Unincorporated Turner County, Georgia requires a building permit before construction, moving, demolition or alteration of a building or structure1. The county zoning ordinance, run by the Building & Zoning Office, sets land use, lot and setback rules by district, but only in unincorporated areas2. Septic permits for every Turner County address, city or not, come from the county health office, Turner Environmental Health3.
At a glance
- Building permit
- Required before covered work in unincorporated Turner County1
- Zoning
- Yes for unincorporated Turner County; district rules vary4
- Septic
- State-regulated; county Health Department permit and inspections required536
- RV living
- Not as a permanent dwelling; occupancy over 30 days is permanent7
- Minimum home size
- Varies by district, from 400 to 1,500 square feet8
- Owner-builder
- Contractor-license exemption only; county permits still apply9
- Private well
- Use a licensed contractor and ask county health about a permit10
Who to call
Building permits
Turner County Building & Zoning Office
Building permits, inspections, zoning administration, rezoning applications and subdivision applications
208 E College Ave, Ashburn, GA 31714
Septic permits
Environmental health, including onsite sewage and well services
Roads & driveways
County roads and driveway work
388 County Farm Rd, Ashburn, GA 31714
Contact details are copied from each office’s official page and were checked against it on October 9, 2026.
Off-grid gear
Going off-grid in Turner County means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Turner County, Georgia?
Yes. Unincorporated Turner County requires a permit before construction, erection, moving, demolition or alteration of a building or structure; signs require a sign permit1. Georgia's mandatory construction codes apply statewide11. An owner may build the owner's own home without holding a Georgia contractor license, but that licensing exemption does not waive county permits, codes or zoning9. Agricultural buildings not intended for human occupancy receive narrower site-plan requirements, not a blanket permit exemption, and must still show the location and size of ingress and egress12. A county permit becomes void if work does not begin, or authorized work is suspended or abandoned, for six months; the Zoning Administrator may grant written extensions of up to six months1.
Who issues building permits in Turner County, and how do you reach them?
The Turner County Building & Zoning Office administers building permits and zoning in unincorporated Turner County1314. The office is at 208 E College Ave, Ashburn, GA 31714; call (229) 567-4313 or email turnerzoning@windstream.net15. The office inspects buildings for code compliance, but ask for the current application, fees and inspection sequence because a complete schedule is not published16. Most covered applications require two scaled site plans, while listed residential and agricultural uses receive narrower plan requirements; every application still must show the location and size of ingress and egress1718. For county-road access questions, contact the Turner County Road Department at 388 County Farm Rd, Ashburn, GA 31714, by phone at (229) 567-4057 or by email at vsylvester@windstream.net19. Zoning amendment and Special Exception applications carry a $150.00 fee and appeals or variance requests a $100.00 fee, but no complete building-permit fee schedule is published, so ask the office what your permit will cost20. Work within a Georgia state-highway right-of-way requires a state permit21.
Does Turner County have zoning?
Yes. The Turner County zoning ordinance governs land use and development in unincorporated Turner County; it does not establish the rules inside incorporated municipalities4. Minimum lot area depends on district, including 5 acres in A-U, 1 acre in R-R, R-1 and R-1A, and 20,000 square feet in R-2022. Minimum dwelling size depends on district: 800 square feet in A-U and R-R, 1,500 in R-1, 1,200 in R-1A and R-20, and 400 in MHP23. Several districts have a 35-foot maximum building height, while W-L-I and H-I list no maximum; taller commercial or industrial buildings trigger added property-line distance24. Front setbacks vary with road classification, and side and rear setbacks vary by district25. In the A-U district, qualifying farms may have accessory dwellings under acreage, occupancy, sanitation, water, access, code and approval conditions26. Inside Turner County's incorporated cities the county ordinance does not set zoning, so ask the city about its rules; septic permits still come from Turner Environmental Health273. Ask the Building & Zoning Office to confirm the parcel's district and standards15.
How do septic permits work in Turner County?
Georgia regulates onsite sewage systems, and Turner County Environmental Health administers local construction permits and inspections528. Contact Turner Environmental Health at 229-238-9595 and use its environmental-health forms page to start29. The written application must cover the owner, property, design, facility, utilities, bedrooms or flow, and soil information; a permit follows a favorable site inspection and remains valid for no more than 12 months6. Where sewer is unavailable, property intended for human occupancy must have an approved onsite system sized for expected use30. Written final approval is required before an onsite system is backfilled or used31. Only about 12.9% of Turner County soils lack severe limitations for a conventional drain field, so make the site evaluation an early purchase contingency32. Public or community sewer must be used when available within 200 feet of the property line or in an abutting public right-of-way33.
Can you live in an RV or tiny home in Turner County?
An RV may not be used as a permanent dwelling in any unincorporated Turner County zoning district, and occupancy exceeding 30 days counts as permanent7. The ordinance does not fully answer temporary camping, so ask the Building & Zoning Office before placing or occupying a camper15. Turner County has no single tiny-home answer because minimum dwelling size depends on district and ranges from 400 to 1,500 square feet8. A site-built or modular tiny home must satisfy applicable Georgia building codes and local siting rules, while Georgia's tiny-house appendix applies only if locally adopted34. In unincorporated Turner County, mobile homes built before June 15, 1976 are prohibited35. Qualifying A-U farms may add accessory dwellings, but acreage, occupant, sanitation, water, access, code and Zoning Administrator approval conditions apply26.
How do you build a home in Turner County, step by step?
- Ask the Turner County Building & Zoning Office to identify the parcel's district and confirm its allowed use, lot size, dwelling size, height and setbacks42282425.
- Plan access: every building-permit site plan must show the location and size of ingress and egress, and state-highway right-of-way work needs a state permit1821.
- Have Turner Environmental Health evaluate the site and apply for the onsite sewage construction permit before developing a septic-served lot629.
- Submit the required building-permit application and site plan before starting covered work; flood-hazard property requires adequate technical information based on Turner County's flood-hazard requirements11736.
- If using a private well, hire a licensed contractor and have the contractor contact county health in advance to determine whether a permit is required10.
What should you check before buying land in Turner County?
Confirm whether the parcel is in unincorporated Turner County, then get its zoning district, allowed use, lot area, dwelling size, height and setbacks from the Building & Zoning Office42282425. Make a satisfactory septic evaluation a purchase contingency because only about 12.9% of county soils lack severe limitations for a conventional drain field32. Verify legal and physical access, including the ingress and egress information needed for a county site plan and any state-highway right-of-way permit1821. Check flood exposure because a building application for identified flood-hazard property must include adequate technical information based on Turner County requirements36. For a private well, ask Turner Environmental Health about site review and any local permit before drilling1029. The effective property-tax rate is about 1.1%, and the median annual property-tax bill is about $1,0773839.
Watch-outs
- Unincorporated Turner County treats RV occupancy exceeding 30 days as permanent and prohibits RVs as permanent dwellings in every zoning district7.
- The minimum house size is not countywide: Turner County's district standards range from 400 to 1,500 square feet8.
- A certificate of occupancy is required before using a newly erected building or a building or premises covered by the ordinance's alteration and use-change rules37.
- Public or community sewer must be used when it is available within 200 feet of the property line or in an abutting public right-of-way33.
Sources
- Turner Zoning Ordinance, quoted and re-checked
- Zoning Ordinance for Turner County, Georgia, quoted and re-checked
- Georgia Rules and Regulations: On-Site Sewage Management Systems, quoted and re-checked
- Turner Zoning Ordinance, quoted and re-checked
- Georgia Rules and Regulations: On-Site Sewage Management Systems, quoted and re-checked
- Georgia Rules and Regulations: On-Site Sewage Management Systems, quoted and re-checked
- Turner Zoning Ordinance, quoted and re-checked
- Turner Zoning Ordinance, quoted and re-checked
- sos.ga.gov, quoted and re-checked
- Water Well Standards (Georgia statewide rule), quoted and re-checked
- Mandatory and Permissive State Codes, quoted and re-checked
- Turner Zoning Ordinance, quoted and re-checked
- Turner Zoning Ordinance (2026 county census)
- Zoning Ordinance for Turner County, Georgia (2026 county census)
- Turner County Building & Zoning Office (turnercountygeorgia.com)
- Building & Zoning Office, quoted and re-checked
- Turner Zoning Ordinance, quoted and re-checked
- Turner Zoning Ordinance, quoted and re-checked
- Turner County Road Department (turnercountygeorgia.com)
- Turner Zoning Ordinance, quoted and re-checked
- Regulations for Driveway & Encroachment Control Manual (Georgia statewide rule), quoted and re-checked
- Turner Zoning Ordinance, quoted and re-checked
- Zoning Ordinance — Turner County, Georgia, quoted and re-checked
- Turner Zoning Ordinance, quoted and re-checked
- Turner Zoning Ordinance, quoted and re-checked
- Turner Zoning Ordinance, quoted and re-checked
- Turner County Building & Zoning Office, quoted and re-checked
- Georgia Rules and Regulations: On-Site Sewage Management Systems (2026 county census)
- Turner Environmental Health (southhealthdistrict.com)
- Georgia Rules and Regulations: On-Site Sewage Management Systems, quoted and re-checked
- Manual for On-Site Sewage Management Systems (Georgia statewide rule), quoted and re-checked
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- Georgia Rules and Regulations: On-Site Sewage Management Systems, quoted and re-checked
- Georgia Tiny House Fact Sheet (Georgia statewide rule), quoted and re-checked
- Turner Zoning Ordinance, quoted and re-checked
- Turner Zoning Ordinance, quoted and re-checked
- Turner Zoning Ordinance, quoted and re-checked
- Effective property tax rate: Bolthole Index county data
- Median property tax bill: Bolthole Index county data
Written October 9, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.