Bolthole Index

Clare County, Michigan

Building permits, zoning and land rules in Clare County, Michigan

76Index Score / 100
#37 of 83 in Michigan

Clare County, Michigan requires a building permit for construction and for changes in use or occupancy, and Clare County Community Development administers the state construction codes12. Zoning is set locally by each township, city or village, not by one county ordinance, so zoning approval comes from the parcel's own township or municipality3. Septic and well permits come from the Central Michigan District Health Department, not the township or the building office, and must be issued before the building permit on a new-build site45.

At a glance

Building permit
Required before construction6
Permit office
Clare County Community Development7
Zoning
Varies by township or municipality3
Septic
CMDHD permit required before the building permit8
Private well
CMDHD permit required before the building permit5
RV living
Not confirmed countywide; ask the parcel's zoning authority3
Owner-builder
State licensing exemption available for a qualifying owner-builder9

Who to call

Building permits

Clare County Community Development

Building, electrical, mechanical and plumbing permit inspections in Clare County

989.539.2761

225 W. Main St., Harrison, MI 48625

Online permits →

Septic permits

Central Michigan District Health Department — Clare branch

Contact office for Clare County septic and environmental-health service

(989) 539-6731

info@cmdhd.org

815 N. Clare Ave. Suite B Harrison, MI 48625

Well permits

Central Michigan District Health Department

Private-well permits and inspections

Roads & driveways

Clare County Road Commission

County-road and right-of-way permit questions

(989) 539 2151

ccrc@clarecrc.com

3900 E. Mannsiding Rd Harrison, MI 48625

Online permits →

Roads & driveways

Clare County Road Commission permits

Transportation and right-of-way permits through the online permit system

Online permits →

Contact details are copied from each office’s official page and were checked against it on October 9, 2026.

Off-grid gear

Going off-grid in Clare County means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Do you need a building permit in Clare County, Michigan?

Yes. Before constructing a building or structure in Clare County, the owner or the owner's representative must apply to the appropriate enforcing agency; a change in use or occupancy also requires a permit.6 Ordinary repairs are exempt only when they do not cross the stated structural, egress, utility, electrical, mechanical, public-health or safety limits.6 Separate soil-erosion, zoning, plumbing, mechanical or electrical applications may also be needed.6

Clare County Community Development handles county building, electrical, mechanical and plumbing permits and inspections, and administers the Michigan construction codes72. All construction phases covered by a county building permit must be inspected and approved before work proceeds, and concealed uninspected work will not be approved.10 A qualifying Michigan owner-builder has a residential-builder licensing exemption for a home built on the owner's property for the owner's own use and occupancy, but permits, inspections, codes, zoning and utility rules still apply.9

Who issues building permits in Clare County, and how do you reach them?

Start with Clare County Community Development at 225 W. Main St., Harrison, MI 48625, or call 989.539.2761.11 The county publishes an application that may call for separate soil-erosion, zoning, plumbing, mechanical and electrical filings; completed building applications are emailed as directed on the form.12 The permit holder schedules inspections with the permit number, holder name, site address, inspection type, jurisdiction and contact information, and most inspections are completed within three business days after the request.12

After completion, request a Certificate of Use and Occupancy with the building-permit information, applicable trade-approval dates and final septic approval.13 The request carries a non-refundable $5 fee, and a noncompliant project may need a temporary certificate or face enforcement.13 A new or altered building may not be occupied until the code official issues the certificate.14

Does Clare County have zoning, and who sets it?

Zoning in Clare County varies by township, city and village rather than following one uniform county rule, so zoning approval comes from the local authority, while building permits come from the county and septic and well permits from the health department1514. The county's township list identifies both zoned and unzoned townships, but each applicable township or municipal ordinance controls its own parcel rules.3 Where zoning applies, obtain the zoning permit before the building permit.15

We could not confirm one countywide minimum dwelling size, minimum lot size, setback, lot-coverage limit or building-height rule. Ask the parcel's township, city or village zoning authority for the zoning map, permitted uses, dimensional schedule and required approval before designing the project.15 A parcel described as unzoned still remains subject to building, septic, well and other applicable requirements.685

How do septic and well permits work in Clare County?

Central Michigan District Health Department permits on-site septic systems in Clare County.16 For a new system, obtain the septic permit before the building permit, mark the vacant property for the site visit and preserve a replacement drainfield area; construction before permit issuance violates the sanitary code.8 A sanitarian evaluates site suitability, and a final inspection is normally required.17

Soil-survey ratings put essentially none of Clare County's land in the not-severely-limited class for a conventional drain field, so expect a site evaluation and often an engineered or mound system, and make the evaluation an early purchase contingency18. In rare cases a contractor affidavit can replace the final Sanitarian inspection19. Existing septic and well systems require evaluation when a building permit is needed or when use changes from residential to non-residential.17 A private-well permit is also required before the building permit for a new-build site.5 New parcels smaller than one acre without public sewer or public water need local health-department approval before the municipality may issue a building permit.20

Can you live in an RV or tiny home in Clare County?

We could not confirm one countywide rule for long-term RV living, temporary camping or tiny-home occupancy on private land in Clare County. Because zoning varies by township and municipality, ask the parcel's local zoning authority whether the proposed use is allowed and what placement, duration and dwelling standards apply.15

Michigan's state campground rules put recreational units on licensed, numbered campsites and do not by themselves allow long-term RV living on ordinary private land21. State guidance also says a tiny house must be built as a resort rather than a campground, and even on wheels cannot be treated as a recreational unit22. A tiny home still needs applicable local zoning, building, electrical and plumbing permits and final approvals, along with required well and septic permits.23 A building with plumbing must connect to a public sewer where available or to an approved private sewage-disposal system.24 State-approved modular housing is treated as a conventional home for permit purposes; a homeowner may obtain the permit when supervising construction, but must submit proof of state approval.25

Building a home in Clare County: what are the steps?

  1. Identify the parcel's township or municipality and obtain any required zoning approval before the building permit.15
  2. Obtain CMDHD septic and private-well permits before the building permit for a new-build site.85
  3. Ask the Clare County Road Commission whether the access needs a right-of-way permit; its transportation and right-of-way permits use the online system.26
  4. Submit the building application and any separate soil-erosion, plumbing, mechanical or electrical applications.12
  5. Have each required construction phase inspected and approved before continuing or concealing work.10
  6. Submit the occupancy request with applicable trade approvals and final septic approval, then wait for the certificate before occupying the building.1314

What should you check before buying land in Clare County?

Make septic feasibility an early contingency: mapped soils rate the surveyed land as severely limited for conventional drain fields, and CMDHD evaluates the site.1817 Confirm well siting and whether public sewer or water is available; a new parcel smaller than one acre without either utility needs health-department approval before a building permit may issue.20

Check the local zoning authority for allowed use and dimensional rules because zoning varies across Clare County.3 Ask the Clare County Road Commission about access and its online right-of-way permit process.26 For land in a qualifying river, stream or drain floodplain, Michigan requires a state permit when the drainage area is at least 2 square miles, and other approvals may still apply.27 The median property-tax bill is about $1,387 per year, though an individual parcel's bill will differ.28

Watch-outs

  • Do not assume a Clare County parcel has the same zoning rules as the next township; confirm the governing local authority and ordinance before purchase.3
  • New-build septic and well permits must come before the building permit, and construction before permit issuance violates the sanitary code.85
  • We could not confirm countywide rules for RV residence, temporary camping or minimum dwelling size; ask the parcel's zoning authority before planning any of these uses.15
  • A permit holder must obtain approval at each required construction phase before continuing, and concealed uninspected work will not be approved.10
  • Floodplain work may need a Michigan permit as well as county or local approval.27

Sources

  1. Building Permit Information, quoted and re-checked
  2. Inspections & Permits | Clare County Community Development, quoted and re-checked
  3. Clare County Township Contact Information, quoted and re-checked
  4. Sewage Systems, quoted and re-checked
  5. Water Wells and Water Quality | CMDHD, quoted and re-checked
  6. Building Permit Information, quoted and re-checked
  7. Clare County Community Development - Applications & Forms (2026 county census)
  8. Sewage Systems | CMDHD, quoted and re-checked
  9. Frequently Asked Questions – Residential Builder (Michigan statewide rule), quoted and re-checked
  10. Building Permit Application, quoted and re-checked
  11. Clare County Community Development (clareco-buildingdev.net)
  12. Building Permit Application, quoted and re-checked
  13. Certificate of Use and Occupancy Request, quoted and re-checked
  14. Certificate of Occupancy Request (Michigan statewide rule), quoted and re-checked
  15. Townships Where Zoning Permits Are Required, quoted and re-checked
  16. Environmental Health | Central Michigan District Health Department, quoted and re-checked
  17. Sewage Systems | CMDHD, quoted and re-checked
  18. Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
  19. Sewage Systems, quoted and re-checked
  20. Subdivisions of Land | CMDHD, quoted and re-checked
  21. ARVC Michigan campground guidance, quoted and re-checked
  22. ARVC Michigan campground guidance, quoted and re-checked
  23. michigan.gov (Michigan statewide rule), quoted and re-checked
  24. Michigan Part 7 Plumbing Code Rules (Michigan statewide rule), quoted and re-checked
  25. clareco-buildingdev.net, quoted and re-checked
  26. Clare County Road Commission permits (clarecrc.com)
  27. FAQ: Floods and Floodplain Management, quoted and re-checked
  28. Median property tax bill: Bolthole Index county data

Written October 9, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Found land here? Start a Property Hunt →

Compared with neighboring counties

Like 5 of its 6 neighbors, Clare County requires a building permit for a home.

RuleClare CountyGladwin CountyOsceola CountyIsabella CountyRoscommon CountyMissaukee CountyMidland County
Building permitRequiredLimitedRequiredRequiredRequiredRequiredRequired
County zoningYesYesNoYesNoNoYes
Septic permitsCMDHDCMDHDCentral Michigan District Health Dept.CMDHDCMDHDDistrict Health Dept. #10County Dept. of Public Health

County locator

Clare County in Michigan

76
County map
Clare County highlighted among the Michigan counties · colored by Index score

How Clare County scores

Seclusion57100% ev.
Self-Sufficiency65100% ev.
Admin Boringness4290% ev.
Durability82100% ev.
Property Autonomy77100% ev.
Carry Cost81100% ev.

Evidence strength: 98%. This reports direct-source completeness and fallback use; it is separate from the score and is not a confidence interval. How it works →

$169kTypical home
1.2%Property tax
$4,419Land / acre
33.2"Annual rain
0% of yrsSevere drought
1.2 / yr (+1.2)Mid-century 100°F days
11.2 daysMid-century dry spell
1.55" (+5.8%)Mid-century 1-day rain
1.63×Wildfire change factor
100%Forward climate coverage
$962Home insurance / yr
-0.1% / yrInsurance growth
0.91%Nonrenewal rate
county median (2+ published ZIPs)Insurance basis
15,053People within 30 min
2,780,801People within 2 hr
35,601Radius comparison (15 mi)
55.5People / sq mi
0.4%Federal land
99%Land at 15% slope or less
0%Soils rated "not limited" for septic (strict USDA rating)
0 acWorkable land screen
69.4%Wooded land
40.7 tonsBiomass / forest ac
45.2°FAvg temp

Scout Clare County

Camp here before you commitBook a few nights nearby on Hipcamp →Already own land here?Earn money hosting campers — get $100 when you become a Hipcamp host →

Some links are affiliate or referral links — we may earn a commission, at no cost to you.

Property hunt

Find land. Bring the promising ones back.

Search live inventory elsewhere, then cost and vet each candidate here. No copied listings, account, or paid data feed.

Each button opens a current land search for Clare County. Listing sites control their own results and filters.

Analyze a property
Add setup-cost allowances

Use rough quotes or placeholders. Blank fields count as $0.

Working estimate

—land + entered setup costs
Asking $ / acre
—
Setup allowance
—
All-in $ / acre
—

A planning estimate, not a valuation or contractor quote. The USDA benchmark includes farm land and buildings; it is context, not a parcel comp.

Before an offer

Parcel due diligence

0/8 checked

Saved properties and checklist progress stay on this device. Bolthole Index does not receive them.

Cities and towns in Clare County

Inside a city, town or township here, that government usually sets zoning and may issue its own building permits; the county’s rules above cover land outside them.

Not yet researched: Arthur Township · Village of Farwell · Franklin Township · Freeman Township · Frost Township · Garfield Township · Grant Township · Greenwood Township · Hamilton Township · Harrison · Hatton Township · Hayes Township · Lincoln Township · Redding Township · Sheridan Township · Summerfield Township · Surrey Township · Winterfield Township

Answers from the rulebook for Clare County

What the ordinances and state agencies actually say — one answer per question, each quoted from the official source and independently re-checked.

Clare County rules

  • Owner-builder exemptionConditional

    State-approved modular housing permit applications processed by Clare County Building Development.

    • The material applies to Michigan Approved Modular Housing, formerly BOCA.
    • The home is treated as a conventional home for permit purposes.
    • The homeowner may obtain the permit if supervising construction or may hire a licensed builder as general contractor.
    • Documentation from the State of Michigan proving state approval must be submitted.
    • This does not establish a general exemption from all licensing, permit, inspection, zoning, septic, or other applicable requirements.
    “Michigan Approved Modular Housing (Formerly BOCA) shall be treated as a conventional home for permit purposes. We do not require a licensed builder to obtain the permit. The homeowner may obtain the permit if he wishes to supervise the construction or he may hire a licensed builder to act as the general contractor. Documentation from the State of Michigan must be submitted providing proof that the home has been state approved.”
  • InspectionsRequired

    Construction performed under a Clare County building permit.

    • All phases of construction must be inspected and approved before further work starts.
    • Electrical, mechanical, and plumbing work requires proper permits and completed inspections before continuation.
    • The permit holder must arrange and obtain necessary inspections.
    • Concealed work will not be approved, and failed, inaccessible, or late-cancelled inspections may incur re-inspection fees.

    pet-related additional inspection fee: 75 USD (charged if a pet is not controlled and the inspection must be rescheduled)

    “ALL WORK SHALL BE INSTALLED IN ACCORDANCE WITH THE STATE BUILDING CODE AND ALL PHASES OF THE CONSTRUCTION NEED AN INSPECTION WILL BE INSPECTED AND APPROVED BY A CLARE COUNTY BUILDING INSPECTOR BEFORE ANY FURTHER WORK IS STARTED.”
  • Certificate of occupancyLimited

    Certificate of Use and Occupancy requests for Clare County building projects.

    • The request requires the building permit information and approval dates for applicable mechanical, electrical, and plumbing permits.
    • The homeowner must provide final septic approval from the Health Department.
    • If the project is not compliant, a Temporary Certificate of Occupancy may be required or enforcement action may be taken.
    • The fee is non-refundable.

    Certificate of Use and Occupancy fee: 5 USD (due upon submission)

    “A Certificate of Use and Occupancy fee of $5.00 is due upon submission. Submit all materials with fee made payable to the Clare County Building Department.”
  • Local zoningVaries (with conditions)

    Aggregate of zoning across Clare County townships, the City of Clare, the City of Harrison, and the Village of Farwell; the actual zoning authorities are the respective local governments, not Clare County as a single countywide zoning administrator.

    • The county reference states that some townships are zoned and require a zoning permit before a building permit can be obtained.
    • The county document lists the City of Clare, City of Harrison, and Village of Farwell among jurisdictions with zoning officials.
    • The county's code-enforcement document separately identifies local zoning contacts and also identifies some townships with no zoning or no county zoning permits; exact current local ordinance coverage must be checked by jurisdiction.
    “WINTERFIELD ZONING: Todd Flint 231-429-0219 [...] FRANKLIN ZONING: None”
    One more reviewed finding on this topic
    • Varies (with conditions) — Aggregate of township-level zoning status across Clare County; the county list identifies some townships as zoned and others as not zoned.
      “Zoned [...] HAMILTON [...] Yes [...] REDDING [...] No”
  • Who permits septicLocal

    Environmental-health and septic services for Clare County through the Central Michigan District Health Department.

    • The opened CMDHD pages identify environmental-health septic services and a Clare office, but do not provide a complete jurisdictional allocation for every septic circumstance.
    “Proudly serving Arenac, Clare, Gladwin, Isabella, Osceola, and Roscommon Counties [...] Sewage System Permits and Information [...] The Sanitarian will issue your permit.”
  • Septic permitRequired

    New-build on-site septic systems in Clare County.

    • A septic permit is required before the building permit.
    • Vacant property must be marked or flagged before the site visit.
    • Construction before permit issuance violates the sanitary code.
    • A reserve area for future drainfield replacement is required.
    • No variations or deviations are allowed.
    • Applicable local codes, including subdivisions, must also be followed.
    “A septic permit is required from the health department prior to obtaining a building permit. Prior to the site visit, a vacant property must be marked/flagged so the Sanitarian can identify the location. Any construction prior to permit issuance is a violation of the sanitary code. A Reserve area for future replacement of the drainfield is required. No variations or deviations are allowed.”
    One more reviewed finding on this topic
    • Required — New residential septic systems in Clare County.
      “A septic permit is required from the health department”
  • Septic inspectionRequired

    On-site septic system site evaluations and final inspections in Clare County.

    • A Sanitarian evaluates site suitability.
    • In rare circumstances, a contractor affidavit may approve construction without a final Sanitarian inspection.
    • An existing septic and well evaluation is required when a building permit is needed on property with an existing system or when residential use changes to non-residential use.
    “In rare circumstances, an affidavit may be filled out by the contractor to approve construction of the septic system without a final inspection by a Sanitarian. [...] An evaluation of the septic system and well is required when building permits are needed on a property with an existing septic system or well, or the use of the property is changing from residential to non-residential use.”
    One more reviewed finding on this topic
    • Required — New septic systems and existing-system evaluations in Clare County.
      “without a final inspection by a Sanitarian.”
  • Well permitRequired

    Private wells and new-build sites in Clare County.

    • A well permit is required before obtaining a building permit for a new-build site.
    • Construction before permit issuance violates the Sanitary Code.
    • The vacant property and proposed well location must be marked or flagged before the site visit.
    • No variations or deviations are allowed.
    • Applicable local codes, including subdivision rules, must also be followed.
    • Irrigation withdrawals with capacity of 75 gallons per minute or greater must also be registered through EGLE's Water Withdrawal Assessment Tool.

    large-quantity irrigation withdrawal threshold: >= 75 gallons/minute (Registration through EGLE's Water Withdrawal Assessment Tool is required.)

    “The State of Michigan and CMDHD Sanitary Code require private wells to be permitted.”
  • Subdividing landRegulated (with conditions)

    New parcels less than one acre in Clare County that lack public sewer and/or public water.

    • Local health department approval is required before the municipality may issue a building permit.
    • Information on on-site water supply and sewage treatment must be submitted for review.
    • The source states the requirement is under the Land Division Act and MDEQ rules.

    parcel size threshold: < 1 acre (Applies to parcels not served by public sewer and/or public water.)

    “requires local health department approval for new parcels less than one acre and not served by public sewer and/or public water”
  • Permit feesVariable (with conditions)

    Clare County building inspection and certificate-related fees identified in official materials.

    • The opened certificate form states that the certificate fee is non-refundable.
    • Re-inspection fees may be charged for failed, inaccessible, late-cancelled, or improperly rescheduled inspections.
    • A complete current general building-fee schedule was not located in the opened materials.

    Certificate of Use and Occupancy fee: 5 USD (due upon submission) · additional inspection fee for uncontrolled pet requiring rescheduling: 75 USD (per Clare County building permit application)

    “Failure to control a pet shall result in rescheduling the inspection and the additional inspection will be charged at $75.00.”
  • Permit processPublished (with conditions)

    Clare County building-permit and inspection application process.

    • The building application may require separate applications for soil erosion, zoning, plumbing, mechanical, and electrical permits.
    • Completed building applications are emailed to the county contact shown on the form.
    • Inspections must be scheduled by the permit holder and require permit number, permit-holder name, site address, inspection type, jurisdiction, and contact information.
    • Most inspections are completed within three business days after request.
    • Work must not continue until inspection is complete; concealed uninspected work will not be approved.
    “Complete the form below. Save the form to your computer. Then Email the completed form to: goodmant@clareco.net”
  • County-wide zoningPresent

    Zoning applies in Clare County, with zoning permits required in certain townships (the county provides a Zoning Authorization Application and a 'Township Where Zoning Permits are Required' reference); zoning is administered at the township level.

    Clare County Community Development - Applications & Forms ↗Scouted from the county site, not yet independently re-checked

Michigan rules that apply here

  • Building permitRequired

    Construction of a building or structure in Michigan, subject to exceptions in the Michigan construction code.

    • The owner, or the owner's builder, architect, engineer, or agent, must submit a written application to the appropriate enforcing agency before construction.
    • The application must use the commission-prescribed form, include the established enforcing-agency fee, contain a detailed affidavit-verified statement of specifications, include complete scaled plans, and include a site plan showing dimensions and locations of proposed and existing buildings or structures on the premises.
    • The act states 'Except as otherwise provided in the code'; specific exemptions require separate verification.
    “Except as otherwise provided in the code, before construction of a building or structure, the owner, or the owner's builder, architect, engineer, or agent, shall submit an application in writing to the appropriate enforcing agency for a building permit.”
    3 more reviewed findings on this topic
    • Required — Construction of buildings or structures and changes in use or occupancy in Clare County.
      “Before construction of a building or structure, an owner, or the owner's builder, architect, engineer, or agent, shall submit an application in writing to the appropriate enforcing agency for a building permit. A permit is also required when the use or occupancy of a structure or portion thereof is changed.”
    • Required — Construction of a building or structure and changes in use or occupancy in Clare County.
      “Before construction of a building or structure, an owner, or the owner's builder, architect, engineer, or agent, shall submit an application in writing to the appropriate enforcing agency for a building permit. A permit is also required when the use or occupancy of a structure or portion thereof is changed.”
    • Required — Construction of buildings or structures and changes in use or occupancy in Michigan, including Clare County.
      “Before construction of a building or structure, an owner, or the owner's builder, architect, engineer, or agent, shall submit an application”
  • Building code adoptedAdopted (with conditions)

    Construction, alteration, relocation, demolition, use, and occupancy of buildings and structures statewide in Michigan, including residential requirements administered under the Michigan Residential Code.

    • The current Michigan Building Code is the 2021 edition and is effective April 9, 2025.
    • The rule adopts the International Building Code by reference with Michigan amendments and exceptions.
    • The adopted rule excludes sections 104.2, 104.3, 104.8, 104.8.1, 104.10, 105.3, 105.3.1, 105.3.2, 105.6, 109.2 to 109.6, 111.2, 111.3, 113.2, 113.3, 113.4, 114.1, 114.2, 114.3, 114.4, 115.1 to 115.4, 423.5, 423.5.1, 423.5.2, 903.2.8.4, 2902 to 2902.6, Table 2902.1, section 3005.5, the definition of agricultural building in section 202, and the definition of recreational vehicle in Appendix G.
    • The rule also incorporates IECC 2021, IEBC 2021, IMC 2021, IPC 2021, IPSDC 2021, and NFPA 70 2023 as listed in chapter 35.
    • Residential requirements are contained in the Michigan Residential Code.
    • The code may be purchased from the International Code Council through the bureau website at a cost of $144.00 as of the time of adoption of the amendatory rules.

    building code edition: 2021 Michigan Building Code (Michigan amendments and listed exceptions apply) · effective date: 2025-04-09

    “The provisions of the international building code, 2021 edition, including appendices F, G, and H, except for [...] govern the construction, alteration, relocation, demolition, use, and occupancy of buildings and structures, and, with exceptions noted, the international building code is adopted by reference in these rules.”
    One more reviewed finding on this topic
    • Adopted — Michigan Building Code and Michigan Residential Code applicable in Clare County.
      “The Michigan Building Code controls all matters concerning the construction, alteration, addition, repair, removal, demolition, use, location, occupancy, and maintenance of all buildings and structures and their service equipment. Presently, provisions for one- and two-family dwellings are included in the Michigan Residential Code.”
  • Zoning districtsPartial

    Michigan's statutory zoning framework for counties, townships, cities, and villages; this does not identify the actual zoning districts adopted by each local government.

    • Actual zoning districts and district regulations are local and must be checked in the applicable county, township, city, or village ordinance.
    • The cited act's stated effective date is July 1, 2006.
    “to provide for the establishment in counties, townships, cities, and villages of zoning districts;”
  • Off-grid sanitationLimited

    Residential sanitary sewage disposal in Michigan without connection to a municipal sanitary sewer.

    • Sanitary sewage from toilets, sinks, showers, washing machines, and dishwashers must be directed to a municipal sanitary sewer or an onsite septic system.
    • An onsite septic system is subject to the EGLE-coordinated permitting and local-health-department permitting and inspection framework.
    • The source does not establish a statewide authorization for untreated discharge or arbitrary off-grid sanitation methods.
    “All sanitary sewage [...] must be directed to municipal sanitary sewer or to an onsite septic system.”
  • Mandatory utility hookupConditional

    Buildings and premises in Michigan that have plumbing fixtures or drainage piping.

    • Connection must be to a public sewer where available, or otherwise to an approved private sewage disposal system.
    • Plumbing work cannot begin until the appropriate enforcing agency issues a permit.
    • Local requirements may apply to water service and building sewer installation.
    “Every building in which plumbing fixtures are installed [...] shall be connected to a public sewer, where available, or an approved private sewage disposal system.”
  • Agricultural exemptionConditional

    Building-permit exemption for shade cloth structures constructed for nursery or agricultural purposes under Michigan Building Code Part 4.

    • The exemption applies to shade cloth structures constructed for nursery or agricultural purposes.
    • Service systems are excluded from the exemption.
    • The exemption does not authorize work violating the building code or other laws or ordinances of the jurisdiction.
    “Exemptions from permit requirements of the code shall not be deemed to grant authorization for any work to be done in any manner in violation of the provisions of the code or any other laws or ordinances of this jurisdiction. Permits shall not be required for any of the following: [...] (x) Shade cloth structures constructed for nursery or agricultural purposes, not including service systems.”
  • Driveway accessRequired

    Commercial and residential driveways constructed or reconstructed within Michigan state highway right-of-way and access to state trunkline highways.

    • An individual permit application package must be submitted through CPS.
    • The package includes the Drainage Design Checklist for Accessing State Trunklines (Form 2484), traffic analysis if applicable, traffic impact study if applicable, and preliminary local planning commission review if appropriate.
    • A driveway constructed or reconstructed after August 6, 1969, is not lawful unless a permit has been obtained.
    • A commercial driveway permit application requires a bond; a residential driveway permit does not require a bond.
    • If accessing a state trunkline highway, the driveway permit is required in addition to the local governmental agency building permit.
    • If upgrading a driveway or only building a new driveway, a driveway permit may be all that is necessary.

    Driveway permit effective date threshold: 1969-08-06 (Driveways constructed or reconstructed after this date require a permit to be lawful) · Commercial driveway bond: true (Residential driveway permit does not require a bond)

    “Applicants must submit an individual permit application package through the Construction Permit System (CPS) with the following: Drainage Design Checklist For Accessing State Trunklines (Form 2484) Traffic Analysis, if applicable Traffic Impact Study, if applicable Preliminary review by the local planning commission, for compliance with local long-range development plans, if appropriate A driveway constructed or reconstructed after August 6, 1969, is not lawful unless a permit has been obtained.”
  • Building in a floodplainRequired

    Alteration or occupation of the 100-year floodplain of a Michigan river, stream, or drain regulated under Part 31.

    • The Part 31 permit requirement applies to rivers, streams, or drains with a drainage area of 2 square miles or greater.
    • A Part 31 EGLE permit is not required for alterations within floodplains of the Great Lakes, inland lakes, or watercourses with drainage areas less than 2 square miles, although other NREPA reviews may still be necessary.
    • Construction and fill may be permitted in non-floodway portions if local ordinances and building standards are met and compensating excavation is provided equal to the volume of fill placed in the floodplain.
    • New residential construction is specifically prohibited in the floodway.
    • The minimum residential elevation standard is one foot above the 100-year flood elevation, and some communities or counties may impose a higher standard.

    Minimum drainage area for Part 31 floodplain authority: >= 2 square miles (Part 31 does not apply below this threshold) · Lowest-floor elevation: >= 1 foot above 100-year flood elevation (Some communities and counties may require a higher elevation)

    “The Floodplain Regulatory Authority deals with the floodplains of rivers, streams, or drains which have a drainage area that is 2 square miles or greater. A permit is not required from EGLE, under Part 31, for alterations within the floodplains of the Great Lakes, inland lakes, or watercourses which have a drainage area less than 2 square miles.”
    One more reviewed finding on this topic
    • Required — Construction, fill, or alteration in qualifying river, stream, or drain floodplains in Clare County.
      “Any construction, fill or alteration of a floodplain of a river, stream, or drain which has a drainage area greater than or equal to 2 square miles will require a state floodplain permit under Part 31 of the Natural Resources and Environmental Protection Act.”
  • Campground & park staysLimited

    Tiny houses, including tiny houses built on wheels, proposed as resort cabins or similar occupancy in Michigan.

    • The source distinguishes tiny houses from recreational units and states they cannot be treated as recreational units even if built on wheels.
    • The tiny house must be built as a resort rather than a campground.
    • Local health department permitting for wells, septic tanks, and drainfields is required as applicable.
    • Local zoning, building, electrical, and plumbing permits and final approvals are required under local authorities.
    • The source does not establish statewide zoning permission or a statewide right to occupy a tiny house.
    “Local zoning, building, electrical, plumbing permits and final approvals under local authorities.”
    5 more reviewed findings on this topic
    • Allowed (with conditions) — RV recreational units in Michigan licensed campgrounds, including any Clare County campground operating under the state campground framework.
      “All recreational units (RVs, tents, camping cabins) must be on licensed, numbered campsites. Coherent site numbering is vital for emergency response personnel.”
    • Limited — Tiny houses or tiny-home-like resort cabins in Michigan campground contexts, including Clare County where applicable.
      ““Tiny Houses” trend – Must be built as a RESORT (not campground) with LHD permitting well, septic tanks and drainfield(s). Local zoning, building, electrical, plumbing permits and final approvals under local authorities. Even if built “on wheels,” these can’t be treated as “recreational units”.”
    • Limited — RV occupancy as part of a Michigan campground consisting of five or more recreational units used for temporary living quarters.
      “requires a campground license when five or more recreational units (i.e., tents, campers, RVs) are placed on a parcel or tract of land”
    • Limited — Temporary camping in a Michigan temporary campground.
      “A temporary campground license issued by the local health department (LHD) having jurisdiction is required prior to operating a temporary campground.”
    • Limited — Occupancy of RVs and other recreational units as temporary living quarters in a Michigan campground offering sites to the public or members of an organization, where 5 or more recreational units are involved.
      “A campground owner shall ensure that a site is occupied by not more than 8 persons and by not more than 1 recreational unit.”
  • county building authorityGeneral

    Michigan counties serving as building-code enforcing agencies for residential construction in unincorporated areas, subject to the Statewide Jurisdiction List and local/state jurisdiction assignments.

    • Before construction, a written building-permit application must be submitted to the appropriate enforcing agency.
    • A permit is also required when use or occupancy changes.
    • Ordinary repairs do not require a permit, but the stated structural, egress, plumbing, electrical, mechanical, and public-health/safety limitations apply.
    • The Michigan Building Code and Michigan Residential Code govern construction; county enforcement applies only where the Statewide Jurisdiction List designates county jurisdiction.
    “If COUNTY is indicated, that unit of government receives code enforcement services from a county enforcing agency.”

Set by your township or city, not the county

In Michigan, zoning is adopted by each township or city, so Clare County has no county-wide answer on these. Find your township or city in the list of places on this page, or call its clerk or zoning administrator.

  • Minimum dwelling size
  • Minimum lot size
  • Setbacks
  • Lot coverage
  • Building height
  • Camping on your land
  • Manufactured homes
  • Accessory dwellings
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Living off-grid in Clare County, Michigan

Is Clare County a good place to live off-grid or homestead?

Clare County scores 76/100 on the Bolthole Index, a strong county profile. Its strengths: mixed durability signals and manageable long-term carry cost.

Do you need a building permit in Clare County, Michigan?

Clare County generally requires a residential building permit, and it enforces county zoning. Onsite septic is permitted by Central Michigan District Health Department (CMDHD). Owner-builders may act as their own contractor to build their home. These answers are quoted from official sources and independently re-checked. Rules change and cities within the county differ — always confirm with the county before you buy or build.

How much does land cost in Clare County, Michigan?

Land in Clare County runs about $4,419 per acre, based on the latest county data.

What is the water situation in Clare County?

Clare County gets about 33.2" of rain a year, with severe drought in roughly 0% of years.

How remote is Clare County?

A representative private-land location has about 15,053 people within a 30-minute drive and 2,780,801 within two hours. The road-network catchments count population across county lines and clusters of smaller cities; straight-line radius values remain available as a comparison.

How Clare compares in Michigan

Compare side-by-side →See all 83 Michigan counties ranked →