Union Point, Georgia (Greene County) is divided into zoning districts under the city's own zoning code1. Manufactured and mobile homes need a permit from the Union Point City Clerk before utility hookups2. Septic approvals inside the city run through the Greene County health department3. We could not confirm who issues general building permits inside city limits, so call City Hall first4.
At a glance
- Zoning
- Yes, the city has its own zoning districts1
- Building permit
- Manufactured/mobile homes: permit from the City Clerk before utility hookups; general rule not confirmed2
- Manufactured home permit fee
- $0.07 per square foot5
- Septic
- Greene County health department sizes lots3
- RV living
- Only in permitted travel trailer parks, 30-day maximum stay6
- Minimum lot, R-1
- 15,000 sq ft, 100 ft wide7
- Owner-builder
- Georgia does not require a license to build your own home; local codes and permits still apply8
Who to call
Building permits
City clerk, manufactured home permits and the starting point for permit questions inside Union Point
107 Scott Street P.O. Box 233 Union Point, Georgia 30669
Septic permits
Greene County Environmental Health
Septic letters, perc tests and onsite sewage approvals for Greene County
Contact details are copied from each office’s official page and were checked against it on October 16, 2026.
Off-grid gear
Going off-grid in Union Point means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Does Union Point, GA have zoning, and what does it mean for lot size and homes?
Yes. Union Point is divided into zoning districts under the city's own code1. The districts include R-1, R-1A, R-2, R-3, C-1, C-2, M-1, MHD, R-M and PI9.
Lot size depends on the district. In R-1, single-family lots need at least 15,000 square feet and 100 feet of width7. In R-1A the minimum is 32,670 square feet and 140 feet10. Septic lots must also meet the city's septic rule, which sets 21,780 square feet with public water and 43,560 with individual water7.
In R-1, a manufactured home counts as a single-family dwelling only where public water and sewerage are available, and it needs a conditional use permit from the mayor and council after a public hearing11. We could not confirm setbacks, minimum dwelling size, building height or accessory dwelling rules inside the city; ask City Hall4.
Do you need a building permit in Union Point, and who issues it?
For manufactured and mobile homes the answer is clear: owners must apply to the Union Point City Clerk for a permit before any utility hookups2. The fee is $0.07 per square foot5.
For site-built homes we could not confirm which office issues building permits inside city limits. The city's website says residents need permits for additions, electrical, HVAC, extensive remodeling and fences, and asks you to call before you work4. Call City Hall at 706-486-41024.
Georgia does not require a license to build your own home, but local building codes and permits still apply8.
How do septic permits work inside Union Point?
Septic is not a city permit. The Greene County health department sizes lots for on-site sewage systems inside Union Point, and it can require larger lots than the city minimum to assure usable soil3.
Outside city limits, Greene County requires a septic approval letter with the building permit application when a property uses an on-site system, obtained through the Greene County Environmental Health Manager12. For inside the city, we could not confirm the permit steps, so call Greene County Environmental Health at (706) 453-447113. Greene County soils vary: USDA rates about 54% of the county's soils as not limited for a conventional drain field, so a site evaluation still matters14.
Can you live in an RV or tiny home in Union Point?
Inside Union Point, travel trailers and RVs are tied to travel trailer parks where the code permits them, such as the MHD district6. A park needs at least 3 acres, highway access and a Greene County Health Department certificate of approval, spaces rent by the day or week only, and an occupant may stay no more than 30 days in the same park6.
We found no tiny-home provision and no general rule for camping on a private lot inside the city, so ask City Hall before you plan either4.
What stays with Greene County, and what should you check before buying?
The county's rules apply to unincorporated Greene County, not to land inside Union Point. For land outside city limits, see the Greene County page. Greene County requires a building permit before work starts on unincorporated land15, and a driveway onto a state highway needs a Georgia Department of Transportation permit16.
Before buying inside Union Point, confirm the lot's zoning district, whether public water and sewer reach it, and whether the septic rules fit the lot. We could not confirm floodplain permit rules or private well rules inside the city; ask City Hall4.
Watch-outs
- We could not confirm which office issues general building permits and inspections inside Union Point; call City Hall at 706-486-4102 before you start work4.
- Manufactured and mobile homes need a City Clerk permit before any utility hookups, and a R-1 placement also needs a conditional use permit211.
- Greene County's building permit, zoning and fee rules are for unincorporated land; they do not automatically apply inside city limits17.
Sources
- Union Point Zoning Sec. 4.1 Division of the city into districts (Union Point), quoted and re-checked
- Union Point Zoning Sec. 9.1 Manufactured homes, mobile homes, and travel trailers (Union Point), quoted and re-checked
- Union Point Code Sec. 38-107 New homes served by a septic tank/drain field system (Union Point), quoted and re-checked
- City of Union Point City Hall (unionpointga.org)
- Union Point Zoning Sec. 9.1 Manufactured homes, mobile homes, and travel trailers (Union Point), quoted and re-checked
- Union Point Zoning Sec. 9.1 Manufactured homes, mobile homes, and travel trailers (Union Point), quoted and re-checked
- Union Point Zoning Sec. 8.1 Minimum lot size (Union Point), quoted and re-checked
- Residential and Commercial General Contractors Frequently Asked Questions (Georgia statewide rule), quoted and re-checked
- Union Point Zoning Sec. 4.1 Division of the city into districts (Union Point), quoted and re-checked
- Union Point Zoning Sec. 8.1 Minimum lot size (Union Point), quoted and re-checked
- Union Point Zoning Sec. 7.1 Residential districts (Union Point), quoted and re-checked
- Septic Tank Permits, quoted and re-checked
- Greene County Environmental Health (greenecountyga.gov)
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- Requirements for Obtaining Building Permits, quoted and re-checked
- Inspections Process, quoted and re-checked
- Identifying Property Zoning, quoted and re-checked
Written October 16, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.