Unincorporated Teton County, Montana has no county zoning, and most single-family homes need no building permit12. Choteau has its own certified city-limits building program, and incorporated towns may apply municipal zoning34. Every septic installation still needs a permit from the Teton County Sanitarian5.
At a glance
- Building permit
- Not required by the county for most homes outside Choteau's certified city-limits building program; state permit rules may still apply2
- Zoning
- No county zoning in rural or unincorporated areas; incorporated municipalities may have their own rules14
- Septic permits
- Teton County Sanitarian; every installation needs a permit application, including systems with prior approval5
- Owner-builder
- Yes, statewide, for an owner working on their own property, with conditions if built for prompt resale6
- Floodplain permit
- Required in the Regulated Flood Hazard Area; $500 application fee, administered by the County Planner7
- Tiny homes and ADUs
- Tiny-home occupancy and accessory dwellings are not restricted by county zoning in unincorporated Teton County; other site rules still apply89
- Water well
- No water-right permit needed at or below 35 gallons/minute and 10 acre-feet/year; a Notice of Intent is required starting 202610
- Septic soil difficulty
- Only 14.8% of county soils are free of severe limits for a conventional drain field11
Who to call
Floodplain permits
Teton County Planner (Floodplain Administrator)
Floodplain permits, absence-of-zoning letters, subdivision regulation and review, hazard mitigation, and 911 addressing for Teton County
bcolesworthy@tetoncountymt.gov
19 Main Ave South, PO Box 610, Choteau, MT 59422
Septic permits
Septic (wastewater treatment) system permits, site evaluations, and nondegradation analysis for Teton County
bcolesworthy@tetoncountymt.gov
19 Main Avenue South, PO Box 610, Choteau, MT 59422
Contact details are copied from each office’s official page and were checked against it on October 5, 2026.
Off-grid gear
Going off-grid in Teton County means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Teton County, Montana?
For most single-family homes, no. Choteau has a certified city-limits building program, while unincorporated Teton County falls under the State Building Codes Bureau3. Montana has adopted statewide building codes, but state permit exemptions still cover farm and ranch buildings, private garages and storage buildings for the owner's own use, and residential buildings with fewer than five dwelling units unless they serve transient guests1213. If a project does require a state building permit, the permit holder must notify the state inspector when work is ready and provide access for required inspections14. The building cannot be occupied until the Bureau approves it, and separate plumbing, electrical and mechanical permits may also be required15. Montana also exempts an owner working on their own property from construction-contractor licensing, with limits for homes built for prompt resale16.
Who handles floodplain and septic permits in Teton County, and how do you reach them?
Teton County has no local building department for unincorporated projects; projects requiring building permits or inspections are under the State Building Codes Bureau, while Choteau runs its own certified city-limits program314. For floodplain permits and absence-of-zoning letters, contact the Teton County Planner at 19 Main Ave South, PO Box 610, Choteau, MT 59422, or 406-466-313017. The Teton County Sanitarian uses the same phone number and requires a septic permit application even when a parcel already has state or county approval18.
Does Teton County have zoning?
Unincorporated Teton County has no county zoning, and the County Planner issues absence-of-zoning letters on request117. The City of Choteau and the towns of Dutton and Fairfield administer their own rules, so check with the relevant municipality inside incorporated limits4. In unincorporated areas, county zoning sets no minimum dwelling size, building setback, lot-coverage limit or building-height limit19202122. There is no single countywide numeric minimum lot size for subdivisions; where zoning does not set one, local and state health authorities determine it, and each lot must have a satisfactory building site23. Subdivision, sanitation and floodplain rules can still control where and how you build247.
How do septic permits work in Teton County?
Every septic installation in Teton County needs a permit application from the Teton County Sanitarian, even when the system has prior state or county approval5. On parcels smaller than 20 acres, the wastewater system and well should have Montana Department of Environmental Quality approval, and the approved locations cannot change without DEQ approval25. Larger parcels may have county-level approval depending on when they were created26. Without prior DEQ or county approval, the owner needs a site evaluation with a soil test pit at least 8 feet deep and 2 feet wide, located within 25 feet of the proposed drainfield5. Only 14.8% of Teton County soils are free of severe limitations for a conventional drain field, so verify the site before committing to a house location11. A proposed system near the floodplain also needs a floodplain determination before installation5.
Can you live in an RV or tiny home on your land in Teton County?
In unincorporated Teton County, tiny-home occupancy is not restricted as a county zoning matter, and county zoning also does not restrict accessory dwellings or temporary camping89. Septic, floodplain, subdivision and applicable building requirements can still determine whether a particular setup works8. Municipal zoning varies, so ask Choteau, Dutton or Fairfield directly when land lies inside incorporated limits4. We could not confirm whether an RV may be used as a permanent residence on an individual rural parcel; ask the County Planner and Sanitarian about the intended use and sanitation before buying. Teton County's specific RV and manufactured-home standards address developments offering two or more rental or lease spaces, not a single unit on private land2728.
What are the steps to build a home in Teton County?
- Confirm whether the parcel is inside Choteau's certified building-program area or unincorporated Teton County3.
- Ask the County Planner whether the site is in a Regulated Flood Hazard Area and obtain the $500 permit before development if required7.
- Verify the parcel's septic approval history; every installation needs a county permit, and a site without prior approval needs an evaluation and soil test pit5.
- Confirm legal road access. Every subdivision lot must reach a public or private road, and an approach onto an MDT road must be permitted and built before final-plat approval29.
- File a Notice of Intent for a qualifying exempt well, or seek a water permit if the use exceeds 35 gallons per minute or 10 acre-feet a year10.
- Confirm any required electrical, plumbing or mechanical permits before starting work15.
What should you check before buying land in Teton County?
Teton County gets about 17.2 inches of precipitation a year, with severe drought in 14.1% of years, so verify the well and water-right status before buying3031. Only 14.8% of county soils are free of severe limitations for a conventional drain field, making septic feasibility an early due-diligence item11. Confirm flood status because new construction is prohibited in a floodway32. For a split parcel, ask whether Teton County subdivision review was completed and whether each lot has legal public- or private-road access2429. A lease or rental division qualifies for the agricultural exemption only when created for farming or agricultural purposes; do not assume that label supports a homesite33. The published subdivision fee schedule is marked pending, so ask the County Planner which nonrefundable application and consulting fees currently apply34. Typical effective property tax is about 0.8%, and the median annual bill is about $1,9293536.
Watch-outs
- County zoning does not restrict temporary camping, tiny-home occupancy or accessory dwellings in unincorporated Teton County, but we could not confirm permission to use an RV as a permanent residence; ask the County Planner and Sanitarian about sanitation and parcel-specific controls89.
- New building construction is not permitted at all within a Teton County floodway, and improvements to existing structures there still need a Floodplain Development Permit; confirm floodway status with the County Planner before you buy32.
- Several other Teton Counties exist (Wyoming and Idaho); confirm you're reading Teton County, Montana (area code 406, Choteau) before trusting a search result17.
Sources
- Planner | Teton County Montana, quoted and re-checked
- Montana DLI Building Codes Program - Building Permit FAQ (2026 county census)
- Certified City, County and Town Programs, quoted and re-checked
- Teton County Growth Policy and Comprehensive Capital Improvements Plan 2023, quoted and re-checked
- Septic System Permiting | Teton County Montana, quoted and re-checked
- Montana Code Annotated, Title 37, Chapter 45, Construction Contractors (2026 county census)
- 2022 Teton County Floodplain Hazard Management Regulations, quoted and re-checked
- Planner | Teton County Montana, quoted and re-checked
- Montana law on county zoning and building authority
- Apply for Water Rights, quoted and re-checked
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- Current Codes, quoted and re-checked
- Building Permits, quoted and re-checked
- Building Permits, quoted and re-checked
- Application for Building Permit, quoted and re-checked
- MCA -- December 2025, Chapter 45 Construction Contractors, quoted and re-checked
- Teton County Planner (Floodplain Administrator) (tetoncountymt.gov)
- Teton County Sanitarian (tetoncountymt.gov)
- Planner | Teton County Montana, quoted and re-checked
- Planner | Teton County Montana, quoted and re-checked
- Planner | Teton County Montana, quoted and re-checked
- Planner | Teton County Montana, quoted and re-checked
- Teton County Subdivision Regulations, quoted and re-checked
- Teton County Subdivision Regulations, quoted and re-checked
- Septic System Permiting | Teton County Montana, quoted and re-checked
- Sanitarian | Teton County Montana, quoted and re-checked
- Teton County Subdivision Regulations, quoted and re-checked
- Teton County Subdivision Regulations, quoted and re-checked
- Teton County Subdivision Regulations, quoted and re-checked
- Annual precipitation: Bolthole Index county data
- Share of years in severe drought: Bolthole Index county data
- Owning Property in a Floodway, quoted and re-checked
- Teton County Subdivision Regulations, quoted and re-checked
- Planning Review Fee Schedule (Exhibit A), quoted and re-checked
- Effective property tax rate: Bolthole Index county data
- Median property tax bill: Bolthole Index county data
Written October 5, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.