St. Louis city, Missouri requires a building permit for new construction, structural changes and major alterations; normal maintenance usually does not need one1. The city enforces adopted building codes and zoning throughout its jurisdiction23. Apply through the Building Division, and expect zoning review, inspections and an occupancy approval before moving into a residential unit45.
At a glance
- Building permit
- Required for new construction, structural changes and major alterations1
- Zoning
- Citywide; the parcel's district and overlays control uses and dimensions36
- Septic
- Public sewer is standard; confirm the authority before proposing an onsite system7
- Homeowner electrical work
- Conditional for limited work in an owner-occupied single-family home; not new construction8
- Residential occupancy
- Inspection and a Certificate of Inspection are required before occupancy9
- Accessory dwelling
- One attached or detached ADU may be permitted in residential zoning districts10
Who to call
Building permits
City of St. Louis Building Division
Enforces the city building code, issues building permits, conducts inspections, and enforces zoning ordinances citywide
dps-building-division@stlouis-mo.gov
1200 Market Street, City Hall, Room 426, St. Louis, Missouri 63103-2826
Zoning
City of St. Louis Zoning Section
Administers and enforces the City of St. Louis Zoning Code Ordinance (Title 26); reviews building and occupancy permits for zoning compliance
1200 Market Street, Room 400, St. Louis, Missouri 63103
Zoning
City of St. Louis Zoning Section — Zoning FAQ
The Zoning Section's own published answers on setbacks, building lines, and lot lines
Septic permits
Metropolitan St. Louis Sewer District (MSD) Customer Service
Public sanitary sewer service and connections for St. Louis city; the practical alternative to septic here
2350 Market Street, St. Louis, MO 63103-2555
Contact details are copied from each office’s official page and were checked against it on October 10, 2026.
Off-grid gear
Going off-grid in St. Louis City means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in St. Louis city, Missouri?
Yes. St. Louis city requires a building permit for new construction, structural changes and major alterations, while normal building maintenance usually does not require one1. The city has adopted building, residential, energy, fire, plumbing, mechanical, fuel-gas, electrical, existing-building and property-maintenance codes2. Separate plumbing, mechanical or electrical permits may also apply11.
A homeowner may obtain an electrical permit only after passing the Building Division's knowledge test and only for a room addition, repair or modification to the existing system in an owner-occupied single-family dwelling8. Service changes, rehabilitation and new construction electrical work must be performed by a licensed contractor8. The city does not state a broader owner-builder exemption for general residential construction, so ask the Building Division who may pull each required permit before choosing contractors12.
Who is the St. Louis city building department, and how do you reach them?
The City of St. Louis Building Division issues building permits, conducts inspections and enforces the building code and zoning ordinances12. Reach the Building Division at (314) 622-3313 or dps-building-division@stlouis-mo.gov12. Its office is at 1200 Market Street, City Hall, Room 426, St. Louis, Missouri 63103-282612.
Direct parcel-use, district and setback questions to the Zoning Section at (314) 622-3666 or zoning@stlouis-mo.gov13. The Zoning Section is in Room 400 at 1200 Market Street, St. Louis, Missouri 6310313. It reviews commercial occupancy and building permits for zoning compliance; an application may be approved as a use by right, sent to a Conditional Use hearing or denied, with denials appealable to the Board of Adjustment13.
Does St. Louis city have zoning?
Yes. St. Louis city enforces zoning throughout the city, and a parcel's zoning district and any overlay determine its permitted uses and dimensional rules3. Current parcel zoning is available through the city's Address Search6. Setbacks depend on the district; side-yard rules can also vary with lot width and the proposed structure's type or height14. Residential garages and carports are typically no more than 5 feet from the alley or rear boundary14.
Minimum lot area is also district- and dwelling-specific rather than a single citywide number15. Districts A through E generally require at least 2,000 square feet for a detached single-family dwelling, with exceptions for qualifying existing lots15. Townhouse and two-family units need 1,000 square feet each in District C and 850 square feet each in District D1617. The available city rules do not confirm one minimum dwelling floor area for ordinary homes, so ask Zoning about the proposed design rather than treating minimum lot area as a minimum house size13.
How does sewer and septic work in St. Louis city?
St. Louis city is ordinarily served by public sanitary sewer through the Metropolitan St. Louis Sewer District, so onsite septic is not the usual arrangement7. Call MSD at (866) 281-5737 to establish new sewer service or service after a move18. For a sewer emergency, call (314) 768-626018.
If a parcel lacks sewer access, do not begin septic work until the permitting authority is identified. Missouri requires a construction permit before installing or repairing most onsite wastewater systems, although some single-family residential lots may qualify for an exemption19. Permitting may be handled by the state program, a local contract authority or a local authority operating under its own ordinance20. Missouri's septic rules also say a local ordinance may be more restrictive than the state standard, and the state page does not name St. Louis city specifically21. We could not confirm which agency administers onsite systems specifically within St. Louis city because the state lookup identifies St. Louis County agencies under the city entry. Ask the Building Division and Missouri Department of Health and Senior Services to resolve jurisdiction before designing or buying around an onsite system1219.
Can you live in an RV or tiny home on your land in St. Louis city?
We could not confirm a St. Louis city rule that allows long-term RV residence or temporary camping on private property, so get a parcel-specific answer from the Zoning Section before relying on an RV for housing13. A tiny house built on wheels cannot be used as a dwelling in St. Louis city: the city's Residential Code treats it like an RV meant for occasional recreational use, with one exception, a manufactured tiny house on a permanent chassis with an affixed HUD or FHA certification tag, which may be placed in a designated house-trailer park22. A tiny house meant as a dwelling unit must sit on an approved foundation and still goes through building and zoning review22113.
An accessory dwelling unit is a clearer path for a small second home. St. Louis permits one attached or detached ADU per parcel in all residential zoning districts, subject to building permits and zoning review10. An ADU may be no taller than 25 feet and no larger than 1,200 square feet; it must sit at least 3 feet from side lot lines, and a detached ADU must be at least 10 feet from the primary structure10. Residential units must be inspected before occupancy5.
What are the steps to build or buy in St. Louis city?
- Check the parcel's district and overlays through Address Search, then confirm uses, setbacks and lot-area rules with the Zoning Section614.
- Confirm sewer service with MSD and ask the city who has authority if an onsite wastewater system is proposed719.
- Prepare the project address, owner authorization when applicable, plans and the $25 building-permit application fee4.
- Apply online or in person; an in-person submission requires 5 plan copies4.
- Obtain any associated plumbing, electrical, mechanical, driveway or floodway permits that the work triggers42324.
- After all assigned city agencies approve the application, pay the permit fee and display the permit onsite during construction25.
- Complete Building Division inspections and obtain the required residential Certificate of Inspection before occupancy526.
What should you check before buying land in St. Louis city?
Start with the zoning district, overlays, legal use and lot dimensions; the same address can be affected by district-specific setbacks and minimum lot area61415. Confirm public sewer service with MSD, and do not assume a private well or septic system is available simply because a listing mentions one718. A Missouri water-well installation permit is generally required to construct or repair a private well, although a landowner may install the landowner's own well or pump under the cited state rules27.
Check FEMA mapping before planning improvements because every construction project in a mapped city flood area needs a Floodway Development Permit even when the Building Code would not require a building permit24. A new or modified driveway also requires a city driveway permit23. For an existing residence, verify the Certificate of Inspection: residential sales and rentals require one before occupancy, and water and electricity must operate for the inspection95.
Watch-outs
- Building-permit fees are based on estimated construction cost, are non-refundable and are due after final approvals; the $25 application fee is due when filing28.
- Every residential unit must be inspected before occupancy, and an occupied dwelling without a current certificate carries a $200 residential inspection application fee instead of the standard $120 fee5.
- A floodway permit can be required even when the proposed work does not otherwise require a building permit24.
- We could not confirm the St. Louis city-specific septic authority because the state lookup points to St. Louis County agencies; resolve jurisdiction before planning an onsite system19.
- A tiny house on wheels used as a home is not allowed in St. Louis city, apart from a certified manufactured tiny house placed in a designated house-trailer park22.
Sources
- When a Residential Building Permit is Needed, quoted and re-checked
- Building Codes Adopted by the City, quoted and re-checked
- Building Division, quoted and re-checked
- Apply for a Building Permit, quoted and re-checked
- Building Division, quoted and re-checked
- Answers to Common Zoning Questions, quoted and re-checked
- Missouri Department of Health and Senior Services, Onsite Sewage (2026 county census)
- Apply for an Electrical Permit, quoted and re-checked
- Apply for a Residential Occupancy Permit (Housing Conservation Inspection), quoted and re-checked
- Accessory Dwelling Units 101, quoted and re-checked
- When a Residential Building Permit is Needed, quoted and re-checked
- City of St. Louis Building Division (stlouis-mo.gov)
- City of St. Louis Zoning Section (stlouis-mo.gov)
- Answers to Common Zoning Questions, quoted and re-checked
- Ordinance 72027 -- Amending the Zoning Code for Minimum Lot Size for Single-Family and Two-Family Dwellings, quoted and re-checked
- Zoning Section, quoted and re-checked
- Zoning Section, quoted and re-checked
- Metropolitan St. Louis Sewer District (MSD) Customer Service (msdprojectclear.org)
- OWTS Construction Permit Process (Missouri statewide rule), quoted and re-checked
- OWTS Construction Permit Process (Missouri statewide rule), quoted and re-checked
- Onsite Wastewater Treatment, quoted and re-checked
- Chapter 25.11 - Residential Code, Section R329.2, quoted and re-checked
- Permits, Inspections, and Certifications, quoted and re-checked
- When a Residential Building Permit is Needed, quoted and re-checked
- Apply for a Building Permit, quoted and re-checked
- Apply for a Residential Occupancy Permit (Housing Conservation Inspection), quoted and re-checked
- Water Wells - PUB2945, quoted and re-checked
- Apply for a Building Permit, quoted and re-checked
Written October 10, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.