Unincorporated Meade County, Kentucky requires a building permit for most excavation, construction, placement, moving, and exterior alteration of buildings1. County zoning also controls land use and site standards outside incorporated municipalities2. Septic permits and inspections go through the Lincoln Trail District Health Department34.

At a glance

Building permit
Required for most building work; stated exceptions apply1
Zoning
County zoning applies in unincorporated areas2
Inspections and occupancy
Code applies statewide; local inspections are limited; occupancy needs a certificate567
Septic
Site evaluation, permit, certified installation, and inspection required84
RV during construction
Allowed temporarily with a dwelling permit and strict conditions9
Small factory-built homes
District-specific; qualifying homes generally need at least 950 square feet1011
Agricultural buildings
Solely agricultural buildings are permit-exempt but must meet setbacks12

Who to call

Building permits

Meade County Planning & Zoning Office

Zoning, building, and electrical permit applications and the county permit packet

270-422-4676

pzadmin@meadeky.gov

516 Hillcrest Dr. Suite #13 Brandenburg KY 40108

Zoning

Meade County Planning & Zoning Office

Zoning administration, the Zoning Ordinance, Board of Adjustments, and Planning Commission

270-422-4676

pzadmin@meadeky.gov

516 Hillcrest Dr. Suite #13 Brandenburg KY 40108

Septic permits

Meade County Health Center Environmental Department

Local environmental office for Lincoln Trail District Health Department onsite sewage services

270-422-5919

520 Hillcrest Dr. Brandenburg, KY 40108

Online permits →

Contact details are copied from each office’s official page and were checked against it on October 7, 2026.

Off-grid gear

Going off-grid in Meade County means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Do you need a building permit in Meade County, Kentucky?

Unincorporated Meade County requires a permit for excavation, construction, placement, moving, or exterior alteration of buildings, including accessory buildings, unless a stated ordinance exception applies1. Kentucky's adopted building and residential codes apply, while the inspection path depends on whether a local single-family inspection program covers the project56. A covered structure or premises may not be occupied until the county issues a certificate of occupancy and water and electricity—and sewer and natural gas where applicable—are available713. Buildings used solely for agricultural farming, dairying, stock raising, or similar purposes are exempt from the building-permit and certificate-of-compliance rules, but setbacks and floodplain review can still apply12. We could not confirm a general owner-builder exemption. A homeowner may personally perform qualifying plumbing, sewerage, or drainage work in a personal residence after applying and filing the required affidavit14.

Who issues building permits in Meade County, and how do you reach them?

The Meade County Planning & Zoning Office is the starting point for zoning, building, and electrical permit applications15. The office is at 516 Hillcrest Dr. Suite #13, Brandenburg, KY 40108; call 270-422-4676 or email pzadmin@meadeky.gov15. The county publishes a building-permit packet and fee schedule effective in 2025, so use the current packet rather than assume a flat charge16. The application needs a dimensioned sketch or scale plan, and required water and sewage approval must accompany it; the county must grant or deny the permit within 14 calendar days17. Written Road Supervisor approval is required for a driveway entrance culvert from a county road before the building permit is issued18. A driveway onto a state highway instead requires a written application to the Kentucky Department of Highways District Engineer19.

Does Meade County have zoning?

Meade County zoning applies in unincorporated parts of the county, while incorporated municipalities may administer different local rules20. The ordinance establishes agricultural, residential, business, industrial, and conservancy districts, so confirm the parcel's mapped district before planning a use21. Minimum lot area and setbacks vary by district or use, and Health Department review determines whether a lot has enough area for septic, a well, and related facilities2223. Height also varies: the general rule is 30 feet, with added side-yard requirements above that and stated district exceptions24. The ordinance's 50% lot-coverage rule cited in the current facts is specifically for apartment houses, not every parcel25. Planning & Zoning can confirm the parcel's mapped district and dimensional schedule26.

How do septic permits work in Meade County?

The Lincoln Trail District Health Department handles onsite sewage site evaluations, permits, and inspections in Meade County273. Apply online or through the local Environmental office and pay the $300 site-evaluation fee with the application3. After a suitable or provisionally suitable evaluation, a certified installer may apply for the installation permit with the required design paperwork and fee8. Kentucky requires a permit before construction, installation, or alteration of an onsite sewage system, and the permit normally expires after 1 year28. The installer must request a Health Department inspection before covering the work8. Only about 17.8% of Meade County soils lack severe limitations for a conventional drain field, so make septic feasibility an early purchase contingency29. Call the Meade County Health Center Environmental Department at 270-422-591930.

Can you live in an RV or tiny home on your land in Meade County?

Meade County allows an RV as temporary shelter only during construction of a permitted residential dwelling9. The construction stay lasts 180 days, with one no-cost extension for another 180 days, and the RV must remain movable without permanent electric, water, or sewage connections9. The rule does not establish general recreational or long-term camping permission31. A small dwelling that qualifies as a modular housing unit can be allowed in specified unincorporated-county districts, but the route ranges from a permitted use to a conditional use and carries construction, certification, and occupancy requirements10. Factory-built housing on applicable non-infill lots must have at least 950 square feet of floor area, excluding basement and garage space11. We could not confirm a distinct rule for an on-site-built tiny home or a general minimum floor area for that type. Ask Planning & Zoning how a proposed small home is classified26.

Building a home in Meade County: the steps, in order

  1. Ask Planning & Zoning to identify the parcel's district and confirm its allowed use, lot area, setbacks, and height rules20222324.
  2. Apply to the Lincoln Trail District Health Department for the onsite sewage site evaluation3.
  3. Secure county-road culvert approval or apply to the state District Engineer, depending on which public road the driveway enters1819.
  4. Submit the dimensioned plan, required water and sewage approval, and building application through the Meade County Planning & Zoning Office11715.
  5. Obtain the septic construction permit and any plumbing permit before that work begins2832.
  6. Arrange the inspections applicable to the project and have the septic system inspected before it is covered63.
  7. Complete required utilities and obtain the certificate of occupancy before moving in713.

What should you check before buying land in Meade County?

Confirm the zoning district, minimum lot area, setbacks, and proposed use before treating acreage as buildable212223. Make the septic evaluation an early contingency because only about 17.8% of county soils lack severe limits for a conventional drain field29. Subdivision lots must satisfy the zoning district or Health Department minimums, whichever is stricter, and a plat cannot be recorded until the Planning Commission approves it3334. Kentucky requires a state permit for covered floodplain construction, demolition, or renovation; eligible low-impact work may use a general permit, while other projects need an individual permit35. A narrow state exemption covers certain work along streams draining less than 1 square mile, but not dams, impoundments, or work that may endanger life or severely damage property36. Meade County review also applies to structures that would increase flood heights or obstruct flow in designated floodways or floodplains37. Confirm road access approval before relying on a proposed entrance1819.

Watch-outs

  • A solely agricultural building can avoid the county building permit, but it still must meet setbacks and may need floodplain review12. Farmstead plumbing has a separate conditional exemption tied to at least 10 acres outside municipal limits and bona fide agricultural use38.
  • Do not move into a covered building before the certificate of occupancy is issued and required utilities are available713.
  • The RV construction exception is temporary and bars permanent utility connections9.
  • Protect the septic evaluation area from grading, heavy equipment, and stored materials because disturbance can void the evaluation3.

Sources

  1. Meade County Planning and Zoning Zoning Ordinance, 2024 Updated Ordinance, quoted and re-checked
  2. Meade County Planning and Zoning Zoning Ordinance, 2024 Updated Ordinance, quoted and re-checked
  3. On-Site Sewage - Lincoln Trail District Health Department, quoted and re-checked
  4. Onsite Sewage Disposal Systems Program, quoted and re-checked
  5. Department of Housing, Buildings and Construction — Division of Building Code Enforcement, quoted and re-checked
  6. Department of Housing, Buildings and Construction — Building Codes, quoted and re-checked
  7. Meade County Planning and Zoning Zoning Ordinance, 2024 Updated Ordinance, quoted and re-checked
  8. On-Site Sewage — Lincoln Trail District Health Department, quoted and re-checked
  9. meadeky.gov, quoted and re-checked
  10. Meade County Zoning Ordinance — 2024 Updated Ordinance, quoted and re-checked
  11. Meade County Zoning Ordinance — 2024 Updated Ordinance, quoted and re-checked
  12. Meade County Zoning Ordinance, 2024 Updated Ordinance, quoted and re-checked
  13. Meade County Planning and Zoning Zoning Ordinance, 2024 Updated Ordinance, quoted and re-checked
  14. Department of Housing, Buildings and Construction FAQ, quoted and re-checked
  15. Meade County Planning & Zoning Office (meadeky.gov)
  16. Planning & Zoning – Permits, quoted and re-checked
  17. Meade County Planning and Zoning Zoning Ordinance, 2024 Updated Ordinance, quoted and re-checked
  18. Meade County Planning and Zoning Zoning Ordinance, 2024 Updated Ordinance, quoted and re-checked
  19. 603 KAR 1:020 Driveway approaches, entrances; construction and maintenance (Kentucky statewide rule), quoted and re-checked
  20. Meade County Zoning Ordinance — 2024 Updated Ordinance, quoted and re-checked
  21. Meade County Planning and Zoning Zoning Ordinance, 2024 Updated Ordinance, quoted and re-checked
  22. Meade County Zoning Ordinance — 2024 Updated Ordinance, quoted and re-checked
  23. Meade County Planning and Zoning Zoning Ordinance, 2024 Updated Ordinance, quoted and re-checked
  24. Meade County Planning and Zoning Zoning Ordinance, 2024 Updated Ordinance, quoted and re-checked
  25. Meade County Planning and Zoning Zoning Ordinance, 2024 Updated Ordinance, quoted and re-checked
  26. Meade County Planning & Zoning Office (meadeky.gov)
  27. Local Health Departments, quoted and re-checked
  28. 902 KAR 10:085. Kentucky on-site sewage disposal systems, quoted and re-checked
  29. Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
  30. Meade County Health Center Environmental Department (ltdhd.org)
  31. meadeky.gov, quoted and re-checked
  32. Division of Plumbing Fee Change and Permit Information (Kentucky statewide rule), quoted and re-checked
  33. Meade County Planning and Zoning Zoning Ordinance, 2024 Updated Ordinance, quoted and re-checked
  34. Meade County Subdivision Regulations, quoted and re-checked
  35. Environmental Permitting in Kentucky, quoted and re-checked
  36. 401 KAR 4:050 Construction exemptions, quoted and re-checked
  37. Meade County Planning and Zoning Zoning Ordinance, 2024 Updated Ordinance, quoted and re-checked
  38. Department of Housing, Buildings and Construction FAQ, quoted and re-checked

Written October 7, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Found land here? Start a Property Hunt →

Compared with neighboring counties

Like 5 of its 6 neighbors, Meade County requires a building permit for a home.

RuleMeade CountyBreckinridge CountyHardin CountyBullitt CountyHancock CountyGrayson CountyJefferson County
Building permitRequiredRequiredRequiredRequiredLimitedRequiredRequired
County zoningYesNoYesYesYesYesYes
Septic permitsLincoln Trail District Health Dept.County Health Dept.Lincoln Trail District Health Dept.County Health Dept.Green River District Health Dept.County Health Dept.Louisville Metro Dept. of Public Health & Wellness

County locator

Meade County in Kentucky

56
County map
Meade County highlighted among the Kentucky counties · colored by Index score

How Meade County scores

Seclusion32100% ev.
Self-Sufficiency72100% ev.
Admin Boringness4390% ev.
Durability70100% ev.
Property Autonomy33100% ev.
Carry Cost81100% ev.

Evidence strength: 98%. This reports direct-source completeness and fallback use; it is separate from the score and is not a confidence interval. How it works →

$274kTypical home
0.7%Property tax
$5,432Land / acre
50"Annual rain
2.7% of yrsSevere drought
8.7 / yr (+8.1)Mid-century 100°F days
13.1 daysMid-century dry spell
2.01" (+10.2%)Mid-century 1-day rain
1.8×Wildfire change factor
100%Forward climate coverage
$1,475Home insurance / yr
0.1% / yrInsurance growth
0.27%Nonrenewal rate
county median (2+ published ZIPs)Insurance basis
77,511People within 30 min
3,211,942People within 2 hr
58,723Radius comparison (15 mi)
98.6People / sq mi
7.8%Federal land
59.2%Land at 15% slope or less
17.8%Soils rated "not limited" for septic (strict USDA rating)
31,257 acWorkable land screen
48.2%Wooded land
52.9 tonsBiomass / forest ac
56°FAvg temp

Scout Meade County

Camp here before you commitBook a few nights nearby on Hipcamp →Already own land here?Earn money hosting campers — get $100 when you become a Hipcamp host →

Some links are affiliate or referral links — we may earn a commission, at no cost to you.

Property hunt

Find land. Bring the promising ones back.

Search live inventory elsewhere, then cost and vet each candidate here. No copied listings, account, or paid data feed.

Each button opens a current land search for Meade County. Listing sites control their own results and filters.

Analyze a property
Add setup-cost allowances

Use rough quotes or placeholders. Blank fields count as $0.

Working estimate

—land + entered setup costs
Asking $ / acre
—
Setup allowance
—
All-in $ / acre
—

A planning estimate, not a valuation or contractor quote. The USDA benchmark includes farm land and buildings; it is context, not a parcel comp.

Before an offer

Parcel due diligence

0/8 checked

Saved properties and checklist progress stay on this device. Bolthole Index does not receive them.

Cities and towns in Meade County

Inside a city or town, that city usually issues building permits and sets zoning; the county’s rules above cover unincorporated land. Septic, wells and floodplain rules usually stay with the county or state everywhere.

Brandenburg · Ekron · Muldraugh

Answers from the rulebook for Meade County

What the ordinances and state agencies actually say — one answer per question, each quoted from the official source and independently re-checked.

Meade County rules

  • Building permitRequired

    Excavation, construction, placement, moving, or exterior alteration of buildings, including accessory buildings, in areas governed by the Meade County zoning ordinance.

    • Recurring maintenance work is excepted.
    • Structures and uses exempted by Sections 3.6.1.e and 3.6.2.e are excepted.
    • Private driveway entrance culverts from county roads require written approval by the Meade County Road Supervisor before a building permit is issued.
    “It shall be unlawful to commence the excavation for or the construction or placement of any building, including accessory buildings, or to commence the moving or exterior alteration of any buildings, including accessory buildings, until the Planning Commission or its authorized agent or inspector has issued any building, electrical, or HVAC permits required for such work.”
    2 more reviewed findings on this topic
    • Required — Construction, placement, excavation, or exterior alteration of buildings, including accessory buildings, in unincorporated Meade County.
      “It shall be unlawful to commence the excavation for or the construction or placement of any building, including accessory buildings, or to commence the moving or exterior alteration of any buildings, including accessory buildings, until the Planning Commission or its authorized agent or inspector has issued any building, electrical, or HVAC permits required for such work.”
    • Required — Excavation, construction, placement, moving, or exterior alteration of buildings, including accessory buildings, in areas governed by the ordinance.
      “It shall be unlawful to commence the excavation for or the construction or placement of any building, including accessory buildings, or to commence the moving or exterior alteration of any buildings, including accessory buildings, until the Planning Commission or its authorized agent or inspector has issued any building, electrical, or HVAC permits required for such work.”
  • InspectionsLimited

    Inspections necessary for administration and enforcement of the county zoning ordinance.

    • The ordinance grants inspection authority; the available source does not establish a universal inspection schedule for every building type.
    “The Commission and its authorized agent or inspector shall have the authority to make inspection of buildings or premises necessary to carry out their duties in administration and enforcement of this Ordinance.”
  • Certificate of occupancyRequired

    Structures or premises created, erected, changed, converted, enlarged, or moved under the Meade County zoning ordinance.

    • The certificate must show conformity with the ordinance.
    • The certificate may be withheld until all ordinance requirements are met.
    • Private water, electricity, applicable sanitary sewer, and natural gas utilities must be available before occupancy.
    “No person shall use or permit the use of any structure or premises or part thereof, hereafter created, erected, changed, converted, enlarged, or moved, wholly or partly, until a Certificate of Occupancy has been issued by the Planning Commission’s authorized agent or inspector.”
    2 more reviewed findings on this topic
    • Required — Structures or premises created, erected, changed, converted, enlarged, or moved under the Meade County zoning ordinance.
      “No person shall use or permit the use of any structure or premises or part thereof, hereafter created, erected, changed, converted, enlarged, or moved, wholly or partly, until a Certificate of Occupancy has been issued by the Planning Commission’s authorized agent or inspector.”
    • Required — Structures or premises created, erected, changed, converted, enlarged, or moved under the county ordinance.
      “No person shall use or permit the use of any structure or premises or part thereof, hereafter created, erected, changed, converted, enlarged, or moved, wholly or partly, until a Certificate of Occupancy has been issued by the Planning Commission’s authorized agent or inspector.”
  • County-wide zoningPresent (with conditions)

    Zoning regulation in the unincorporated portions of Meade County.

    • The ordinance divides the unincorporated portions of the county into zones.
    • Incorporated municipalities may administer separate local rules.
    “By adoption of this ordinance, Meade County wishes to exercise the authority granted by the Kentucky Constitution, and the Kentucky Revised Statutes, Chapter 100, Section 100.201 through 100.271 to a legislative body to regulate and restrict the height, number of stories, and size of buildings and other structures, the percentage of lot that may be occupied, the size of yards, courts and open spaces, the density of population, and the location and use of buildings, structures, and land for trade, industry, residence, or other purposes, that the unincorporated areas in Meade County be divided into districts as hereinafter described”
    2 more reviewed findings on this topic
    • Present (with conditions) — Zoning regulation in the unincorporated portions of Meade County.
      “To prepare the text and map of all zoning regulations which shall divide the unincorporated portions of the county into zones on an interim or permanent basis to promote public health, safety, morals and general welfare of the county, to facilitate orderly and harmonious development in the visual or historic character of the unit, to regulate the density of population and intensity of land use in order to provide for adequate light and air.”
    • Present — Zoning regulation in unincorporated areas of Meade County.
      “that the unincorporated areas in Meade County be divided into districts as hereinafter described”
  • Local zoningPresent (with conditions)

    County zoning regulation in unincorporated Meade County.

    • The ordinance divides Meade County into use districts and relies on a zoning map.
    • The ordinance states that its purpose includes land use in the unincorporated areas of Meade County.
    • Incorporated municipalities may have separate municipal rules; this record does not independently determine those rules.
    “the unincorporated areas in Meade County be divided into districts as hereinafter described”
    One more reviewed finding on this topic
    • Present (with conditions) — County zoning administered by the Meade County Planning Commission in unincorporated areas.
      “The Planning Commission and its authorized agent or inspector shall administer and enforce this Ordinance.”
  • Zoning districtsPublished

    Zoning districts in unincorporated Meade County.

    • The ordinance identifies 11 districts and adopts a zoning map dated December 3, 1997.
    • Map amendments may change parcel classifications.
    “In order to implement the stated purpose of this ordinance, the county is divided into “Use Districts,” of which there shall be 11 known as: “A-1” Agricultural “A-2” Agricultural “R-1” Residential “R-2” Residential “R-3” Residential “R-4” Residential “B-1” Neighborhood Business “B-2” Highway Business “LI” Light Industrial “HI” Heavy Industrial “C” Conservancy”
    2 more reviewed findings on this topic
    • Published (with conditions) — Zoning districts and official zoning maps for unincorporated Meade County.
      “To prepare and adopt official zoning maps.”
    • Published (with conditions) — Zoning districts established by the Meade County zoning ordinance.
      “Districts,” of which there shall be 11 known as: “A-1” Agricultural “A-2” Agricultural “R-1” Residential “R-2” Residential “R-3” Residential “R-4” Residential “B-1” Neighborhood Business “B-2” Highway Business “LI” Light Industrial “HI” Heavy Industrial “C” Conservancy”
  • Minimum dwelling sizeDistrict specific (with conditions)

    Factory-built housing placed on lots in applicable Meade County zoning districts that do not qualify as infill sites, within the unincorporated county.

    • The zoning ordinance applies to unincorporated areas of Meade County.
    • The 950-square-foot rule is stated in Section 4.3.6.c for factory-built housing placed on lots that do not qualify as infill sites in the applicable district.
    • Basement and garage space are excluded from the floor-area calculation.
    • Additional zoning, dimensional, compatibility, building-code, septic, and certificate-of-occupancy requirements may apply.

    minimum residence floor area: >= 950 square feet (Basement and garage space are not included.)

    “Each residence must measure at least nine hundred fifty (950) square feet of floor area”
  • Minimum lot sizeDistrict specific (with conditions)

    Lots created under the Meade County zoning ordinance in its listed zoning districts.

    • Any parcel or lot created upon adoption of the ordinance must meet the lot standards in Section 3.7.
    • Minimum lot areas are subject to County Health Department review and approval for adequate septic-system, well, and related facility area.
    • Additional area must be accounted for where required by the Health Department.
    • When sanitary sewer becomes available, minimum lot-size requirements in residential districts may be reduced upon individual Planning Commission review.
    • The schedule includes exceptions and cross-references, including Sections 3.6.7 and 4.2.

    minimum lot area schedule: The Section 3.7 table lists district-specific square-footage requirements, including 217,800; 87,120; 39,204; and 43,560 square feet for the listed one-family and two-family district columns. square feet (See the ordinance table and footnotes for district-column mapping and exceptions.)

    “Zoning Districts Units A-1 A-2 R-1 R-2 R-3 R-4 B-1”
    2 more reviewed findings on this topic
    • Specified — Lots created or developed under the county zoning ordinance.
      “All minimum lot areas shall be subject to review and approval by the County Health Department to ensure there is adequate area for placement of septic systems, wells, etc.”
    • Specified — Lots in Meade County zoning districts.
      “At the time when sanitary sewer is made available, the minimum lot size requirements in the “R” districts may be reduced upon individual review by the Planning Commission.”
  • SetbacksSpecified

    Buildings and structures subject to the Meade County zoning district setback schedule.

    • Front, rear, and side setbacks vary by district and use.
    • Corner lots and double-frontage lots have additional rules.
    • Unattached accessory buildings must be at least eight feet from property lines except as provided in referenced sections.
    “A building setback line shall be established to provide a front yard for all buildings and structures at the minimum distance found in the schedule of Lot Dimensions and Area Regulations.”
    2 more reviewed findings on this topic
    • Specified — Buildings and structures in county zoning districts.
      “A building setback line shall be established to provide a front yard for all buildings and structures at the minimum distance found in the schedule of Lot Dimensions and Area Regulations.”
    • Specified — Front, rear, and side setbacks in Meade County zoning districts.
      “All unattached accessory buildings shall be at least eight (8) feet from all property lines, except as provided in Sections 3.6.7. and 4.2”
  • Lot coverageSpecified

    Apartment houses governed by section 4.3.3 of the Meade County zoning ordinance.

    • The combined area of principal and accessory buildings may not exceed 50 percent of total lot area.
    • Nonconforming lots with public water and sewer have a separate exception.

    maximum combined building coverage: <= 50 percent of total lot area

    “The combined area occupied by all principal and accessory buildings shall not exceed fifty percent (50%) of the total lot area.”
    One more reviewed finding on this topic
  • Building heightSpecified

    Buildings in zoning districts governed by the Meade County zoning ordinance.

    • Buildings generally may not exceed two stories or 30 feet unless side yards are increased.
    • Height may not exceed 50 feet under the stated rule.
    • The rule does not apply to Light Industrial buildings in the same manner and imposes no height restrictions in Heavy Industrial and Agricultural districts.
    • Airport and FAA height regulations take precedence where applicable.

    default maximum height: 30 feet (additional side-yard increases may allow greater height) · absolute maximum height: <= 50 feet (Heavy Industrial and Agricultural districts have no height restrictions under this section)

    “No building shall exceed two (2) stories or thirty (30) feet in height, unless each side yard is increased over the required minimum by five (5) feet for every five (5) feet, or fraction thereof, of additional height over thirty (30) feet. In no case shall the height exceed fifty (50) feet.”
    One more reviewed finding on this topic
    • Specified — Buildings in county zoning districts.
      “No building shall exceed two (2) stories or thirty (30) feet in height, unless each side yard is increased over the required minimum by five (5) feet for every five (5) feet, or fraction thereof, of additional height over thirty (30) feet. In no case shall the height exceed fifty (50) feet.”
  • Living in an RVTemporary only (with conditions)

    Use of a recreational vehicle as temporary shelter during construction of a residential dwelling.

    • A building permit for the associated residential dwelling must have been issued.
    • Use is limited to 180 days.
    • The RV may not be attached to permanent electric, water, or sewage systems.
    • The RV must remain mobile or movable.
    • One additional 180-day extension is allowed at no cost.

    initial period: 180 days (one-time additional 180-day extension allowed at no cost)

    “Recreational Vehicles may be utilized as temporary shelter for no longer than 180 days during the construction process of a residential dwelling for which a building permit has been issued but may not be attached to any permanent electric, water or sewage system and must remain mobile/movable at all times.”
    2 more reviewed findings on this topic
    • Limited — Use of a recreational vehicle as temporary shelter during residential construction.
      “Recreational Vehicles may be utilized as temporary shelter for no longer than 180 days during the construction process of a residential dwelling for which a building permit has been issued but may not be attached to any permanent electric, water or sewage system and must remain mobile/movable at all times.”
    • Limited — Residential or temporary RV occupancy in areas governed by the Meade County zoning ordinance.
      “Recreational Vehicles may be utilized as temporary shelter for no longer than 180 days during the construction process of a residential dwelling for which a building permit has been issued but may not be attached to any permanent electric, water or sewage system and must remain mobile/movable at all times.”
  • Camping on your landLimited

    Temporary RV shelter during construction of a permitted residential dwelling.

    • The rule is limited to the construction process and does not establish general recreational or long-term camping authorization.
    • The 180-day period begins when the associated building permit is issued; one additional 180-day extension is allowed at no cost.

    construction-shelter period: 180 days (one-time additional 180-day extension)

    “The 180 day period begins on the date that the building permit for the associated residential structure is issued. As with a building permit, a one-time extension of an additional 180 days is allowed at no cost.”
  • Tiny homesLimited

    A small dwelling that qualifies as the ordinance's Modular Housing Unit in unincorporated Meade County.

    • The zoning ordinance expressly applies to unincorporated areas of Meade County.
    • In A-1 Agricultural districts, Modular Housing Units are permitted, subject to the applicable minimum lot area in Section 3.7.
    • In A-2 Agricultural districts, additional family dwellings including modular housing units are permitted only when occupied by the owner, full-time operator, family members of the farm, or necessary full-time farm employees, on separate tracts of at least two acres.
    • In R-2 and R-3 districts, Modular Housing Units are listed as permitted uses, subject to the district's dimensional and area regulations.
    • In R-1 districts, placement of Modular Housing Units is a conditional use requiring Board of Adjustment approval and compliance with Section 4.3.6 compatibility standards; the Board may not accept an application knowingly contrary to a deed restriction or private covenant of record.
    • A Modular Housing Unit must be built in off-site sections, become a permanent fixture, use permanent support and enclosure systems, be transported without attached wheels, axles, or hitch mechanisms, meet the listed exterior and roofing standards, bear a Kentucky Department of Building, Housing and Construction M certification seal, be inspected under applicable residential building codes, and receive a certificate of occupancy.

    modular occupied space threshold: > 950 feet of occupied space (The ordinance states this threshold for its defined Modular Housing Unit.) · A-2 additional-family-dwelling tract size: >= 2 acres (Applies to additional family dwellings in the A-2 agricultural district.)

    “3.6.1.a. Permitted Uses - 1. Manufactured Home, Modular Housing Unit”
  • Manufactured homesAllowed (with conditions)

    Manufactured and sectional homes in the A-1, A-2, and R-4 zoning districts.

    • Manufactured mobile and sectional housing must be placed on concrete foundations or mortared concrete blocks.
    • The unit bottom must not be more than four feet above ground except where flooding is prevalent.
    • A solid permanent-material enclosure must be built between the ground and the unit bottom edge.
    • Manufactured mobile home parks are authorized in the R-4 district.

    maximum unit elevation: <= 4 feet above ground (except where flooding is prevalent)

    “Homes occupied by a resident not solely engaged in agricultural activity shall be allowed in the “A-1,” “A-2,” and “R-4” districts. Manufactured mobile home parks shall be authorized in the “R-4” district.”
    2 more reviewed findings on this topic
    • Limited — Manufactured mobile and sectional homes in A-1, A-2, and R-4 districts.
      “Manufactured Mobile Homes and Manufactured Sectional Homes occupied by a resident not solely engaged in agricultural activity shall be allowed in the “A-1,” “A-2,” and “R-4” districts. Manufactured mobile home parks shall be authorized in the “R-4” district.”
    • Allowed (with conditions) — Manufactured homes in the county A-1 Agricultural zoning district.
      “Manufactured Home, Modular Housing Unit, Qualified Manufactured Home and On-Site Constructed Homes.”
  • Accessory dwellingsLimited

    Accessory family-care units functioning as a second dwelling.

    • A second dwelling is allowed on a lot only with Environmental Office approval.
    • The owner must live on the property; the unit may not be rented to the public; an approved septic system is required; annual reporting and removal requirements apply.
    “Family Care Units: Additional provisions for Family Care Units: (a) Second dwelling allowed on lot per approval of Environmental Office.”
  • Who permits septicLocal (with conditions)

    Onsite sewage disposal administration for Meade County through the Lincoln Trail District Health Department.

    • The Kentucky Cabinet for Health and Family Services identifies Lincoln Trail District Health Department as serving Meade County.
    • The statewide program is administered through local health departments, which perform onsite evaluations and inspections.
    • The cited sources do not establish that Meade County itself administers the program.
    “The Onsite Sewage Disposal Systems Program is administered through local health departments and begins with the use of onsite evaluations to determine if site and soil conditions are suitable for onsite wastewater systems.”
  • Septic permitRequired

    On-site sewage disposal systems, including septic systems, located in Meade County within the Lincoln Trail District Health Department service area.

    • The Lincoln Trail District Health Department provides inspections and permitting for on-site sewage disposal systems in Meade County and five other named counties.
    • A person or agent applies for a Health Department site evaluation online or at the local Environmental office.
    • The site evaluation fee is $300 and must be paid when the application is submitted.
    • If the site is suitable or provisionally suitable, a certified installer may apply to the Health Department for a permit to install the septic system with required paperwork and permit fee.
    • The installer must request a Health Department inspection before any installed work is covered.
    • All onsite sewage program fees must be paid before a site evaluation, permit issuance, existing-system inspection, or other onsite sewage service; credit-card payments incur a 5% fee.
    • Meade County Health Center: 520 Hillcrest Dr., Brandenburg, KY 40108; Environmental phone 270-422-5919; Environmental Department hours Monday through Friday, 8:00-9:30 a.m. and 3:30-4:30 p.m. EST.

    site evaluation fee: 300 USD · credit-card fee: 5 percent (applies to all credit-card payments)

    “provides inspections and permitting for on-site sewage disposal systems including septic systems in Hardin, LaRue, Marion, Meade, Nelson, and Washington Counties.”
    2 more reviewed findings on this topic
    • Required — New septic-system installation in Meade County served by the Lincoln Trail District Health Department.
      “the certified installer may apply at the Health Department for a permit to install the septic system.”
    • Limited — Homeowner installation of an onsite sewage system in Meade County through the local health department.
      “A homeowner who wishes to install his or her own system must obtain a homeowner’s permit through the local health department.”
  • Septic inspectionLimited

    Onsite sewage site evaluations and inspections performed by the local health department serving Meade County.

    • Local health department onsite septic inspectors perform site evaluations and inspections in Kentucky.
    • The cited official text does not state that inspection is mandatory for every onsite sewage system, so the claim is limited to the inspection function described by the state program.
    “The local health department onsite septic system inspectors perform site evaluations and inspections in Kentucky.”
    One more reviewed finding on this topic
  • Mandatory utility hookupConditional

    Occupancy of buildings governed by the Meade County zoning ordinance.

    • Water and electricity must be completed and available for use.
    • Sanitary sewer and natural gas are required where applicable.
    • The ordinance does not establish universal public utility connection for every parcel.
    “No person shall allow occupancy of any building until the Planning Commission has been notified by the appropriate agencies that the private details of water, electricity, and where applicable, sanitary sewer and natural gas are completed in such a fashion that such private utilities are available for use on the property in question.”
    2 more reviewed findings on this topic
    • Conditional — Occupancy of buildings governed by the Meade County zoning ordinance.
      “No person shall allow occupancy of any building until the Planning Commission has been notified by the appropriate agencies that the private details of water, electricity, and where applicable, sanitary sewer and natural gas are completed in such a fashion that such private utilities are available for use on the property in question.”
    • Conditional — Buildings in areas governed by the Meade County zoning ordinance.
      “within 500 feet), buildings shall be connected to such mains. In every other case, individual sewerage disposal must meet the requirements set by the State Plumbing Inspector.”
  • Agricultural exemptionAvailable (with conditions)

    Agricultural buildings on land used solely for agricultural farming, dairying, stock raising, or similar purposes.

    • No building permit or certificate-of-compliance regulations apply, except setbacks must be met.
    • Buildings or structures in designated floodways or floodplains that tend to increase flood heights or obstruct flood flow require Planning Commission review and approval.
    “Agricultural buildings on land which is used solely for agricultural farming, dairying, stock raising or similar purposes, shall have no regulations imposed as to building permits or certificates of compliance, except that: (a) setback requirements must be met; and (b) that all buildings or structures in a designated flood-way or flood plain which tend to increase flood heights or obstruct the flow of flood waters shall be regulated by the Planning Commission, and therefore, require the review and approval of the Meade County Planning Commission.”
    One more reviewed finding on this topic
    • Available (with conditions) — Land used solely for agricultural use under the Meade County zoning ordinance.
      “Land which is used solely for agricultural use as defined herein shall be exempt from any non-conforming status regulations in any and all zoning districts.”
  • Subdividing landRegulated (with conditions)

    Subdivision of land in unincorporated Meade County.

    • The Planning Commission reviews, approves, and disapproves subdivision plats.
    • No subdivision plat may be recorded until Commission approval is entered on the plat.
    “Pursuant to the authority granted by the State of Kentucky to cities and counties by the Kentucky Revised Statutes (KRS) 100.273 to 100.291 and 100.334 and upon adoption of these regulations, the Meade County Planning Commission does hereby exercise the power and authority to review, approve and disapprove plats for the subdivision of land.”
    One more reviewed finding on this topic
  • Driveway accessRequired

    Private driveway entrance culverts from county roads in Meade County.

    • Written approval by the Meade County Road Supervisor is required before a building permit is issued.
    • Unauthorized development of an entrance culvert is subject to ordinance penalties.
    “All private driveway entrance culverts from county roads developed on real estate must be approved in writing by the Meade County Road Supervisor prior to a building permit being issued.”
    2 more reviewed findings on this topic
    • Required — Private driveway entrance culverts from county roads on real estate governed by the county ordinance.
      “All private driveway entrance culverts from county roads developed on real estate must be approved in writing by the Meade County Road Supervisor prior to a building permit being issued.”
    • Required — Private driveway entrance culverts from county roads developed on real estate in unincorporated Meade County.
      “All private driveway entrance culverts from county roads developed on real estate must be approved in writing by the Meade County Road Supervisor”
  • Building in a floodplainLimited

    Subdivision development in Meade County.

    • Subdivision preliminary plats must identify 100-year flood plains and other environmentally sensitive or hazardous areas.
    • The source establishes a subdivision-plan disclosure requirement, not a complete countywide floodplain permit rule.
    “Existing drainage channels, water courses, ponds, sinkholes, springs, poorly drained areas, 100 year flood plains, wetlands or other environmentally sensitive or hazardous areas such as soils which might affect the design of the subdivision.”
    2 more reviewed findings on this topic
    • Required — Structures in designated floodways or floodplains under Meade County zoning.
      “All buildings or structures in a designated flood-way or flood plain which tend to increase flood heights or obstruct the flow of flood waters shall be regulated by the Planning Commission, and therefore, require the review and approval of the Meade County Planning Commission.”
    • Limited — Agricultural buildings and structures in designated floodways or floodplains that tend to increase flood heights or obstruct flood flow.
      “all buildings or structures in a designated flood-way or flood plain which tend to increase flood heights or obstruct the flow of flood waters shall be regulated by the Planning Commission, and therefore, require the review and approval of the Meade County Planning Commission.”
  • Permit feesPublished

    Meade County Planning and Zoning building-permit application packet and fee schedule.

    • The county page states that the updated packet and fee schedule became effective September 9, 2025.
    • Applicants are encouraged to review the requirements before submitting an application.
    • The zoning ordinance states that fees for zoning/building permits, certificates of compliance, variances, conditional use permits, appeals, and zone changes may be established by the county legislative body.
    • Preliminary charges and fees must be paid in full before specified Board of Zoning Adjustment proceedings or changes are granted or acted upon.
    • Planning Commission and Board of Adjustment requests must include the County Clerk filing fee required by KRS 100.3681 where applicable.
    • Planning and Zoning Commission fees are subject to annual review and Fiscal Court approval.

    fee schedule effective date: 2025-09-09

    “updated its Building Permit Application Packet and fee schedule, effective September 9, 2025.”
    One more reviewed finding on this topic
    • Published (with conditions) — Meade County Planning and Zoning building and electrical permit fees for the unincorporated areas governed by the county zoning ordinance.
      “Building Permit Fees New Fees as of 9/9/2025 Plan Review 100-150 Storm Shelter 130 Inground Swimming Pool 130”
  • Permit processPublished (with conditions)

    Meade County building permit applications.

    • Applications require zoning, plans, site layout, septic approval or engineered septic documentation, plat or survey, deed, and applicable subdivision restrictions.
    • Approval may take up to 14 days.
    • Electrical permits are obtained through Planning and Zoning; plumbing and HVAC permits are obtained through the state.

    review period: <= 14 days

    “PLANS/ BUILDING DOCUMENTS MUST BE REVIEWED. ADDITIONAL DOCUMENTS MAY BE REQUIRED BY THE BUILDING INSPECTOR. This application will be accepted when ALL required information is furnished.”
    2 more reviewed findings on this topic
    • Published (with conditions) — Meade County building permit applications.
      “The authorized agent or inspector shall grant or deny the permit within fourteen (14) calendar days from the date the application is submitted.”
    • Published (with conditions) — County zoning and building permit applications for construction in the unincorporated areas of Meade County.
      “Once the building permit is approved (estimated 1-3 days, no more than 14 days) you will receive an email invoice to pay the permit fee. The building permit and placard can then be issued and posted at the building location.”

Kentucky rules that apply here

  • Owner-builder exemptionConditional

    An individual property owner performing heating, ventilation, and air conditioning work on property the individual owns and occupies.

    • The exemption applies to KRS 198B.650 to 198B.689, Kentucky's HVAC contractor provisions.
    • The owner must own and occupy the property.
    • For installation of an initial HVAC system, the owner must apply for a permit before beginning installation.
    • An exempt owner need not possess or show proof of an HVAC license to obtain the required HVAC permit.
    • Applying for the HVAC permit constitutes consent to inspection by authorized Commonwealth and relevant local-government inspectors.
    • No HVAC permit is required for installation on a manufactured home by a licensed manufactured-home retailer or manufacturer, and no permit or inspection is required for window-unit air conditioners, space heaters, or HVAC systems in buildings not designed for human occupancy.
    “KRS 198B.650 to 198B.689 shall not apply to: [...] (3) An individual owner of real property while practicing heating, ventilation, and air conditioning work on or within property owned and occupied by the individual;”
    One more reviewed finding on this topic
    • Conditional — Homeowner plumbing, sewerage, or drainage work in a home occupied by the owner or constructed by the owner for personal residential use.
      “Permits to construct, install or alter plumbing, sewerage or drainage may be issued to homeowners who desire to install plumbing in homes actually occupied by them or in a home to be constructed by them for their own personal residential use, if all the following requirements are met:”
  • Building code adoptedAdopted (with conditions)

    Buildings constructed statewide in Kentucky, including residential and nonresidential construction subject to the Kentucky Building Code and Kentucky Residential Code.

    • The 2015 International Building Code is the mandatory state building code for buildings constructed in Kentucky, subject to Kentucky amendments in the 2018 Kentucky Building Code.
    • One-family dwellings, two-family dwellings, and townhouses are governed by 815 KAR 7:125 and the 2015 International Residential Code with Kentucky amendments in the 2018 Kentucky Residential Code.
    • Permits, inspections, and certificates of occupancy are not required for a single-family dwelling unless required by local ordinance.
    • Residential occupancies that are not single-family dwellings, two-family dwellings, or townhouses must comply with the 2015 International Building Code and the 2018 Kentucky Building Code.
    • Manufactured homes are governed by KRS 227.550 through 227.665.

    base building code: 2015 International Building Code (Kentucky amendments in the 2018 Kentucky Building Code supersede conflicting provisions) · residential code: 2015 International Residential Code; 2018 Kentucky Residential Code amendments (Applies to single-family dwellings, two-family dwellings, and townhouses under 815 KAR 7:125) · mandatory effective date: 2019-01-01

    “Building Code. The 2015 International Building shall be the mandatory state building code for all buildings constructed in Kentucky except that: (1) The Kentucky amendments in the 2018 Kentucky Building Code shall supersede any conflicting provision in the 2015 International Building Code; (2) One (1) family dwellings, two (2) family dwellings, and townhouses shall be governed by 815 KAR 7:125; and (3) Manufactured homes shall be governed by KRS 227.550 through 227.665.”
    3 more reviewed findings on this topic
    • Adopted (with conditions) — Kentucky Building Code and Kentucky Residential Code requirements applicable to construction in Meade County.
      “This administrative regulation establishes the basic mandatory uniform statewide code provisions relating to construction of one (1) and two (2) family dwellings and townhouses.”
    • Adopted (with conditions) — Kentucky building construction, including Meade County, subject to the regulation's exceptions.
      “The Department of Housing, Buildings and Construction adopted the 2018 Kentucky Building Code, Second Edition and the 2018 Kentucky Residential Code, Second Edition on August 3, 2019.”
    • Adopted — Mandatory Kentucky residential building-code standards for single-family dwellings, two-family dwellings, and townhouses constructed statewide, including unincorporated areas.
      “Except as provided in subsection (2) of this section, the 2015 International Residential Code for One (1) and Two (2) Family Dwellings (IRC) shall be the mandatory state residential building code for all single-family dwellings, two (2) family dwellings, and townhouses constructed in Kentucky, except that the Kentucky amendments in the 2018 Kentucky Residential Code shall supersede any conflicting provision in the 2015 IRC.”
  • Off-grid sanitationProhibited

    Use of seepage pits, cesspools, or dry wells as onsite sewage disposal systems statewide in Kentucky, subject to the Section 13 exception.

    • The prohibition is subject to the exception provided in Section 13 of 902 KAR 10:085.
    • Section 13 permits limited repair or alteration of existing seepage-pit systems when municipal or public sewage treatment is unavailable and repair or alteration is required because of malfunction, damage, or upgrade.
    • A limited single-family vacant-lot exception applies to certain lots purchased on or before May 1, 1992, if bona fide construction began by December 25, 1992.
    “Except as provided in Section 13 of this administrative regulation, use of seepage pits, cesspools, or dry wells;”
    One more reviewed finding on this topic
  • Well permitNot required

    Construction or abandonment of a private water well by a property owner statewide in Kentucky.

    • Construction, modification, and abandonment must be performed by a Kentucky Certified Water Well Driller.
    • The certified driller must complete and submit required documentation within sixty days after completion.
    • The conclusion concerns owner permitting applications and fees; it does not eliminate the separate driller-certification requirement.

    well documentation submission deadline: 60 days after completion

    “there are no permitting applications or fees for constructing or abandoning a water well required of the property owner.”
    One more reviewed finding on this topic
  • Campground & park staysTemporary only (with conditions)

    Sleeping temporarily in a recreational vehicle or other vehicle in a vehicle-based location covered by KRS 511.110.

    • The vehicle must be parked lawfully on a public road, street, or parking lot.
    • Sleeping and parking at the location must occur for less than twelve (12) hours.
    • This provision does not establish permission for long-term or permanent RV occupancy on private land.
    • KRS 511.110 separately prohibits camping in specified areas when the area has not been designated for sleeping or camping or the person lacks authorization.

    maximum sleeping and parking period: < 12 hours

    “Nothing in this section shall prevent a person from sleeping temporarily in his or her vehicle parked lawfully on a public road, street, or parking lot, where the sleeping and parking of the vehicle at the location occur for a period of less than twelve (12) hours.”
  • county zoning authorityGeneral

    Kentucky counties' statutory authority to enact zoning regulations, including county-regulated areas outside incorporated municipalities as determined by the applicable planning-unit and political-boundary structure.

    • The statute expressly authorizes both cities and counties to enact zoning regulations.
    • A zoning regulation must contain text listing the types of zones and regulations applicable in each zone, uniform throughout the zone, and provisions for variances, conditional-use permits, and nonconforming uses.
    • Authorized subjects include land activities, structure dimensions and locations, open-space and distance requirements, density, special-interest districts, fringe areas, and activities or structures near thoroughfares, water bodies, public facilities, aircraft facilities, unique places, and floodplains.
    • Agricultural land must have no regulations except that setback lines may be required for streets and highways; floodway or floodplain buildings or structures may be fully regulated; mobile homes and other dwellings may be regulated; and uses under KRS 100.111(2)(c) may be regulated as conditional uses.
    • The applicable planning unit and political boundaries determine the area governed by a county zoning regulation.
    “Cities and counties may enact zoning regulations which shall contain:”
    One more reviewed finding on this topic
    • General — Kentucky counties may adopt permanent land-use regulations, including zoning, through the applicable planning-unit process; this authority reaches county jurisdiction, including unincorporated areas, subject to the statutory planning prerequisites.
      “When all required elements of the comprehensive plan have been adopted in accordance with the provisions of this chapter, then the legislative bodies and fiscal courts within the planning unit may enact permanent land use regulations, including zoning and other kinds of growth management regulations”
  • county building authorityGeneral

    Kentucky fiscal courts may adopt and enforce construction regulations and may require building permits for construction in the county, including residential construction in unincorporated areas.

    • The construction regulations must be adopted by county order or resolution.
    • The regulations operate pursuant to KRS 198B.060 and the Uniform State Building Code framework.
    • A county building inspector may administer the regulations.
    • No person may build, erect, construct, reconstruct, remodel, relocate, alter, or repair a building within the county without first obtaining a building permit from the building inspector when the county permit system applies.
    • Permit fees must be reasonable and may not exceed the cost of the service provided.
    • A person aggrieved by the building inspector's ruling, order, or decision may appeal under KRS 198B.070.

    permit fee ceiling: <= cost of the service provided

    “The fiscal court of any county shall have authority, by order or resolution, to adopt, and to enforce, regulations governing construction as defined by KRS 198B.010 pursuant to the provisions of KRS 198B.060.”
    One more reviewed finding on this topic
    • General — Kentucky county authority, as a local government, to enforce the Uniform State Building Code and issue building permits within its jurisdiction, including unincorporated residential construction.
      “Each local government shall employ a building official or inspector and other code enforcement personnel as necessary, or shall contract for inspection and code enforcement services in accordance with subsections (8) and (11) of this section to enforce the Uniform State Building Code within the boundaries of its jurisdiction, except that permits, inspections, and certificates of occupancy shall not be mandatory for single-family residences unless a local government passes an ordinance requiring inspections of single-family residences.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission — ask the county directly.

  • Short-term rentals — Short-term rental use in Meade County.

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Living off-grid in Meade County, Kentucky

Is Meade County a good place to live off-grid or homestead?

Meade County scores 56/100 on the Bolthole Index, a solid county profile. Its strengths: manageable long-term carry cost and strong self-sufficiency basics: 50″/yr rainfall plus 48.2% wooded land. Watch-outs: about 77,511 people within a 30-minute drive and a weaker property-autonomy legal backdrop.

Do you need a building permit in Meade County, Kentucky?

Meade County generally requires a residential building permit, and it enforces county zoning. Onsite septic is permitted by Lincoln Trail District Health Department. Owner-builders may act as their own contractor to build their home. These answers are quoted from official sources and independently re-checked. Rules change and cities within the county differ — always confirm with the county before you buy or build.

Can you live in an RV or tiny home on your land in Meade County?

Living in an RV on your own land in Meade County is allowed on a temporary basis only: Use of a recreational vehicle as temporary shelter during construction of a residential dwelling. A building permit for the associated residential dwelling must have been issued. Use is limited to 180 days. A tiny home is limited to specific cases. Confirm with the county before relying on it.

How much does land cost in Meade County, Kentucky?

Land in Meade County runs about $5,432 per acre, based on the latest county data.

What is the water situation in Meade County?

Meade County gets about 50" of rain a year, with severe drought in roughly 2.7% of years.

How remote is Meade County?

A representative private-land location has about 77,511 people within a 30-minute drive and 3,211,942 within two hours. The road-network catchments count population across county lines and clusters of smaller cities; straight-line radius values remain available as a comparison.

How Meade compares in Kentucky

Compare side-by-side →See all 120 Kentucky counties ranked →