Bolthole Index

Ogemaw County, Michigan

Building permits, zoning and land rules in Ogemaw County, Michigan

76Index Score / 100
#36 of 83 in Michigan

Ogemaw County, Michigan requires a building permit before covered construction, alteration or relocation begins1. The Ogemaw County Building Department handles building and trade permits, but zoning authority varies by parcel23. District Health Department No. 2 separately issues septic construction permits and performs final septic inspections throughout Ogemaw County4.

At a glance

Building permit
Required before covered construction begins1
Permit office
Ogemaw County Building Department2
Zoning
County zoning covers most unincorporated land; local jurisdiction varies3
Septic authority
District Health Department No. 2; permit required before system construction4
Owner-builder
State licensing exemption may apply, but permits and inspections still apply5
Minimum home size
District-specific; county rules set 720 square feet for covered single-family homes6
RV or tiny-home living
Limited in county-zoned areas; temporary occupancy has time and utility conditions78

Who to call

Building permits

Ogemaw County Building Department

County building, electrical, mechanical, plumbing and soil erosion permits

989-345-3370

205 S. 8th St. West Branch, MI 48661

Zoning

Ogemaw County Planning & Zoning Department

County zoning ordinance, planning commission and zoning board of appeals matters

989-345-3375

205 S. 8th St. West Branch, MI 48661

Septic permits

District Health Department No. 2 Environmental Health

Environmental health, residential onsite sewage and vacant-land evaluations for Ogemaw County

(989) 345-5020 ext.1842

630 Progress Street West Branch, MI 48661

Contact details are copied from each office’s official page and were checked against it on October 7, 2026.

Off-grid gear

Going off-grid in Ogemaw County means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Do you need a building permit in Ogemaw County, Michigan?

Yes. Ogemaw County requires a permit before excavation for a building or structure begins and before a building is erected, added to, altered or moved; regulated land use also requires a permit1. The county lists building, electrical, mechanical, plumbing and soil-erosion permit categories2. Ogemaw County lists the 2021 Michigan Building Code for commercial work and the 2015 Michigan Residential Code for residential all-trades work9.

Permit needs vary by project, and nearly all applications require a floor plan, cross-section and a site plan showing the construction and dimensions to lot lines10. A project beside a county road may also need approval for a new or existing driveway11. Permitted construction is subject to periodic inspection, and an Ogemaw County residential building permit includes three inspections, with more possible1213.

Who issues Ogemaw County building permits, and how do you reach them?

The Ogemaw County Building Department handles building, electrical, mechanical, plumbing and soil-erosion permits2. Zoning approval is separate and comes from the government that zones the parcel; District Health Department No. 2 separately handles septic construction permits and final septic inspections throughout Ogemaw County34. The Building Department is at 205 S. 8th St. West Branch, MI 48661, and its phone number is 989-345-33702. Applications may be emailed to permits@ocmi.us or left with check payment in the Annex drop box102.

Call before submitting because the building-permit fee depends on the project14. Ask which trade permits, drawings, site information, health-department approvals and driveway documents the project requires10. Michigan's owner-builder licensing exemption can cover a person building on their own property for their own use and occupancy, but it does not remove applicable building-permit, inspection, code, zoning or utility requirements5.

Does Ogemaw County have zoning?

Zoning authority varies across Ogemaw County. The county ordinance generally covers land outside incorporated cities and villages and Edwards Township; West Branch Township administers its own zoning, while Ogemaw County administers zoning for the Village of Prescott3. Cities, villages and excluded townships may administer their own zoning, but septic construction permits and final septic inspections remain with District Health Department No. 2 throughout Ogemaw County34. The county publishes conservancy, agricultural/rural-preservation, waterfront, residential, business and industrial districts for its jurisdiction15. The county zoning office is at 205 S. 8th St. West Branch, MI 48661, phone 989-345-337516.

Minimum lot size, front, rear and side setbacks, lot coverage and building height all vary by district in the county-zoned area17181920. County rules require at least 720 square feet of finished living area for covered single-family homes outside manufactured-home parks and at least 400 square feet for efficiency dwelling units6.

How do septic permits work in Ogemaw County?

District Health Department No. 2 requires a septic construction permit before an onsite sewage system is installed or repaired in Ogemaw County and requires a final inspection before the system is covered or backfilled4. The Ogemaw County Environmental Health contact is at 630 Progress Street West Branch, MI 48661, phone (989) 345-5020 ext.184221.

In the county-zoned area, a building with drinking water or sanitary facilities cannot receive a permit on a lot without public water and sewer unless District Health Department No. 2 approves the private water supply or onsite sewage system22. Outdoor restrooms, outhouses and similar off-grid sanitation are prohibited for residential use in the county-zoned area23. Only 2.5% of county soils are rated without severe limitations for a conventional drain field, so complete the site evaluation before committing to a house site24.

Can you live in an RV or tiny home in Ogemaw County?

In residential districts governed by Ogemaw County zoning, recreational vehicles may be used for no more than 14 days in any 30-day period and must be removed for the rest of that period7. One RV may remain from April 1 through November 30 when connected to a well and septic system approved by District Health Department No. 225. During construction of a permanent home, temporary occupancy may be approved after the home building permit is issued; the approval lasts up to 365 days and may be renewed with full payment8.

Zoning authority varies in cities, villages and excluded townships, so ask the parcel's zoning office about RV or tiny-home occupancy; septic construction permits still go through District Health Department No. 234. Tiny-home classification is not expressly confirmed. In the county-zoned area, covered single-family homes outside manufactured-home parks require at least 720 square feet of finished living area6.

Building a home in Ogemaw County: the steps, in order

  1. Identify the governing zoning office and district, then confirm the use, minimum lot size, dwelling size, setbacks, lot coverage, height and any temporary RV occupancy31762619207.
  1. Obtain the septic construction permit and private-water approval from District Health Department No. 2; ask whether the proposed well requires a permit or notification42227.
  1. Confirm driveway approval if the property borders a county road11.
  1. Ask the Building Department for the building-permit fee and application package; nearly all building permits need a floor plan, cross-section and dimensioned site plan1410.
  1. Obtain the building permit and applicable electrical, mechanical, plumbing and soil-erosion permits, then arrange required inspections212.
  1. Obtain the required certificate of occupancy before covered occupancy or a change of use28.

What should you check before buying land in Ogemaw County?

Start with jurisdiction, zoning district, water, septic feasibility and legal access. Confirm the parcel's district-specific minimum lot size and setbacks, obtain District Health Department No. 2 requirements for the septic construction permit and private water supply, and verify driveway approval where land borders a county road3172642211. Only 2.5% of county soils are rated without severe limits for a conventional drain field, so do not assume a standard system will fit the site24.

The landscape is 70.1% wooded, and 94.6% of county land has a slope of 15% or less2930. The nearest city of 100,000 or more is about 114 miles from the county center, so account for long supply and service trips31. The median property-tax bill is $1,417 per year, but obtain the parcel's current assessment and taxable-value history before estimating carrying costs32.

Watch-outs

  • Michigan's owner-builder licensing exemption does not waive applicable building permits, inspections, codes, zoning or utility requirements5.
  • A county-road frontage project may need a driveway permit or approval of the existing driveway before the building application is complete11.
  • County-zoned residential parcels limit ordinary RV use to 14 days in any 30-day period; longer construction-related occupancy requires zoning approval and a home building permit78.
  • Only 2.5% of Ogemaw County soils are rated without severe limitations for a conventional septic drain field, so arrange a site evaluation before relying on a standard system24.

Sources

  1. Ogemaw County Building & Soil Erosion General Information, quoted and re-checked
  2. Ogemaw County Building Department (ocmi.us)
  3. Ogemaw County Zoning Ordinance, quoted and re-checked
  4. Residential On-Site Sewage Disposal System - DHD2, quoted and re-checked
  5. Frequently Asked Questions – Residential Builder (Michigan statewide rule), quoted and re-checked
  6. Ogemaw County Zoning Ordinance, quoted and re-checked
  7. Ogemaw County Zoning Ordinance, quoted and re-checked
  8. Ogemaw County Zoning Ordinance, quoted and re-checked
  9. Ogemaw County Building Department Current Codes, quoted and re-checked
  10. Ogemaw County Building & Soil Erosion General Information, quoted and re-checked
  11. ocmi.us, quoted and re-checked
  12. courts.michigan.gov (Michigan statewide rule), quoted and re-checked
  13. Ogemaw County Building & Soil Erosion, quoted and re-checked
  14. Ogemaw County Building & Soil Erosion General Information, quoted and re-checked
  15. Ogemaw County Zoning Ordinance, quoted and re-checked
  16. Ogemaw County Planning & Zoning Department (ocmi.us)
  17. Microsoft Word - Ogemaw County Zoning Ordinance_081925, quoted and re-checked
  18. Ogemaw County Zoning Ordinance, quoted and re-checked
  19. Ogemaw County Zoning Ordinance, quoted and re-checked
  20. Ogemaw County Zoning Ordinance, quoted and re-checked
  21. District Health Department No. 2 Environmental Health (dhd2.org)
  22. Ogemaw County Zoning Ordinance, quoted and re-checked
  23. Ogemaw County Zoning Ordinance, quoted and re-checked
  24. Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
  25. Ogemaw County Zoning Ordinance, quoted and re-checked
  26. Ogemaw County Zoning Ordinance, quoted and re-checked
  27. Before you start a well drilling business (Michigan statewide rule), quoted and re-checked
  28. Ogemaw County Zoning Ordinance, quoted and re-checked
  29. Wooded share of land: Bolthole Index county data
  30. Share of land at 15% slope or less: Bolthole Index county data
  31. Straight-line distance from the county center to the nearest city of 100,000+ people: Bolthole Index county data
  32. Median property tax bill: Bolthole Index county data

Written October 7, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Found land here? Start a Property Hunt →

Compared with neighboring counties

Like 5 of its 6 neighbors, Ogemaw County requires a building permit for a home.

RuleOgemaw CountyRoscommon CountyOscoda CountyArenac CountyIosco CountyGladwin CountyCrawford County
Building permitRequiredRequiredRequiredRequiredRequiredLimitedRequired
County zoningYesNoYesYesYesYesYes
Septic permitsDistrict Health Dept. No. 2CMDHDDistrict Health Dept. No. 2CMDHDDistrict Health Dept. No. 2CMDHDDistrict Health Dept. #10

County locator

Ogemaw County in Michigan

76
County map
Ogemaw County highlighted among the Michigan counties · colored by Index score

How Ogemaw County scores

Seclusion69100% ev.
Self-Sufficiency59100% ev.
Admin Boringness4190% ev.
Durability75100% ev.
Property Autonomy77100% ev.
Carry Cost83100% ev.

Evidence strength: 98%. This reports direct-source completeness and fallback use; it is separate from the score and is not a confidence interval. How it works →

$184kTypical home
1%Property tax
$3,407Land / acre
32.3"Annual rain
1.4% of yrsSevere drought
1.4 / yr (+1.4)Mid-century 100°F days
11.6 daysMid-century dry spell
1.39" (+11.4%)Mid-century 1-day rain
1.65×Wildfire change factor
100%Forward climate coverage
$965Home insurance / yr
-0.4% / yrInsurance growth
0.95%Nonrenewal rate
county median (2+ published ZIPs)Insurance basis
17,978People within 30 min
1,398,574People within 2 hr
26,492Radius comparison (15 mi)
37.2People / sq mi
6.3%Federal land
94.6%Land at 15% slope or less
2.5%Soils rated "not limited" for septic (strict USDA rating)
8,979 acWorkable land screen
70.1%Wooded land
31.3 tonsBiomass / forest ac
44.7°FAvg temp

Scout Ogemaw County

Camp here before you commitBook a few nights nearby on Hipcamp →Already own land here?Earn money hosting campers — get $100 when you become a Hipcamp host →

Some links are affiliate or referral links — we may earn a commission, at no cost to you.

Property hunt

Find land. Bring the promising ones back.

Search live inventory elsewhere, then cost and vet each candidate here. No copied listings, account, or paid data feed.

Each button opens a current land search for Ogemaw County. Listing sites control their own results and filters.

Analyze a property
Add setup-cost allowances

Use rough quotes or placeholders. Blank fields count as $0.

Working estimate

—land + entered setup costs
Asking $ / acre
—
Setup allowance
—
All-in $ / acre
—

A planning estimate, not a valuation or contractor quote. The USDA benchmark includes farm land and buildings; it is context, not a parcel comp.

Before an offer

Parcel due diligence

0/8 checked

Saved properties and checklist progress stay on this device. Bolthole Index does not receive them.

Cities and towns in Ogemaw County

Inside a city, town or township here, that government usually sets zoning and may issue its own building permits; the county’s rules above cover land outside them.

Churchill Township · Cumming Township · Edwards Township · Foster Township · Goodar Township · Hill Township · Horton Township · Klacking Township · Logan Township · Mills Township · Ogemaw Township · Village of Prescott · Richland Township · Rose Township · Rose City · West Branch · West Branch Township

Answers from the rulebook for Ogemaw County

What the ordinances and state agencies actually say — one answer per question, each quoted from the official source and independently re-checked.

Ogemaw County rules

  • Building permitRequired

    Construction-related building permits in Ogemaw County.

    • Each project may require different additional permits or information.
    • A driveway permit or existing-driveway approval may be required where property borders a county road.
    • A septic tank permit may be required when bedrooms are added.
    “Excavation for any building or structure shall not be commenced; the erection, addition to, alteration of, or moving of any building or structure shall not be undertaken; and no land shall be used until a permit for such has been secured from the County Building Inspector.”
  • Building code adoptedAdopted

    Commercial and residential construction subject to Ogemaw County building administration.

    • Commercial building code: 2021 Michigan Building Code effective April 9, 2025.
    • Residential all-trades code: 2015 Michigan Residential Code effective April 20, 2017.
    • The page also lists separate mechanical, electrical, plumbing, energy, fire, and accessibility codes.
    “Building: 2021 Michigan Building Code Effective April 9, 2025”
  • InspectionsLimited

    Construction-related permits administered by the Ogemaw County Building Department.

    • The county residential application states that the building permit includes three inspections and additional inspections may be required.
    • The general information page states that the department performs all inspections, but does not independently state that every project must undergo inspection.

    inspections included with building permit: 3 inspections (additional inspections may be required)

    “Building Permit includes 3 inspections; additional inspections may be required”
  • Certificate of occupancyRequired

    Occupancy or use of buildings, changed uses, and land uses regulated by the county zoning ordinance.

    • Agricultural crop raising and other agricultural pursuits are excepted unless a zoning district rule specifically requires a certificate.
    • Unpermitted uses require a certificate for continued use, stating the authorized use and limiting conditions.
    • Application is coincident with the building-permit application or within ten days of a contemplated change of use.
    • The certificate is to be issued within ten days after lawful completion as certified by the Zoning Administrator.

    application deadline after contemplated change of use: 10 days · issuance deadline after lawful completion: 10 days

    “Hereafter, a Certificate of Occupancy shall be required for the following: 1. Occupancy or use of a building erected, altered, extended, relocated, or reconstructed. 2. Change in the use of a building.”
  • County-wide zoningPresent (with conditions)

    Ogemaw County zoning ordinance jurisdiction outside incorporated cities and villages and outside Edwards Township.

    • West Branch Township assumed its own zoning on 12/16/05.
    • Ogemaw County assumed zoning authority for the Village of Prescott on 11/13/08.
    • The ordinance applies to buildings, structures, alterations, relocations, enlargements, additions, districts, and uses within its jurisdiction.
    “The jurisdiction of this Ordinance shall include all lands and waters lying outside the limits of incorporated cities and villages within Ogemaw County and Edwards Township.”
  • Local zoningVaries (with conditions)

    Aggregate local zoning status across Ogemaw County; the county ordinance applies only to lands outside incorporated cities and villages and Edwards Township, while West Branch Township assumed its own zoning and incorporated municipalities may administer their own ordinances.

    • This is an aggregate county claim and does not mean Ogemaw County administers every local ordinance.
    • The Ogemaw County ordinance expressly excludes incorporated cities and villages and Edwards Township.
    • West Branch Township assumed its own zoning on 12/16/05.
    • Ogemaw County assumed zoning authority for the Village of Prescott on 11/13/08.
    “****WEST BRANCH TOWNSHIP ASSUMED THEIR OWN ZONING 12/16/05**** *****OGEMAW COUNTY ASSUMED ZONING AUTHORITY FOR THE VILLAGE OF PRESCOTT ON 11/13/08****”
    One more reviewed finding on this topic
    • Varies (with conditions) — Aggregate county conclusion: zoning administration varies by jurisdiction; the county ordinance applies outside incorporated cities and villages and Edwards Township, while excluded municipalities and townships may administer their own zoning.
      “The jurisdiction of this Ordinance shall include all lands and waters lying outside the limits of incorporated cities and villages within Ogemaw County and Edwards Township. [...] WEST BRANCH TOWNSHIP ASSUMED THEIR OWN ZONING 12/16/05 [...] OGEMAW COUNTY ASSUMED ZONING AUTHORITY FOR THE VILLAGE OF PRESCOTT ON 11/13/08”
  • Zoning districtsPublished

    Published districts in the Ogemaw County Zoning Ordinance for the county zoning jurisdiction.

    • The ordinance publishes CD, CE, A/RP, WF, R-1, R-2, R-3, R-4, B-1, B-2, B-3, and M-1 districts.
    • The district schedule and other provisions must be read together.
    • The ordinance excludes incorporated cities and villages and Edwards Township, subject to the stated Prescott exception.
    “CHAPTER 3 MAPPED DISTRICTS [...] SECTION 3.1 Districts [...] CHAPTER 4 CD - CONSERVANCY DISTRICT [...] CHAPTER 5 CE - COUNTRY ESTATE DISTRICT [...] CHAPTER 6 A/RP - AGRICULTURAL/RURAL PRESERVATION [...] CHAPTER 7 WF - WATERFRONT DISTRICT [...] CHAPTER 8 R-1 LOW DENSITY RESIDENTIAL DISTRICT [...] CHAPTER 9 R-2 MEDIUM DENSITY RESIDENTIAL DISTRICT [...] CHAPTER 10 R-3 HIGH DENSITY RESIDENTIAL DISTRICT [...] CHAPTER 11 R-4 MANUFACTURED HOME PARK DISTRICT [...] CHAPTER 12 B-1 LOCAL BUSINESS DISTRICT [...] CHAPTER 13 B-2 GENERAL BUSINESS DISTRICT [...] CHAPTER 14 B-3 HIGHWAY BUSINESS DISTRICT [...] CHAPTER 15 M-1 INDUSTRIAL DISTRICT”
    One more reviewed finding on this topic
    • Published (with conditions) — Districts published in the Ogemaw County Zoning Ordinance for its limited jurisdiction.
      “CHAPTER 16 SCHEDULE OF DISTRICT REGULATIONS”
  • Minimum dwelling sizeDistrict specific (with conditions)

    Dwelling floor-area requirements vary by zoning district in the county-zoned area.

    • The ordinance separately requires single-family homes outside manufactured-home parks to have at least 720 square feet of finished living area.
    • The district schedule lists 400 square feet for CD and CE, 400 square feet for A/RP, WF, R-1, and R-2, and differing R-3 and business/industrial rules.
    • The county ordinance excludes incorporated cities and villages and Edwards Township.

    single-family minimum finished living area outside manufactured-home parks: >= 720 square feet · CD and CE schedule minimum floor area: 400 square feet

    “Single family homes shall have a minimum finished living area of at least seven hundred twenty (720) square feet. Efficiency Dwelling Units (EDU’s) shall have at least 400 square feet of living space.”
  • Minimum lot sizeDistrict specific (with conditions)

    Minimum lot sizes vary by Ogemaw County zoning district and use.

    • The schedule states that its footnotes are integral and that other ordinance provisions may also apply.
    • Where both public water and sanitary sewer serve a lot, the minimum lot size may be reduced to 10,000 square feet where footnote 2 applies.
    • R-3 minimum areas vary by dwelling type: single-family 20,000 square feet, two-family 20,000 square feet, and multifamily one acre with at least 5,000 square feet per unit.
    • R-4 Manufactured Home Park regulations are governed by the State Mobile Home Code Commission under footnote 9.

    CD minimum lot size: 10 acres · CE minimum lot size: 5 acres · A/RP minimum lot size: 1 acre · WF, R-1, and R-2 minimum lot size: 20000 square feet (May be reduced to 10,000 square feet when served by both public water and sanitary sewer where footnote 2 applies.) · B-1 minimum lot size: 10000 square feet · B-2 minimum lot size: 15000 square feet · B-3 minimum lot size: 40000 square feet · M-1 minimum lot size: 1 acre

    “CD - Conservancy 10 acres [...] CE - Country Estate 5 acres [...] A/RP - Agricultural/ Rural Preservation 1 acre”
    One more reviewed finding on this topic
    • District specific (with conditions) — Lots in zoning districts governed by the Ogemaw County Zoning Ordinance.
      “Minimum required lot areas and widths by type of dwelling are as follows: single family - 20,000 sq. ft., 60 ft. wide two family - 20,000 sq. ft., 80 ft. wide multi family - one (1) acre with a minimum lot area per unit of 5,000 sq. ft., no minimum width”
  • SetbacksDistrict specific (with conditions)

    Minimum front, rear, and side setbacks vary by zoning district in the county-zoned area.

    • Waterfront lots have a 50-foot front setback where the yard abutting the water is the front yard.
    • R-1 and R-2 side setbacks may be 10 percent of lot width for lots under 100 feet wide.
    • The county ordinance excludes incorporated cities and villages and Edwards Township.

    CD setbacks: 75 ft front; 50 ft rear; 50 ft side · CE setbacks: 50 ft front; 50 ft rear; 50 ft side · A/RP setbacks: 50 ft front; 25 ft rear; 10 ft side · WF setbacks: 25 ft front; 25 ft rear; 10 ft side (50-foot waterfront front setback)

    “Note that waterfront lots shall have a minimum front yard setback of fifty (50) ft., that yard abutting the water is the front yard.”
    2 more reviewed findings on this topic
    • District specific (with conditions) — Required yard setbacks in zoning districts within the county zoning jurisdiction.
      “Note that waterfront lots shall have a minimum front yard setback of fifty (50) ft., that yard abutting the water is the front yard.”
    • District specific (with conditions) — Minimum front, rear, and side setbacks in zoning districts governed by the Ogemaw County Zoning Ordinance.
      “in the case of lots less than one hundred (100) ft. in width, the minimum side yard setback shall be equivalent to ten (10) percent of lot width.”
  • Lot coverageDistrict specific (with conditions)

    Maximum building lot coverage varies by zoning district in the county-zoned area.

    • The schedule lists 10 percent CD, 20 percent CE and A/RP, 30 percent WF/R-1/R-2/R-3, and 35 percent business and industrial districts.
    • The county ordinance excludes incorporated cities and villages and Edwards Township.

    CD maximum lot coverage: 10 percent · CE and A/RP maximum lot coverage: 20 percent · WF, R-1, R-2, and R-3 maximum lot coverage: 30 percent · B-1, B-2, B-3, and M-1 maximum lot coverage: 35 percent

    “ZONING DISTRICTS MINIMUM LOT SIZE MINIMUM SETBACKS MAXIMUM HEIGHT (stories/ft.) MAXIMUM LOT COVERAGE (%)”
    One more reviewed finding on this topic
    • District specific (with conditions) — Maximum building lot coverage in zoning districts governed by the Ogemaw County Zoning Ordinance.
      “G. Lot Coverage: The total area of all buildings on the parcel shall not exceed a maximum of thirty-five (35) percent of the parcel size.”
  • Building heightDistrict specific (with conditions)

    Maximum principal-building height varies by zoning district in the county-zoned area.

    • Most residential and conservancy districts are limited to 35 feet or 2.5 stories, whichever is less.
    • Business and industrial districts have different height limits, including 30 feet or 2 stories in B districts and 45 feet or 3 stories in M-1.
    • The county ordinance excludes incorporated cities and villages and Edwards Township.

    CD, CE, A/RP, WF, R-1, R-2, R-3 maximum height: 35 feet or 2.5 stories (whichever is less) · M-1 maximum height: 45 feet or 3 stories (whichever is less)

    “No principal building in this District shall exceed a height of forty-five (45) ft. or three (3) stories, whichever is less.”
    One more reviewed finding on this topic
    • District specific (with conditions) — Maximum building height in zoning districts governed by the Ogemaw County Zoning Ordinance.
      “All buildings and structures shall comply with the Joint West Branch Community Airport Zoning Ordinance regulations restricting building and structure height.”
  • Living in an RVLimited

    Recreational vehicle occupancy or storage on vacant lots within residential zoning districts in the county ordinance jurisdiction.

    • RVs are allowed for a maximum of 14 days in any 30-day period, with removal for the remainder of the period.
    • A maximum of three camping vehicles or tents, or a combination, is allowed per parcel.
    • One RV may remain April 1 through November 30 if connected to DHD2-approved septic and well.
    • RVs on parcels without a permanent dwelling must be removed December 1 through March 31 unless enclosed inside a permitted accessory structure.
    • RVs may be used while a permanent dwelling is being constructed until the building permit expires or a certificate of occupancy is issued; construction must start within 30 days of permit issuance.
    • The ordinance excludes incorporated cities and villages and Edwards Township; West Branch Township has its own zoning.

    maximum occupancy period: 14 days per 30-day period (residential zoning districts)

    “Recreational vehicles are allowed in any residential zoning district (CD, CE, A/RP, R-1, R-2, R-3, and WF) for a maximum of fourteen (14) days in any thirty (30) day period. Tents and/or recreational vehicles must be removed from the property for the remainder of the thirty (30) day period.”
  • Camping on your landLimited

    Temporary dwelling or camping use on residentially zoned lots within the county ordinance jurisdiction.

    • The zoning administrator may issue approval only while the owner constructs a permanent residence on the same lot.
    • A building permit for the permanent residence must have been issued.
    • The temporary dwelling must connect to an approved well and septic system or be self-contained.
    • The permit lasts a maximum of 365 days and may be renewed with full payment.
    • The temporary dwelling must be removed after permit expiration or completion of the permanent structure.
    • The ordinance excludes incorporated cities and villages and Edwards Township; West Branch Township has its own zoning.

    maximum permit duration: 365 days (renewal may be available with full payment)

    “The zoning administrator may issue zoning approval to an individual to park and occupy a temporary dwelling in any residential district provided that the following conditions are met:”
  • Who permits septicLocal (with conditions)

    Residential onsite sewage disposal systems in Ogemaw County, within District Health Department No. 2.

    • A construction permit is required before installing or repairing an onsite sewage disposal system.
    • Applications require an associated fee, site visit, site review, and soil evaluation.
    • A final inspection must occur before covering or backfilling the system.
    • The program operates under local Environmental Health Regulations.
    “The Environmental Health Regulations require that property owners obtain a construction permit prior to installing or repairing an onsite sewage disposal system.”
    One more reviewed finding on this topic
    • Local (with conditions) — Residential onsite sewage disposal permits and final inspections in Ogemaw County through District Health Department No. 2.
      “A final inspection of the completed system must be conducted by District Health Department No. 2 staff prior to covering/backfilling the sewage disposal system.”
  • Off-grid sanitationLimited

    Recreational vehicles and recreational equipment stored on vacant lots within the county ordinance jurisdiction.

    • One recreational vehicle may remain from April 1 through November 30 if connected to septic and well approved by District No. 2 Health Department.
    • Outhouses or similar temporary structures used to store human waste are prohibited.
    • The ordinance excludes incorporated cities and villages and Edwards Township; West Branch Township has its own zoning.
    “One (1) recreational vehicle may remain on a parcel from April 1st through November 30th if connected to a septic and well approved by the District #2 Health Department. Outhouses or similar temporary structures used to store human waste are prohibited.”
    One more reviewed finding on this topic
    • Prohibited — Outdoor restrooms, outhouses, or similar off-grid sanitation for residential use in the county-zoned area.
      “Outdoor restrooms/outhouses shall not be permitted for any residential use.”
  • Well permitRequired

    New or replacement private residential wells, Type III public wells, other water supplies, and extensive repairs to existing wells in Ogemaw County.

    • A Notification/Permit Form must be purchased, completed, and submitted at least four business days before construction.
    • A person constructing a well for their own home must submit the form, comply with construction codes, and obtain written authorization after a pre-drilling site visit.
    • Construction must comply with the state Well Construction Code and DHD2 local sanitary code.
    • Deviations may be granted case-by-case under Michigan's well construction code and documented in writing.

    advance submission: >= 4 business days (before well construction)

    “The Environmental Health Regulations for District Health Department No. 2 requires that prior to construction of a new or replacement residential or Type III public well, or other type of water supply, and prior to extensive repair to an existing well, a person must apply for and obtain a water supply construction permit from District Health Department No. 2.”
  • Mandatory utility hookupConditional

    Dwellings outside approved manufactured home parks within the Ogemaw County zoning ordinance jurisdiction.

    • The ordinance jurisdiction excludes incorporated cities and villages and Edwards Township.
    • West Branch Township assumed its own zoning.
    • A dwelling must use public sewer and water and/or a well or septic system approved by District No. 2 Health Department.
    “All dwellings shall be connected to a public sewer system and water supply system and/or a well or septic system approved by the District No. 2 Health Department.”
    One more reviewed finding on this topic
    • Conditional — Buildings with drinking water or sanitary facilities in the county-zoned area outside incorporated cities and villages and Edwards Township.
      “No permit shall be issued for the construction of a building or structure which is to have drinking water and/or sanitary facilities therein and which is to be located on a lot not served by public water and sanitary sewer facilities, unless on-site private water supply and/or sewage disposal facilities, as the case may be, are approved by the District No. 2 Health Department.”
  • Driveway accessLimited

    Construction projects where property borders a county road.

    • A driveway permit or approval of an existing driveway may be required if the property borders a county road.
    “Driveway permit, or approval of your existing driveway if your property borders a county road.”
  • Permit feesVariable (with conditions)

    Ogemaw County building and zoning permit fees.

    • The Building Department states that the proper fee depends on the project.
    • Credit/debit card payments add a GovPayNet service fee.
    • The payment page gives Pay Location Code 5958 and directs applicants to call 888-604-7888 or use GovPayNow.

    GovPayNet pay location code: 5958

    “Please call to obtain the proper fee for your project and more details on the new building requirements.”
  • Permit processPartial

    Ogemaw County construction permit application process.

    • Applications may be left in the Annex drop box with payment by check.
    • Nearly all permits require a floor plan and cross-section, plus a site plan showing construction and dimensions to lot lines.
    • Additional requirements may include septic, first-building-on-parcel information, driveway approval, and other project-specific information.
    • Permit applications may be emailed to permits@ocmi.us.
    “In addition to an application for a building permit, you will be required to supply this department with additional information specific to your project.”

Michigan rules that apply here

  • Owner-builder exemptionAvailable (with conditions)

    Michigan residential-builder licensing when an individual erects a residential structure or combination residential and commercial structure for the individual's own use and occupancy on the individual's property.

    • The exemption concerns the residential-builder licensing definition and does not eliminate otherwise applicable building-permit, inspection, code, zoning, or utility requirements.
    • The owner-builder must personally satisfy the statutory own-use, own-occupancy, and own-property conditions stated in the source.
    • The source states that persons constructing residential structures for compensation are generally within the residential-builder licensing definition, subject to statutory exceptions.
    “or a person who erects a residential structure or combination residential and commercial structure except for the person's own use and occupancy on the person's property.”
  • Agricultural exemptionConditional

    Building-permit exemption for shade cloth structures constructed for nursery or agricultural purposes under Michigan Building Code Part 4.

    • The exemption applies to shade cloth structures constructed for nursery or agricultural purposes.
    • Service systems are excluded from the exemption.
    • The exemption does not authorize work violating the building code or other laws or ordinances of the jurisdiction.
    “Exemptions from permit requirements of the code shall not be deemed to grant authorization for any work to be done in any manner in violation of the provisions of the code or any other laws or ordinances of this jurisdiction. Permits shall not be required for any of the following: [...] (x) Shade cloth structures constructed for nursery or agricultural purposes, not including service systems.”
  • Subdividing landRegulated (with conditions)

    Subdivision plat review and administration under Michigan's Land Division Act statewide.

    • The Office of Land Survey and Remonumentation administers applicable Land Division Act provisions.
    • Staff conducts final reviews of plat maps for compliance with the Act.
    • Final plats are authorized for submission to the Register of Deeds for proper recordation.
    “The Office of Land Survey and Remonumentation administers the applicable provisions of the Land Division Act, 1967 PA 288 in order to ensure the orderly development of subdivisions in the State of Michigan. Staff conducts final reviews of plat maps to ensure compliance with the Act and authorizes final plats to be submitted to the Register of Deeds for proper recordation.”
    One more reviewed finding on this topic
    • Regulated (with conditions) — Subdivision plat review and recordation in Michigan.
      “The Office of Land Survey and Remonumentation administers the applicable provisions of the Land Division Act, 1967 PA 288 in order to ensure the orderly development of subdivisions in the State of Michigan. Staff conducts final reviews of plat maps to ensure compliance with the Act and authorizes final plats to be submitted to the Register of Deeds for proper recordation.”
  • Building in a floodplainRequired

    Alteration or occupation of the 100-year floodplain of a Michigan river, stream, or drain regulated under Part 31.

    • The Part 31 permit requirement applies to rivers, streams, or drains with a drainage area of 2 square miles or greater.
    • A Part 31 EGLE permit is not required for alterations within floodplains of the Great Lakes, inland lakes, or watercourses with drainage areas less than 2 square miles, although other NREPA reviews may still be necessary.
    • Construction and fill may be permitted in non-floodway portions if local ordinances and building standards are met and compensating excavation is provided equal to the volume of fill placed in the floodplain.
    • New residential construction is specifically prohibited in the floodway.
    • The minimum residential elevation standard is one foot above the 100-year flood elevation, and some communities or counties may impose a higher standard.

    Minimum drainage area for Part 31 floodplain authority: >= 2 square miles (Part 31 does not apply below this threshold) · Lowest-floor elevation: >= 1 foot above 100-year flood elevation (Some communities and counties may require a higher elevation)

    “The Floodplain Regulatory Authority deals with the floodplains of rivers, streams, or drains which have a drainage area that is 2 square miles or greater. A permit is not required from EGLE, under Part 31, for alterations within the floodplains of the Great Lakes, inland lakes, or watercourses which have a drainage area less than 2 square miles.”
  • Campground & park staysLimited

    Tiny houses, including tiny houses built on wheels, proposed as resort cabins or similar occupancy in Michigan.

    • The source distinguishes tiny houses from recreational units and states they cannot be treated as recreational units even if built on wheels.
    • The tiny house must be built as a resort rather than a campground.
    • Local health department permitting for wells, septic tanks, and drainfields is required as applicable.
    • Local zoning, building, electrical, and plumbing permits and final approvals are required under local authorities.
    • The source does not establish statewide zoning permission or a statewide right to occupy a tiny house.
    “Local zoning, building, electrical, plumbing permits and final approvals under local authorities.”
    3 more reviewed findings on this topic
    • Limited — RV occupancy as part of a Michigan campground consisting of five or more recreational units used for temporary living quarters.
      “requires a campground license when five or more recreational units (i.e., tents, campers, RVs) are placed on a parcel or tract of land”
    • Limited — Temporary camping in a Michigan temporary campground.
      “A temporary campground license issued by the local health department (LHD) having jurisdiction is required prior to operating a temporary campground.”
    • Limited — Occupancy of RVs and other recreational units as temporary living quarters in a Michigan campground offering sites to the public or members of an organization, where 5 or more recreational units are involved.
      “A campground owner shall ensure that a site is occupied by not more than 8 persons and by not more than 1 recreational unit.”
  • county building authorityGeneral

    Michigan counties serving as building-code enforcing agencies for residential construction in unincorporated areas, subject to the Statewide Jurisdiction List and local/state jurisdiction assignments.

    • Before construction, a written building-permit application must be submitted to the appropriate enforcing agency.
    • A permit is also required when use or occupancy changes.
    • Ordinary repairs do not require a permit, but the stated structural, egress, plumbing, electrical, mechanical, and public-health/safety limitations apply.
    • The Michigan Building Code and Michigan Residential Code govern construction; county enforcement applies only where the Statewide Jurisdiction List designates county jurisdiction.
    “If COUNTY is indicated, that unit of government receives code enforcement services from a county enforcing agency.”

Set by your township or city, not the county

In Michigan, zoning is adopted by each township or city, so Ogemaw County has no county-wide answer on these. Find your township or city in the list of places on this page, or call its clerk or zoning administrator.

  • Tiny homes
  • Accessory dwellings
  • Short-term rentals

Still unanswered

We looked and could not find an official answer yet. Silence is not permission — ask the county directly.

  • Septic permit — Residential on-site sewage permit requirements in Ogemaw County.
  • Septic inspection — Residential septic inspections in Ogemaw County.

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Living off-grid in Ogemaw County, Michigan

Is Ogemaw County a good place to live off-grid or homestead?

Ogemaw County scores 76/100 on the Bolthole Index, a strong county profile. Its strengths: manageable long-term carry cost and a stronger property-autonomy legal backdrop. Watch-outs: more administrative friction around building and land use.

Do you need a building permit in Ogemaw County, Michigan?

Ogemaw County generally requires a residential building permit, and it enforces county zoning. Onsite septic is permitted by District Health Department No. 2. Owner-builders may act as their own contractor to build their home. These answers are quoted from official sources and independently re-checked. Rules change and cities within the county differ — always confirm with the county before you buy or build.

Can you live in an RV or tiny home on your land in Ogemaw County?

Living in an RV on your own land in Ogemaw County is limited to specific cases: Recreational vehicle occupancy or storage on vacant lots within residential zoning districts in the county ordinance jurisdiction. RVs are allowed for a maximum of 14 days in any 30-day period, with removal for the remainder of the period. A maximum of three camping vehicles or tents, or a combination, is allowed per parcel. Confirm with the county before relying on it.

How much does land cost in Ogemaw County, Michigan?

Land in Ogemaw County runs about $3,407 per acre, based on the latest county data.

What is the water situation in Ogemaw County?

Ogemaw County gets about 32.3" of rain a year, with severe drought in roughly 1.4% of years.

How remote is Ogemaw County?

A representative private-land location has about 17,978 people within a 30-minute drive and 1,398,574 within two hours. The road-network catchments count population across county lines and clusters of smaller cities; straight-line radius values remain available as a comparison.

How Ogemaw compares in Michigan

Compare side-by-side →See all 83 Michigan counties ranked →