Bolthole Index

Cedar County, Missouri

Building permits, zoning and land rules in Cedar County, Missouri

76Index Score / 100
#20 of 115 in Missouri

Unincorporated Cedar County, Missouri does not require a residential building permit according to state records and has no county planning and zoning regulations12. El Dorado Springs and Stockton require city building permits; El Dorado Springs also has city zoning345. Start septic questions with the Cedar County Health Department; some incorporated areas may be referred to Missouri DHSS6.

At a glance

Building permit
Not required in unincorporated areas per state records; El Dorado Springs and Stockton require city building permits134
Zoning
No county zoning; El Dorado Springs has city zoning75
Septic permits
Start with Cedar County Health Department; most new or repaired systems need approval, and some city addresses may be referred to DHSS68
RV living
No county zoning restriction in unincorporated areas; wastewater and floodplain requirements still apply91011
Tiny homes
No county zoning minimum home size in unincorporated areas9
Owner-builder
No county owner-builder exemption was confirmed12
Water wells
A permit is generally required, but a landowner may install the landowner's own well or pump without one1314
Floodplain work
Development in a regulated floodplain requires a floodplain permit11

Who to call

Septic permits

Cedar County Health Department

Local contact for Cedar County onsite wastewater permitting under the county ordinance

417-876-5477

1317 S. Hwy 32, Suite B, El Dorado Springs, MO 64744-2037

Also useful

Cedar County Commission

County policy, subdivision plat approval, CAFO permits, and questions about unpublished county land rules

417-276-6700 ext. 221

113 South Street, Stockton, MO 65785

Also useful

Cedar County Recorder of Deeds

Records approved plats and surveys

417-276-6700 ext. 246

113 South Street, Stockton, MO 65785

Floodplain permits

Cedar County Floodplain Administrator

County floodplain administration for locations outside separately listed cities

(417) 276-6700

113 South St., Stockton, MO 65785

Contact details are copied from each office’s official page and were checked against it on October 12, 2026.

Off-grid gear

Going off-grid in Cedar County means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Do you need a building permit in Cedar County, Missouri?

Unincorporated Cedar County does not require a residential building permit according to Missouri’s county building-code records1. We could not confirm Cedar County’s current inspection or certificate-of-occupancy requirements; ask the Cedar County Commission before construction15. Stockton requires building permits for construction and regulated alterations, repairs, demolition and utility work, with exceptions for specified minor work4. El Dorado Springs requires building permits for new residential and commercial buildings, additions, alterations and demolition3. El Dorado Springs has adopted the International Building Code 2006, and city building permits are available at City Hall after building code officer approval16. Septic questions remain separate: start with the Cedar County Health Department, which may refer some incorporated-area applications to DHSS6.

Who issues building permits in Cedar County, Missouri?

For an unincorporated parcel, ask the Cedar County Commission about residential construction requirements at 417-276-6700 ext. 221, 113 South Street in Stockton15. In Stockton, apply to the city Building Inspector before starting work that requires a building permit4. In El Dorado Springs, building permits are issued at City Hall after building code officer approval3. Start septic questions separately with the Cedar County Health Department at 417-876-5477; some incorporated areas may be referred to DHSS617. County Commission approval is required before recording a plat, and the Recorder requires 1 original and 4 copies18. Plat and survey recording costs $25 for each page after the first; confirm the first-page fee with the Recorder at 417-276-6700 ext. 2461920.

Does Cedar County, Missouri have zoning?

Unincorporated Cedar County has no county planning and zoning regulations2. El Dorado Springs administers city zoning with residential, commercial and industrial zones; activities are restricted to their respective zones521. Cedar County’s absence of county zoning does not displace municipal zoning inside city limits22. Septic permitting remains a separate question for the Cedar County Health Department, with some incorporated areas referred to DHSS6. No county zoning does not remove plat approval: all plats need County Commission approval before recording18. Cedar County’s concentrated animal feeding operation ordinance also imposes classification-based setbacks for County Health Permit applications23.

How do septic permits work in Cedar County?

The Cedar County Health Department administers the county onsite wastewater ordinance, which may add requirements beyond Missouri’s minimum standards; some incorporated areas may be referred to DHSS6. Missouri requires a construction permit before installing or repairing most onsite wastewater systems; some single-family residential lots may qualify for an exemption, while nonresidential systems require a permit regardless of parcel size8. Residential property under 3 acres requires a construction permit, but ask the Health Department to decide the parcel's status before work begins817. Only 2.3% of mapped county soils lack severe limitations for a conventional drain field, so make the site evaluation an early contingency24. Wastewater may not discharge into a road ditch or onto the ground10. State guidance calls for septic-tank inspection at least every 2 years, although the technical standard is only enforceable if adopted by rule or local ordinance25.

Can you live in an RV or tiny home in Cedar County?

Unincorporated Cedar County has no county zoning rule setting RV occupancy, temporary camping, tiny-home or manufactured-home placement, accessory dwellings, minimum home size, minimum lot size, lot coverage or building height9. Inside El Dorado Springs, city zoning applies; ask the city about the proposed use5. A small dwelling or RV still needs lawful wastewater disposal: most onsite systems require a construction permit, and wastewater cannot discharge onto the ground or into a road ditch810. Floodplain approval applies independently of dwelling size11. Ask the Cedar County Health Department about the wastewater plan before placing a dwelling; some incorporated-area applications may go to DHSS617.

What are the steps to build a home in Cedar County, Missouri?

  1. Confirm whether the parcel is in unincorporated Cedar County or inside a city; in El Dorado Springs or Stockton, obtain the required city building permit, and for unincorporated land ask the Cedar County Commission about construction requirements13415.
  1. Check the flood map and contact the Cedar County Floodplain Administrator before disturbing land in a regulated floodplain1126.
  1. Contact the Cedar County Health Department early for the site evaluation and onsite wastewater permit process617.
  1. If creating a recordable plat, obtain County Commission approval and take 1 original and 4 copies to the Recorder of Deeds1820.
  1. Obtain a state access permit before constructing a driveway in Missouri Department of Transportation right-of-way27.
  1. Use Missouri's permit process for a contractor-installed well or pump; a landowner installing the landowner's own well or pump has a permit exception1314. A well serving a public water system needs written state approval before drilling28.

What should you check before buying land in Cedar County, Missouri?

Start with septic feasibility: only 2.3% of Cedar County's mapped soils lack severe limitations for a conventional drain field, so do not assume a conventional system will work24. The terrain is broadly gentle, with 94.4% of land at a slope of 15% or less, while 40.4% is wooded2930. Confirm whether access is on a county road, a special road district road, or state right-of-way; state-right-of-way driveways require a Missouri Department of Transportation permit1527. Check floodplain status because regulated floodplain development needs a permit1126. The effective property-tax rate is about 0.6%, and the median annual property-tax bill is about $9533132. Ask about nearby concentrated animal feeding operations: lawful operations existing when the county ordinance was enacted are exempt, but expansion or a classification change triggers full compliance and a County Health Permit33.

Watch-outs

  • We could not confirm Cedar County’s current residential inspection or certificate-of-occupancy requirements; ask the County Commission before construction15.
  • Cedar County’s homepage lists a temporary data-center moratorium despite the absence of county zoning; ask the County Commission about qualifying development3415.
  • A poor conventional-septic soil rating does not decide an individual site, but only 2.3% of county soils lack severe conventional drain-field limits, so obtain a site evaluation before choosing a house location24.

Sources

  1. State of Missouri - County Building Codes for Missouri (2026 county census)
  2. Home - Cedar County Missouri, quoted and re-checked
  3. El Dorado Springs: official source (Cedar County), quoted and re-checked
  4. Stockton: Article III: Construction of Structures (Cedar County), quoted and re-checked
  5. El Dorado Springs: official source (Cedar County), quoted and re-checked
  6. OWTS Construction Permit Process, quoted and re-checked
  7. Home - Cedar County Missouri, quoted and re-checked
  8. OWTS Construction Permit Process, quoted and re-checked
  9. Missouri law on county zoning and building authority
  10. health.mo.gov, quoted and re-checked
  11. Floodplain Forms, quoted and re-checked
  12. (2026 county census)
  13. Water Wells - PUB2945, quoted and re-checked
  14. Water Wells - PUB2945, quoted and re-checked
  15. Cedar County Commission (cedarcountymo.gov)
  16. Municipal Ordinance - Codes - City of El Dorado Springs Missouri, quoted and re-checked
  17. Cedar County Health Department (cedarcountymo.gov)
  18. Recording, Fees, UCC Filings, Copywork and Refunds, quoted and re-checked
  19. Recording, Fees, UCC Filings, Copywork and Refunds, quoted and re-checked
  20. Cedar County Recorder of Deeds (cedarcountymo.gov)
  21. Official City Website - City Boards and Commissions Information - El Dorado Springs, Missouri, quoted and re-checked
  22. Home - Cedar County Missouri, quoted and re-checked
  23. An Ordinance Establishing Health Regulations for Concentrated Animal Feeding Operations, quoted and re-checked
  24. Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
  25. An Onsite Wastewater Treatment System Owner’s Manual, quoted and re-checked
  26. Cedar County Floodplain Administrator (sema.dps.mo.gov)
  27. Permits | Missouri Department of Transportation (Missouri statewide rule), quoted and re-checked
  28. Who Regulates Water Wells in Missouri? - PUB4001, quoted and re-checked
  29. Share of land at 15% slope or less: Bolthole Index county data
  30. Wooded share of land: Bolthole Index county data
  31. Effective property tax rate: Bolthole Index county data
  32. Median property tax bill: Bolthole Index county data
  33. An Ordinance Establishing Health Regulations for Concentrated Animal Feeding Operations, quoted and re-checked
  34. Home - Cedar County Missouri, quoted and re-checked

Written October 12, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Found land here? Start a Property Hunt →

Compared with neighboring counties

Like all 6 of its neighbors, Cedar County requires no county building permit for a home.

RuleCedar CountyDade CountySt. Clair CountyPolk CountyVernon CountyBarton CountyLawrence County
Building permitNot requiredNot requiredNot requiredNot requiredNot requiredNot requiredNot required
County zoningNoNoNot publishedNoNoNot publishedNo
Septic permitsCounty Health Dept.County Health Dept.County Health CenterCounty Health CenterCounty Health Dept.County Health Dept.County Health Dept.

County locator

Cedar County in Missouri

76
County map
Cedar County highlighted among the Missouri counties · colored by Index score

How Cedar County scores

Seclusion62100% ev.
Self-Sufficiency62100% ev.
Admin Boringness8790% ev.
Durability58100% ev.
Property Autonomy47100% ev.
Carry Cost80100% ev.

Evidence strength: 98%. This reports direct-source completeness and fallback use; it is separate from the score and is not a confidence interval. How it works →

$238kTypical home
0.6%Property tax
$3,763Land / acre
44.9"Annual rain
7.5% of yrsSevere drought
16.6 / yr (+12.9)Mid-century 100°F days
17.7 daysMid-century dry spell
2.22" (+4.5%)Mid-century 1-day rain
1.64×Wildfire change factor
100%Forward climate coverage
$1,884Home insurance / yr
2.9% / yrInsurance growth
1.4%Nonrenewal rate
county median (2+ published ZIPs)Insurance basis
16,307People within 30 min
2,915,104People within 2 hr
16,150Radius comparison (15 mi)
30.9People / sq mi
8.1%Federal land
94.4%Land at 15% slope or less
2.3%Soils rated "not limited" for septic (strict USDA rating)
6,553 acWorkable land screen
40.4%Wooded land
41.7 tonsBiomass / forest ac
56.8°FAvg temp

Scout Cedar County

Camp here before you commitBook a few nights nearby on Hipcamp →Already own land here?Earn money hosting campers — get $100 when you become a Hipcamp host →

Some links are affiliate or referral links — we may earn a commission, at no cost to you.

Property hunt

Find land. Bring the promising ones back.

Search live inventory elsewhere, then cost and vet each candidate here. No copied listings, account, or paid data feed.

Each button opens a current land search for Cedar County. Listing sites control their own results and filters.

Analyze a property
Add setup-cost allowances

Use rough quotes or placeholders. Blank fields count as $0.

Working estimate

—land + entered setup costs
Asking $ / acre
—
Setup allowance
—
All-in $ / acre
—

A planning estimate, not a valuation or contractor quote. The USDA benchmark includes farm land and buildings; it is context, not a parcel comp.

Before an offer

Parcel due diligence

0/8 checked

Saved properties and checklist progress stay on this device. Bolthole Index does not receive them.

Cities and towns in Cedar County

Inside a city or town, that city usually issues building permits and sets zoning; the county’s rules above cover unincorporated land. Septic, wells and floodplain rules usually stay with the county or state everywhere.

Not yet researched: Village of Jerico Springs · Village of Umber View Heights

Answers from the rulebook for Cedar County

What the ordinances and state agencies actually say — one answer per question, each quoted from the official source and independently re-checked.

Cedar County rules

  • County-wide zoningAbsent

    Countywide planning and zoning regulation in Cedar County, including unincorporated areas.

    • The county source describes Cedar County as a third-class county without county planning and zoning regulations.
    • Municipal zoning rules may apply within incorporated cities, including Stockton and El Dorado Springs.
    “Citizens are encouraged to attend and participate in the discussion concerning the futuredevelopment of Cedar County, including the county's current status as a third-class county withoutplanning and zoning regulations.”
    3 more reviewed findings on this topic
    • Absent — County planning and zoning regulation in unincorporated Cedar County.
      “Citizens are encouraged to attend and participate in the discussion concerning the futuredevelopment of Cedar County, including the county's current status as a third-class county withoutplanning and zoning regulations.”
    • Absent — Cedar County's county-level planning and zoning regulation, including the unincorporated county jurisdiction.
      “Citizens are encouraged to attend and participate in the discussion concerning the futuredevelopment of Cedar County, including the county's current status as a third-class county withoutplanning and zoning regulations.”
    • Absent — Cedar County's countywide planning and zoning regulations, including unincorporated county territory.
      “Citizens are encouraged to attend and participate in the discussion concerning the future development of Cedar County, including the county's current status as a third-class county without planning and zoning regulations.”
  • Local zoningVaries (with conditions)

    Aggregate local zoning status across Cedar County municipalities and unincorporated areas; municipal rules are administered by the respective municipality, not by Cedar County.

    • Stockton's official city website states that the city currently has no zoning.
    • El Dorado Springs' official city website states that the city is zoned and describes residential, commercial, and industrial zones.
    • The status of other Cedar County municipalities was not established in this research pass.
    • Countywide absence of county planning and zoning does not eliminate municipal zoning within incorporated places.
    “The majority of the commercial businesses are located near the downtown area, surrounded by residential homes, the city currently has no zoning.”
    2 more reviewed findings on this topic
    • Varies (with conditions) — Aggregate of zoning administered in Cedar County by incorporated municipalities and the absence of county planning and zoning regulations; Cedar County does not administer each municipal ordinance.
      “The City of El Dorado Springs is zoned. Zoning divides the City into three basic zones – residential, commercial and industrial. Zoning prohibits these activities from taking place outside their respective areas. This minimizes conflicts created when these activities are mixed together in close quarters.”
    • Varies (with conditions) — Countywide aggregate of county and municipal zoning: Cedar County reports no county planning and zoning regulations, while incorporated El Dorado Springs administers zoning.
      “The City of El Dorado Springs is zoned. Zoning divides the City into three basic zones - residential, commercial and industrial. Zoning prohibits these activities from taking place outside their respective areas.”
  • Zoning districts · by state lawNot published

    Unincorporated Cedar County: no county rule sets this, because Cedar County's own reviewed answer confirms it has no county-wide zoning ordinance.

    • Septic, floodplain, subdivision and health rules still apply; cities and towns set their own rules inside their limits.
    • This conclusion concerns county planning and zoning regulations, not municipal zoning within incorporated places.
    • The county homepage separately lists “Temporary Moratorium on Data Centers 2026.09.08”; that temporary measure may affect qualifying data-center development despite the absence of county planning and zoning regulations.
    “Citizens are encouraged to attend and participate in the discussion concerning the futuredevelopment of Cedar County, including the county's current status as a third-class county withoutplanning and zoning regulations.”
  • Minimum dwelling size · by state lawNone

    Unincorporated Cedar County: no county rule sets this, because Cedar County's own reviewed answer confirms it has no county-wide zoning ordinance.

    • Septic, floodplain, subdivision and health rules still apply; cities and towns set their own rules inside their limits.
    • This conclusion concerns county planning and zoning regulations, not municipal zoning within incorporated places.
    • The county homepage separately lists “Temporary Moratorium on Data Centers 2026.09.08”; that temporary measure may affect qualifying data-center development despite the absence of county planning and zoning regulations.
    “Citizens are encouraged to attend and participate in the discussion concerning the futuredevelopment of Cedar County, including the county's current status as a third-class county withoutplanning and zoning regulations.”
  • Minimum lot size · by state lawNone

    Unincorporated Cedar County: no county rule sets this, because Cedar County's own reviewed answer confirms it has no county-wide zoning ordinance.

    • Septic, floodplain, subdivision and health rules still apply; cities and towns set their own rules inside their limits.
    • This conclusion concerns county planning and zoning regulations, not municipal zoning within incorporated places.
    • The county homepage separately lists “Temporary Moratorium on Data Centers 2026.09.08”; that temporary measure may affect qualifying data-center development despite the absence of county planning and zoning regulations.
    “Citizens are encouraged to attend and participate in the discussion concerning the futuredevelopment of Cedar County, including the county's current status as a third-class county withoutplanning and zoning regulations.”
  • SetbacksSpecified

    Concentrated animal feeding operations applying for a Cedar County Health Permit.

    • The distances apply only to an application for a County Health Permit and are measured from the proposed CAFO to CAFOs existing when the application is filed.
    • CAFO-to-CAFO distances vary by CAFO classification: Class IA requires 1.5 miles from another Class IA and 1 mile from other classifications; Class IB requires 1 mile from Class IA, IB, IC, or II; Class IC requires 1 mile from Class IA or IB and three-fourths mile from Class IC or II; Class II requires one-fourth mile from any Class IA, IB, IC, or II.
    • Occupied-dwelling setbacks do not apply to occupied dwellings owned by the CAFO or to dwellings not in existence when the County Health Permit was issued.
    • Occupied-dwelling setbacks are three-fourths mile for Class IA, increasing by one-fourth mile per 500 AU or fractional portion above 7,000 AU; three-fourths mile for Class IB; one-half mile for Class IC; and one-quarter mile for Class II.
    • The ordinance provides a variance procedure for certain requirements and requires a County Health Permit before covered CAFO operation.

    Class IA to another Class IA CAFO setback: 1.5 miles · Class IA to other CAFO classification setback: 1 mile · Class IB to listed CAFO classifications setback: 1 mile · Class IC to Class IA or IB setback: 1 mile · Class IC to Class IC or II setback: 0.75 mile · Class II to any listed CAFO classification setback: 0.25 mile

    “These distances shall apply only to the application for a County Health Permit, and shall be measured only from the proposed CAFO to CAFOs in existence at the time of an application for a County Health Permit.”
  • Lot coverage · by state lawNone

    Unincorporated Cedar County: no county rule sets this, because Cedar County's own reviewed answer confirms it has no county-wide zoning ordinance.

    • Septic, floodplain, subdivision and health rules still apply; cities and towns set their own rules inside their limits.
    • This conclusion concerns county planning and zoning regulations, not municipal zoning within incorporated places.
    • The county homepage separately lists “Temporary Moratorium on Data Centers 2026.09.08”; that temporary measure may affect qualifying data-center development despite the absence of county planning and zoning regulations.
    “Citizens are encouraged to attend and participate in the discussion concerning the futuredevelopment of Cedar County, including the county's current status as a third-class county withoutplanning and zoning regulations.”
  • Building height · by state lawNone

    Unincorporated Cedar County: no county rule sets this, because Cedar County's own reviewed answer confirms it has no county-wide zoning ordinance.

    • Septic, floodplain, subdivision and health rules still apply; cities and towns set their own rules inside their limits.
    • This conclusion concerns county planning and zoning regulations, not municipal zoning within incorporated places.
    • The county homepage separately lists “Temporary Moratorium on Data Centers 2026.09.08”; that temporary measure may affect qualifying data-center development despite the absence of county planning and zoning regulations.
    “Citizens are encouraged to attend and participate in the discussion concerning the futuredevelopment of Cedar County, including the county's current status as a third-class county withoutplanning and zoning regulations.”
  • Living in an RV · by state lawUnrestricted

    Unincorporated Cedar County: no county rule sets this, because Cedar County's own reviewed answer confirms it has no county-wide zoning ordinance.

    • Septic, floodplain, subdivision and health rules still apply; cities and towns set their own rules inside their limits.
    • This conclusion concerns county planning and zoning regulations, not municipal zoning within incorporated places.
    • The county homepage separately lists “Temporary Moratorium on Data Centers 2026.09.08”; that temporary measure may affect qualifying data-center development despite the absence of county planning and zoning regulations.
    “Citizens are encouraged to attend and participate in the discussion concerning the futuredevelopment of Cedar County, including the county's current status as a third-class county withoutplanning and zoning regulations.”
  • Camping on your land · by state lawUnrestricted

    Unincorporated Cedar County: no county rule sets this, because Cedar County's own reviewed answer confirms it has no county-wide zoning ordinance.

    • Septic, floodplain, subdivision and health rules still apply; cities and towns set their own rules inside their limits.
    • This conclusion concerns county planning and zoning regulations, not municipal zoning within incorporated places.
    • The county homepage separately lists “Temporary Moratorium on Data Centers 2026.09.08”; that temporary measure may affect qualifying data-center development despite the absence of county planning and zoning regulations.
    “Citizens are encouraged to attend and participate in the discussion concerning the futuredevelopment of Cedar County, including the county's current status as a third-class county withoutplanning and zoning regulations.”
  • Tiny homes · by state lawUnrestricted

    Unincorporated Cedar County: no county rule sets this, because Cedar County's own reviewed answer confirms it has no county-wide zoning ordinance.

    • Septic, floodplain, subdivision and health rules still apply; cities and towns set their own rules inside their limits.
    • This conclusion concerns county planning and zoning regulations, not municipal zoning within incorporated places.
    • The county homepage separately lists “Temporary Moratorium on Data Centers 2026.09.08”; that temporary measure may affect qualifying data-center development despite the absence of county planning and zoning regulations.
    “Citizens are encouraged to attend and participate in the discussion concerning the futuredevelopment of Cedar County, including the county's current status as a third-class county withoutplanning and zoning regulations.”
  • Manufactured homes · by state lawUnrestricted

    Unincorporated Cedar County: no county rule sets this, because Cedar County's own reviewed answer confirms it has no county-wide zoning ordinance.

    • Septic, floodplain, subdivision and health rules still apply; cities and towns set their own rules inside their limits.
    • This conclusion concerns county planning and zoning regulations, not municipal zoning within incorporated places.
    • The county homepage separately lists “Temporary Moratorium on Data Centers 2026.09.08”; that temporary measure may affect qualifying data-center development despite the absence of county planning and zoning regulations.
    “Citizens are encouraged to attend and participate in the discussion concerning the futuredevelopment of Cedar County, including the county's current status as a third-class county withoutplanning and zoning regulations.”
  • Accessory dwellings · by state lawUnrestricted

    Unincorporated Cedar County: no county rule sets this, because Cedar County's own reviewed answer confirms it has no county-wide zoning ordinance.

    • Septic, floodplain, subdivision and health rules still apply; cities and towns set their own rules inside their limits.
    • This conclusion concerns county planning and zoning regulations, not municipal zoning within incorporated places.
    • The county homepage separately lists “Temporary Moratorium on Data Centers 2026.09.08”; that temporary measure may affect qualifying data-center development despite the absence of county planning and zoning regulations.
    “Citizens are encouraged to attend and participate in the discussion concerning the futuredevelopment of Cedar County, including the county's current status as a third-class county withoutplanning and zoning regulations.”
  • Who permits septicCounty (with conditions)

    Onsite wastewater treatment system permitting in Cedar County, Missouri, including systems covered by the county's onsite wastewater ordinance.

    • Cedar County Health Department is identified by Missouri DHSS as the county permitting agency and the authority type is Ordinance.
    • Contact the Cedar County Health Department for onsite wastewater permitting instructions.
    • The county may impose requirements beyond Missouri's state minimum construction standards.
    • A construction permit is required before installing or repairing most onsite wastewater treatment systems; some single-family residential lots may be exempt based on lot size.
    • Effective August 28, 2026, application fees for onsite sewage disposal system construction, modifications, and repairs are temporarily suspended pending new standards under RSMo 701.046.
    • Some incorporated cities may not fall under the local permitting authority; for work in such an incorporated area, the local permitting authority defers the permit process to DHSS.
    • DHSS regulations cover single-family residential systems, including lagoons, and onsite or cluster systems treating domestic wastewater flows of 3,000 gallons per day or less and dispersing wastewater through soil treatment/absorption systems.
    • The Missouri Department of Natural Resources regulates lagoons serving anything other than a single-family residence, systems discharging into surface waters, systems treating wastewater flows greater than 3,000 gallons per day and dispersing wastewater through soil treatment/absorption systems, and industrial non-domestic wastewater systems.
    • DNR approval is required for subdivisions, mobile home parks, and campgrounds if onsite wastewater systems are planned.

    domestic wastewater flow covered by DHSS OWTS regulations: <= 3000 gallons per day (Systems exceeding this flow may be regulated by the Missouri Department of Natural Resources.) · temporary application-fee suspension effective date: 2026-08-28 (Applies to onsite sewage disposal system construction, modifications, and repairs pending new standards.)

    “Agency: Cedar County Health Dept. Authority Type: Ordinance [...] County: Cedar [...] Contact the agency above for onsite wastewater permitting instructions. This county has their own Onsite Wastewater Ordinance and may have additional requirements beyond the state minimum construction standards.”
  • Agricultural exemptionConditional

    Concentrated animal feeding operations lawfully in existence when Cedar County's CAFO ordinance was enacted.

    • The exemption applies only to a CAFO lawfully in existence at enactment.
    • Before an existing CAFO may expand or change its operations in a way that changes its CAFO classification, it must comply with the ordinance in every respect and obtain a County Health Permit.
    • The source excerpt does not state the ordinance's enactment date.
    “A CAFO lawfully in existence at the time of the enactment of this Ordinance shall be exempt from its terms and conditions; provided, however, that before a CAFO in existence at the time of the enactment of this Ordinance may expand or change its operations in terms of a change in CAFO classification, the CAFO shall comply with the provisions of this Ordinance in every respect and shall obtain a County Health Permit.”
  • Subdividing landRegulated (with conditions)

    Plats and surveys presented for recording in Cedar County, Missouri

    • The Cedar County Recorder requires one original and four copies.
    • All plats must be approved by the Cedar County Commission before recording.
    • The page lists recording fees of $46.00 for the first page and $25.00 for each page thereafter.
    • The official page does not establish whether a separate comprehensive county subdivision ordinance exists or whether the rule applies to every type of land division.

    plat or survey recording fee, first page: 46 USD · plat or survey recording fee, each page thereafter: 25 USD · copies required: 4 copies (In addition to one original.)

    “Recorder requires 1 original and 4 copies. All plats have to be approved by the Cedar County Commission before recording.”
    2 more reviewed findings on this topic
    • Regulated (with conditions) — Plats and surveys presented for recording in Cedar County.
      “Plats and Surveys $44.00 1st Page $25.00 Thereafter Recorder requires 1 original and 4 copies. All plats have to be approved by the Cedar County Commission before recording.”
    • Regulated (with conditions) — Plats and surveys submitted for recording in Cedar County
      “Recorder requires 1 original and 4 copies. All plats have to be approved by the Cedar County Commission before recording.”
  • Permit feesPublished (with conditions)

    County Health Permit applications for concentrated animal feeding operations (CAFOs) in Cedar County.

    • The fee schedule applies to the CAFO classes specified in the ordinance.
    • Fees must be paid before an application is accepted for consideration.
    • Fees are non-refundable except as provided in paragraph 10.4.
    • Class IA has an application fee of $10,000 plus $1.00 per animal unit exceeding 10,000 AU and a $500 renewal fee.
    • Class IB has a $7,000 application fee and a $300 renewal fee.
    • Class IC has a $3,000 application fee and a $200 renewal fee.
    • Class II has a $1,000 application fee and a $100 renewal fee.
    • An escrow fund may reimburse actual administration, investigation, processing, expert, and public-hearing costs; unexpended or unencumbered balances are refunded after approval, conditional approval, or denial.
    • The ordinance exempts CAFOs lawfully existing at enactment, except expansions or classification changes require compliance and a County Health Permit.

    Class IA application fee: 10000 USD (plus $1.00 per AU exceeding 10,000 AU) · Class IA renewal fee: 500 USD · Class IB application fee: 7000 USD · Class IB renewal fee: 300 USD · Class IC application fee: 3000 USD · Class IC renewal fee: 200 USD · Class II application fee: 1000 USD · Class II renewal fee: 100 USD

    “10.1 No application for approval ofaCounty Health Permit shall be accepted for consideration until the applicant has paid all administrative fees set forth in this Section. Fees paid shall be non-refundable, except as provided in paragraph 10.4, below.”
    One more reviewed finding on this topic
    • Published (with conditions) — Recording plats and surveys with the Cedar County Recorder of Deeds.
      “Plats and Surveys $44.00 1st Page $25.00 Thereafter Recorder requires 1 original and 4 copies. All plats have to be approved by the Cedar County Commission before recording.”
  • Permit processPublished (with conditions)

    County Health Permit process for concentrated animal feeding operations (CAFOs) in Cedar County.

    • A CAFO may not be erected, constructed, developed, used, operated, occupied, expanded to a different classification, or otherwise established until the Cedar County Commission issues a County Health Permit.
    • Applicants must submit applicable Missouri Department of Natural Resources materials, a County Commission application, required information, and the application fee.
    • The application is incomplete until all ordinance-required information is submitted; the County Commission has no obligation to review it before completion.
    • At least one public hearing must occur before approval.
    • Renewal is required every five years, with the renewal application and fee due at least 30 days before the anniversary date.
    • A variance may be requested for extraordinary or exceptional property-specific hardship if the ordinance standards are met.
    • CAFOs lawfully existing at enactment are exempt, but expansion or classification changes require compliance and a County Health Permit.

    permit renewal interval: 5 years · renewal filing deadline: >= 30 days before permit anniversary

    “An application for aCounty Health Permit shall not be considered complete unless and until the information required by this Ordinance is submitted to the County Commission. The County Commission shall have no obligation to review an application until this requirement is satisfied.”
  • Building permitNot required

    Missouri has no statewide residential building code and non-charter rural counties generally cannot require building permits; the state's county building code dataset lists no code for Cedar County. Corroborated by the state County Building Codes dataset (data.mo.gov iq7s-izvt, 2021): no county residential building code adopted.

    State of Missouri - County Building Codes for Missouri ↗Scouted from the county site, not yet independently re-checked

Missouri rules that apply here

  • Building code adoptedPartial

    Missouri statewide legal framework for building-code adoption by counties and other communities; the statutes authorize local adoption rather than establishing one uniformly adopted statewide building code.

    • County authority under RSMo 64.170 applies to counties of the first and second classification.
    • A county that had not adopted a building code before August 28, 2001 must obtain voter approval before adopting under RSMo 64.170 to 64.200.
    • The adoption vote is limited to voters in the affected area; a code affecting a county is not voted on by citizens of incorporated territory.
    • A county adopting under RSMo 64.180 must use a current nationally recognized building code edition from calendar year 1999 or later, as amended.
    • A county building ordinance may not conflict with liquefied petroleum gas installation requirements governed by RSMo 323.020.
    • A community may incorporate a code by reference only if it otherwise has legal power to adopt the ordinance.
    • A code incorporated by reference must be filed with the community clerk and available for public inspection for 90 days before adoption.
    • An ordinance adopting a code by reference must state the penalty separately rather than incorporate the penalty by reference.
    • RSMo 67.280 defines community to include any county, fire protection district, or municipality, and municipality to include an incorporated city, town, or village.
    “Because fire and building codes are adopted at the local level in Missouri”
    2 more reviewed findings on this topic
  • Septic permitLimited

    Installation or repair of onsite wastewater treatment systems in Missouri, including Cedar County where state standards apply.

    • A construction permit is required before installing or repairing most onsite wastewater treatment systems.
    • Some single-family residential lots may be exempt from permitting.
    • A construction permit is required for residential properties less than three acres; the exemption does not apply in some counties, so the county authority must be checked.
    • A permit is required regardless of property size for onsite systems serving non-residential structures.
    • Work should not begin until a permit is issued or an exemption is confirmed by the appropriate permitting authority.
    • Effective August 28, 2026, application fees for onsite sewage disposal system construction, modifications, and repairs are temporarily suspended due to changes to RSMo 701.046.
    • Lagoons serving anything other than a single-family residence fall under Missouri Department of Natural Resources jurisdiction.
    • Local authority may impose additional requirements beyond state minimum standards.

    residential property threshold: < 3 acres (The exemption does not apply in some counties.) · domestic wastewater flow covered by DHSS regulations: <= 3000 gallons per day (Other systems may fall under DNR jurisdiction.) · permit application fee: temporarily suspended effective August 28, 2026 (Subject to later DHSS standards and fee-setting.)

    “A construction permit is required before installing or repairing most onsite wastewater treatment systems (OWTS). Some single family residential lots may be exempt from permitting.”
    3 more reviewed findings on this topic
    • Required — Installing or repairing most onsite wastewater treatment systems in Missouri, including residential systems subject to state permitting.
      “A construction permit is required before installing or repairing most onsite wastewater treatment systems (OWTS). Some single family residential lots may be exempt from permitting.”
    • Required — Installing or repairing most onsite wastewater treatment systems statewide in Missouri.
      “A construction permit is required before installing or repairing most onsite wastewater treatment systems (OWTS). Some single family residential lots may be exempt from permitting.”
    • Required — Proposed campgrounds, mobile home parks, and subdivisions planning to use onsite wastewater treatment systems anywhere in Missouri.
      “DNR must approve subdivisions, mobile home parks and campgrounds if the use of OWTS is planned.”
  • Septic inspectionLimited

    Inspection or evaluation of existing onsite wastewater systems in connection with Missouri real-estate transfers.

    • Local public health agencies generally no longer inspect existing systems for real-estate transfers.
    • A private licensed inspector may perform an inspection or evaluation.
    • A lender, buyer, or other transaction participant may require an assessment.
    • Some local standards may be more stringent than state regulations.
    • Inspections and evaluations are distinct; an inspection includes a hydraulic test, while an evaluation does not.
    “For the most part, local public health agencies no longer inspect existing systems related to real estate transfer. The help of a licensed inspector can be obtained to check the condition of the system.”
    2 more reviewed findings on this topic
    • Limited — Routine inspection guidance for septic tanks in Missouri, including Cedar County systems subject to the state guidance.
      “Septic tanks must be inspected at least every two years.”
    • Limited — Inspections of existing onsite sewage systems in connection with property sales statewide in Missouri.
      “Missouri Department of Health and Senior Services' (DHSS) rules governing onsite sewage systems cover minimum construction requirements, system inspections at the time of property sales, and requirements for percolation testers and soil evaluators.”
  • Off-grid sanitationLimited

    Off-grid domestic wastewater treatment using onsite wastewater treatment systems where central sewer service is unavailable.

    • Onsite systems treat and dispose of domestic sewage on the property where generated.
    • A construction permit is generally required, including for residential property less than three acres, subject to county-specific exceptions.
    • Wastewater may not be discharged into a road ditch or onto the ground.
    • Local permitting authorities may impose additional requirements.

    residential lot threshold: < 3 acres (The exemption does not apply in some counties.)

    “Onsite wastewater treatment systems are sometimes referred to as "septic systems." These systems treat and dispose of domestic sewage on the property where it is generated.”
    2 more reviewed findings on this topic
    • Prohibited — Discharge of wastewater from an off-grid or onsite system into a road ditch or onto the ground in Missouri, including Cedar County.
      “Is it legal for wastewater to discharge into a road ditch or onto the ground? No.”
    • Allowed (with conditions) — Use of onsite wastewater treatment systems as off-grid sanitation where central sewer service is unavailable in Missouri.
      “In Missouri, where central sewer service is not available, homeowners and small business owners use various types of onsite wastewater treatment systems (OWTS).”
  • Well permitLimited

    Construction or alteration of a public well serving a Missouri public water system.

    • Public water systems must receive written approval from the Missouri Department of Natural Resources Public Drinking Water Branch before constructing or altering a public well.
    • The requirement does not apply when the system meets the charitable-and-benevolent-organization exemptions in section 640.116, RSMo.
    • Anyone proposing to install a public well must contact the department’s regional office for a well-site survey.
    • The survey addresses minimum isolation or setback distances from known or potential contaminant sources, including septic tanks, sanitary sewer lines, and landfills.
    • Before applying for construction authorization, the public water system must obtain an estimated casing-depth letter from the Missouri Geological Survey Water Resources Center.
    • There is no fee for the well-site-survey and estimated-casing-depth-letter services.
    • Failure to obtain construction authorization may result in approval delays and possibly require the owner to properly plug the well and drill a new one according to 10 CSR 60-3.

    public water system threshold: at least 15 service connections or regularly serves an average of at least 25 individuals daily, at least 60 days per calendar year

    “Public water systems must receive written approval from the PDWB before constructing or altering a public well”
    5 more reviewed findings on this topic
    • Required — Non-restricted water well construction or repair in Cedar County, Missouri, including installation or replacement of a pump and specified plumbing or electrical lines.
      “A non-restricted water well installation permit is required to construct or repair a water well in Missouri. A non-restricted pump installation permit is required to install or replace a pump in a water well.”
    • Not required — A landowner installing the landowner’s own well or pump in Cedar County, Missouri.
      “Landowners may install their own well or pump without a permit pursuant to the above mentioned law and rules.”
    • Required — A water well in Cedar County that serves, or will serve, a Missouri public water system.
      “Public water systems must receive written approval from the PDWB before constructing or altering a public well, unless the system meets the charitable and benevolent organization exemptions in section 640.116, RSMo.”
    • Required — A person or contractor conducting regulated work to drill, construct, repair, reconstruct, plug, or install pumps or pumping equipment in a water well, heat-pump well, monitoring well, or related well in Missouri.
      “A non-restricted permit is required to drill, construct, repair, reconstruct, plug, or install pumps or pumping equipment in a well.”
    • Limited — Construction or repair of water wells, installation or replacement of pumps, and associated plumbing and electrical work in Missouri.
      “A non-restricted water well installation permit is required to construct or repair a water well in Missouri.”
  • Driveway accessRequired

    Construction or modification of driveways within MoDOT right-of-way statewide.

    • A permit is required for construction of driveways and modifications to existing driveways on MoDOT right-of-way.
    • An initial online request must be submitted for each planned listed activity.
    • Engineered plans, traffic studies, hydraulic analysis, traffic-control plans, surety deposits, or performance bonds may be required depending on the work.
    • The rule does not establish a permit requirement for driveways outside MoDOT right-of-way.
    “We require you to obtain a permit to work on MoDOT's Right of Way for: Construction of driveways”
  • Building in a floodplainLimited

    Projects including mining, dredging, building construction, and other dirt-moving activities in designated flood hazard areas within participating Missouri jurisdictions.

    • The source describes local county or city flood damage reduction ordinances rather than one uniform statewide ordinance.
    • The project must be within a participating jurisdiction.
    • The project must be within a designated flood hazard area.
    • The cited rule does not apply if either condition is absent.
    • Covered projects must not raise flood heights.
    “Some jurisdictions (for example, county, city) require any projects in certain floodplains do not raise flood heights.”
    2 more reviewed findings on this topic
    • Required — Development in floodplains within Cedar County and other Missouri communities, subject to the applicable community floodplain management ordinance.
      “Regardless, some type of permit MUST be issued for ALL development in the floodplain.”
    • Required — All development in a Missouri floodplain, administered through the applicable community floodplain permitting process.
      “Regardless, some type of permit MUST be issued for ALL development in the floodplain.”
  • county zoning authorityLimited

    Missouri county zoning authority over unincorporated land.

    • RSMo § 64.850 applies to counties of the first class without a charter and counties of the second, third, or fourth class.
    • RSMo § 64.620 applies to counties of the second or third class to which §§ 64.510–64.690 apply.
    • Adoption under §§ 64.510–64.690 requires approval by vote of the people under § 64.530.
    • The authority applies in unincorporated portions and not incorporated portions.
    • The regulations must be in accordance with a comprehensive plan.
    • Under § 64.090, the zoning power does not apply to raising crops, livestock, orchards, or forestry; seasonal or temporary rice-farming or flood-irrigation impoundments; specified farm structures outside mapped flood-hazard areas; or underground mining entered through shafts outside mapped flood-hazard areas.
    • Existing lawful uses and specified public-utility services are protected under the cited statutory schemes.
    “the county commission of any county of the first class not having a charter form of government, or of any county of the second, third or fourth class may, after approval by vote of the people as provided in section 64.845, regulate and restrict, by order of record, in the unincorporated portions of the county, the height, number of stories, and size of buildings, the percentage of lots that may be occupied, the size of yards, courts and other open spaces, the density of population, the location and use of buildings, structures and land for trade, industry, residence or other purposes.”
    2 more reviewed findings on this topic
  • county building authorityLimited

    County authority to regulate residential construction and issue building permits in unincorporated areas of Missouri.

    • The authority under sections 64.170 to 64.200 applies to counties of the first and second classification.
    • A county that had not adopted a building code before August 28, 2001, must obtain voter approval before adopting one under those sections.
    • Only voters in the area affected by the proposed code may vote; incorporated-territory citizens cannot vote on a code affecting a county.
    • The county commission must hold at least three public hearings and provide the statutory newspaper publication and county posting notices before adoption.
    • Regulations adopted under section 64.180 apply to unincorporated territory, except as otherwise provided.
    • Adopted or amended codes after August 28, 2001, must use a current, calendar year 1999 or later edition of a nationally recognized building code, as amended.
    • A county building ordinance may not conflict with liquefied petroleum gas installations governed by section 323.020.

    public hearings before adoption: >= 3 hearings minimum (Section 64.180(3)) · newspaper notice: >= 15 days (Notice of hearing time and place must be published in at least two newspapers having general circulation within the county) · posted notice: >= 15 days (Notice must be posted in four conspicuous places in the county) · minimum nationally recognized building-code edition: >= calendar year 1999 edition year (Applies after August 28, 2001, under section 64.180)

    “The regulations adopted shall be applicable to the unincorporated territory of the county, except as otherwise provided herein”
    2 more reviewed findings on this topic
    • Limited — County regulation of construction and issuance of building permits for buildings, including residential construction, in Missouri counties, with the practical focus on county-controlled areas outside incorporated territory.
      “the county commission in all counties of the first and second classification [...] is for this purpose empowered [...] to adopt [...] regulations to control the construction”
    • Limited — Missouri counties' authority to require permits and regulate residential construction in unincorporated areas.
      “Before the adoption of such code of regulations, the county commission shall hold at least three public hearings thereon”

Inside cities and towns in Cedar County

Municipal rules found while researching the county. They apply inside that city or town, not to unincorporated land.

  • Building code adoptedAdopted (with conditions)

    Buildings and structures within the City of Stockton, Missouri.

    • The code page warns: “Electronic access to the City Code is offered to the public as a convenience, but does not necessarily include the most recent changes and amendments.”
    • The City Engineer is the building official.
    • For regulated construction, alteration, repair, demolition, moving, occupancy change, or regulated electrical, gas, mechanical, or plumbing work, the owner or authorized agent must apply to the building official and obtain the required permit.
    • A permit becomes invalid if authorized work is not commenced within 180 days of issuance, or is suspended or abandoned for 180 days after commencement; written extensions may be granted for periods of no more than 180 days each upon a written request showing justifiable cause.
    • Emergency equipment replacements and repairs require permit application by the next working business day.
    • This municipal adoption does not establish a Cedar County building-code adoption for unincorporated areas.

    adoption ordinance date: 2003-05-27 (Ordinance No. 299 §§1 — 4) · permit commencement or suspension period: 180 days (Extensions may be granted in writing for periods not more than 180 days each upon written request and justifiable cause.)

    “Certain document(s), three (3) copies of which are on file in the office of the City Clerk of the City of Stockton being marked and designated as "The BOCA National Building Code, 2000"; "The International Mechanical Code, 2000"; "The National Electrical Code, 1999"; "The International Plumbing Code, 2000"; and "The International One-and Two- Family Dwelling Code, 2000" be and are hereby adopted as the Building Codes of the City of Stockton, Missouri for the control of buildings and structures as herein provided; and each and all of the regulations, provisions, penalties, conditions and terms of said odes, are hereby referred to, adopted and made a part hereof as if fully set out in this Article, with the additions, insertions, deletions and changes, if any, prescribed in Subsection (C).”
    3 more reviewed findings on this topic
    • Adopted (with conditions) — Buildings and structures within the City of Stockton, Cedar County, Missouri.
      “Certain document(s), three (3) copies of which are on file in the office of the City Clerk of the City of Stockton being marked and designated as "The BOCA National Building Code, 2000"; "The International Mechanical Code, 2000"; "The National Electrical Code, 1999"; "The International Plumbing Code, 2000"; and "The International One-and Two- Family Dwelling Code, 2000" be and are hereby adopted as the Building Codes of the City of Stockton, Missouri for the control of buildings and structures as herein provided; and each and all of the regulations, provisions, penalties, conditions and terms of said odes, are hereby referred to, adopted and made a part hereof as if fully set out in this Article, with the additions, insertions, deletions and changes, if any, prescribed in Subsection (C).”
    • Adopted (with conditions) — Residential and commercial construction within the incorporated City of El Dorado Springs, Cedar County, Missouri.
      “The City of El Dorado Springs, a political subdivision of the state, has adopted building codes consistent with the regulations of state law.”
    • Adopted (with conditions) — Residential and commercial construction within the incorporated City of El Dorado Springs, Cedar County, Missouri.
      “The City of El Dorado Springs, a political subdivision of the state, has adopted building codes consistent with the regulations of state law.”
  • Local zoningPresent (with conditions)

    Zoning within the incorporated City of El Dorado Springs, Missouri.

    • The city states that zoning divides the city into residential, commercial, and industrial zones.
    • The city states that activities are prohibited outside their respective zones.
    • The Planning Commission recommends rezonings; the City Council enacts and amends zoning regulations and zoning district maps.

    zoning districts: 3 zones (residential, commercial, and industrial)

    “The City of El Dorado Springs is zoned. Zoning divides the City into three basic zones - residential, commercial and industrial. Zoning prohibits these activities from taking place outside their respective areas.”
    One more reviewed finding on this topic

Still unanswered

We looked and could not find an official answer yet. Silence is not permission — ask the county directly.

  • Owner-builder exemption — Owner-builder exemptions from residential building-permit, inspection, or related construction requirements in Cedar County.
  • Inspections — Building inspections for residential construction in Cedar County, including unincorporated areas.
  • Certificate of occupancy — Certificates of occupancy for residential construction in Cedar County, including unincorporated areas.
  • Mandatory utility hookup — Whether Cedar County requires connection to public water, public sewer, both, or neither for a particular parcel or development.
  • Short-term rentals — Short-term rental use in Cedar County, including unincorporated areas and incorporated municipalities.

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Living off-grid in Cedar County, Missouri

Is Cedar County a good place to live off-grid or homestead?

Cedar County scores 76/100 on the Bolthole Index, a strong county profile. Its strengths: low administrative friction for a quiet rural property and manageable long-term carry cost.

Do you need a building permit in Cedar County, Missouri?

Cedar County does not require a county building permit for a home in unincorporated areas, and it has no county-wide zoning. Onsite septic is permitted by Cedar County Health Department (Environmental). These answers are quoted from official sources and independently re-checked. Rules change and cities within the county differ — always confirm with the county before you buy or build.

Can you live in an RV or tiny home on your land in Cedar County?

Living in an RV on your own land in Cedar County is allowed: Unincorporated Cedar County: no county rule sets this, because Cedar County's own reviewed answer confirms it has no county-wide zoning ordinance. Septic, floodplain, subdivision and health rules still apply; cities and towns set their own rules inside their limits. This conclusion concerns county planning and zoning regulations, not municipal zoning within incorporated places. A tiny home is allowed. Confirm with the county before relying on it.

How much does land cost in Cedar County, Missouri?

Land in Cedar County runs about $3,763 per acre, based on the latest county data.

What is the water situation in Cedar County?

Cedar County gets about 44.9" of rain a year, with severe drought in roughly 7.5% of years.

How remote is Cedar County?

A representative private-land location has about 16,307 people within a 30-minute drive and 2,915,104 within two hours. The road-network catchments count population across county lines and clusters of smaller cities; straight-line radius values remain available as a comparison.

How Cedar compares in Missouri

Compare side-by-side →See all 115 Missouri counties ranked →