Washington County, Indiana requires a site improvement application for a new home in county jurisdiction outside Salem city limits and its annex area.1 Start with the Highway Department if the project involves a new driveway, extension or culvert replacement, then secure septic approval before applying to the Building Department.2
At a glance
- Building permit
- Required for new homes in county jurisdiction outside Salem and its annex area1
- Zoning
- County zoning applies where Salem or Livonia ordinances do not; authority depends on the parcel34
- Septic permit
- Required through the Washington County Health Department56
- RV or camper
- Requires a site improvement application; flood-hazard areas add placement limits78
- Tiny home
- An off-site manufactured unit needs approved identification and a site improvement application9
- Owner-builder
- An owner may manage the project, but permits, code, inspections and occupancy approval still apply10
- Private well
- County permit requirement unconfirmed; ask Environmental Health before drilling1112
Who to call
Building permits
Washington County Building Department
Site improvement applications, residential inspections, certificates of occupancy, county zoning questions and local floodplain development review
buildingdepartment@washingtoncounty.in.gov
601 Anson Street, Salem, IN 47167
Septic permits
Washington County Health Department Environmental Health
Private sewage disposal permits, septic plan review, inspections and environmental-health questions
cboling@washingtoncounty.in.gov
806 Martinsburg Road, Suite 100, Salem, IN 47167
Roads & driveways
Washington County Highway Department
Driveway permits for new driveways, driveway extensions and culvert replacements on county-controlled roads
600 Anson Street, Salem, IN 47167
Contact details are copied from each office’s official page and were checked against it on October 9, 2026.
Off-grid gear
Going off-grid in Washington County means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Washington County, Indiana?
Yes. Washington County requires a site improvement application for a new single-family or multifamily home in county jurisdiction outside Salem city limits and its annex area.1 Residential additions and remodels, attached garages, mobile, modular or manufactured homes, temporary structures, RVs and campers also appear on the required-project list.13 Decks, roofing, pools and remodeling that does not add living area are listed as not requiring that application, although another permit may still apply.1 Fees are based on gross project area, including basements and garages, and the published schedule runs from $50 through $500.14 Washington County enforces Indiana building code and county codes, and the Indiana residential code is in effect statewide.15
Who is the Washington County building department, and how do you reach it?
The Washington County Building Department handles site improvement applications and county building-code administration at 601 Anson Street, Salem, IN 47167; call 812-883-0139 or email buildingdepartment@washingtoncounty.in.gov.8 Give the office the project location first because the applicable authority depends on the parcel's municipal, township or county jurisdiction.4 Washington County requires evaluations at each phase of covered construction with at least 24 hours' notice; missed evaluations can bring fines or stop-work orders.16 A property owner may act as project manager or builder, but required permits, code compliance, evaluations, health requirements and the certificate of occupancy still apply.10 A final inspection determines compliance, and the certificate of occupancy must be issued before a new home is occupied.17
Does Washington County have zoning?
Yes. Washington County maintains zoning regulations and a Plan Commission, but the controlling authority varies by location: the county land-use chapter applies where Salem or Livonia ordinances do not, and subdivisions in the ordinance's specified Washington Township territory go to the Salem Plan Commission.4 The county publishes its zoning ordinance, amended zoning regulations, airport overlay ordinance and related planning documents.18 Ask the Building Department to identify the parcel's jurisdiction, zoning district and controlling standards before designing the project.8 The Building Commissioner lists setbacks of 5 feet from a property line and 10 feet from a residence without saying whether they are universal or project-specific.19 Subdivision is regulated, though the specific thresholds and procedure were not confirmed.208
How do septic permits work in Washington County?
The Washington County Health Department's Environmental Health section issues residential private-sewage permits; commercial sites require state approval.21 For a new system, first receive the driveway permit, then submit the septic application, ownership documents and $100 fee.6 A certified soil scientist must test the site, and the installer must complete plan review before the construction permit is issued.6 County environmentalists inspect residential septic sites before construction and after installation.22 The office is at 806 Martinsburg Road, Suite 100, Salem, IN 47167; call (812) 883-5603 ext. 8 or email cboling@washingtoncounty.in.gov.12 Only about 29.9% of mapped soils avoid severe limits for a conventional drain field, so resolve septic feasibility before fixing the house site.23
Can you live in an RV or tiny home on land in Washington County?
Washington County requires a site improvement application for an RV, camper or temporary structure in county jurisdiction, and those temporary units do not receive a permanent emergency-service address.78 In a special flood-hazard area, an RV must be on site for less than 180 days and remain licensed and highway-ready, or it must meet the requirements for a manufactured home.7 That floodplain rule does not answer how long an RV may be occupied on every private parcel, so ask the Building Department about the proposed location, duration, utilities and residential use.8 An off-site manufactured tiny home or cabin in county jurisdiction needs a HUD identification plate or Indiana industrialized-building or modular marking, plus a site improvement application and any applicable septic, driveway, stormwater and inspection approvals.9 Washington County's available rules do not establish a general minimum dwelling size or temporary-camping allowance.24
Building a home in Washington County: what are the steps?
- Give the Washington County Building Department the project location and plans so it can confirm jurisdiction, zoning, setbacks and required permits.25
- If installing a driveway, adding an extension or replacing a culvert, obtain the Highway Department permit before applying for the building permit; a driveway permit also comes before the septic permit and permanent address when applicable.126
- Apply to Environmental Health for septic approval, arrange the certified soil test and have the installer complete plan review.6
- Submit the site improvement application to the Building Department; soil disturbance above 1 acre also requires a Construction Stormwater General Permit.2
- Request each construction evaluation at least 24 hours ahead, then complete the final inspection and obtain the certificate of occupancy before moving in.2
- For a state-highway entrance, apply through Indiana's electronic permit system.27
What should you check before buying land in Washington County?
Confirm whether county, municipal or township authority governs the parcel before relying on a listing's description of permitted use.4 If the tract may be divided, ask the Building Department which plan commission must review it before committing to a layout.208 Indiana DNR approval is required before regulated structures, excavation or other development begins in a state-waterway floodway, and other permits may still apply.28 Commission a soil evaluation before fixing a homesite because only about 29.9% of mapped soils avoid severe limits for a conventional drain field.23 Confirm legal road access and the correct driveway authority; state-highway access needs Indiana permission, while applicable county access work goes through the Highway Department.2726 The standalone private-well permit requirement could not be confirmed, so ask Environmental Health before drilling.1112
Watch-outs
- Washington County requires construction evaluations at least 24 hours in advance, and missed evaluations may lead to fines or stop-work orders.16
- A new Washington County home cannot be occupied until the final inspection is complete and the certificate of occupancy has been issued.17
- A Washington County property owner may manage or build a residential project, but that role does not waive required permits, code compliance, inspections, health requirements or occupancy approval.10
- No general private-land camping rule, minimum dwelling size or standalone well-permit answer was confirmed; ask the Building Department and Environmental Health before relying on any of them.11812
Sources
- Washington County Building Commissioner, quoted and re-checked
- Washington County Building Commissioner, quoted and re-checked
- Planning Commission, quoted and re-checked
- Washington County, Indiana Title XV Land Usage, quoted and re-checked
- Washington County: Septic Systems (2026 county census)
- Washington County: Septic Systems, quoted and re-checked
- cms7files1.revize.com, quoted and re-checked
- Washington County Building Department (washingtoncounty.in.gov)
- Washington County Building Commissioner, quoted and re-checked
- Washington County Building Commissioner, quoted and re-checked
- Recommended Standards For Private Water Wells (Indiana statewide rule), quoted and re-checked
- Washington County Health Department Environmental Health (in.gov)
- Washington County Building Commissioner, quoted and re-checked
- Washington County Building Commissioner, quoted and re-checked
- Washington County Building Commissioner, quoted and re-checked
- Washington County Building Commissioner, quoted and re-checked
- Washington County Building Commissioner, quoted and re-checked
- Washington County Planning Commission, quoted and re-checked
- Washington County Building Commissioner, quoted and re-checked
- Planning Commission, quoted and re-checked
- Washington County: Septic Systems, quoted and re-checked
- Septic System Information, quoted and re-checked
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- Planning Commission (2026 county census)
- Washington County Building Commissioner, quoted and re-checked
- Washington County Building Commissioner, quoted and re-checked
- INDOT Driveway Permit Guide 2024 (Indiana statewide rule), quoted and re-checked
- Water: Regulatory Programs, quoted and re-checked
Written October 9, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.