Unincorporated Beaverhead County, Montana generally does not require a building permit for a home with fewer than five dwelling units, but state permits apply to covered projects and county septic permits remain mandatory.12 Beaverhead County has no general county zoning regulations, though landowners can petition for voluntary zoning districts, so ask Land Use and Planning whether a specific parcel sits in one.34
At a glance
- Building permit
- Generally not required for an unincorporated home with fewer than five dwelling units1
- Building inspections
- Required for projects that need a state building permit5
- Zoning
- No general county zoning; voluntary petition-based districts can exist34
- Septic
- County permit and approval required for new or altered systems26
- RV or tiny-home living
- Not confirmed; ask Land Use and Planning, and a wastewater permit applies to occupied structures74
- Minimum dwelling size
- No general county zoning minimum; a petition-based district could set one34
- Wells
- Small groundwater uses may use the state permit-exception process8
Who to call
Planning & zoning
Beaverhead County Land Use and Planning Department
Subdivision review and county land-use permits, including floodplain, airport affected area, Big Hole River standards, wireless facilities, and buildings for rent or lease
tina.caron@beaverheadcountymt.gov
2 South Pacific Street, Suite 7 Dillon, MT 59725
Septic permits
Beaverhead County Environmental Health Office
Wastewater-system permits and inspections, installer licensing, and subdivision sanitation reviews
Second Floor of the Beaverhead County Courthouse 2 South Pacific Street Dillon, MT 59725
Roads & driveways
Beaverhead County Road Department
County-road maintenance and the county-road approach permit
dbasile@beaverheadcountymt.gov
2 South Pacific Street, Suite 13 Dillon, MT 59725
Contact details are copied from each office’s official page and were checked against it on October 10, 2026.
Off-grid gear
Going off-grid in Beaverhead County means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Beaverhead County, Montana?
A home with fewer than five dwelling units in unincorporated Beaverhead County is exempt from the state building permit unless it serves transient guests.1 State building permits are required before certain other new construction, alterations, additions and repairs begin, and state-permitted work must be made available for required inspections.15
Farm and ranch buildings are also exempt from the state building permit, but that exemption does not remove county wastewater, subdivision, floodplain or other land-use requirements.9 Separate electrical, plumbing or mechanical approvals may still apply to work exempt from the building permit, so confirm the full permit set with the Montana Building Codes Program before construction.10
Who handles Beaverhead County building permits and questions?
Beaverhead County is under the State Building Codes Bureau rather than a certified local building-code program, so the state issues building permits for covered construction in unincorporated areas.1 The permit holder must notify the state inspector when permitted work is ready and provide access for inspection.5
Beaverhead County Land Use and Planning is the first county call for subdivision review, floodplain development and special land-use categories such as the Big Hole River area, Dillon Airport affected area, wireless facilities and buildings for rent or lease.11 The county does not publish one process covering every land-use permit, so ask the office which application and supporting documents match the parcel and project.11
Does Beaverhead County have zoning?
Beaverhead County has no general county zoning regulations, so there is no countywide rule on minimum dwelling size, building height or setbacks for an ordinary rural parcel.3 That is not the same as no rules: landowners can petition for voluntary zoning districts, and the county's petition policy sets a $300 filing fee, so Land Use and Planning should confirm whether a particular parcel lies in one.4 Subdivision regulations, floodplain rules and HOA covenants can also apply.3
Subdivision standards still matter. Commercial and industrial subdivisions and commercial lots within subdivisions need at least two acres, plus a 40-foot front setback and 50-foot side-yard setback.1213 Subdivision sites near rivers and other surface water have additional frontage, building and drain-field distances.13
How do septic permits work in Beaverhead County?
Beaverhead County Environmental Health requires a wastewater permit before a new system is built or an existing system is repaired, replaced or altered.2 Off-grid occupancy does not avoid that rule: a regularly occupied structure producing wastewater must use a permitted individual or multi-user system unless a listed exception applies.7
The system must be inspected before backfilling unless the department grants permission for the documented alternative using an as-built drawing, installation photos and installer verification.14 Inspection must be requested at least eight working hours before completion.14 Only 13.1% of mapped county soils lack severe limitations for a conventional drain field, so make wastewater feasibility an early purchase contingency.15
Can you live in an RV or tiny home in Beaverhead County?
Beaverhead County's rule on long-term RV, tiny-home or manufactured-home occupancy on private land is not confirmed, so ask Land Use and Planning before placing a unit.3 With no general county zoning, no countywide zoning rule is known to bar these uses on an ordinary parcel, but a petition-created zoning district, recorded subdivision covenants, floodplain regulation or a special-area permit could.411
Wastewater is the firm requirement: a regularly occupied structure producing wastewater generally needs a permitted individual or multi-user system, and a new or altered system needs a county permit from Environmental Health.72 A tiny home serving transient guests may also fall outside the small-residential building-permit exemption.1
Building a home in Beaverhead County: what should you do first?
- Ask Land Use and Planning to screen the parcel for subdivision restrictions, a petition-created zoning district, floodplain status and special-area permits.164
- Confirm with the Montana Building Codes Program whether the project is exempt or needs state plan review, a building permit and inspections.15
- Obtain the county wastewater permit before septic construction and schedule inspection before backfilling.26
- For a new groundwater use, complete the applicable Montana water-right process; smaller uses may qualify for the permit exception but require a Notice of Intent before use.8
- If access meets a county road, ask the Road Department about its approach permit.17
What should you check before buying land in Beaverhead County?
Start with wastewater feasibility because only 13.1% of mapped soils avoid severe conventional-drain-field limitations.15 Confirm legal water: groundwater use of no more than 35 gallons per minute and 10 acre-feet per year may qualify for Montana's permit exception, but the state requires a Notice of Intent before use and combined wells can trigger a permit.8
Ask Land Use and Planning whether floodplain development or subdivision review applies; designated flood areas can require county permitting and no-build treatment during subdivision review.18 A subdivision must complete county review and record its final plat before title is transferred, subject to the stated exceptions.19 Current subdivision fees are available from the Clerk and Recorder and must be paid before the county acts.20
Watch-outs
- No general county zoning does not erase recorded covenants, petition-created zoning districts, subdivision standards, floodplain controls or special-area permits.34
- A septic system generally must be inspected before any part is backfilled unless Environmental Health authorizes the documented alternative.6
- Small groundwater uses may avoid a water permit, but the Montana Notice of Intent process still applies before use.8
Sources
- Certified City, County and Town Programs, quoted and re-checked
- Beaverhead County Wastewater System Regulations, quoted and re-checked
- Beaverhead County Growth Policy Update, quoted and re-checked
- Beaverhead County Zoning Petitions Policy, quoted and re-checked
- bsd.dli.mt.gov, quoted and re-checked
- Beaverhead County Wastewater System Regulations, quoted and re-checked
- Beaverhead County Wastewater System Regulations, quoted and re-checked
- Exceptions To Permit Requirements, quoted and re-checked
- bsd.dli.mt.gov, quoted and re-checked
- Building Permits (Montana statewide rule), quoted and re-checked
- Land Services (Planner), quoted and re-checked
- Beaverhead County Subdivision Regulations - 2024, quoted and re-checked
- Beaverhead County Subdivision Regulations - 2024, quoted and re-checked
- Beaverhead County Wastewater System Regulations, quoted and re-checked
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- Land Services (Planner), quoted and re-checked
- Beaverhead County Road Department (beaverheadcountymt.gov)
- Land Services (Planner), quoted and re-checked
- Land Services (Planner) | Beaverhead County, quoted and re-checked
- Beaverhead County Subdivision Regulations - 2024, quoted and re-checked
Written October 10, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.