Kingman County, Kansas

Building permits, zoning and septic rules in Kingman, Kansas

Building inside Kingman, Kansas requires a city building permit before work begins, issued by the city clerk after the chief building official approves it1. The city also zones land inside its corporate limits under its own adopted regulations2. Where no public sewer is available, septic permits inside the city come from the city utility superintendent3. Kingman County's own rules cover only unincorporated land4.

At a glance

Building permit
Required inside city limits, before work begins1
Building code
2015 International Building Code adopted by the city5
Zoning
City zoning regulations apply inside corporate limits2
Septic (no public sewer)
Written permit from the city utility superintendent3
Septic lot size
No permit for a soil absorption system on a lot under one acre3
Subdivision
City subdivision regulations apply6

Who to call

Building permits

City of Kingman Building Inspector & Code Enforcement

Building permit applications, contractor licenses and zoning questions inside Kingman city limits

620-491-0990

erobinson@kingmanks.gov

324 North Main Street, Kingman, KS 67068

Septic permits

Kingman County Appraiser's Office (septic and well permits, unincorporated land)

Septic-system and water-well permits for unincorporated Kingman County; also the office to ask about county health-officer requirements that can apply on top of city rules

620-532-2256

Contact details are copied from each office’s official page and were checked against it on October 24, 2026.

Off-grid gear

Going off-grid in Kingman means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Does Kingman, Kansas have zoning, and what does it mean for RVs, tiny homes and setbacks?

Yes. Kingman adopts a model set of zoning regulations by reference, and the city's jurisdiction covers land inside its corporate limits, including later annexations, but not the unincorporated county2. The official zoning map is kept with the city's zoning administrator2.

The district use tables, lot sizes, setbacks and height limits sit inside those incorporated regulations, and we could not confirm them. That means we also could not confirm whether an RV, tiny home or accessory dwelling is allowed on a given lot in Kingman. Ask the City of Kingman Building Inspector & Code Enforcement7 which district your parcel is in before you buy.

One state rule can matter on larger parcels: city zoning does not apply to land and buildings used for agricultural purposes, but dwellings, garages and similar accessory buildings do not count as agricultural buildings8.

Do you need a building permit in Kingman, Kansas, and who issues it?

Yes. Inside Kingman, an owner or agent who intends to construct, enlarge, alter, repair, move or demolish a building must obtain a permit first1. The city clerk issues the permit after the chief building official or an authorized assistant approves the application, and the permit must be in hand before work begins on the building or foundation1. Regulated electrical, gas, mechanical and plumbing work needs a permit as well1.

The city has incorporated the 2015 edition of the International Building Code5.

The city's building permit application and contractor license application are posted on its Building & Zoning page, and the Building Inspector & Code Enforcement office is at 324 North Main Street7. We could not confirm the permit fee schedule, plan requirements, inspection steps or any owner-builder allowance; ask that office.

How do septic permits work inside Kingman, Kansas?

Septic is a separate approval from the building permit. Inside Kingman, a property with no public sanitary sewer needs a written permit signed by the city utility superintendent before construction of a private sewage disposal system begins3. The city issues no permit for a subsurface soil absorption system on a lot under one acre3.

The utility superintendent can inspect at any stage, and the inspection happens within 48 hours of the applicant's notice9. Once a public sewer becomes available to the property, the owner must connect to it10.

Kansas also bars seepage pits, cesspools and dry wells, and allows no surface discharge from a private onsite system11. The city or county health officer may add requirements of their own12. We could not confirm the permit fee or whether private wells inside the city need a permit.

Building a home in Kingman, Kansas: the steps, in order

  1. Ask the City of Kingman Building Inspector & Code Enforcement which zoning district your lot is in and whether your use is allowed there7.
  2. Check whether a public sewer serves the lot. If not, a soil absorption system needs a lot of at least one acre3.
  3. If you are dividing a lot, expect the city's subdivision regulations to apply6.
  4. Apply for the building permit and get it before any work on the building or foundation starts1.
  5. Get the septic permit from the city utility superintendent before construction of the system begins3.
  6. Notify the superintendent before covering underground septic work, so the inspection happens first9.
  7. Ask the building inspector which inspections and occupancy approval apply, since we could not confirm them7.

What stays with Kingman County, and what to check before you buy

The county's rules apply to unincorporated Kingman County, not to land inside city limits4. If the parcel is outside the city, the county Planning and Zoning office requires a Certificate of Zoning Compliance before construction, and a house application is $5013. The county's septic and well permits go through the Kingman County Appraisers Office14, with a $75 fee for a wastewater or water well application15. See the Kingman County page for the full county picture.

Before buying, confirm whether the lot is inside the corporate limits, because that decides which office permits the work. Confirm also whether the lot is in a mapped flood area, since Kansas local floodplain ordinances require a separate floodplain development permit for each structure where they apply16. A driveway onto a state highway needs a state permit17.

Watch-outs

  • Zoning district standards, RV and tiny home rules, setbacks and fees inside Kingman sit in documents we could not confirm; call the City of Kingman Building Inspector & Code Enforcement before you sign a contract7.
  • The city's code text we reviewed runs through a 2024 supplement, so later changes to zoning or the adopted building code may not be reflected5.
  • County zoning and county septic rules do not follow you into city limits, and city septic permits do not apply outside them14.
  • A driveway onto a state highway needs a state permit before any work in the right-of-way17.

Sources

  1. Kingman Code § 4-210 Building permit required; application; approval (Kingman), quoted and re-checked
  2. Kingman Code § 16-201 Zoning regulations incorporated; § 16-301 Subdivision regulations incorporated; Article 4 Floodplain management (Kingman), quoted and re-checked
  3. Kingman Code Chapter XV Utilities §§ 15-411 to 15-417 (private sewage disposal, sewer connection) (Kingman), quoted and re-checked
  4. Planning / Zoning, quoted and re-checked
  5. Kingman Code § 4-202 International building code incorporated (Kingman), quoted and re-checked
  6. Kingman Code § 16-201 Zoning regulations incorporated; § 16-301 Subdivision regulations incorporated; Article 4 Floodplain management (Kingman), quoted and re-checked
  7. City of Kingman Building Inspector & Code Enforcement (kingmanks.gov)
  8. K.S.A. 12-758 — Agricultural land exempted from zoning regulations (Kansas statewide rule), quoted and re-checked
  9. Kingman Code Chapter XV Utilities §§ 15-411 to 15-417 (private sewage disposal, sewer connection) (Kingman), quoted and re-checked
  10. Kingman Code Chapter XV Utilities §§ 15-411 to 15-417 (private sewage disposal, sewer connection) (Kingman), quoted and re-checked
  11. MF2214 Minimum Standards for Design and Construction of Onsite Wastewater Systems (Kansas statewide rule), quoted and re-checked
  12. Kingman Code Chapter XV Utilities §§ 15-411 to 15-417 (private sewage disposal, sewer connection) (Kingman), quoted and re-checked
  13. Planning / Zoning, quoted and re-checked
  14. Sanitation Code, quoted and re-checked
  15. Planning / Zoning, quoted and re-checked
  16. Model Floodplain Management Ordinance (Kansas statewide rule), quoted and re-checked
  17. Kansas Administrative Regulations, Volume 3 (Kansas statewide rule), quoted and re-checked

Written October 24, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Answers from the rulebook for Kingman

Kingman’s own rules

  • Building permitRequired

    Construction, alteration, relocation or demolition of a building or structure inside Kingman city

    • Permit is issued by the city clerk after approval by the chief building official or an authorized assistant.
    • The application must be made and the permit obtained before work begins on the building or foundation, or before demolition starts.
    • Required for regulated electrical, gas, mechanical or plumbing system work as well.
    “it shall be unlawful for any owner or authorized agent who intends to construct, enlarge, alter, repair, move, demolish or change the occupancy of a building or structure”
  • Building code adoptedAdopted

    Construction inside Kingman city limits

    • Adopting ordinance is ord. 2017, passed 12-22-2016, per the section text.
    • Code text is current only through 2024 S-1; later amendments to the adopted editions not checked.
    “the standard code known as the 2015 edition of the international building code by the international code council is hereby incorporated by reference herein”
  • Local zoningPresent (with conditions)

    Land inside Kingman city limits (corporate limits, including later annexations). Not the unincorporated county area.

    • Kingman adopts the 2009 model 'Zoning Regulations of the City of Kingman, Kansas' by reference, with jurisdiction limited to land within the corporate limits.
    • Official zoning district map adopted by reference under ord. 1937 on March 25, 2010 and kept with the zoning administrator.
    • District use and dimensional tables sit in the incorporated model regulations and were not reproduced in the code text; not retrieved.
    • Code text is current only through 2024 S-1 (ordinance 2126, passed 4-11-2024); later zoning amendments not checked.
    “zoning regulations are hereby approved and adopted by the governing body of the city, as prepared and published in book form as model regulations”
  • Who permits septicMixed (with conditions)

    Private sewage disposal systems on land inside Kingman city where no public sanitary sewer is available

    • City utility superintendent issues the construction permit and inspects the work (§§ 15-413, 15-414).
    • System type, capacity, location and layout must comply with state water pollution control requirements (§ 15-415(a)).
    • City or county health officer may impose additional requirements (§ 15-416); city or county board of health can abate unapproved systems as a nuisance (§ 15-417).
    • County health department service-area rules were not confirmed.
    “no statement contained in this article shall be construed to interfere with any additional requirements that may be imposed by the city or county health officer.”
  • Septic permitRequired

    New private sewage disposal systems inside Kingman city where no public sanitary sewer is available

    • Permit must be signed by the utility superintendent before construction begins.
    • No permit for a subsurface soil absorption system on a lot under one acre (§ 15-415(a)).
    • Permit and inspection fee set by the governing body; amount not retrieved.

    minimum lot area for subsurface soil absorption system permit: >= 1 acre (No permit issued where lot is less than one acre)

    “before commencing construction of a private sewage disposal system, the owner shall first obtain a written permit signed by the utility superintendent.”
  • Septic inspectionRequired

    Private sewage disposal system construction inside Kingman city

    • Utility superintendent or authorized representative may inspect at any stage of construction.
    • Applicant must notify the superintendent when work is ready for final inspection or before underground portions are covered.
    • Inspection made within 48 hours of receipt of notice.

    inspection response time: <= 48 hours

    “the utility superintendent or his or her authorized representative shall be allowed to inspect the work at any stage of construction and the applicant shall notify the superintendent when the work is ready for final inspection or before any underground portions are covered. the inspection shall be made within 48 hours of the receipt of notice by the superintendent.”
  • Off-grid sanitationLimited

    Sewage disposal on land inside Kingman city outside a public sewer

    • Privies, vaults, septic tanks and cesspools are unlawful except as provided in the sewage article (§ 15-411).
    • Subsurface soil absorption systems need at least one acre (§ 15-415(a)).
    • Discharging sewage on the ground is unlawful (§ 15-417).

    minimum lot area for subsurface soil absorption system: >= 1 acre

    “it shall be unlawful to construct or maintain any privy, privy vault, septic tank, cesspool or other facility intended or used for the disposal of sewage except as provided in this article.”
  • Mandatory utility hookupSewer (with conditions)

    A property inside Kingman city on a private septic system once a public sanitary sewer is available

    • Where a public sanitary sewer is not available under § 15-402, the building sewer goes to a private system (§ 15-412).
    • When a public sewer becomes available, a direct connection must be made and septic tanks and cesspools abandoned and filled (§ 15-415(b)).
    • The § 15-402 availability or distance test was not retrieved; the threshold is unverified.
    “at such time as a public sewer becomes available to a property served by a private sewage disposal system, as provided in § 15-402, a direct connection shall be made to the public sewer in compliance with this article”
  • Subdividing landRegulated (with conditions)

    Subdivision of land and vacation of rights-of-way, easements and public reservations located within Kingman city

    • Subdivision regulations of the City of Kingman, Kansas (2016 model) are incorporated by reference (§ 16-301(a)).
    • The regulations apply from the section's effective date (§ 16-301(c)).
    • Approval steps and standards in the incorporated subdivision regulations were not reviewed.
    “subdivision regulations are hereby approved and adopted by the governing body of the city, as prepared and published as model regulations in book form by the kingman city planning commission”
  • Permit processPartial

    Building permit application process inside Kingman city

    • Application goes to the city clerk after chief building official approval (§ 4-210).
    • Permit must be obtained before work begins.
    • Application forms, plan requirements (§ 4-211, § 4-212) and fees (§ 4-213) were not retrieved, so the process is only partly documented.
    “it shall be unlawful for any owner or authorized agent who intends to construct, enlarge, alter, repair, move, demolish or change the occupancy of a building or structure”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Kingman or Kingman County directly.

  • Owner-builder exemption — Owner-builder work inside Kingman city
  • Inspections — Building inspections for construction inside Kingman city
  • Certificate of occupancy — Occupancy approval for new buildings inside Kingman city
  • Zoning districts — Zoning district list and map for land inside Kingman city
  • Minimum dwelling size — Minimum dwelling size in the main single-family residential district inside Kingman city (district not yet identified)
15 more unanswered
  • Minimum lot size
  • Setbacks
  • Lot coverage
  • Building height
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Well permit
  • Agricultural exemption
  • Driveway access
  • Building in a floodplain
  • Short-term rentals
  • Permit fees

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Kingman publishes no rule on the point, not that none exists. Kingman County’s page lists the county offices to call.