Bolthole Index

Turner County, Georgia

Building permits, zoning and land rules in Turner County, Georgia

69Index Score / 100
#46 of 159 in Georgia

Unincorporated Turner County, Georgia requires a building permit before construction, moving, demolition or alteration of a building or structure1. The county zoning ordinance, run by the Building & Zoning Office, sets land use, lot and setback rules by district, but only in unincorporated areas2. Septic permits for every Turner County address, city or not, come from the county health office, Turner Environmental Health3.

At a glance

Building permit
Required before covered work in unincorporated Turner County1
Zoning
Yes for unincorporated Turner County; district rules vary4
Septic
State-regulated; county Health Department permit and inspections required536
RV living
Not as a permanent dwelling; occupancy over 30 days is permanent7
Minimum home size
Varies by district, from 400 to 1,500 square feet8
Owner-builder
Contractor-license exemption only; county permits still apply9
Private well
Use a licensed contractor and ask county health about a permit10

Who to call

Building permits

Turner County Building & Zoning Office

Building permits, inspections, zoning administration, rezoning applications and subdivision applications

(229) 567-4313

turnerzoning@windstream.net

208 E College Ave, Ashburn, GA 31714

Septic permits

Turner Environmental Health

Environmental health, including onsite sewage and well services

229-238-9595

Online permits →

Roads & driveways

Turner County Road Department

County roads and driveway work

(229) 567-4057

vsylvester@windstream.net

388 County Farm Rd, Ashburn, GA 31714

Contact details are copied from each office’s official page and were checked against it on October 9, 2026.

Off-grid gear

Going off-grid in Turner County means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Do you need a building permit in Turner County, Georgia?

Yes. Unincorporated Turner County requires a permit before construction, erection, moving, demolition or alteration of a building or structure; signs require a sign permit1. Georgia's mandatory construction codes apply statewide11. An owner may build the owner's own home without holding a Georgia contractor license, but that licensing exemption does not waive county permits, codes or zoning9. Agricultural buildings not intended for human occupancy receive narrower site-plan requirements, not a blanket permit exemption, and must still show the location and size of ingress and egress12. A county permit becomes void if work does not begin, or authorized work is suspended or abandoned, for six months; the Zoning Administrator may grant written extensions of up to six months1.

Who issues building permits in Turner County, and how do you reach them?

The Turner County Building & Zoning Office administers building permits and zoning in unincorporated Turner County1314. The office is at 208 E College Ave, Ashburn, GA 31714; call (229) 567-4313 or email turnerzoning@windstream.net15. The office inspects buildings for code compliance, but ask for the current application, fees and inspection sequence because a complete schedule is not published16. Most covered applications require two scaled site plans, while listed residential and agricultural uses receive narrower plan requirements; every application still must show the location and size of ingress and egress1718. For county-road access questions, contact the Turner County Road Department at 388 County Farm Rd, Ashburn, GA 31714, by phone at (229) 567-4057 or by email at vsylvester@windstream.net19. Zoning amendment and Special Exception applications carry a $150.00 fee and appeals or variance requests a $100.00 fee, but no complete building-permit fee schedule is published, so ask the office what your permit will cost20. Work within a Georgia state-highway right-of-way requires a state permit21.

Does Turner County have zoning?

Yes. The Turner County zoning ordinance governs land use and development in unincorporated Turner County; it does not establish the rules inside incorporated municipalities4. Minimum lot area depends on district, including 5 acres in A-U, 1 acre in R-R, R-1 and R-1A, and 20,000 square feet in R-2022. Minimum dwelling size depends on district: 800 square feet in A-U and R-R, 1,500 in R-1, 1,200 in R-1A and R-20, and 400 in MHP23. Several districts have a 35-foot maximum building height, while W-L-I and H-I list no maximum; taller commercial or industrial buildings trigger added property-line distance24. Front setbacks vary with road classification, and side and rear setbacks vary by district25. In the A-U district, qualifying farms may have accessory dwellings under acreage, occupancy, sanitation, water, access, code and approval conditions26. Inside Turner County's incorporated cities the county ordinance does not set zoning, so ask the city about its rules; septic permits still come from Turner Environmental Health273. Ask the Building & Zoning Office to confirm the parcel's district and standards15.

How do septic permits work in Turner County?

Georgia regulates onsite sewage systems, and Turner County Environmental Health administers local construction permits and inspections528. Contact Turner Environmental Health at 229-238-9595 and use its environmental-health forms page to start29. The written application must cover the owner, property, design, facility, utilities, bedrooms or flow, and soil information; a permit follows a favorable site inspection and remains valid for no more than 12 months6. Where sewer is unavailable, property intended for human occupancy must have an approved onsite system sized for expected use30. Written final approval is required before an onsite system is backfilled or used31. Only about 12.9% of Turner County soils lack severe limitations for a conventional drain field, so make the site evaluation an early purchase contingency32. Public or community sewer must be used when available within 200 feet of the property line or in an abutting public right-of-way33.

Can you live in an RV or tiny home in Turner County?

An RV may not be used as a permanent dwelling in any unincorporated Turner County zoning district, and occupancy exceeding 30 days counts as permanent7. The ordinance does not fully answer temporary camping, so ask the Building & Zoning Office before placing or occupying a camper15. Turner County has no single tiny-home answer because minimum dwelling size depends on district and ranges from 400 to 1,500 square feet8. A site-built or modular tiny home must satisfy applicable Georgia building codes and local siting rules, while Georgia's tiny-house appendix applies only if locally adopted34. In unincorporated Turner County, mobile homes built before June 15, 1976 are prohibited35. Qualifying A-U farms may add accessory dwellings, but acreage, occupant, sanitation, water, access, code and Zoning Administrator approval conditions apply26.

How do you build a home in Turner County, step by step?

  1. Ask the Turner County Building & Zoning Office to identify the parcel's district and confirm its allowed use, lot size, dwelling size, height and setbacks42282425.
  1. Plan access: every building-permit site plan must show the location and size of ingress and egress, and state-highway right-of-way work needs a state permit1821.
  1. Have Turner Environmental Health evaluate the site and apply for the onsite sewage construction permit before developing a septic-served lot629.
  1. Submit the required building-permit application and site plan before starting covered work; flood-hazard property requires adequate technical information based on Turner County's flood-hazard requirements11736.
  1. If using a private well, hire a licensed contractor and have the contractor contact county health in advance to determine whether a permit is required10.
  1. Obtain written septic approval before backfilling or use, arrange the code-compliance inspections identified by the Building & Zoning Office, and obtain the certificate of occupancy before occupying a newly erected building311637.

What should you check before buying land in Turner County?

Confirm whether the parcel is in unincorporated Turner County, then get its zoning district, allowed use, lot area, dwelling size, height and setbacks from the Building & Zoning Office42282425. Make a satisfactory septic evaluation a purchase contingency because only about 12.9% of county soils lack severe limitations for a conventional drain field32. Verify legal and physical access, including the ingress and egress information needed for a county site plan and any state-highway right-of-way permit1821. Check flood exposure because a building application for identified flood-hazard property must include adequate technical information based on Turner County requirements36. For a private well, ask Turner Environmental Health about site review and any local permit before drilling1029. The effective property-tax rate is about 1.1%, and the median annual property-tax bill is about $1,0773839.

Watch-outs

  • Unincorporated Turner County treats RV occupancy exceeding 30 days as permanent and prohibits RVs as permanent dwellings in every zoning district7.
  • The minimum house size is not countywide: Turner County's district standards range from 400 to 1,500 square feet8.
  • A certificate of occupancy is required before using a newly erected building or a building or premises covered by the ordinance's alteration and use-change rules37.
  • Public or community sewer must be used when it is available within 200 feet of the property line or in an abutting public right-of-way33.

Sources

  1. Turner Zoning Ordinance, quoted and re-checked
  2. Zoning Ordinance for Turner County, Georgia, quoted and re-checked
  3. Georgia Rules and Regulations: On-Site Sewage Management Systems, quoted and re-checked
  4. Turner Zoning Ordinance, quoted and re-checked
  5. Georgia Rules and Regulations: On-Site Sewage Management Systems, quoted and re-checked
  6. Georgia Rules and Regulations: On-Site Sewage Management Systems, quoted and re-checked
  7. Turner Zoning Ordinance, quoted and re-checked
  8. Turner Zoning Ordinance, quoted and re-checked
  9. sos.ga.gov, quoted and re-checked
  10. Water Well Standards (Georgia statewide rule), quoted and re-checked
  11. Mandatory and Permissive State Codes, quoted and re-checked
  12. Turner Zoning Ordinance, quoted and re-checked
  13. Turner Zoning Ordinance (2026 county census)
  14. Zoning Ordinance for Turner County, Georgia (2026 county census)
  15. Turner County Building & Zoning Office (turnercountygeorgia.com)
  16. Building & Zoning Office, quoted and re-checked
  17. Turner Zoning Ordinance, quoted and re-checked
  18. Turner Zoning Ordinance, quoted and re-checked
  19. Turner County Road Department (turnercountygeorgia.com)
  20. Turner Zoning Ordinance, quoted and re-checked
  21. Regulations for Driveway & Encroachment Control Manual (Georgia statewide rule), quoted and re-checked
  22. Turner Zoning Ordinance, quoted and re-checked
  23. Zoning Ordinance — Turner County, Georgia, quoted and re-checked
  24. Turner Zoning Ordinance, quoted and re-checked
  25. Turner Zoning Ordinance, quoted and re-checked
  26. Turner Zoning Ordinance, quoted and re-checked
  27. Turner County Building & Zoning Office, quoted and re-checked
  28. Georgia Rules and Regulations: On-Site Sewage Management Systems (2026 county census)
  29. Turner Environmental Health (southhealthdistrict.com)
  30. Georgia Rules and Regulations: On-Site Sewage Management Systems, quoted and re-checked
  31. Manual for On-Site Sewage Management Systems (Georgia statewide rule), quoted and re-checked
  32. Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
  33. Georgia Rules and Regulations: On-Site Sewage Management Systems, quoted and re-checked
  34. Georgia Tiny House Fact Sheet (Georgia statewide rule), quoted and re-checked
  35. Turner Zoning Ordinance, quoted and re-checked
  36. Turner Zoning Ordinance, quoted and re-checked
  37. Turner Zoning Ordinance, quoted and re-checked
  38. Effective property tax rate: Bolthole Index county data
  39. Median property tax bill: Bolthole Index county data

Written October 9, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Found land here? Start a Property Hunt →

Compared with neighboring counties

Like 5 of its 6 neighbors, Turner County requires a building permit for a home.

RuleTurner CountyCrisp CountyWorth CountyTift CountyWilcox CountyIrwin CountyBen Hill County
Building permitRequiredRequiredRequiredRequiredNot requiredRequiredRequired
County zoningYesYesYesYesNoYesYes
Septic permitsCounty Env. HealthCounty Env. HealthCounty Env. HealthCounty Env. HealthSouth Central Health District Env. HealthSouth Health DistrictCounty Health Dept.

County locator

Turner County in Georgia

69
County map
Turner County highlighted among the Georgia counties · colored by Index score

How Turner County scores

Seclusion62100% ev.
Self-Sufficiency57100% ev.
Admin Boringness44100% ev.
Durability65100% ev.
Property Autonomy56100% ev.
Carry Cost83100% ev.

Evidence strength: 100%. This reports direct-source completeness and fallback use; it is separate from the score and is not a confidence interval. How it works →

$139kTypical home
1.1%Property tax
$3,300Land / acre
48.6"Annual rain
12.2% of yrsSevere drought
12.5 / yr (+11.6)Mid-century 100°F days
16.6 daysMid-century dry spell
2.11" (+2.1%)Mid-century 1-day rain
1.25×Wildfire change factor
100%Forward climate coverage
$1,618Home insurance / yr
0.1% / yrInsurance growth
0.57%Nonrenewal rate
county median (2+ published ZIPs)Insurance basis
18,848People within 30 min
1,443,755People within 2 hr
29,436Radius comparison (15 mi)
31.2People / sq mi
0%Federal land
100%Land at 15% slope or less
12.9%Soils rated "not limited" for septic (strict USDA rating)
23,338 acWorkable land screen
48.5%Wooded land
39.2 tonsBiomass / forest ac
65.7°FAvg temp

Scout Turner County

Camp here before you commitBook a few nights nearby on Hipcamp →Already own land here?Earn money hosting campers — get $100 when you become a Hipcamp host →

Some links are affiliate or referral links — we may earn a commission, at no cost to you.

Property hunt

Find land. Bring the promising ones back.

Search live inventory elsewhere, then cost and vet each candidate here. No copied listings, account, or paid data feed.

Each button opens a current land search for Turner County. Listing sites control their own results and filters.

Analyze a property
Add setup-cost allowances

Use rough quotes or placeholders. Blank fields count as $0.

Working estimate

—land + entered setup costs
Asking $ / acre
—
Setup allowance
—
All-in $ / acre
—

A planning estimate, not a valuation or contractor quote. The USDA benchmark includes farm land and buildings; it is context, not a parcel comp.

Before an offer

Parcel due diligence

0/8 checked

Saved properties and checklist progress stay on this device. Bolthole Index does not receive them.

Cities and towns in Turner County

Inside a city or town, that city usually issues building permits and sets zoning; the county’s rules above cover unincorporated land. Septic, wells and floodplain rules usually stay with the county or state everywhere.

Not yet researched: Town of Rebecca · Sycamore

Answers from the rulebook for Turner County

What the ordinances and state agencies actually say — one answer per question, each quoted from the official source and independently re-checked.

Turner County rules

  • Building permitRequired

    Construction, erection, moving, demolition, or alteration of a building, structure, or sign in unincorporated Turner County.

    • A permit must be issued in advance of the listed activity.
    • No permit may be issued except in conformity with the zoning ordinance.
    • A permit becomes void if work has not begun within six months after issuance or if authorized work is suspended or abandoned for six months after commencement.
    • Written extensions of periods not exceeding six months each may be allowed by the Zoning Administrator.
    • The ordinance states that single-family residential, duplex, and agricultural buildings not intended for human occupancy, and accessory uses, are exceptions to specified site-plan contents; the permit requirement itself is stated separately in § 12-2.

    permit commencement deadline: 6 months (Extensions not exceeding six months each may be allowed in writing by the Zoning Administrator.)

    “A building permit, or a sign permit in case of a sign, issued by the Zoning Administrator is required in advance of the initiation of construction, erection, moving, demolition, or alteration of any building or structure or sign.”
    2 more reviewed findings on this topic
    • Required — Construction, erection, moving, demolition, or alteration of buildings, structures, or signs in the unincorporated area governed by the zoning ordinance.
      “A building permit, or a sign permit in case of a sign, issued by the Zoning Administrator is required in advance of the initiation of construction, erection, moving, demolition, or alteration of any building or structure or sign.”
    • Required — Construction, erection, moving, demolition, or alteration of a building or structure, and signs, in the ordinance jurisdiction.
      “A building permit, or a sign permit in case of a sign, issued by the Zoning Administrator is required in advance of the initiation of construction, erection, moving, demolition, or alteration of any building or structure or sign.”
  • InspectionsLimited

    Building-code inspections performed by the Turner County Building & Zoning Office.

    • The official county page states that the office inspects buildings to ensure they meet current code.
    • The page does not publish a complete inspection schedule or identify all exemptions.
    “The Building & Zoning Office provides the following services to Turner County Residents: ♦ Inspects building to ensure they meet current code.”
  • Certificate of occupancyRequired

    Occupancy or use of newly erected buildings, buildings altered to affect height or required yards, and buildings or premises undergoing a change in type of use in unincorporated Turner County.

    • The certificate must be obtained in advance of occupancy or use.
    • The proposed use must conform to the applicable ordinance provisions.
    • The building as finally constructed must substantially comply with the approved sketch or plan.
    • All required fees must be paid before issuance.
    • An unapproved deviation from the site plan causes the Zoning Administrator not to issue the certificate.
    “A Certificate of Occupancy issued by the Zoning Administrator is required in advance of occupancy or use of: a. A building hereafter erected. b. A building hereafter altered so as to affect height, the side, front, or rear yard. c. Any building or premises where a change in the type of use will occur.”
    One more reviewed finding on this topic
    • Required — Occupancy or use of a newly erected building, a building altered to affect height or required yards, or a building or premises undergoing a change in type of use.
      “A Certificate of Occupancy issued by the Zoning Administrator is required in advance of occupancy or use of: a. A building hereafter erected. b. A building hereafter altered so as to affect height, the side, front, or rear yard. c. Any building or premises where a change in the type of use will occur.”
  • County-wide zoningPresent (with conditions)

    County zoning regulations governing land use and development in the unincorporated area of Turner County, Georgia.

    • The ordinance applies within the unincorporated area of Turner County only.
    • The ordinance creates zoning districts and establishes their boundaries.
    • The ordinance was adopted January 20, 2000 and states that it was last revised August 23, 2000.
    “1-4 Jurisdiction. These regulations shall govern the use of all land and the developments thereof within the unincorporated area of Turner County, Georgia.”
  • Local zoningPresent (with conditions)

    Turner County's locally adopted zoning ordinance and zoning administration for unincorporated Turner County.

    • The county Building & Zoning Office administers zoning ordinances and processes zoning and rezoning applications.
    • The ordinance's stated jurisdiction is the unincorporated area of Turner County; this evidence does not establish zoning status inside incorporated municipalities.
    • The ordinance was adopted January 20, 2000 and states that it was last revised August 23, 2000.
    “The Building & Zoning Office provides the following services to Turner County Residents: [...] Administer zoning ordinances [...] Process zoning & re-zoning applications”
    One more reviewed finding on this topic
    • Present (with conditions) — Land use and development in unincorporated Turner County under the Turner County Zoning Ordinance.
      “These regulations shall govern the use of all land and the developments thereof within the unincorporated area of Turner County, Georgia.”
  • Minimum dwelling sizeSpecified

    Dwelling units in county zoning districts.

    • The ordinance development-standard table provides district-specific minimum gross floor areas.

    A-U minimum gross floor area: 800 square feet · R-R minimum gross floor area: 800 square feet · R-1 minimum gross floor area: 1500 square feet · R-1A minimum gross floor area: 1200 square feet · R-20 minimum gross floor area: 1200 square feet · MHP minimum gross floor area: 400 square feet

    “Minimum Gross Floor Area Per Dwelling Unit (Sq.Ft.) 800 800 1,500 1,200 1,200 400”
  • Minimum lot sizeSpecified

    Dwelling-unit lots in county zoning districts.

    • Minimum lot area varies by zoning district.
    • R-1 and R-1A require one acre; R-20 requires 20,000 square feet; MHP has a gross minimum lot size of ten acres for the park, subject to Section 9-5 individual-unit rules.

    A-U minimum lot area: 5 acres · R-R minimum lot area: 1 acre · R-1 minimum lot area: 1 acre · R-1A minimum lot area: 1 acre · R-20 minimum lot area: 20000 square feet · MHP gross minimum lot size: 10 acres (See Section 9-5 for individual units)

    “Minimum Lot Area For Dwelling Units 5 Ac. 1 Ac. 1 Ac. 1 Ac. 20,000sf”
  • SetbacksSpecified

    Buildings and structures in county zoning districts.

    • Front setbacks are measured from the centerline of the right-of-way and vary by street classification.
    • Side and rear setbacks vary by district.
    • The ordinance provides a permitted modification where adjoining lots have nonconforming setbacks.

    front setback on local streets: 70 feet from right-of-way centerline (plus one-half any amount by which right-of-way width exceeds 60 feet) · front setback on collector streets: 80 feet from right-of-way centerline (plus one-half any amount by which right-of-way width exceeds 80 feet) · front setback on principal/minor arterials: 90 feet from right-of-way centerline (plus one-half any amount by which right-of-way width exceeds 100 feet)

    “Minimum Front Yard Setback from the Centerline of R/W (Feet) Principal & Minor Arterials Collector Streets Local Streets”
  • Building heightDistrict specific (with conditions)

    Building height in the residential, commercial, and industrial zoning districts listed in the Turner County Zoning Ordinance.

    • Residential districts A-U, R-R, R1, R1A, R-20, and MHP each show a 35-foot maximum height.
    • Commercial/industrial table entries show 35 feet for R-C, G-B, and C-A, and 'None' for W-L-I and H-I.
    • For the commercial/industrial table, buildings over 35 feet trigger increased property-line distance: one foot for every two feet, or part of two feet, above 35 feet.
    • The ordinance applies only in unincorporated Turner County.

    maximum height in residential districts: 35 feet (District-specific table; A-U, R-R, R1, R1A, R-20, and MHP.) · maximum height in commercial/industrial districts: 35 or none feet (R-C, G-B, and C-A show 35 feet; W-L-I and H-I show None.)

    “Maximum Height (Feet) 35* 35* None* None* 35*”
    One more reviewed finding on this topic
    • District specific (with conditions) — Buildings and structures in the zoning districts shown on the Official Zoning Maps of Turner County, Georgia.
      “Within the various zoning districts as indicated on the "Official Zoning Maps of Turner County, Georgia", no building or structure, excluding all signs, shall be constructed or erected except as indicated in the following schedule:”
  • Living in an RVLimited

    Use of recreational vehicles as dwellings in unincorporated Turner County.

    • Recreational vehicles may not be used as permanent dwellings in any zoning district.
    • Occupancy exceeding thirty days is considered permanent.

    permanent-occupancy threshold: > 30 days

    “Recreational vehicles shall not be utilized as a permanent dwelling in any zoning district. Occupancy exceeding 30 days shall be considered permanent.”
  • Tiny homesLimited

    Tiny homes used or intended for use as dwelling units in unincorporated Turner County, Georgia.

    • The ordinance governs land use and development within the unincorporated area of Turner County.
    • A tiny home treated as a recreational vehicle may not be used as a permanent dwelling in any zoning district; occupancy exceeding 30 days is considered permanent.
    • Dwelling units must satisfy the district-specific minimum gross floor-area standards: 800 square feet in A-U, 800 square feet in R-R, 1,500 square feet in R-1, 1,200 square feet in R-1A, 1,200 square feet in R-20, and 400 square feet in MHP.
    • The ordinance's permitted-use schedule applies by zoning district; uses not designated by X or SE are not allowed, and SE uses require special review and approval by the County Commission.
    • Other applicable building, septic, health, and zoning requirements may apply.

    minimum gross floor area per dwelling unit — A-U: 800 sq ft · minimum gross floor area per dwelling unit — R-R: 800 sq ft · minimum gross floor area per dwelling unit — R-1: 1500 sq ft · minimum gross floor area per dwelling unit — R-1A: 1200 sq ft · minimum gross floor area per dwelling unit — R-20: 1200 sq ft · minimum gross floor area per dwelling unit — MHP: 400 sq ft · permanent recreational-vehicle occupancy threshold: > 30 days (Occupancy exceeding 30 days is considered permanent.)

    “Recreational vehicles shall not be utilized as a permanent dwelling in any zoning district. Occupancy exceeding 30 days shall be considered permanent.”
  • Manufactured homesLimited

    Manufactured-home occupancy and manufactured-home parks in unincorporated Turner County.

    • Mobile homes constructed before June 15, 1976 are not allowed in the unincorporated area.
    • Only manufactured homes constructed to federal manufactured-housing standards are permitted.
    • Manufactured-home parks require Planning Commission review and approval before building permits.
    • Park occupancy may not exceed the number of homes authorized in the approved site plan.

    pre-1976 mobile-home cutoff: 1976-06-15

    “No mobile homes, defined as units constructed prior to June 15, 1976 shall be allowed within the unincorporated area of Turner County.”
  • Accessory dwellingsAllowed (with conditions)

    Accessory dwellings in the A-U Agricultural Use district in unincorporated Turner County.

    • One accessory dwelling is allowed for farms between 20 and 50 acres.
    • For farms over 50 acres up to 200 acres, one accessory dwelling per 50 acres is allowed.
    • For farms over 200 acres, one accessory dwelling per additional 100 acres is allowed.
    • Additional conditions include family or qualifying agricultural-employee occupancy, at least 43,560 square feet per non-principal use, health-authority sanitation approval, domestic water, access, utilities, local construction codes, and Zoning Administrator approval before permits.

    farm acreage threshold: >= 20 acres (one accessory dwelling for farms between 20 and 50 acres) · farm acreage upper threshold: 50 acres (one accessory dwelling per 50 acres over 50 acres up to 200 acres)

    “In A-U zones within the unincorporated area of Turner County, there shall be permitted, as a matter of right, to any owner of property one primary dwelling and for farms between 20 and 50 acres, one (1) accessory dwelling.”
  • Who permits septicCounty

    Turner County Board of Health administration of onsite sewage permits and inspections.

    • The state rule assigns the construction permit and inspection functions to the County Health Department or County Board of Health.
    “No person may begin the physical development of a lot or structure where an on-site sewage management system will be utilized, nor install an on-site sewage management system or component thereof, without having first obtained from the County Health Department a construction permit for the installation of an onsite sewage management system..”
  • Septic permitRequired

    Installation of an onsite sewage management system in Turner County.

    • The application is made in writing on County Board of Health forms.
    • The application must include owner, property, design, facility, utility, bedroom or flow, soil, signature, and any necessary suitability information.
    • The County Board of Health should approve or disapprove a complete application within twenty days.
    • The permit is issued only after a favorable site inspection and is valid for not more than twelve months.

    application decision period: 20 days · permit validity: <= 12 months

    “On-site sewage management construction permits shall remain valid for not more than twelve months from the date of issue.”
  • Agricultural exemptionConditional

    Building-permit site-plan submission requirements for agricultural buildings not intended for human occupancy.

    • The zoning ordinance excludes such agricultural buildings from specified site-plan documentation requirements, but does not exempt them from the building-permit requirement itself.
    • The ingress/egress requirement remains applicable under the stated exception.
    “All applications for building permits, except single family residential, duplexes and agricultural buildings not intended for human occupancy, and their accessory uses shall be accompanied by two (2) site plans drawn to scale”
  • Driveway accessLimited

    Ingress and egress information for building-permit site plans in unincorporated Turner County.

    • Location and size of ingress/egress are required on the site plan before the site plan is considered and permits are approved.
    • The ordinance does not, in the located passage, establish a separate driveway-construction permit or driveway-design standard.
    • The ingress/egress item remains required for the listed single-family residential, duplex, agricultural, and accessory-use exceptions.

    required site-plan item: location and size of ingress/egress

    “The following is required on the site plan before the site plan is considered by the Zoning Administrator and any permits are approved (single family residential, duplexes and agricultural buildings, and their accessory uses are excluded from the following items except number 3 below): 1. Topography (MSL) existing and proposed 2. Drainage plans 3. Location and size of ingress/egress 4. Water and sewer mains and services, both existing and proposed 5. Water and sewer services as well as fire hydrants in the lot and the specific meter size and location.”
    One more reviewed finding on this topic
    • Limited — Ingress and egress shown on a building-permit application site plan under the Turner County zoning ordinance.
      “The following is required on the site plan before the site plan is considered by the Zoning Administrator and any permits are approved (single family residential, duplexes and agricultural buildings, and their accessory uses are excluded from the following items except number 3 below): 1. Topography (MSL) existing and proposed 2. Drainage plans 3. Location and size of ingress/egress”
  • Building in a floodplainRequired

    Building-permit applications for properties identified as having flood-hazard potential in unincorporated Turner County.

    • The requirement applies when the property has been duly identified as having flood-hazard potential.
    • The application must provide adequate technical information.
    • The information must be based on Turner County flood-hazard management requirements.
    • The ordinance does not state in the located passage that all floodplain development is prohibited.

    required submission: adequate technical information (Applies to properties duly identified as having flood-hazard potential.)

    “Any application for a building permit which proposes to develop properties which have been duly identified as having a flood hazard potential must provide adequate technical information based on the flood hazard management requirements of Turner County, Georgia.”
    One more reviewed finding on this topic
    • Required — Building-permit applications for properties duly identified as having flood-hazard potential.
      “Any application for a building permit which proposes to develop properties which have been duly identified as having a flood hazard potential must provide adequate technical information based on the flood hazard management requirements of Turner County, Georgia.”
  • Permit feesPublished (with conditions)

    Published county fees for zoning-related applications and appeals under Turner County's zoning ordinance governing the unincorporated area.

    • Applications for amendments to the zoning text, zoning maps, or Special Exception approval must be submitted to the Zoning Administrator and include a $150.00 fee payable to the county.
    • Appeals, variance requests, and requests for extension of non-conforming residential uses require a $100.00 fee to defray expenses.
    • No zoning-change application affecting the same parcel or part thereof may be accepted until at least twelve months after the Turner County Commission defeated a rezoning request for that parcel.
    • The ordinance excerpt does not provide a comprehensive fee schedule for every building or sign permit type.

    zoning amendment application fee: 150 USD (Applies to applications for amendment of the zoning regulations, zoning maps, or Special Exception approval.) · appeal or variance application fee: 100 USD (Applies to appeals, variance requests, and requests for extension of non-conforming residential uses.) · waiting period after defeated rezoning request: >= 12 months (Same parcel or part thereof.)

    “Applications for amendment shall be submitted to the Zoning Administrator and shall include a fee of $150.00 payable to the county, to defray expenses.”
  • Permit processPublished (with conditions)

    Building permit application and site-plan process in unincorporated Turner County.

    • Applications generally require two scaled site plans showing lot dimensions, lot size and location, dwelling-unit count, setbacks, easements, and other information needed to determine compliance.
    • Single-family residential, duplex, and agricultural buildings not intended for human occupancy, and accessory uses, are exempt from the listed site-plan items except ingress/egress location and size.
    • Site plans for those exempted uses need not be drawn to scale but must accurately state lot and proposed-building dimensions.
    • Flood-hazard properties require adequate technical information based on Turner County flood-hazard management requirements.
    • Applicants must certify that the lot is a lot of record, subject to the stated pre-adoption or governmental-taking exception.
    • Permits expire under the six-month commencement or abandonment rules, subject to written extensions not exceeding six months each.

    site plans for covered applications: 2 plans (Specified residential and agricultural categories have listed site-plan exemptions.) · permit commencement or abandonment period: 6 months (Written extensions not exceeding six months each may be allowed.)

    “All applications for building permits, except single family residential, duplexes and agricultural buildings not intended for human occupancy, and their accessory uses shall be accompanied by two (2) site plans drawn to scale”
    One more reviewed finding on this topic
    • Published (with conditions) — Applications for building permits under the Turner County zoning ordinance.
      “All applications for building permits, except single family residential, duplexes and agricultural buildings not intended for human occupancy, and their accessory uses shall be accompanied by two (2) site plans drawn to scale showing the actual dimensions of the lot to be built upon, the size and location of the lot, the number of dwelling units the building is designed to accommodate, the setback lines of the building on the "permit lot", the various easements on the lot and such other information as may be essential for determining whether the provisions of this ordinance are being observed.”

Georgia rules that apply here

  • Owner-builder exemptionAvailable (with conditions)

    An owner building the owner's own home in Georgia, as an exemption from the state residential/general contractor licensing requirement.

    • The exemption concerns contractor licensure and does not waive local building codes, permits, inspections, zoning, or other requirements administered by the authority having jurisdiction.
    • The Georgia Secretary of State directs owners to check with the applicable local authority for all required local building codes and regulations.
    “Georgia does not require that you hold a license to build your own home; [...] comply with all required local building codes and regulations.”
    One more reviewed finding on this topic
    • Available (with conditions) — An owner building the owner's own home in Georgia, including Turner County.
      “Georgia does not require that you hold a license to build your own home; however, check with your local authority having jurisdiction to ensure you comply with all required local building codes and regulations.”
  • Building code adoptedAdopted

    The Georgia mandatory state minimum construction codes, including the International Building Code, International Residential Code for One- and Two-Family Dwellings, International Fire Code, International Plumbing Code, International Mechanical Code, International Fuel Gas Code, National Electrical Code, International Energy Conservation Code, and International Swimming Pool and Spa Code, apply to construction statewide.

    • Any structure built in Georgia must comply with the mandatory codes whether or not the local government chooses to locally enforce them.
    • Local governments are not required to adopt the mandatory codes, but must adopt administrative procedures to enforce them under O.C.G.A. Section 8-2-25(a).
    • A local government may choose which mandatory codes it will locally enforce.
    • Local amendments cannot be less stringent than the state minimum code; must be based on local climatic, geologic, topographic, or public safety factors; must identify the need for more stringent requirements in legislative findings; and must be submitted to DCA 60 days before proposed adoption.
    • DCA has 60 days after submission to make a recommendation. If DCA recommends against adoption, the local governing body must specifically reject that recommendation before adopting and enforcing the amendment. If DCA does not respond within 60 days, the local government may adopt the amendment. Adopted local amendments must be filed with DCA.
    “As noted above, the building, one and two family dwelling residential, fire, plumbing, mechanical, gas, electrical, energy, and swimming pool codes are mandatory codes, meaning that under Georgia law, any structure built in Georgia must comply with these codes, whether or not the local government chooses to locally enforce these codes. In addition, since Georgia law gives the enumerated codes statewide applicability, it is not required that local governments have to adopt the mandatory codes.”
    4 more reviewed findings on this topic
    • Adopted — Construction in Turner County subject to Georgia mandatory state minimum codes.
      “The mandatory codes are applicable to all construction whether or not they are locally enforced and the permissive codes are only applicable if a local government chooses to adopt and enforce one or more of these codes.”
    • Partial — Georgia permissive state construction codes, including the Disaster Resilient Building Code IBC Appendix, Disaster Resilient Building Code IRC Appendix, International Property Maintenance Code, International Existing Building Code, and National Green Building Standard.
      “The remaining codes are referred to as permissive codes. Unlike the mandatory codes, in order for a local government to enforce one or more of these permissive codes, that code or codes must be adopted, either by ordinance or resolution, by the local jurisdiction. A copy of the ordinance or resolution adopted must be forwarded to DCA (O.C.G.A. Section 8-2-25 (b)).”
    • Partial — Georgia construction, including residential construction, under the statewide State Minimum Standard Codes framework.
      “The mandatory codes are applicable to all construction whether or not they are locally enforced and the permissive codes are only applicable if a local government chooses to adopt and enforce one or more of these codes.”
    • Adopted — Georgia construction, including residential construction in unincorporated county areas.
      “The mandatory codes are applicable to all construction whether or not they are locally enforced”
  • Zoning districtsPartial

    Georgia zoning authority and local zoning-district systems.

    • The state source establishes local-government authority to use zoning but does not publish the zoning districts for any particular parcel, county, or municipality.
    • The applicable zoning ordinance and district must be identified from the parcel's county or municipality.
    “It contains the Zoning Procedures Law which gives local governments the authority to use zoning to manage development activities.”
    One more reviewed finding on this topic
    • Partial — Zoning regulation and zoning districts used to manage development activities in Georgia.
      “It contains the Zoning Procedures Law which gives local governments the authority to use zoning to manage development activities.”
  • Septic inspectionRequired

    Onsite sewage management systems before backfilling or use in Georgia.

    • The County Board of Health must conduct the final inspection and issue written approval before the system is backfilled or used.
    • Inspection also applies to repairs, replacements, and additions to existing systems.
    “until a final inspection has been made”
  • Off-grid sanitationLimited

    Off-grid sanitation using privies, approved alternative onsite sewage systems, or certified composting toilets in Georgia.

    • Privies must meet the Manual's minimum design and construction criteria.
    • Alternative onsite sewage systems must be approved by the Department and meet the Manual's minimum design and construction criteria.
    • Composting toilets must be certified by the National Sanitation Foundation to current Standard 41 or certified by the manufacturer as meeting a nationally recognized standard.
    • Applicable County Board of Health permits and inspections remain required where the system is an onsite sewage management system.
    “composting toilets may be considered”
    One more reviewed finding on this topic
    • Limited — Off-grid sanitation where public or community sewage treatment is unavailable.
      “If public or community sewage treatment systems are not available, the owner of a building, residence, or property that is designed or intended for human occupancy or congregation shall provide an approved on-site sewage management system sufficient for the number of persons normally expected to use or frequent the building, residence or other property for two hours or more.”
  • Well permitLimited

    Domestic and other water-well construction in Georgia.

    • All water wells must comply with the Water Well Standards Act.
    • A water-well contractor must contact the local county health department in advance for site review.
    • Certain county health departments require a well-construction permit before construction.
    • Agricultural irrigation wells require a Letter of Concurrence before drilling begins.
    • Well Construction Data must be sent to the owner and local health department within 30 days after completion.

    well construction data submission deadline: <= 30 days after completion

    “certain county health departments require well construction permits prior to well construction”
  • Mandatory utility hookupSewer (with conditions)

    Buildings, residences, and properties designed or intended for human occupancy or congregation in Georgia when a public or community sewage treatment system is available.

    • Connection is required when a public or community sewage treatment system is available within 200 feet of the property line or in a public right-of-way abutting the property.
    • If an existing onsite sewage system fails, immediate connection to a public or community sewerage system is required if such a system is available.
    • If a public or community sewage treatment system is to be constructed, an existing public or community sewer is to be extended to serve a lot, or an approved onsite sewage management system is to be used, the building sewer must be installed to ensure gravity flow at a self-cleaning velocity throughout.
    • A residential onsite sewage system of less than 2,000 gallons per day that is failing may be exempted from connecting to sewer if repair or replacement meets the Manual for Onsite Sewage Management Systems criteria and the County Board of Health determines that sufficient area and usable soils exist.

    sewer availability distance: <= 200 feet from property line (A public right-of-way abutting the property is an alternative availability condition.) · failing residential onsite sewage system flow: < 2000 gallons per day (The County Board of Health must determine sufficient area and usable soils, and repair or replacement must meet the Manual for Onsite Sewage Management Systems criteria.)

    “Connection shall be made to a public or community sewage treatment system if such system is available within two hundred feet (200') of the property line, or available in a public right-of-way abutting the property. [...] If an existing on-site sewage system fails, immediate connection shall be made to a public or community sewerage system if such a system is available. (b) A residential on-site sewage system of less than two thousand gallons per day that is failing may be exempted from connecting to sewer if the repair or replacement of the system will meet the criteria set forth in the Manual for Onsite Sewage Management Systems and has sufficient area and usable soils as determined by the County Board of Health.”
    One more reviewed finding on this topic
    • Conditional — Properties using onsite sewage systems where public or community sewer is available.
      “Connection shall be made to a public or community sewage treatment system if such system is available within two hundred feet (200') of the property line, or available in a public right-of-way abutting the property.”
  • Subdividing landRegulated (with conditions)

    Statewide Georgia legal framework for subdivision creation and enforcement of properly adopted county subdivision ordinances.

    • County subdivision ordinances and regulations remain enforceable against the developer or owner seeking to create the subdivision.
    • Local subdivision ordinances may not alter the superior-court clerk’s mandatory recording duties or add recording requirements beyond those prescribed by general law.
    • The source is an Attorney General opinion addressing the recording statute and local subdivision regulation.
    “All of the properly adopted ordinances and regulations of a county remain fully enforceable against the developer or owner seeking to create the subdivision.”
    2 more reviewed findings on this topic
    • Regulated (with conditions) — Creation and recording of subdivisions and subdivision plats in Georgia, subject to applicable state recording law and properly adopted local subdivision ordinances.
      “All of the properly adopted ordinances and regulations of a county remain fully enforceable against the developer or owner seeking to create the subdivision.”
    • Limited — Creation and recording of subdivisions and subdivision plats in Georgia, subject to applicable county and municipal ordinances and statutory plat-recording rules.
      “All of the properly adopted ordinances and regulations of a county remain fully enforceable against the developer or owner seeking to create the subdivision.”
  • Short-term rentalsLimited

    Property-management services for Georgia properties available for less than 90 days' occupancy by guests or occupants; this is a conditional exemption from Chapter 40 of Title 43 and does not eliminate applicable zoning, tax, licensing, permit, or other local requirements.

    • The property manager must enter into a written agreement with the owner specifying all management terms and conditions, reporting of income and expenses, and remitting income to the owner.
    • The management agreement must not allow the property manager to rent or lease the property, and the guest or occupant agreement must not be a lease or rental agreement.
    • Applicable zoning laws must not prohibit short-term occupancy uses of the property.
    • The guest's or occupant's occupancy must be for less than 90 days.
    • No deposit may exceed the cost of the rental required for the minimum rental period.
    • The guest or occupant must pay required state or local sales taxes or excise taxes on rooms, lodgings, and accommodations, and the property manager must have required state or local business licenses or permits.
    • The property manager must have authority to specify the rooms or units the guest or occupant will occupy.
    • No extra charge may be made for basic utilities.
    • Notice is not required for a guest or occupant to terminate occupancy of the room or unit, except as provided under Article 1 of Chapter 21 of Title 43.
    • The room or unit must not be the guest's or occupant's permanent residence.
    • The cited enactment concerns exemption from real-estate-broker licensing requirements; it is not a statewide authorization overriding local short-term-rental ordinances or private restrictions.

    maximum occupancy duration: < 90 days (The condition requires occupancy for less than 90 days.)

    “(a) Except as otherwise provided, this chapter shall not apply to: [...] (11) Any person who provides property management services on properties available for less than 90 days' occupancy by guests or occupants and meets all of the following conditions:”
  • county zoning authorityGeneral

    Georgia counties exercising zoning power over unincorporated areas within their territorial boundaries.

    • The Zoning Procedures Law confirms local-government zoning authority generally; it does not require a local government to exercise zoning power.
    • For counties, territorial boundaries are the unincorporated areas and certain areas defined in O.C.G.A. § 36-70-2(5.1).
    • County zoning ordinances and zoning decisions remain subject to the statutory minimum procedures, including public-hearing and notice requirements.
    • The statute defines zoning to include districting property for various uses, prohibiting other uses within zones or districts, and regulating development and improvement of real estate within those zones or districts.
    “While recognizing and confirming the authority of local governments to exercise zoning power within their respective territorial boundaries [...] “Local government” means any county or municipality”
  • county building authorityGeneral

    Georgia counties administering and enforcing state minimum construction codes, including residential construction in unincorporated areas.

    • Local governments must adopt reasonable administrative provisions for administering and enforcing state minimum standard codes.
    • Those administrative powers include inspecting buildings, employing inspectors and other personnel, requiring permits and establishing permit charges, and contracting with other local governments for code enforcement.
    • A local government may choose which mandatory state codes it locally enforces, but any mandatory code locally enforced must use the latest edition and DCA amendments.
    • Local amendments may not be less stringent than the state minimum code, must be based on local climatic, geologic, topographic, or public-safety factors, require legislative findings identifying the need, and must be submitted to DCA 60 days before proposed adoption.
    • Local amendments must be filed with DCA after adoption.
    “These powers include: [...] Requiring permits and to establishment charges for said permits; and Contracting with other local governments for code enforcement.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission — ask the county directly.

  • Lot coverage — Lot-coverage limits under the Turner County zoning ordinance.
  • Camping on your land — Temporary camping on private land in unincorporated Turner County.

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Water rights & wells in Turner County

Whether a new home can legally get its own water here — the sub-state groundwater regime, from Georgia’s water agency.

Over-appropriated / declining

The aquifer here is over-appropriated and declining. A domestic well is usually still permit-exempt, but long-term supply is a genuine risk.

Household wellExempt — no permit or water right

O.C.G.A. 12-5-96: no groundwater permit below 100,000 gpd. Household wells (a few hundred gpd) are exempt statewide; local well-construction rules still apply.

Limit: withdrawal permit only at/above 100,000 gpd

Georgia Code 12-5-96 (Ground-Water Use Act) ↗
  • Lower Flint / Dougherty Plain Agricultural Withdrawal Suspension (Sub-area 4)partial of county

    In the karst Dougherty Plain (lower Flint River Basin), surface streams and Upper Floridan groundwater are tightly connected, so EPD suspended new AGRICULTURAL withdrawal permits (surface + Floridan irrigation >=100,000 gpd) — a 1999 moratorium plus the 2012 Sub-area 4 suspension, partially reopened April 2025. Individual domestic wells are below the threshold and unaffected.

    Georgia EPD — Agricultural Water Withdrawal Program ↗

Regulated-riparian state (large uses permitted). Groundwater rules change and basin boundaries follow the aquifer, not the county line — confirm current well and appropriation rules with the Georgia state water agency before you buy or drill.Groundwater governance as of Jul 2026, cited to each administering agency.

Living off-grid in Turner County, Georgia

Is Turner County a good place to live off-grid or homestead?

Turner County scores 69/100 on the Bolthole Index, a strong county profile. Its strengths: manageable long-term carry cost and mixed durability signals.

Do you need a building permit in Turner County, Georgia?

Turner County generally requires a residential building permit, and it enforces county zoning. Onsite septic is permitted by Turner County Environmental Health (Georgia DPH South Health District). Owner-builders may act as their own contractor to build their home. These answers are quoted from official sources and independently re-checked. Rules change and cities within the county differ — always confirm with the county before you buy or build.

Can you live in an RV or tiny home on your land in Turner County?

Living in an RV on your own land in Turner County is limited to specific cases: Use of recreational vehicles as dwellings in unincorporated Turner County. Recreational vehicles may not be used as permanent dwellings in any zoning district. Occupancy exceeding thirty days is considered permanent. A tiny home is limited to specific cases. Confirm with the county before relying on it.

How much does land cost in Turner County, Georgia?

Land in Turner County runs about $3,300 per acre, based on the latest county data.

What is the water situation in Turner County?

Turner County gets about 48.6" of rain a year, with severe drought in roughly 12.2% of years. On water rights, Turner County lies in the Lower Flint / Dougherty Plain Agricultural Withdrawal Suspension (Sub-area 4) — In the karst Dougherty Plain (lower Flint River Basin), surface streams and Upper Floridan groundwater are tightly connected, so EPD suspended new AGRICULTURAL withdrawal permits (surface + Floridan irrigation >=100,000 gpd) — a 1999 moratorium plus the 2012 Sub-area 4 suspension, partially reopened April 2025. Individual domestic wells are below the threshold and unaffected..

How remote is Turner County?

A representative private-land location has about 18,848 people within a 30-minute drive and 1,443,755 within two hours. The road-network catchments count population across county lines and clusters of smaller cities; straight-line radius values remain available as a comparison.

How Turner compares in Georgia

Compare side-by-side →See all 159 Georgia counties ranked →