Unincorporated Tazewell County, Illinois requires building permits, and the Community Development Department issues them and administers zoning there12. Septic and well permits come from the Tazewell County Health Department, not Community Development34. A residential application requires plans, a site plan, road-access approval and health approval for a septic system or a sanitary-district hookup letter, as applicable5.
At a glance
- Building permit
- Required for new buildings and many alterations in unincorporated areas1
- Zoning
- County-administered in unincorporated areas; standards vary by district67
- Septic permit
- Required through the Tazewell County Health Department; published fee is $15038
- Well permit
- Required before well or pump work; published fee is $1004
- RV occupancy
- Generally in an RV park; a bona fide guest may stay up to 60 days per year9
- Tiny home
- Accessory dwelling: 350–800 square feet, subject to conditions; primary dwelling: at least 700 square feet1011
- Owner-builder
- Owner may apply as SELF, but the building permit is still required12
- Certificate of occupancy
- Required before a building or structure is occupied or used13
Who to call
Building permits
Tazewell County Community Development Department
Building permits, zoning compliance certificates, construction regulation, subdivision administration and floodplain ordinance enforcement in unincorporated Tazewell County
McKenzie Building, 11 S. 4th Street, Ste. 400, Pekin, IL 61554
Septic permits
Tazewell County Health Department
Permits for constructing, altering or extending private sewage disposal systems in Tazewell County
21306 IL Route 9, Tremont, IL 61568-9252
Contact details are copied from each office’s official page and were checked against it on October 12, 2026.
Off-grid gear
Going off-grid in Tazewell County means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Tazewell County, Illinois?
Yes. Unincorporated Tazewell County requires a building permit for residential structures, and not every structure requires plan review1. Routine repairs and maintenance are exempt, as are qualifying ornamental or agricultural fences and accessory structures smaller than 25 square feet14. Building-permit fees vary by project and floor area; a dwelling project of 700–1,000 square feet has a published $400 fee, and starting without the required building permit doubles the fee1516. An owner doing residential work may identify the general contractor as SELF, but owner-builder status does not waive the permit or its submittal requirements12. The county code adopts the 2018 International Building Code and applies the currently adopted Illinois Energy Conservation Code17. Ask Community Development to identify the plan review and inspection requirements for the exact project18.
Who is the Tazewell County building department, and how do you reach it?
The Tazewell County Community Development Department issues building permits and zoning compliance certificates for unincorporated land18. The office is in the McKenzie Building, 11 S. 4th Street, Ste. 400, Pekin, IL 61554; call 309-477-223518. Pekin, Creve Coeur, Marquette Heights, Tremont handle their own building permits.19202122 Private-sewage permits throughout Tazewell County remain with the Tazewell County Health Department3. A residential submission needs a 911 address, septic or Health Department approval or a sanitary-district hookup letter, road-access approval, an energy-code report, scaled plans and a site plan5. The 48-hour review target for new homes and room additions means contact about status or questions, not guaranteed building-permit issuance5.
Does Tazewell County have zoning?
Tazewell County Community Development administers zoning in unincorporated areas and publishes a zoning-districts map; allowed uses depend on the parcel’s district2723. Pekin, East Peoria, Morton, Washington, Tremont, North Pekin, South Pekin, Peoria Heights (mainly in Peoria County, extending into Tazewell County) set their own zoning.2425262728293031 Private-sewage permits throughout Tazewell County remain with the Tazewell County Health Department3. County minimum lot size varies by district, public water, sewer availability and soil type32. Primary single- and two-family dwellings need at least 700 square feet per unit11. Setbacks depend on district, road classification and principal versus accessory use33. Community Development also administers the Subdivision Ordinance; ask the department to confirm a proposed land split before treating the resulting lots as buildable3418.
How do septic and well permits work in Tazewell County?
The Tazewell County Health Department issues private-sewage permits countywide; constructing, altering or extending a system requires a permit, with a published $150 fee and 1-year validity38. A soil investigation is required unless the ordinance’s pre-site-inspection waiver applies; routine cleaning, cover, baffle or riser replacement and rodding do not require a septic permit35. The Board of Health may refuse a private-system permit where a practical public-sewer connection is available, including a single-family property within 300 feet under the ordinance’s conditions36. The Health Department inspects new and repaired systems and requires zoning inspections for replatting, added bedrooms or floor area, or rebuilding after loss37. A pre-sale operational inspection is recommended, not generally mandatory, and is valid for 90 days37. Only 20.4% of county soils are rated without severe limits for conventional drain fields, making site evaluation a priority before purchase38. Well or pump work requires a $100 Health Department permit; new wells need water analysis and approval before service39.
Can you live in an RV or tiny home on your land in Tazewell County?
Tazewell County generally limits dwelling occupancy of an RV to an RV park, although a bona fide guest may occupy one for up to 60 days per calendar year9. A temporary-use permit can allow an RV or manufactured home at a dwelling destroyed or made uninhabitable by fire or natural disaster while its replacement is built; approved septic is required, and the initial permit and possible extension are each limited to 6 months40. Seasonal RV use in agricultural and conservation districts requires adequate water and sewage facilities plus Health Department approval9. Tazewell County has no stand-alone tiny-home category that we could confirm; a primary single- or two-family dwelling still faces the 700-square-foot minimum11. A tiny home can work as an accessory dwelling in a residential or agricultural district if the lot’s main use is a single-family dwelling, the accessory dwelling is between 350 and 800 square feet and no more than 50% of the principal dwelling, it shares the principal dwelling’s driveway, and it is not rented to non-family members4110. Only 1 accessory dwelling is allowed per lot, the owner must live in the principal dwelling, and the accessory dwelling needs a 911 address and a building permit first10. Manufactured-home parks require special use in the A-2 or R-2 district and must meet state and county health rules42. We could not confirm the rule for an individual manufactured home outside a park; ask Community Development before purchase18.
How do you build a home in Tazewell County, step by step?
- Confirm that the parcel is unincorporated and have Community Development identify its zoning district, permitted residential use, minimum lot size and setbacks673233.
- Have the Health Department determine whether the site can use private sewage or must connect to an available sewer, and obtain septic and well permits as needed36354.
- Assemble the address, health or sewer approval, road-access approval, energy report, scaled plans and site plan; submit the required full plan sets for a single- or two-family dwelling, addition or residential accessory dwelling545.
What should you check before buying land in Tazewell County?
Start with jurisdiction and zoning because these county rules apply to unincorporated Tazewell County, while incorporated places may regulate land separately2. Confirm the district, minimum lot size, setbacks, subdivision status and legal road access with Community Development before treating a listing as buildable732334744. Ask whether floodplain permitting or an elevation certificate applies because the county administers a floodplain ordinance but the project-specific triggers remain unconfirmed43. Resolve sewer availability and soil suitability early because a nearby public sewer can prevent approval of a private system, and only 20.4% of county soils are rated without severe limits for a conventional drain field3638. Work on a driveway within county-highway right-of-way requires a written County Engineer permit, with a $15 entrance-permit fee48. If access enters a state-maintained highway, obtain the state permit before right-of-way work begins49. The effective property-tax rate is about 2.1%, and the median annual bill is about $3,4815051.
Watch-outs
- Do not occupy or use a structure before Tazewell County issues its certificate of occupancy; a violation may bring a $50-per-day fine46.
- RV guest occupancy is limited to 60 days per calendar year, and the disaster-reconstruction exception requires a temporary-use permit and approved septic940.
- New road access for a building project needs approval from the state, county or township road authority with jurisdiction; driveways must stay at least 1 foot from side and rear lot lines unless shared by recorded easement44.
- Manufactured/mobile-home parks must connect to reasonably available public water and sewage treatment; private treatment otherwise needs Department of Public Health approval before the building permit, so these park rules do not establish an off-grid sanitation option for an individual home5253.
Sources
- Residential Permitting Fees and Setbacks, quoted and re-checked
- Community Development | Tazewell County, quoted and re-checked
- Sewage Disposal, quoted and re-checked
- Water Supply, quoted and re-checked
- Submittal Requirements for Residential Permits, quoted and re-checked
- Community Development | Tazewell County, quoted and re-checked
- Community Development | Tazewell County, quoted and re-checked
- Sewage Disposal, quoted and re-checked
- District Regulations and Standards, quoted and re-checked
- § 157.055 Accessory Dwellings, quoted and re-checked
- District Regulations and Standards, quoted and re-checked
- Submittal Requirements for Residential Permits, quoted and re-checked
- Inspection Checklist - Dwelling and Additions, quoted and re-checked
- Building Permit, quoted and re-checked
- Residential Permitting Fees and Setbacks, quoted and re-checked
- Building Permit, quoted and re-checked
- Building and Property Maintenance Code, quoted and re-checked
- Tazewell County Community Development Department (tazewell-il.gov)
- Pekin: Community Development Department | Pekin, IL (Tazewell County), quoted and re-checked
- Village of Creve Coeur: 4-1-22: Building Permit Fees (Tazewell County), quoted and re-checked
- Marquette Heights: 4-1-2: Building Code Amendments (Tazewell County), quoted and re-checked
- Village of Tremont: § 153.248 Permits (Tazewell County), quoted and re-checked
- Building and Permit Information, quoted and re-checked
- Pekin: Planning and Zoning | Pekin, IL (Tazewell County), quoted and re-checked
- East Peoria: Title 5 - Zoning Regulations (Tazewell County), quoted and re-checked
- Village of Morton: Planning & Community Development (Tazewell County), quoted and re-checked
- Washington: Sec. 56-78. R-1 One- and Two-Family Residential District (Tazewell County), quoted and re-checked
- Village of Tremont: § 153.020 Districts Established (Tazewell County), quoted and re-checked
- Village of North Pekin: North Pekin, IL Laws (Tazewell County), quoted and re-checked
- Village of South Pekin: South Pekin, Illinois Code of Ordinances (Tazewell County), quoted and re-checked
- Village of Peoria Heights: TITLE 10 ZONING REGULATIONS (Tazewell County), quoted and re-checked
- Land Use Matrix, quoted and re-checked
- Land Use Matrix and Bulk Chart, quoted and re-checked
- Community Development, quoted and re-checked
- Sewage Disposal, quoted and re-checked
- Sewage Disposal, quoted and re-checked
- Sewage, quoted and re-checked
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- Water Supply, quoted and re-checked
- Temporary Uses, quoted and re-checked
- District Regulations and Standards, quoted and re-checked
- Manufactured/Mobile Home Parks, quoted and re-checked
- Community Development | Tazewell County, quoted and re-checked
- Building Permit, quoted and re-checked
- Building Permit, quoted and re-checked
- Certificate of Occupancy, quoted and re-checked
- Community Development | Tazewell County, quoted and re-checked
- Doing Business - Highway Entrance Permits, quoted and re-checked
- Highway Permits (Illinois statewide rule), quoted and re-checked
- Effective property tax rate: Bolthole Index county data
- Median property tax bill: Bolthole Index county data
- Manufactured/Mobile Home Parks, quoted and re-checked
- Manufactured/Mobile Home Parks, quoted and re-checked
Written October 12, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.