share of years in severe drought: Bolthole Index county data
  43. Annual precipitation: Bolthole Index county data
  44. Typical home value (Zillow): Bolthole Index county data
  45. Effective property tax rate: Bolthole Index county data
  46. Median property tax bill: Bolthole Index county data
  47. California Government Code Section 66428, quoted and re-checked
  48. Madera County Standard Plans and Specifications, quoted and re-checked

Written October 16, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Found land here? Start a Property Hunt →

Compared with neighboring counties

Unlike all 6 of its neighbors, Madera County requires a building permit only in limited cases.

RuleMadera CountyMariposa CountyFresno CountyMerced CountyTuolumne CountyMono CountyStanislaus County
Building permitLimitedRequiredRequiredRequiredRequiredRequiredRequired
County zoningYesYesYesYesYesYesYes
Septic permitsCounty Env. Health Div.County Env. Health Div.County Env. Health Dept.County Div. of Env. HealthCounty Env. Health Div.County Env. HealthCounty Dept. of Env. Resources

County locator

Madera County in California

44
County map
Madera County highlighted among the California counties · colored by Index score

How Madera County scores

Seclusion47100% ev.
Self-Sufficiency47100% ev.
Admin Boringness41100% ev.
Durability22100% ev.
Property Autonomy56100% ev.
Carry Cost45100% ev.

Evidence strength: 100%. This reports direct-source completeness and fallback use; it is separate from the score and is not a confidence interval. How it works →

$429kTypical home
0.7%Property tax
$13,239Land / acre
22.4"Annual rain
39.7% of yrsSevere drought
35.2 / yr (+18.4)Mid-century 100°F days
87.3 daysMid-century dry spell
1.91" (+4.9%)Mid-century 1-day rain
1.1×Wildfire change factor
100%Forward climate coverage
$2,340Home insurance / yr
6.8% / yrInsurance growth
3.26%Nonrenewal rate
county median (2+ published ZIPs)Insurance basis
13,228People within 30 min
2,079,362People within 2 hr
55,120Radius comparison (15 mi)
76.2People / sq mi
37.1%Federal land
30.2%Land at 15% slope or less
2%Soils rated "not limited" for septic (strict USDA rating)
20,277 acWorkable land screen
35.3%Wooded land
63.2 tonsBiomass / forest ac
56.6°FAvg temp

Scout Madera County

Camp here before you commitBook a few nights nearby on Hipcamp →Already own land here?Earn money hosting campers — get $100 when you become a Hipcamp host →

Some links are affiliate or referral links — we may earn a commission, at no cost to you.

Property hunt

Find land. Bring the promising ones back.

Search live inventory elsewhere, then cost and vet each candidate here. No copied listings, account, or paid data feed.

Each button opens a current land search for Madera County. Listing sites control their own results and filters.

Analyze a property
Add setup-cost allowances

Use rough quotes or placeholders. Blank fields count as $0.

Working estimate

—land + entered setup costs
Asking $ / acre
—
Setup allowance
—
All-in $ / acre
—

A planning estimate, not a valuation or contractor quote. The USDA benchmark includes farm land and buildings; it is context, not a parcel comp.

Before an offer

Parcel due diligence

0/8 checked

Saved properties and checklist progress stay on this device. Bolthole Index does not receive them.

Cities and towns in Madera County

Inside a city or town, that city usually issues building permits and sets zoning; the county’s rules above cover unincorporated land. Septic, wells and floodplain rules usually stay with the county or state everywhere.

Not yet researched: Madera

Answers from the rulebook for Madera County

What the ordinances and state agencies actually say — one answer per question, each quoted from the official source and independently re-checked.

Madera County rules

  • Building permitLimited

    Building, electrical, mechanical, mobile-home, demolition, and reroof work administered by Madera County in unincorporated Madera County.

    • The cited official source limits the county Building and Fire Safety Division's building-code jurisdiction to the unincorporated area of Madera County.
    • Madera County has adopted the California Building Code, Title 24, and the Building and Fire Safety Division administers the code.
    • Electrical permits are required for new or altered existing electrical systems.
    • Mechanical permits are required for new or replacement heating, ventilation, refrigeration systems and components.
    • Mobile homes and temporary or permanent mobile offices installed within Madera County require a building permit regardless of the type of installation.
    • A demolition permit is required for removal of any structure in excess of 120 square feet; demolition permits are issued in conjunction with and with approval of the San Joaquin Valley Air Pollution Control District.
    • Reroof permits are required for alteration, repair, or reconstruction of a building's roof system.
    • The official material identifies permit requirements for particular work but does not establish that every activity within the listed code categories requires a permit; therefore the aggregate value is limited rather than universally required.

    demolition structure size threshold: > 120 square feet (A demolition permit is required for removal of any structure in excess of 120 square feet.)

    “buildings and structures within the unincorporated area of the county. [...] Electrical permits are required for new or alterations to existing electrical systems.”
  • Owner-builder exemptionAvailable (with conditions)

    Owners applying through Madera County's owner-builder building-permit process and seeking exemption from contractor licensure.

    • The owner-builder may personally perform the work or use the owner's employees whose wages are their sole compensation, provided the structure is not intended or offered for sale.
    • The owner-builder may contract with properly licensed subcontractors; for a single-family residential structure, the form limits structures intended or offered for sale to four or fewer in a calendar year.
    • The owner-builder may contract with a general Building (B) contractor; the form states the number of structures is then unlimited.
    • A homeowner improving the principal residence is exempt if the work is performed before sale, the homeowner resides in the residence for the 12 months before completion, and the homeowner has not used this exemption on more than two structures during any three-year period.
    • Property owners are prohibited from personally performing well-drilling work covered by the Well Drilling (C-57) classification.
    • For homes built for resale, the form lists licensed tradesmen for no more than four structures per calendar year, a licensed general contractor with no annual structure limit, or owner performance with residence in the completed structure for one year before resale, limited to two structures in a three-year period.
    • The owner-builder declaration and notice must be completed and returned before permit issuance; the property owner must execute the notice personally and an agent cannot execute it.

    structures offered for sale with licensed subcontractors: <= 4 structures per calendar year (single-family residential construction) · principal-residence occupancy before completion: >= 12 months (homeowner principal-residence improvement exemption) · structures using principal-residence exemption: <= 2 structures per three-year period (homeowner principal-residence improvement exemption) · owner-builder resale residence period: >= 1 year (owner performs all or part of work before resale) · owner-builder resale structures: <= 2 structures per three-year period (owner performs all or part of work before resale)

    “An owner-builder is exempt from licensure, but there are limitations.”
    One more reviewed finding on this topic
    • Conditional — Owner-builders applying for Madera County building permits in the unincorporated county.
      “An owner-builder is exempt from licensure, but there are limitations.”
  • Building code adoptedAdopted (with conditions)

    Buildings, structures, swimming pools, solar systems, and related electrical, plumbing, heating, and cooling facilities in the unincorporated area of Madera County.

    • The source states that Madera County adopted the California Building Code, Title 24, as mandated by California.
    • The provisions are administered by the Building and Fire Safety Division.
    • The cited applicability is limited to the unincorporated area of the county.
    • The source also states that Madera County Ordinances and the Uniform Code for the Abatement of Dangerous Buildings are enforced alongside the California Building Code.

    adopted code: California Building Code, Title 24 (part of the 12-part California Code of Regulations)

    “As mandated by the State of California, Madera County has adopted the California Building Code, Title 24 which is part of the 12-part California Code of Regulations. Along with enforcing the California Building Code, the Building and Fire Safety Division enforces Madera County Ordinances and the Uniform Code for the Abatement of Dangerous Buildings. The provisions of this Code shall be administered by the Building and Fire Safety Division. These codes shall apply to the erection, construction, enlargement, alteration, repair, relocation, conversion, occupancy, and maintenance of buildings, structures, swimming pools, solar systems, the installation of electrical wiring and appliances, plumbing, heating and cooling facilities and appurtenances necessary within the unincorporated area of the county.”
    One more reviewed finding on this topic
    • Adopted (with conditions) — California Building Code, Title 24, as administered by Madera County Building and Fire Safety for buildings and related facilities in the unincorporated county.
      “As mandated by the State of California, Madera County has adopted the California Building Code, Title 24 which is part of the 12-part California Code of Regulations.”
  • InspectionsRequired

    Ground-mounted photovoltaic systems regulated through the Madera County Building Division.

    • Foundations on ground mount systems must be inspected before footings are poured.
    • After new photovoltaic equipment is installed, an inspection is required to confirm proper system bonding and installation according to the design drawings.
    • The form also requires an Owner Builder Authorization form or Contractor Authorization form and a Madera County Plot Plan for ground-mount systems.
    “Foundations on ground mount systems shall be inspected prior to pouring footings. After the new equipment has been installed, an inspection is required to confirm proper system bonding and installation per design drawings.”
  • County-wide zoningPresent (with conditions)

    County land-use regulation under Title 18 of the Madera County Code, confirmed for grading-permit applications in the unincorporated county.

    • The official source specifically states that grading-permit applications must conform to Title 18 zoning regulations.
    • The cited source does not state an effective or adoption date for Title 18.
    • Incorporated-area exclusions are not stated in the cited passage.
    “Applications shall conform to land use regulations as required by Title 18 (“Zoning), of the Madera County Code.”
  • Local zoningPresent (with conditions)

    Local zoning administered by Madera County for land-use compliance in the unincorporated county, at least for grading-permit applications.

    • Applications must conform to Title 18 zoning regulations.
    • The official passage does not resolve zoning rules administered by the incorporated Cities of Madera or Chowchilla.
    • No effective date or broader applicability statement was found in the opened official sources.
    “Applications shall conform to land use regulations as required by Title 18 (“Zoning), of the Madera County Code.”
  • Minimum lot sizeDistrict specific (with conditions)

    Agricultural zoning districts in unincorporated Madera County.

    • The applicable minimum depends on the agricultural zoning district shown in the county table.
    • Other zoning districts may have different minimum-lot requirements.
    • Applicable density, setbacks, lot coverage, building, water, wastewater, and other development requirements also apply.

    minimum lot area: 4½, 18, 36, 80, 160, 320, 640, 2½ acres (Values are reproduced exactly from the official table excerpt; the excerpt's compressed formatting does not safely identify each value's corresponding district column.)

    “The development standards table for agricultural zones identifies the parcel size, density standards, lot coverage, setbacks and height regulations that apply in the agricultural zones.”
  • SetbacksSpecified

    Eligible accessory dwelling units on qualifying parcels in unincorporated Madera County

    • The guide states that ADUs are allowed on parcels zoned residential or in a zone district allowing residential uses, with an existing or proposed single-family home or multifamily development.
    • Detached and attached ADUs have different setback rules.
    • A converted structure may have no setback requirement when constructed in the same location and to the same dimensions as the existing structure; expansions must maintain the existing setback or use 4-foot side and rear setbacks.
    • The guide directs users to Madera County Zoning Code Chapter 18.50.020 for all standards and requirements.

    detached or attached new-construction ADU side setback: >= 4 feet · detached or attached new-construction ADU rear setback: >= 4 feet · ADU front setback: same as primary dwelling

    “Front Yard: Same as Primary dwelling Side Yard: 4 ft. min. Rear Yard: 4 ft. min.”
    One more reviewed finding on this topic
  • Building heightSpecified

    Accessory dwelling units in eligible unincorporated Madera County residential zones

    • The guide states that the 16-, 18-, and 20-foot detached-ADU limits depend on criteria in the ADU ordinance.
    • Attached ADUs have a 25-foot maximum height.
    • The guide directs users to Madera County Zoning Code Chapter 18.50.020 for all standards and requirements.

    detached ADU maximum height: 16, 18, or 20 feet (See ADU ordinance for criteria) · attached ADU maximum height: <= 25 feet

    “16 ft. / 18 ft. / 20 ft. – see ADU ordinance for criteria 16 ft. / 18 ft. / 20 ft. – see ADU ordinance for criteria 25 ft. max. 25 ft. max.”
    One more reviewed finding on this topic
    • Specified — Accessory dwelling units in unincorporated Madera County.
      “16 ft. / 18 ft. / 20 ft. – see ADU ordinance for criteria 25 ft. max.”
  • Living in an RVTemporary only (with conditions)

    Temporary travel-trailer or recreational-vehicle occupancy in any Madera County zoning district while a permanent dwelling is under construction.

    • A building permit for the permanent dwelling must be issued before installation.
    • The environmental health department must provide written confirmation that acceptable sewer and water service exist on the parcel.
    • The owner must sign a planning-department form stating the unit will no longer be occupied or connected to services when the permanent dwelling is completed.
    • The temporary unit must be removed upon completion of the permanent dwelling or within one year of issuance of the permanent-dwelling building permit, whichever occurs first.
    • An extension may be considered only upon written request and demonstration of substantial progress.

    maximum temporary occupancy period: 1 year (While a permanent dwelling is under construction; removal upon completion or within one year of permit issuance, whichever occurs first.)

    “In any zone district, a temporary manufactured home (not subject to architectural standards of Section 18.84.010 ), a temporary travel trailer, or a temporary recreational vehicle shall be permitted, for a period of one year while a permanent dwelling is under construction subject to the following conditions:”
  • Accessory dwellingsAllowed (with conditions)

    Accessory dwelling units on parcels in unincorporated Madera County that are zoned residential or are in a zone district allowing residential uses and contain an existing or proposed single-family or multifamily development.

    • The parcel must be appropriately zoned and contain an existing or proposed single-family or multifamily development.
    • The County guide instructs applicants to confirm utility capacity and identify applicable utility constraints.
    • The project must comply with Madera County Zoning Code Chapter 18.50.020 and the County's ADU requirements.
    • All ADUs require a building permit and standard application and permitting fees; additional permits, studies, and reports may be required depending on the project.
    • Inspections must be completed before occupancy; complete applications are generally acted on within 60 days or deemed approved when an existing single-family home or multifamily development is present, subject to exceptions in Chapter 18.50.020.
    • Detached ADUs have maximum size limits of 850 square feet for a one-bedroom unit and 1,000 square feet for a unit with more than one bedroom; attached-unit limits and conversion exceptions are governed by the cited ordinance.
    • Detached and attached new-construction ADUs generally require four-foot minimum side and rear setbacks, with stated conversion-location exceptions; height and parking standards vary by ADU type.

    detached ADU maximum size: 850 sq ft (One-bedroom unit) · detached ADU maximum size: 1000 sq ft (Unit with more than one bedroom) · side setback: >= 4 ft minimum (Subject to stated conversion exceptions) · rear setback: >= 4 ft minimum (Subject to stated conversion exceptions) · application action timeline: <= 60 days (Generally applies to complete applications where an existing single-family home or multifamily development is present; Chapter 18.50.020 exceptions apply)

    “ADUs are allowed on parcels in the County that are zoned residential or are within a zone district that allow residential uses and contain an existing or proposed single-family home or multi-family development.”
  • Who permits septicCounty

    Administration of the Madera County OWTS Local Agency Management Program.

    • The Central Valley Water Board approved the Local Agency Management Program submitted by Madera County Environmental Health Division.
    • The Regional Water Board retains review and approval authority for projects referred under the LAMP, including certain projects exceeding 5,000 gpd or involving specified high-strength wastewater.
    “Therefore, be it RESOLVED, that the Central Valley Water Board hereby approves the Local Agency Management Program submitted by Madera County Environmental Health Division.”
    2 more reviewed findings on this topic
    • County — Administration of Madera County’s onsite wastewater treatment system permitting and local management program.
      “Therefore, be it RESOLVED, that the Central Valley Water Board hereby approves the Local Agency Management Program submitted by Madera County Environmental Health Division.”
    • County (with conditions) — Madera County Environmental Health Division administration of the county OWTS permitting program.
      “Therefore, be it RESOLVED, that the Central Valley Water Board hereby approves the Local Agency Management Program submitted by Madera County Environmental Health Division.”
  • Septic permitRequired

    Installation, rebuilding, repair, abandonment, or additions to existing on-site wastewater treatment systems in Madera County.

    • The permit expires 180 days after issuance; a new permit is required before resuming unfinished work after expiration.
    • The applicant may renew the septic permit if the contractor remains the same, subject to the current MCEHD fee schedule.
    • Greater setback distances may be required to avoid groundwater pollution; lesser distances require evidence that installation will not cause pollution and a setback exception granted by the Division.
    • After issuance, a signed copy of the permit must be submitted to the Division before construction begins.
    • The permittee must notify the Division at least 48 hours before backfilling for inspection, and may not backfill until the Division inspects and approves the work.
    • New-construction and addition OWTS design proposals must show at least 100% reserve area for the active OWTS.
    • The LAMP excludes OWTS with projected wastewater flow over 5,000 gallons per day and specified high-strength wastewater categories, which require individual Regional Water Board requirements or waivers.

    permit validity: 180 days (A renewal may be available if the contractor remains the same and the current MCEHD fee is paid.) · advance inspection notice: >= 48 hours · reserve area for active OWTS: >= 100 percent

    “The Ordinance requires that a permit be obtained to construct, modify, repair or abandon an OWTS. [...] A permit to install, rebuild, repair, abandon or add on to an existing on-site wastewater treatment system shall expire 180 days from the date it was issued.”
    One more reviewed finding on this topic
  • Well permitRequired

    Construction, modification, or destruction of water wells under Madera County Environmental Health jurisdiction.

    • Permits are obtained from the local environmental health agency or local water district before construction, modification, or destruction.
    • Water well construction must be performed by a licensed C-57 well drilling contractor.
    • Applicable local and state well standards apply.
    • Madera County Environmental Health Department is the listed local permitting agency for Madera County; incorporated-city exceptions or separate local jurisdiction rules may apply.
    “regulatory authority over well construction, alteration, and destruction activities rests with local jurisdictions [...] Madera County Environmental Health Department”
  • Mandatory utility hookupSewer (with conditions)

    New or replacement onsite wastewater treatment systems in Madera County under the County Environmental Health Division’s Local Agency Management Program.

    • MCEHD does not authorize installation of a new or replacement OWTS where public sewer is available within 200 feet.
    • Public sewer availability means the property abuts a public sewer, is within the sewer district boundaries or annexation has been approved by the sewer district, and no easement is required to access the sewer line.
    • An exception applies when the public or community sewer system is under a connection ban.
    • An exception applies when the public or community sewer system does not agree to provide a service connection.
    • The OWTS applicant must make an effort to ensure that operation of the OWTS will not adversely affect adjacent properties and must maintain applicable setbacks.
    • Any such system or deviation not authorized by MCEHD may only be approved by the Central Valley Regional Water Quality Control Board.

    public sewer availability distance: <= 200 feet (The source states public sewer is available within 200 feet.)

    “Installation of new or replacement OWTS where public sewer is available within 200 feet.”
  • Subdividing landRegulated (with conditions)

    Land divisions and subdivision-related road and access improvements in unincorporated Madera County.

    • Agriculturally designated properties are exempt from the two-point-access provision only if the maximum road length does not exceed the specified length.
    • Dead-end-road maximum lengths are 800 feet for parcels zoned less than 1 acre, 1,320 feet for parcels zoned 1 to 4.99 acres, 2,640 feet for parcels zoned 5 to 19.99 acres, and 5,280 feet for parcels zoned 20 acres or more.
    • Dead-end roads require a dedicated turnaround with a minimum 50-foot radius; areas zoned for 5 acres or more require a turnaround at least every 1,320 feet.
    • If a land division accesses a substandard county-maintained road, the subdivider must upgrade it to county standards to an intersection with another fully compliant county-maintained road; this applies to parcels of 20 acres or less.
    • Sidewalks are required along the project frontage for residential or commercial development creating lots one-half acre or less.
    • Road design exceptions are regulated by Madera County Code Chapter 17.32.100; driveway design exceptions are regulated by Chapter 17.32.120.

    maximum dead-end road length, parcels zoned less than 1 acre: 800 feet · maximum dead-end road length, parcels zoned 1 to 4.99 acres: 1320 feet · maximum dead-end road length, parcels zoned 5 to 19.99 acres: 2640 feet · maximum dead-end road length, parcels zoned 20 acres or more: 5280 feet · minimum turnaround radius: >= 50 feet (Larger radius required if road improvements and appurtenances necessitate additional right-of-way) · sidewalk threshold: one-half acre or less (Residential or commercial development)

    “THESE MAXIMUM LENGTH STANDARDS APPLY TO LAND DIVISIONS ON BOTH EXISTING AND PROPOSED ROADS.”
  • Driveway accessLimited

    Driveway and local-road access standards administered by Madera County for development and land divisions covered by the county standards.

    • All local roads generally require access to a Class II through road and a secondary access as recommended by the Road Department, subject to the agricultural exemption stated in the standard.
    • Access may be limited on highways, freeways, expressways, arterials, and collectors and may require traffic-impact mitigation.
    • Dead-end-road maximum lengths are 800 feet for parcels under 1 acre, 1,320 feet for parcels from 1 to 4.99 acres, 2,640 feet for parcels from 5 to 19.99 acres, and 5,280 feet for parcels of 20 acres or more.
    • Dead-end roads require an offer of dedication for a turnaround with at least a 50-foot radius; areas zoned for 5 acres or more require a turnaround at least every 1,320 feet.
    • Driveway grade is limited to 16% below 3,000 feet elevation and 12% above 3,000 feet; agriculturally designated properties are exempt from the 12% provision but remain subject to a 16% maximum.
    • Steeper grades may be allowed for existing parcels approved before the effective date of the requirement when the standards cannot be met.
    • Driveways exceeding 150 feet but less than 800 feet require a midpoint turnout; driveways exceeding 800 feet require turnouts at least every 400 feet.
    • County-maintained roads below county standards must be upgraded for land divisions accessing them when the parcel is 20 acres or less.
    • Emergency access roads or easements are not allowed where an available primary access road is intended for the parcel.

    maximum driveway grade below 3,000 feet: <= 16 percent (Agriculturally designated properties remain subject to this maximum even when exempt from the 12% provision.) · maximum driveway grade at or above 3,000 feet: <= 12 percent (Agriculturally designated properties are exempt from this provision but subject to a 16% maximum; existing approved parcels may qualify for steeper grades.) · midpoint turnout threshold: > 150 feet (Applies to driveways more than 150 feet and less than 800 feet long.) · turnout spacing threshold: per 400 feet (Required when a driveway exceeds 800 feet.) · dead-end turnaround radius: >= 50 feet (Larger radius may be required for road improvements and appurtenances.)

    “THE MAXIMUM GRADE FOR DRIVEWAYS IS 16% IN AREAS BELOW 3,000 FOOT ELEVATION. THE MAXIMUM GRADE FOR DRIVEWAYS ABOVE 3,000 FOOT ELEVATION IS 12%.”
  • Building in a floodplainRequired

    Grading and fill work in Madera County flood zones under the county grading and erosion-control permit process.

    • Cut and fill slopes may not exceed 2:1 unless the work is treated as engineered grading subject to California Building Code Appendix Chapter 33, sections 3309.4-3309.7.
    • Fill must be placed in lifts no greater than 10 inches and compacted to at least 90%, certified by a geotechnical or civil engineer.
    • Fills over 5 feet require benching inspections at each progressive bench lift before additional fill is placed.
    • All fill material in flood zones must be compacted to 95%.
    • Erosion-control measures necessary to constrain construction sediment must be in place before construction begins.
    • Applications must conform to Title 18 zoning regulations.
    • The source is a grading-permit document and does not establish a complete floodplain ordinance or all elevation requirements.

    maximum fill lift: <= 10 inches · minimum compaction for ordinary fill: >= 90 percent (Certification by a geotechnical or civil engineer is required.) · minimum compaction for fill in flood zones: >= 95 percent · benching inspection threshold: > 5 feet (Required at each progressive bench lift before fill placement.)

    “All fill material in flood zones shall be compacted to 95%.”
  • Permit feesPublished (with conditions)

    Accessory dwelling unit building permit applications handled by Madera County.

    • Building permit application fees are invoiced.
    • All fees must be paid before the application is deemed complete.
    • Building permit fees are separate from building permit application fees.
    • Permit fees are calculated at the time of issuance.
    • Impact fees are invoiced before building permit approval.
    • ADUs less than 750 square feet are not subject to impact fees.

    ADU impact-fee exemption threshold: < 750 square feet (ADUs less than 750 square feet are not subject to impact fees.)

    “All fees must be paid before the application is deemed complete. [...] ADUs less than 750 square feet are not subject to impact fees.”
  • Permit processPartial

    Madera County grading and erosion-control permit processing for residential, commercial, driveway, leveling, and related grading work.

    • The application is under Chapter 14.50 of the Madera County Code and California Health and Safety Code sections 19825-19832.
    • An onsite inspection for a private sewage disposal area may be required before grading permit issuance.
    • A cash deposit or performance bond equal to 100% of estimated soil-stabilization and revegetation costs is required; it is not released until stabilization and vegetation have been established for one full year.
    • All grading permits must be inspected and finaled.
    • The permit becomes null and void if work is not started within 180 days, or if work is suspended or abandoned for 180 days; failure to request and pass progress inspections during a 180-day period constitutes abandonment.
    • Access must be from a public roadway approved by Madera County Public Works; private easement or emergency-access-road access requires specific approval by Public Works and the Planning Division.
    • Where appropriate, encroachment permits from Madera County Public Works or Caltrans are required before grading.
    • Applications must conform to Title 18 zoning regulations.

    permit commencement deadline: 180 days (Permit becomes null and void if work is not commenced within this period.) · soil stabilization and revegetation deposit or bond: 100 percent of estimated cost (Deposit or bond is not released until required stabilization and vegetation have been established for one full year.)

    “All grading permits shall be inspected and finaled.”

California rules that apply here

  • Certificate of occupancyRequired

    Completed construction projects within HCAI jurisdiction involving California health facilities.

    • The HCAI Compliance Officer issues the project-completion Substantial Compliance or Certificate of Occupancy once required conditions are met.
    • The stated examples include delivery of all test reports to the Inspector of Record, clearance of outstanding items, and completion of the Testing, Inspection and Observation Program.
    • Once construction is completed, the certificate of occupancy allows the owner to apply to the Department of Health Services for a license to operate the health facility.
    “Issues the certificate of occupancy and/or construction final.”
  • Zoning districtsPartial

    California city and county zoning codes and the zoning districts established by those local jurisdictions.

    • The city or county zoning code implements general-plan policies at the individual-parcel level.
    • Local zoning codes identify allowed land uses in the jurisdiction’s zoning districts.
    • Since 1971, state law requires city or county zoning codes to be consistent with the jurisdiction’s general plan, except in charter cities.
    • The source does not publish a statewide list of parcel-specific zoning districts; the applicable local jurisdiction must be consulted.
    “The zoning code presents standards for different land uses and identifies which land uses [...] are allowed in the various zoning districts of the jurisdiction.”
  • Minimum dwelling sizeSpecified

    Efficiency units permitted by a California city, county, or city and county.

    • The local jurisdiction must adopt an ordinance permitting the efficiency unit.
    • Occupancy is limited to no more than two persons.
    • The unit may have partial kitchen or bathroom facilities as specified by the local ordinance.
    • All other applicable minimum standards under Health and Safety Code Part 1.5 continue to apply.

    minimum floor area: >= 150 square feet · maximum occupancy: <= 2 persons

    “Notwithstanding Sections 17922, 17958, and 17958.5, a city, county, or city and county may, by ordinance, permit efficiency units for occupancy by no more than two persons which have a minimum floor area of 150 square feet and which may also have partial kitchen or bathroom facilities, as specified by the ordinance.”
  • Camping on your landLimited

    Camping in units operated by the California Department of Parks and Recreation statewide.

    • Camping is confined to areas designated for that purpose.
    • Occupancy by the same persons, equipment, or vehicles is generally limited to 30 days in any calendar year in that unit.
    • The Department may establish shorter or longer occupancy limits.
    • When a shorter seasonal limit applies, the camper must vacate the campsite and may not reregister in the unit until 48 hours have expired, measured from 12:00 noon on the checkout day to 12:00 noon on the second day following.
    • A district superintendent may permit one-night camping in a day-use area or portion of one, subject to Department-established fees and vehicle limitations; occupants must vacate by 9:00 a.m. the following morning.
    • California State Parks' current reservation policy states that each campground has a consecutive-night limit, requires a 48-hour absence after that limit, and generally has a 30-night annual maximum, subject to individual park policies.

    general annual occupancy limit: 30 days per calendar year per unit (The Department may establish shorter or longer limits of occupancy.) · return interval after shorter seasonal limit: 48 hours (Measured from 12:00 noon of the checkout day to 12:00 noon of the second day following.) · one-night camping in day-use area: 1 night (Only if permitted by the district superintendent; occupants must vacate by 9:00 a.m. the following morning.)

    “Occupancy by the same persons, equipment, or vehicles of any camping facility is limited to a total of 30 days in any calendar year in that unit.”
    One more reviewed finding on this topic
    • Allowed (with conditions) — Temporary camping in California special occupancy parks, including parks containing recreational vehicles, tents, or camping cabins.
      ““Special occupancy park” means a recreational vehicle park, temporary recreational vehicle park, incidental camping area, or tent camp.”
  • Tiny homesAllowed (with conditions)

    Occupancy of a structure marketed or described as a tiny home in California.

    • The tiny home must comply with applicable standards and be approved as a HUD-Code manufactured home, California Residential or Building Code home, factory-built housing, recreational vehicle, park trailer, or camping cabin.
    • The location must be approved for the applicable classification.
    • A tiny home that does not fit one of those classifications and does not comply with the California Building Standards Code is a noncomplying structure whose occupancy is illegal.
    • Approving and enforcing agencies vary depending on whether the unit is inside or outside a mobilehome or special occupancy park.

    park trailer or RV gross area limit: <= 400 square feet (Applicable classification-specific exclusions and standards apply.)

    “In order to be occupied, a tiny home must comply with the standards of, and be approved as one of the following types of structures: a HUD-Code manufactured home (MH), California Residential Code or California Building Code home, factory-built housing (FBH), recreational vehicle (RV), park trailer (PT) or camping cabin (CC).”
  • Manufactured homesAllowed

    Certified manufactured homes installed on foundation systems on lots zoned for conventional single-family residential dwellings, including applicable Madera County lots.

    • The manufactured home must be certified under the National Manufactured Housing Construction and Safety Standards Act of 1974.
    • Installation must be on a foundation system pursuant to California Health and Safety Code section 18551.
    • The manufactured home and lot are subject to the same development standards as a conventional single-family dwelling on the same lot, including setbacks, yards, enclosures, access, parking, aesthetic requirements, and minimum square footage.
    • Architectural requirements imposed on the manufactured home itself are limited to roof overhang, roofing material, and siding material; roofing and siding requirements may not exceed those required for conventional single-family dwellings.
    • A local legislative body may preclude installation if more than 10 years have elapsed between manufacture and the permit application.
    • A historic-property exemption may apply where the property is listed on the National Register of Historic Places.

    maximum age at permit application: <= 10 years (A local legislative body may preclude installation when more than 10 years have elapsed since manufacture.)

    “A city, including a charter city, county, or city and county, shall allow the installation of manufactured homes certified under the National Manufactured Housing Construction and Safety Standards Act of 1974 (42 U.S.C. Secs. 5401 et seq.) on a foundation system, pursuant to Section 18551 of the Health and Safety Code, on lots zoned for conventional single-family residential dwellings.”
    One more reviewed finding on this topic
    • Allowed (with conditions) — Occupancy of manufactured homes inside or outside mobilehome parks in California.
      “MHs may be occupied outside or inside of mobilehome parks and installation and approval for occupancy is governed by the Mobilehome Parks Act (MPA), HSC Sections 18200, et seq., and Title 25, CCR Sections 1000, et seq.”
  • Septic inspectionLimited

    OWTS in a Tier 3 Advanced Protection Management Program with supplemental treatment components, including systems in specified impaired-water-body areas statewide.

    • The requirement applies to OWTS in an Advanced Protection Management Program with supplemental treatment components.
    • Ongoing monitoring must follow the OWTS operation and maintenance manual or occur more frequently if required by the local agency or Regional Water Board.
    • Where telemetry is not possible, the owner or owner's agent must inspect at least monthly while the system is in use and notify the service provider at least quarterly of observed operating parameters.
    • For systems designed to meet disinfection requirements, a service provider must inspect proper operation quarterly while the system is in use unless continuous telemetric monitoring is capable of assessing operation.
    • Quarterly effluent sampling and certified-laboratory requirements apply to systems subject to the disinfection provisions.

    inspection frequency where telemetry is not possible: per monthly (While the system is in use.) · inspection frequency for disinfection systems: per quarterly (While the system is in use, unless continuous telemetric monitoring is capable of assessing operation.)

    “Where telemetry is not possible, the owner or owner’s agent shall inspect the system at least monthly while the system is in use as directed and instructed by a service provider and notify the service provider not less than quarterly of the observed operating parameters of the OWTS. [...] OWTS in an Advanced Protection Management Program designed to meet the disinfection requirements in Section 10.10 shall be inspected for proper operation quarterly while the system is in use by a service provider unless a telemetric monitoring system is capable of continuously assessing the operation of the disinfection system.”
  • Campground & park staysLimited

    Occupancy and use of manufactured homes and mobilehomes in California mobilehome parks and other locations subject to HCD jurisdiction.

    • HCD administers titling and registration for manufactured homes and mobilehomes.
    • HCD-inspected mobilehome parks are subject to health and safety enforcement where local government has not assumed enforcement.
    • Manufactured/mobilehome park regulations address construction, use, maintenance, and occupancy.
    • Separate local land-use, building, fire, health, and utility requirements may apply.
    “MHs may be occupied outside or inside of mobilehome parks and installation and approval for occupancy is governed by the Mobilehome Parks Act (MPA), HSC Sections 18200, et seq., and Title 25, CCR Sections 1000, et seq.”
    One more reviewed finding on this topic
    • Limited — Occupancy and use of recreational vehicles in California special occupancy parks and designated RV sections of mobilehome parks.
      “Unless otherwise allowed by a local ordinance, RVs generally may be occupied only in mobilehome parks or special occupancy parks governed by the Mobilehome Parks Act”
  • county zoning authorityGeneral

    California county legislative bodies' authority to adopt zoning ordinances regulating buildings, structures, land uses, lots, yards, open space, lot coverage, intensity of use, parking, loading, and setbacks within county jurisdiction, including unincorporated areas.

    • The authority is exercised pursuant to Government Code Chapter 4, Zoning Regulations.
    • The statute separately authorizes city legislative bodies; incorporated municipalities may exercise their own zoning authority.
    • Government Code Section 65850 also lists authority to regulate signs and billboards, building and structure location, height, bulk, number of stories, and size, lot and open-space size and use, lot coverage, intensity of land use, offstreet parking and loading, and building setback lines.
    • The cited section states it was amended by Stats. 2017, Ch. 376, Sec. 1, effective January 1, 2018.
    “The legislative body of any county or city may, pursuant to this chapter, adopt ordinances that do any of the following:”
  • county building authorityGeneral

    California counties administering and enforcing state building standards through county building departments, including residential construction in unincorporated areas.

    • Each county must maintain building standards and state building regulations in the office of the building official responsible for administration and enforcement of state building standards.
    • The statewide Title 24 standards apply subject to statutory exceptions and any authorized local amendments or local requirements.
    • The cited HCD bulletin concerns the 2019 California Building Standards Code and its July 1, 2021 supplement; later code editions may supersede those particular edition dates.
    “These codes shall be maintained in the office of the building official responsible for the administration and enforcement of state building standards”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission — ask the county directly.

  • Lot coverage — Lot coverage in unincorporated Madera County
  • Agricultural exemption — Agricultural-building or agricultural-use exemptions from Madera County development, zoning, or building requirements.
  • Short-term rentals — Short-term rentals in unincorporated Madera County.

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Water rights & wells in Madera County

Whether a new home can legally get its own water here — the sub-state groundwater regime, from California’s water agency.

Over-appropriated / declining

The aquifer here is over-appropriated and declining. A domestic well is usually still permit-exempt, but long-term supply is a genuine risk.

Household wellPermit required — restricted

California requires no STATE permit for a domestic well — wells are permitted by the county — but under SGMA a Groundwater Sustainability Agency can meter or restrict new wells in medium/high-priority and critically overdrafted basins, and Executive Order N-7-22 requires counties in those basins to get GSA verification that a new well is consistent with the Groundwater Sustainability Plan before permitting.

Limit: 2 acre-feet/year de minimis under SGMA (Water Code §10721(e)) — largely exempt from GSA metering/fees

California DWR / State Water Board — SGMA de minimis & EO N-7-22 Action 9 FAQ ↗

Hybrid state (appropriation + riparian). Groundwater rules change and basin boundaries follow the aquifer, not the county line — confirm current well and appropriation rules with the California state water agency before you buy or drill.Groundwater governance as of Jul 2026, cited to each administering agency.

Living off-grid in Madera County, California

Is Madera County a good place to live off-grid or homestead?

Madera County scores 44/100 on the Bolthole Index, a marginal county profile. Watch-outs: elevated mid-century heat, water, rain, or wildfire exposure and more administrative friction around building and land use.

Do you need a building permit in Madera County, California?

Madera County requires a building permit only in limited cases (such as floodplains or specific zones), and it enforces county zoning. Onsite septic is permitted by Madera County Environmental Health Division (OWTS Local Agency Management Program). Owner-builders may act as their own contractor to build their home. These answers are quoted from official sources and independently re-checked. Rules change and cities within the county differ — always confirm with the county before you buy or build.

Can you live in an RV or tiny home on your land in Madera County?

Living in an RV on your own land in Madera County is allowed on a temporary basis only: Temporary travel-trailer or recreational-vehicle occupancy in any Madera County zoning district while a permanent dwelling is under construction. A building permit for the permanent dwelling must be issued before installation. The environmental health department must provide written confirmation that acceptable sewer and water service exist on the parcel. A tiny home is allowed. Confirm with the county before relying on it.

How much does land cost in Madera County, California?

Land in Madera County runs about $13,239 per acre, based on the latest county data.

What is the water situation in Madera County?

Madera County gets about 22.4" of rain a year, with severe drought in roughly 39.7% of years. On water rights, Madera County lies in the Madera Subbasin — Critically Overdrafted — Among the most stressed valley subbasins for subsidence and dry domestic wells; GSP pumping reductions; new wells subject to GSA review and EO N-7-22..

How remote is Madera County?

A representative private-land location has about 13,228 people within a 30-minute drive and 2,079,362 within two hours. The road-network catchments count population across county lines and clusters of smaller cities; straight-line radius values remain available as a comparison.

How Madera compares in California

Compare side-by-side →See all 58 California counties ranked →