Unincorporated Queen Anne's County, Maryland requires a building permit or zoning certificate for residential and accessory construction, with zoning administered by county Planning & Zoning12. Inside Centreville, the town handles building permits and zoning; septic and well approvals remain with the Queen Anne's County Health Department3456. A Certificate of Occupancy is required before moving into a permitted home7.
At a glance
- Building permit
- Required for new construction and for alteration, renovation or repair of residential or accessory structures1
- Zoning
- County Planning & Zoning for unincorporated land; Centreville has its own zoning24
- Septic
- Required for a new or altered onsite system; the county Health Department approves and inspects it8910
- Well permit
- Required; a licensed well driller applies through the county Health Department116
- Owner-builder
- Conditional landowner affirmation for direct construction for personal use; no contracted builder or construction manager12
- Accessory dwelling
- One guest residence or apartment is allowed per single-family lot, subject to location, size, owner-occupancy and septic conditions13
- RV occupancy
- Only narrow rules are confirmed for a qualifying WVC fraternal use and for RVs in special flood hazard areas; ask Planning & Zoning about other parcels141516
- Floodplain
- Construction or fill requires a floodplain permit; new structures must meet elevation requirements17
Who to call
Building permits
Queen Anne's County Planning & Zoning: Permits, Licenses and Zoning Division
Building, zoning, and driveway permits and licensing for Queen Anne's County, including the Building Official's office
110 Vincit Street, Suite 104, Centreville, MD 21617
Zoning
Queen Anne's County Department of Planning & Zoning
Zoning ordinance, subdivision regulations, critical area ordinance and forest conservation regulations for the county
110 Vincit Street, Suite 104, Centreville, MD 21617
Also useful
Queen Anne's County Emergency Services, Office of the Fire Marshal
Fire, alarm, sprinkler, LP-gas and fuel-tank permits and inspections, separate from the building permit
Also useful
Building, electrical, plumbing and HVAC inspections for Queen Anne's County permits, performed under contract rather than by county staff
Septic permits
Queen Anne's County Health Department, Environmental Health Division
Septic (sewage disposal) permits and inspections, well-site and well-construction inspections, and water testing for private wells
206 N. Commerce St., Centreville, MD
Floodplain permits
Queen Anne's County Public Works, Engineering & General Services (Floodplain Information)
Floodplain development permits and elevation-certificate requirements for construction in a mapped flood zone
Roads & driveways
Queen Anne's County Planning & Zoning: Paved Driveway Permit
Paved driveway permit application, fee and inspection requirements
110 Vincit Street, Suite 104, Centreville, MD 21617
Contact details are copied from each office’s official page and were checked against it on October 11, 2026.
Off-grid gear
Going off-grid in Queen Anne's County means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Queen Anne's County, Maryland?
Unincorporated Queen Anne's County requires a building permit or zoning certificate for new construction and for alteration, renovation or repair of a residential or accessory structure; applicable plumbing, electrical, HVAC and septic permits must be in place before the building permit is issued18. Inside Centreville, the town's Zoning Administrator issues building permits; septic and well approvals remain with the Queen Anne's County Health Department356. Queen Anne's County enforces adopted residential, building, mechanical, energy, plumbing, electrical, life-safety, fire and related codes19.
Residential work proceeds through the inspections required for the particular permit, potentially including footing, foundation, framing, insulation, fire-code and final building-code inspections20. The owner must ensure all applicable final inspections are approved, including a passing duct-tightness test certificate where required21. The owner must then obtain a Certificate of Occupancy from the Zoning Department before occupying the building7. Fire alarms, sprinkler systems, LP-gas work and certain fuel tanks require separate Fire Marshal permits2223.
Who is the Queen Anne's County building department, and how do you reach them?
The Permits, Licenses and Zoning Division, at 110 Vincit Street, Suite 104 in Centreville, is open weekdays 8:00 a.m. to 3:30 p.m.; call 410-758-408824. Since October 21, 2024, permit applications can be submitted, paid for, and tracked online through the county's Citizen Self Service Portal, in addition to the in-person option2524. The Planning line at the same address, 410-758-1255, handles zoning, subdivision, critical area and forest conservation questions on weekdays 8:00 a.m. to 4:30 p.m.16.
Inspections themselves are not done by county staff: Queen Anne's County contracts building, electrical, plumbing and HVAC inspections to the Middle Department Inspection Agency (MDIA), reached at 410-822-830026. Fire-related permits and inspections, including for fire alarms, sprinklers and fuel tanks, go through the Office of the Fire Marshal instead; call 410-758-4500, extension 1144, at least three working days ahead to schedule23.
Does Queen Anne's County have zoning?
County Planning & Zoning administers zoning, subdivision, Critical Area and forest conservation regulations for unincorporated Queen Anne's County; Centreville administers its own zoning, while septic and well approvals remain with the Queen Anne's County Health Department2456. County minor subdivisions create no more than 7 lots; major subdivisions exceed 7 and require Planning Commission approval, and administrative and sliding-scale subdivisions require stormwater planning for future development2728.
Minimum lot sizes depend on the district29. The county's 2004 residential-lot ordinance states a 20-foot building-height limit below 2 acres and, above 2 but below 5 acres, the greater of 20 feet or the principal building's height; ask Planning which structures and current provisions govern your parcel3016. One accessory guest residence or apartment per single-family lot may occupy the principal dwelling or an approved accessory structure, up to 1,500 square feet; the owner must reside onsite and obtain Health Department approval without public sewer13. We could not confirm a general setback schedule or minimum dwelling size; ask Planning & Zoning16.
How do septic and well permits work in Queen Anne's County?
The Queen Anne's County Health Department approves onsite sewage disposal and well construction under Maryland's delegated program56. Sewage disposal requires an approved onsite permit, and new or altered systems cannot be covered or used before approval and inspection3189. Environmental Health evaluates new and existing systems; call 410-758-2281 at 206 N. Commerce St., Centreville3210. Any Maryland well requires a construction permit; a licensed Maryland driller applies to the county approving authority, submits a completion report, and obtains a Certificate of Potability before drinking-water use116.
Covered septic systems generally require pumping every 5 years or a licensed hauler's qualifying inspection certification; holding tanks and qualifying nutrient-removal systems under maintenance contracts are excepted33. Privies, portable units, holding tanks and nonconventional sanitation require Health Department approval under limited conditions34. The approving authority may require connection to adequate, economically available community sewerage; an interim individual system must connect when community sewer becomes available3536.
Can you live in an RV or tiny home on your land in Queen Anne's County?
We could not confirm a general Queen Anne's County rule allowing an RV as a residence on an ordinary private lot; ask Planning & Zoning before buying or moving one onto a parcel16. A qualifying Waterfront Village Center fraternal use may host up to 15 RVs overnight for no more than 4 consecutive days per RV, while a Suburban Residential camping cooperative is seasonal and prohibits year-round residency1437. In a special flood hazard area, an RV must meet manufactured-home requirements, be highway-ready, or remain onsite fewer than 180 consecutive days15.
Tiny-home occupancy also remains unconfirmed; ask Planning & Zoning how the proposed unit is classified in the parcel's district16. In the Agricultural district, a single-wide manufactured home is limited to replacing a legal existing mobile or single-wide home, providing temporary shelter, or serving as the primary residence on a farm under the applicable use rules38. An accessory dwelling is another possible route on a single-family lot, subject to the county's location, size, owner-occupancy and septic conditions13.
Building a home in Queen Anne's County: the steps, in order
- Confirm the parcel's zoning district, subdivision status and any critical area or forest conservation overlay with Planning before designing2716.
- Obtain onsite sewage and, if needed, well approval through Environmental Health8610.
- Check floodplain requirements and driveway access; paved-driveway review requires a site plan and zoning inspection, with a State Highway or County Roads entrance permit when applicable39.
- Submit the residential building-permit application after applicable trade and septic permits are in place1824. The landowner affirmation requires direct construction solely for personal use without contracting a builder or construction manager; notify the building-permit office before later hiring one12. Maryland also has a limited owner HVAC licensing exception for a single-family dwelling the owner occupies or is building to occupy; required county building and trade permits still apply40.
- Apply separately for Fire Marshal-regulated work23.
- Schedule the required building and trade inspections through MDIA2026.
- Obtain the Certificate of Occupancy after final approvals and before moving in; allow 7–10 business days after requesting final building inspection unless Zoning is notified in advance4142.
What should you check before you buy land in Queen Anne's County?
Ask Environmental Health whether the parcel can support a septic system and whether it has an approved well site10. Confirm legal driveway access before closing: a paved driveway needs a site plan and county zoning inspection, and access may also require approval from State Highway or County Roads39. Check the flood map because all construction or fill in a floodplain needs a permit, and check whether Critical Area lot-coverage limits apply1743. Qualifying farm employee dwellings in Agricultural or Countryside districts with specified conservation protections may receive an impact-fee exemption; that exemption does not waive building, zoning or septic approvals44.
Although 99.1% of the county's land has a slope of 15% or less, the NRCS rates 0% of its soils free of severe limitations for a conventional septic drain field; do not assume gentle ground will support a standard system4546. If rental income matters, short-term residential rentals require an annual zoning certificate and compliance with occupancy, inspection, parking and local-manager conditions47. Also price the carrying costs: farmland averages $8,163 an acre, and the median property-tax bill is $3,503 a year4849.
Watch-outs
- Forest Conservation Act updates took effect July 1, 2026, and new applications filed after that date must meet the new standards; confirm which version applies to your project with Planning & Zoning16.
- Queen Anne's County contracts its building, electrical, plumbing and HVAC inspections to Middle Department Inspection Agency (MDIA) at 410-822-8300, not county staff, and fire-related permits and inspections go through a separate Fire Marshal's office at 410-758-4500 ext. 11442623.
- Covered onsite septic systems generally need pump-out documentation every 5 years, but a licensed hauler's qualifying inspection certification may be used instead33.
- The county's confirmed RV rules cover only a qualifying fraternal use in the Waterfront Village Center district and RVs in special flood hazard areas; neither rule establishes permission to live in an RV on an ordinary private lot1415.
- The landowner affirmation excludes contracts to erect, manage or supervise new-home construction; notify the building-permit office before later contracting a builder12.
- We could not confirm a general setback schedule, minimum dwelling size or tiny-home occupancy rule; ask Planning & Zoning directly16.
Sources
- Requirements for a Residential Building Permit, quoted and re-checked
- Planning & Zoning | Queen Anne's County, MD - Official Website, quoted and re-checked
- Town of Centreville: Forms & Permit Applications (Queen Anne's County), quoted and re-checked
- Town of Centreville: Planning & Zoning (Queen Anne's County), quoted and re-checked
- health.maryland.gov, quoted and re-checked
- Water Well Construction, quoted and re-checked
- Requirements for a Residential Building Permit, quoted and re-checked
- .03 On-Site Sewage Disposal Permits, quoted and re-checked
- regs.maryland.gov, quoted and re-checked
- Queen Anne's County Health Department, Environmental Health Division (health.maryland.gov)
- Well Construction Permit, quoted and re-checked
- Affirmation of Landowner, quoted and re-checked
- County Ordinance No. 04-22 — Accessory Apartments, quoted and re-checked
- Article V: District Standards - Queen Anne's County, MD, quoted and re-checked
- Queen Annes County, MD Requirements in All Flood Hazard Areas, quoted and re-checked
- Queen Anne's County Department of Planning & Zoning (qac.org)
- Building in a Flood Zone, quoted and re-checked
- Residential Assistance Bulletin, quoted and re-checked
- Current Adopted Codes, quoted and re-checked
- Residential Building Code Inspections, quoted and re-checked
- Residential Building Code Inspections Guidelines, quoted and re-checked
- Fire Marshal's Inspection Information, quoted and re-checked
- Queen Anne's County Emergency Services, Office of the Fire Marshal (qac.org)
- Queen Anne's County Planning & Zoning: Permits, Licenses and Zoning Division (qac.org)
- Planning and Zoning Citizen Self Service Portal, quoted and re-checked
- Middle Department Inspection Agency (MDIA), the county's contracted building/electrical/plumbing/HVAC inspector (qac.org)
- Planning & Zoning, quoted and re-checked
- Planning & Zoning, quoted and re-checked
- Queen Anne's County Housing Strategy, quoted and re-checked
- COUNTY ORDINANCE NO. 04-21, quoted and re-checked
- State Groundwater Discharge Permit Application, quoted and re-checked
- Environmental Health, quoted and re-checked
- County Ordinance No. 08-09: Mandatory Pump-Out of On-Site Septic Systems, quoted and re-checked
- regs.maryland.gov, quoted and re-checked
- regs.maryland.gov, quoted and re-checked
- Sanitary Construction Application, quoted and re-checked
- County Ordinance No. 24-02 — Camping Cooperative, quoted and re-checked
- Queen Anne's County zoning code materials, quoted and re-checked
- Application for Paved Driveway, quoted and re-checked
- mgaleg.maryland.gov, quoted and re-checked
- Residential Assistance Bulletin, quoted and re-checked
- Residential Building Code Inspections Guidelines, quoted and re-checked
- qac.org, quoted and re-checked
- County Ordinance No. 24-14 — Impact Fee — Farm Employee Dwelling Exemption, quoted and re-checked
- Share of land at 15% slope or less: Bolthole Index county data
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- County Ordinance No. 24-09, quoted and re-checked
- Farmland value per acre (USDA census): Bolthole Index county data
- Median property tax bill: Bolthole Index county data
Written October 11, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.