Hazelwood, Missouri (St. Louis County) runs its own zoning under Chapter 405 of the city code1, and the city's Building Department takes building permit applications online2. Electrical and plumbing permits are handled by St. Louis County under contract with the city2. We could not confirm who issues septic permits inside city limits, so ask St. Louis County Department of Public Health before you plan one3.
At a glance
- Zoning
- Hazelwood's own zoning ordinance (Chapter 405) applies inside city limits1
- Building permits
- City Building Department, applications online2
- Electrical and plumbing permits
- St. Louis County, under contract with the city2
- R-1 minimum lot
- 1 acre, at least 70 feet wide4
- NU Non-Urban minimum lot
- 3 acres per dwelling, at least 125 feet wide5
- Septic permits
- Not confirmed for city limits; ask St. Louis County Department of Public Health3
- RV and tiny-home living
- Not confirmed; ask the Building Department2
Who to call
Building permits
City of Hazelwood Building Department and Code Enforcement
Building permits and inspections inside Hazelwood city limits, residential occupancy permits and code enforcement
415 Elm Grove Lane Hazelwood, MO 63042
Septic permits
St. Louis County Department of Public Health
Septic (onsite wastewater) permitting in St. Louis County; confirm whether it applies inside Hazelwood
administration.doh@stlouisco.com
6121 N Hanley Rd, Berkeley, MO 63134
Contact details are copied from each office’s official page and were checked against it on October 24, 2026.
Off-grid gear
Going off-grid in Hazelwood means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Does Hazelwood, Missouri have zoning, and what does it mean for lot size and setbacks?
Yes. Hazelwood has its own zoning ordinance, Chapter 405 of the city code, and it applies inside Hazelwood city limits rather than the unincorporated county zoning1. The published districts include NU Non-Urban, R-1 through R-5 single-family districts, commercial, industrial and a historic overlay6.
Dimensions depend on the district. In R-1, every lot needs at least 1 acre and 70 feet of width4. R-1 homes need a front yard of at least 45 feet and side yards of at least 10 feet on each side7, and buildings may not exceed 2 stories or 35 feet, whichever is less8.
In the NU Non-Urban district, each dwelling needs at least 3 acres and 125 feet of width5. NU buildings may cover no more than 30% of an interior lot9. We could not confirm the rules for RVs, tiny homes or accessory dwellings, which sit in the zoning use regulations (1); ask the Building Department2.
Do you need a building permit in Hazelwood, and who issues it?
Hazelwood's own Building Department handles building permit and inspection requests, and the city has moved all residential and commercial applications to an online portal2. The county's unincorporated-area permit rules do not apply inside the city; St. Louis County's code states that municipal zoning approval is needed where a municipality contracts with it10.
The city contracts with St. Louis County for electrical and plumbing permits and inspections2. We could not confirm the city's permit fees or exemptions from an official page. The Building Department publishes a residential permit fee table, so ask there before you budget2.
How do septic permits work inside Hazelwood?
We could not confirm who issues septic permits inside Hazelwood city limits. Missouri requires a construction permit before installing or repairing most onsite wastewater systems, though some single-family lots may be exempt11. In St. Louis County, the state lists the county plumbing department and Department of Public Health as the ordinance authorities, and incorporated areas may be handled differently12.
Before planning a septic system or well in Hazelwood, call St. Louis County Department of Public Health and ask whether a permit is needed and whether public sewer is required at your address3. Do not start work until a permit is issued or an exemption is confirmed13.
What are the steps to build a home in Hazelwood, in order?
- Identify your zoning district and read its Chapter 405 lot, setback and height rules6.
- Ask the Building Department what the city requires for your project, including any fee table2.
- Apply for the building permit through the city's online portal2.
- Request electrical and plumbing permits, which St. Louis County handles under contract2.
- Ask St. Louis County Department of Public Health about septic or sewer before you buy3.
- Check Chapter 410 if you plan to divide land; Hazelwood regulates subdivisions14.
What stays with St. Louis County, and what to check before you buy in Hazelwood?
St. Louis County handles electrical and plumbing permits for the city2. Septic is probably a county matter, but confirm it with the health department3. Missouri requires a permit for any development in a floodplain, so check the flood map for your lot first15. A driveway onto a state highway needs a MoDOT permit16.
For land outside Hazelwood in unincorporated areas, the rules differ; see the St. Louis County page. Farmland in the county averages $10,928 per acre17, and the county's effective property tax rate is 1.2%18.
Watch-outs
- Hazelwood's zoning use regulations decide whether RVs, tiny homes and accessory dwellings are allowed, and we could not confirm them; ask the Building Department before buying2.
- Structures built under St. Louis County rules before incorporation may continue, but additions may not extend past existing setbacks without a variance1.
- Septic authority inside city limits is unconfirmed; call St. Louis County Department of Public Health before relying on any septic plan3.
Sources
- Hazelwood Code Chapter 405 Zoning Regulations, Article I (eCode360) (Hazelwood), quoted and re-checked
- City of Hazelwood Building Department and Code Enforcement (hazelwoodmo.org)
- St. Louis County Department of Public Health (stlouiscountymo.gov)
- Hazelwood Code Chapter 405 Zoning Regulations, district regulations (eCode360) (Hazelwood), quoted and re-checked
- Hazelwood Code Chapter 405 Zoning Regulations, district regulations (eCode360) (Hazelwood), quoted and re-checked
- Hazelwood Code Chapter 405 Zoning Regulations, district regulations (eCode360) (Hazelwood), quoted and re-checked
- Hazelwood Code Chapter 405 Zoning Regulations, district regulations (eCode360) (Hazelwood), quoted and re-checked
- Hazelwood Code Chapter 405 Zoning Regulations, district regulations (eCode360) (Hazelwood), quoted and re-checked
- Hazelwood Code Chapter 405 Zoning Regulations, district regulations (eCode360) (Hazelwood), quoted and re-checked
- Chapter 1115 - Building Code, quoted and re-checked
- OWTS Construction Permit Process (Missouri statewide rule), quoted and re-checked
- OWTS Construction Permit Process — St. Louis County authorities, quoted and re-checked
- OWTS Construction Permit Process, quoted and re-checked
- City of Hazelwood, MO code of ordinances table of contents (eCode360) (Hazelwood), quoted and re-checked
- Floodplain Forms (Missouri statewide rule), quoted and re-checked
- Permits | Missouri Department of Transportation (Missouri statewide rule), quoted and re-checked
- Farmland value per acre (USDA census): Bolthole Index county data
- Effective property tax rate: Bolthole Index county data
Written October 24, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.