The City of Bonne Terre, Missouri (St. Francois County) runs its own zoning under Chapter 405 of the city code1, and its building inspector issues building permits for new homes, additions, sheds, fences and decks inside city limits2. Septic permits are required where no public sewer is available3; we could not confirm whether the city or the St. Francois County Health Center issues them.
At a glance
- Zoning
- Yes: city Chapter 405 zoning with A-1, R-1, R-2, R-3, MH, commercial and industrial districts1
- Building permit
- Required from the city building inspector for new construction, additions, sheds, fences and decks2
- Permit fee
- $1.00 per $1,000 of construction cost, $10.00 minimum2
- Farm buildings
- No building permit for agricultural structures in the A-1 district4
- Septic
- Permit required where no public sewer is available; issuing office to confirm3
- Public sewer
- Connection required when a city sewer is within 200 feet5
Who to call
Building permits
City of Bonne Terre Building Inspector (City Hall)
Building permits, occupancy inspections and zoning compliance inside Bonne Terre city limits
118 North Allen Street, Bonne Terre, MO 63628
Septic permits
St. Francois County Health Center, Environmental Health Department
Onsite wastewater permits in St. Francois County; confirm whether it covers addresses inside Bonne Terre
1025 West Main Street, Park Hills, Missouri 63601
Contact details are copied from each office’s official page and were checked against it on October 23, 2026.
Off-grid gear
Going off-grid in Bonne Terre means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Does Bonne Terre, Missouri have zoning?
Yes. Land inside Bonne Terre city limits is governed by the city's own Chapter 405 Zoning Code, with agricultural (A-1), residential (R-1, R-2, R-3), manufactured home (MH), commercial and industrial districts1. The district regulations are published in Chapter 405, Article II6.
In the R-1 single-family district, a detached house needs a lot of at least 8,500 square feet and 75 feet of width at the setback line, excluding previously platted lots7. Buildings, accessory buildings included, may cover no more than 30 percent of an R-1 lot8 and stand no taller than 35 feet9. R-2 uses the same 8,500 square foot average lot area and 35-foot height1011.
We could not confirm the city's rules on RVs, tiny homes, accessory dwellings, manufactured homes or minimum house size. Ask the city building inspector before you plan any of them.
Do you need a building permit in Bonne Terre, and who issues it?
Yes, in most cases. The City of Bonne Terre Building Inspector issues building permits for new residential and commercial construction inside city limits2. A permit is required before starting additions, sheds and detached garages, fences, swimming pools and decks2. Work may not begin until the city approves the permit2.
The fee is $1.00 per $1,000 of construction cost, with a $10.00 minimum2. Agricultural structures in the A-1 agricultural district are the exception: the city code does not require a building permit for them4, and only farm uses qualify, with one farmhouse per farmsite12. A carport added to an R-1 front yard does need a permit and must stay open on both sides and one end13.
We could not confirm which building code edition the city enforces or whether an owner-builder exemption exists. Call City Hall.
How do septic permits work in Bonne Terre?
Where no public sewer is available, a private septic system inside Bonne Terre needs a permit signed before construction starts3. The city inspects within 48 hours of notice14, and a system with a subsurface soil absorption field is not permitted on a lot under 15,000 square feet3.
A house on a street with a city sewer main within 200 feet of the property line must connect within 90 days of official notice5. Privies, septic tanks and cesspools are otherwise unlawful15.
We could not confirm whether the city or the county issues the permit inside city limits. St. Francois County's septic program is run by the Health Center's Environmental Health Department16, and Missouri's program lets some incorporated areas fall outside the local agency, where the state health department handles the permit17. Call the Health Center and City Hall before you buy.
Building a home in Bonne Terre: the steps, in order
- Confirm the lot's zoning district and its lot-size, coverage and height limits with the city1.
- Ask City Hall whether a public sewer is within 200 feet; if so, plan to connect5.
- If there is no sewer, contact the St. Francois County Health Center about a septic permit16.
- Submit a building permit application, a plat if applicable, a site plan showing setbacks, and the fee to the building inspector2.
- Wait for approval before breaking ground2.
- Schedule the occupancy inspection; an occupancy inspection is required before a building may be occupied2.
What stays with St. Francois County (and what to check before you buy)?
The city's rules cover land inside Bonne Terre only. For land outside city limits, see the St. Francois County page, where the county's own permit rules apply.
Wells and floodplains are not city matters we could confirm. Missouri requires a state permit and a licensed contractor to drill or repair a water well18, and development in a mapped floodplain needs a floodplain permit19. St. Francois County also states that new construction in its floodplain must be elevated at least one foot above base flood elevation20.
County figures: the effective property tax rate in St. Francois County is 0.7%21, with a median bill of $1,161 a year22.
Watch-outs
- We could not confirm Bonne Terre's rules on RV occupancy, tiny homes, accessory dwellings or manufactured homes; ask the city building inspector at City Hall before buying2.
- We could not confirm whether the city or the St. Francois County Health Center issues septic permits inside city limits; call both16.
- The state notice that septic application fees were temporarily suspended from August 28, 2026 may change what you pay; confirm the current fee17.
Sources
- Table of Contents - City of Bonne Terre, MO (Bonne Terre), quoted and re-checked
- City of Bonne Terre Building Inspector (City Hall) (bonneterre.net)
- Chapter 705: Sewers - City of Bonne Terre, MO (Bonne Terre), quoted and re-checked
- Article II: District Regulations - City of Bonne Terre, MO (Bonne Terre), quoted and re-checked
- Chapter 705: Sewers - City of Bonne Terre, MO (Bonne Terre), quoted and re-checked
- Article II: District Regulations - City of Bonne Terre, MO (Bonne Terre), quoted and re-checked
- Article II: District Regulations - City of Bonne Terre, MO (Bonne Terre), quoted and re-checked
- Article II: District Regulations - City of Bonne Terre, MO (Bonne Terre), quoted and re-checked
- Article II: District Regulations - City of Bonne Terre, MO (Bonne Terre), quoted and re-checked
- Article II: District Regulations - City of Bonne Terre, MO (Bonne Terre), quoted and re-checked
- Article II: District Regulations - City of Bonne Terre, MO (Bonne Terre), quoted and re-checked
- Article II: District Regulations - City of Bonne Terre, MO (Bonne Terre), quoted and re-checked
- Article II: District Regulations - City of Bonne Terre, MO (Bonne Terre), quoted and re-checked
- Chapter 705: Sewers - City of Bonne Terre, MO (Bonne Terre), quoted and re-checked
- Chapter 705: Sewers - City of Bonne Terre, MO (Bonne Terre), quoted and re-checked
- St. Francois County Health Center, Environmental Health Department (sfchealth.org)
- OWTS Construction Permit Process, quoted and re-checked
- Well and Pump Installation Contractor Permitting (Missouri statewide rule), quoted and re-checked
- Floodplain Forms (Missouri statewide rule), quoted and re-checked
- St. Francois County Floodplain, quoted and re-checked
- Effective property tax rate: Bolthole Index county data
- Median property tax bill: Bolthole Index county data
Written October 23, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.