Bolthole Index

Renville County, North Dakota

Building permits, zoning and land rules in Renville County, North Dakota

49Index Score / 100
#28 of 53 in North Dakota

Renville County, North Dakota requires a building permit before a covered structure is erected, moved, enlarged or structurally altered, although structures associated with the normal incidents of agriculture are excepted12. County zoning controls land use and dimensional standards, while cities may retain their own authority and two townships direct building applicants to township officers345. First District Health Unit handles septic permits and inspections67.

At a glance

Building permit
Required for covered structures; normal agricultural structures are excepted12
Zoning
Yes; rules vary by district and cities may exercise their own authority34
Septic
First District Health Unit permit and approved design required68
RV living
Long-term private-land occupancy is not confirmed; commercial RV campgrounds in the Recreational District require conditional-use review910
Manufactured home
Conditional-use permit required in the Recreational District; rules elsewhere depend on the district and proposal1112
Owner-builder
No building-permit exemption confirmed; a discretionary builder property-tax exemption may include someone building their own home1314
Lot size
District-specific; agricultural nonfarm homes generally need at least 3 acres15
Private well
State appropriation permit required only above 12.5 acre-feet per year; qualifying lower-volume uses must still be reported16

Who to call

Building permits

Renville County Planning & Zoning

County building-permit applications, demolition permits, fence permits and zoning questions outside areas administered by cities or the listed townships

701.756.6288

205 Main Street E P.O. Box 68 Mohall, ND 58761-0068

Septic permits

First District Health Unit Environmental Health Division

Onsite sewage permits, site evaluations, system design approval and final inspections in Renville County

701-837-5121

slmeyer@nd.gov

801 11th Ave SW, Minot ND 58701

Contact details are copied from each office’s official page and were checked against it on October 5, 2026.

Off-grid gear

Going off-grid in Renville County means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Do you need a building permit in Renville County, North Dakota?

Yes. Renville County requires a building permit before a covered building or structure is erected, moved, enlarged or structurally altered; structures associated with the normal incidents of agriculture are excepted, and nonstructural maintenance does not need a permit12. Apply to the Planning Commission or designated Zoning Administrator; conforming plans may be approved after applicable fees are collected17. The published building-permit fee is $50, and the county takes no action until applicable fees are paid18. A permit expires if construction does not begin within one year17. After permit-required work is complete, notify the Planning Commission for its onsite zoning-compliance inspection19. Before occupying land, a building or a structure built or altered under a required permit, obtain the county's certificate of compliance20.

Who handles building permits in Renville County?

Renville County Planning & Zoning handles county building applications, demolition permits, fence permits and zoning questions, and its office number is 701.756.62885. The county office directs building applications in Van Buren Township and Rockford Township to the appropriate township officer instead5. Cities and their extraterritorial areas may exercise their own zoning authority, so a parcel inside or near city boundaries may not use the county process4. The county permit process establishes zoning compliance, but we could not confirm whether Renville County separately adopted and enforces the North Dakota State Building Code. North Dakota's state code framework took effect in 2026, while enforcement belongs to jurisdictions that elect to adopt and enforce it2122. Ask Planning & Zoning which construction-code inspections, if any, apply before ordering plans.

Does Renville County have zoning?

Yes. Renville County uses Agricultural, Rural Residential, Commercial, Industrial and Recreational zoning districts, with the official zoning map kept by the County Auditor3. Standards depend on the district. An individual nonfarm dwelling in the Agricultural District generally needs at least 3 acres, while Rural Residential, Commercial and Recreational lots generally need at least 5,000 square feet with common sewer or 3 acres with an onsite drainage field15. Principal and accessory buildings together may cover no more than 50 percent of a lot in the districts where that coverage standard applies23. Agricultural structures have a permit exception, but applicable setbacks remain, and new Agricultural District construction requires contacting Planning & Zoning and paying a filing fee before work begins2. Agricultural District structures generally sit 150 feet from section lines and township or county road centerlines, or 250 feet from state and federal highway centerlines24. Cities may exercise their own zoning authority, and the county directs applicants in Van Buren Township and Rockford Township to township officers45.

How do septic permits work in Renville County?

First District Health Unit administers onsite sewage permits and inspections in Renville County6. A permit is required before installing or repairing any part of an onsite system and when a new building will produce wastewater without an available community septic system8. Before applying, flag utilities and mark the proposed building corners, plumbing stub-out, well sites and property boundaries8. First District evaluates the site, samples soil, chooses a location and determines or approves the design8. Only 11.7% of county soils are rated without severe limits for a conventional drain field, so do not assume a standard field will work before evaluation25. Off-grid sanitation still requires an approved onsite system where community service is unavailable26. Schedule the final inspection before covering the system, then submit the As-Built Form; without final approval, the system is unapproved and illegal7.

Can you live in an RV or tiny home in Renville County?

Renville County's ordinance does not confirm a general right to occupy an RV as a full-time home on private land. The Recreational District is intended in part for RV parks with short-term or seasonal parking, and commercial tent or RV campgrounds there require a conditional-use permit910. Those campground provisions do not answer long-term residential RV occupancy elsewhere, so ask Renville County Planning & Zoning—or the applicable city or township authority—about the exact parcel before relying on an RV during construction45. A tiny home must be classified as a permitted or conditional residential use in its district; uses not listed require an amendment or variance, and covered structures need a building permit11. A manufactured home in the Recreational District requires a conditional-use permit, while mobile-home parks are conditional uses in the Agricultural and Rural Residential districts12. We could not confirm a county minimum dwelling floor area, so ask Planning & Zoning before choosing a small plan5.

Building a home in Renville County: the steps, in order

  1. Ask Renville County Planning & Zoning—or the appropriate city or township—who administers the parcel, then confirm its mapped zoning district and allowed residential use45.
  1. Lay out the house, access, well and septic area against the district's lot-size, lot-coverage and setback rules152327.
  1. Submit the application and plans to the Planning Commission or Zoning Administrator; conforming plans may be approved after the applicable fees are collected1718.
  1. Apply to First District Health Unit before beginning septic work; mark the utilities, building, well and boundaries so the health unit can evaluate soil and approve the design8.
  1. Confirm any well reporting or appropriation requirement; withdrawals above 12.5 acre-feet per year require a state permit16.
  1. After construction, request the county inspection and certificate of compliance, schedule the septic inspection before the system is covered, and submit the septic As-Built Form19207.

What should you check before buying land in Renville County?

Start with the zoning map and the government that administers the parcel: city boundaries, extraterritorial areas and the two townships identified by the county can change where you apply45. Verify the district's permitted use, lot size, coverage and setbacks before relying on a seller's description152324. An irregular tract described only by metes and bounds, or a hard-to-locate tract under 10 acres, must be platted or replatted before its conveyance can be recorded28. Get the septic site evaluated early because only 11.7% of county soils are rated without severe limitations for a conventional drain field25. Confirm legal road access and ask the responsible road authority whether a driveway approval applies; we could not confirm a county driveway-permit rule. Also check flood maps with the county before closing because we could not confirm a local floodplain-development process. The median property-tax bill is about $1,107 per year, with an effective rate of about 0.7%2930.

Watch-outs

  • Van Buren Township and Rockford Township building applicants must contact the appropriate township officer rather than assuming the county office will issue the application5.
  • A county building permit expires if construction does not begin within one year of issuance17.
  • Do not cover a new septic system before First District Health Unit's final inspection; without final approval, the system is unapproved and illegal7.
  • Long-term private-land RV occupancy and county-specific tiny-home occupancy remain unconfirmed; ask the zoning authority for the parcel before buying or moving a unit onsite931.

Sources

  1. Planning and Zoning Ordinances, quoted and re-checked
  2. Renville County Planning and Zoning Ordinances, quoted and re-checked
  3. Planning and Zoning Ordinances, quoted and re-checked
  4. Planning & Zoning, quoted and re-checked
  5. Renville County Planning & Zoning (renvillecountynd.org)
  6. Septic (Onsite Wastewater) Systems, quoted and re-checked
  7. Septic (Onsite Wastewater) Systems, quoted and re-checked
  8. Septic (Onsite Wastewater) Systems, quoted and re-checked
  9. renvillecountynd.org, quoted and re-checked
  10. Planning and Zoning Ordinances, quoted and re-checked
  11. Planning and Zoning Ordinances, quoted and re-checked
  12. Planning and Zoning Ordinances, quoted and re-checked
  13. Property Tax Exemption for Builders of Certain New Single Family Residential Properties (2026 county census)
  14. Property Tax Exemption for Builders of Certain New Single Family Residential Properties (North Dakota statewide rule), quoted and re-checked
  15. Planning and Zoning Ordinances, quoted and re-checked
  16. Water Appropriation Permits (North Dakota statewide rule), quoted and re-checked
  17. Renville County Planning and Zoning Ordinances, quoted and re-checked
  18. Planning and Zoning Ordinances, quoted and re-checked
  19. Planning and Zoning Ordinances, quoted and re-checked
  20. Planning and Zoning Ordinances, quoted and re-checked
  21. Building Codes | Commerce | North Dakota (North Dakota statewide rule), quoted and re-checked
  22. Building Codes (North Dakota statewide rule), quoted and re-checked
  23. Planning and Zoning Ordinances, quoted and re-checked
  24. Planning and Zoning Ordinances, quoted and re-checked
  25. Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
  26. Septic (Onsite Wastewater) Systems, quoted and re-checked
  27. Application for Building Permit, quoted and re-checked
  28. renvillecountynd.org, quoted and re-checked
  29. Median property tax bill: Bolthole Index county data
  30. Effective property tax rate: Bolthole Index county data
  31. Renville County Planning and Zoning Ordinances (2026 county census)

Written October 5, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Found land here? Start a Property Hunt →

Compared with neighboring counties

Like all 6 of its neighbors, Renville County has countywide zoning.

RuleRenville CountyBurke CountyWard CountyBottineau CountyMountrail CountyMcHenry CountyDivide County
Building permitRequiredRequiredRequiredLimitedLimitedLimitedRequired
County zoningYesYesYesYesYesYesYes
Septic permitsFirst District Health UnitFirst District Health UnitFirst District Health UnitFirst District Health UnitUpper Missouri District Health UnitFDHUUMDHU

County locator

Renville County in North Dakota

49
County map
Renville County highlighted among the North Dakota counties · colored by Index score

How Renville County scores

Seclusion82100% ev.
Self-Sufficiency2096% ev.
Admin Boringness4390% ev.
Durability49100% ev.
Property Autonomy73100% ev.
Carry Cost7996% ev.

Evidence strength: 97%. This reports direct-source completeness and fallback use; it is separate from the score and is not a confidence interval. How it works →

$195kTypical home
0.7%Property tax
$2,334Land / acre
17.1"Annual rain
13.6% of yrsSevere drought
3.5 / yr (+3.1)Mid-century 100°F days
20.8 daysMid-century dry spell
1.31" (+2%)Mid-century 1-day rain
1.51×Wildfire change factor
100%Forward climate coverage
$1,966Home insurance / yr
-0.1% / yrInsurance growth
6.56%Nonrenewal rate
single ZIP shrunk to state medianInsurance basis
95,535People within 2 hr
2,484Radius comparison (15 mi)
2.6People / sq mi
27.1%Federal land
97.8%Land at 15% slope or less
11.7%Soils rated "not limited" for septic (strict USDA rating)
64,773 acWorkable land screen
1.4%Wooded land
19.6 tonsBiomass / forest ac
39.9°FAvg temp

Scout Renville County

Camp here before you commitBook a few nights nearby on Hipcamp →Already own land here?Earn money hosting campers — get $100 when you become a Hipcamp host →

Some links are affiliate or referral links — we may earn a commission, at no cost to you.

Property hunt

Find land. Bring the promising ones back.

Search live inventory elsewhere, then cost and vet each candidate here. No copied listings, account, or paid data feed.

Each button opens a current land search for Renville County. Listing sites control their own results and filters.

Analyze a property
Add setup-cost allowances

Use rough quotes or placeholders. Blank fields count as $0.

Working estimate

—land + entered setup costs
Asking $ / acre
—
Setup allowance
—
All-in $ / acre
—

A planning estimate, not a valuation or contractor quote. The USDA benchmark includes farm land and buildings; it is context, not a parcel comp.

Before an offer

Parcel due diligence

0/8 checked

Saved properties and checklist progress stay on this device. Bolthole Index does not receive them.

Cities and towns in Renville County

Inside a city, town or township here, that government usually sets zoning and may issue its own building permits; the county’s rules above cover land outside them.

Brandon Township · Callahan Township · Clay Township · Colquhoun Township · Eden Valley Township · Ensign Township · Fairbanks Township · Glenburn · Grano · Grassland Township · Grover Township · Hamerly Township · Hamlet Township · Hurley Township · Ivanhoe Township · Lockwood Township · Loraine · McKinney Township · Mohall · Muskego Township · Plain Township · Prescott Township · Prosperity Township · Rockford Township · Roosevelt Township · Sherwood · Stafford Township · Tolley · Van Buren Township · White Ash Township

Answers from the rulebook for Renville County

What the ordinances and state agencies actually say — one answer per question, each quoted from the official source and independently re-checked.

Renville County rules

  • Building permitRequired

    Buildings and structures subject to the county zoning regulations.

    • Structures associated with the normal incidents of agriculture are excepted from the quoted permit requirement.
    • No permit is required for maintenance that does not structurally alter the building.
    • A permit expires if no construction takes place within one year of issuance.
    • Plans must conform to district regulations and applicable ordinances unless a conditional use, administrative review, or variance order is obtained.
    “No building or structure, other than those associated with the normal incidents of agriculture, shall be erected, moved, added to, or structurally altered without a building permit. [...] No permit is required for maintenance of any building or structure which does not structurally alter the building.”
    One more reviewed finding on this topic
    • Required — Buildings and structures in county-regulated areas of Renville County.
      “No building or structure, other than those associated with the normal incidents of agriculture, shall be erected, moved, added to, or structurally altered without a building permit.”
  • InspectionsRequired

    Permit-compliance inspections for construction requiring a Renville County building permit.

    • The Planning Commission conducts an onsite inspection after notification that work is complete.
    • Inspection is tied to the work specified on the building permit.
    “Inspection for permit compliance in accordance with these Zoning Regulations.”
    One more reviewed finding on this topic
    • Required — Inspection for compliance with Renville County zoning regulations and inspection of completed work requiring a building permit.
      “Upon notification of completion of any work requiring a building permit, the Planning Commission conducts an onsite inspection of the work specified on the building permit.”
  • Certificate of occupancyRequired

    Occupation of a structure, building, or land built or structurally altered in a manner requiring a building permit.

    • The county document calls this a certificate of compliance.
    • The Planning Commission issues it only if completed work conforms to the zoning ordinance.
    • A refusal must be stated in writing within fifteen days after the applicant's request, with written notice sent within one week after refusal.
    “A certificate of compliance is required before any structure, building or land can be occupied which has been built or structurally altered such that it requires a building permit.”
    2 more reviewed findings on this topic
    • Required — Occupation of a structure, building, or land built or structurally altered so that a building permit is required.
      “A certificate of compliance is required before any structure, building or land can be occupied which has been built or structurally altered such that it requires a building permit.”
    • Required — Any structure, building, or land in county-regulated areas that requires a building permit before occupancy.
      “A certificate of compliance is required before any structure, building or land can be occupied”
  • County-wide zoningPresent (with conditions)

    Land within the jurisdiction of Renville County's zoning regulations.

    • The ordinance divides land covered by its jurisdiction into AG, RR, CO, IN, and RE districts.
    • Municipal and township authorities may administer separate rules in their own jurisdictions.
    “These zoning regulations shall apply to all areas within the civil boundaries of Renville County North Dakota; with the exception of those areas within the civil boundaries and extraterritorial zoning boundaries of organized cities in Renville County.”
  • Local zoningVaries (with conditions)

    County aggregate of county, township, and municipal land-use administration.

    • Renville County administers its county zoning regulations through the Planning Commission.
    • The county page directs applicants for Van Buren Township or Rockford Township building applications to the appropriate township officer.
    • This aggregate does not claim that Renville County administers every municipal or township ordinance.
    “If you are inquiring about a building application for either Van Buren Township or Rockford Township, please contact the appropriate township officer.”
    One more reviewed finding on this topic
    • Varies — Aggregate local zoning across Renville County, including county-administered zoning and township or municipal administration.
      “Those areas that are within the civil boundaries and extraterritorial boundaries of an organized city will retain the opportunity to exercise their own zoning authority.”
  • Zoning districtsPublished (with conditions)

    Renville County zoning districts and official zoning map.

    • The ordinance establishes AG, RR, CO, IN, and RE districts.
    • District boundaries are shown on maps attached to the ordinance, kept on file with the county auditor, and regularly updated after amendments.
    “The location and boundaries of the zoning districts are hereby established as shown on the maps attached and made a part of this ordinance.”
    One more reviewed finding on this topic
    • Published — Renville County zoning districts and official zoning map.
      “the land covered by the jurisdiction of these regulations shall be divided into the following zoning districts: "AG" - Agricultural District "RR" - Rural Residential District "CO" - Commercial District "IN" - Industrial District "RE" - Recreational District”
  • Minimum lot sizeDistrict specific (with conditions)

    Residential, commercial, and recreational zoning districts under the Renville County ordinance.

    • Agricultural District individual nonfarm dwellings generally require lots of at least three acres and no more than one nonfarm dwelling per 40 acres.
    • An exception allows individual nonfarm dwellings on lots of at least two acres without density restriction in the NE 1/4 of 15-158-82, Ensign Township.
    • Rural Residential, Commercial, and Recreational District lots generally require 5,000 square feet with common sewer collection or three acres with an onsite user-owned drainage field.
    • Industrial District has no minimum lot-size standard.

    AG individual nonfarm dwelling lot size: >= 3 acres (NE 1/4 of 15-158-82, Ensign Township: at least 2 acres without density restriction) · AG nonfarm dwelling density: <= 1 dwelling per 40 acres (Immediate family of surface owner excluded from lot-size terms) · RR/CO/RE lot size with common sewer collection: >= 5000 square feet · RR/CO/RE lot size with onsite drainage field: >= 3 acres

    “Lot Size - Not less than three (3) acres. [...] Lot size - not less than 5,000 square feet if served by a sewer collection system common to other adjoining users; not less than three (3) acres if the sewer is drained into an onsite user owned drainage field. [...] Lot size - No minimum standard.”
    One more reviewed finding on this topic
  • SetbacksDistrict specific (with conditions)

    Buildings and structures in Renville County zoning districts.

    • AG requires 150 feet from section lines and township or county road centerlines, or 250 feet from state and federal highway centerlines.
    • RR specifies front and rear setbacks of 20 feet and side setbacks of 6 feet, with larger section-line, property-line, water-source, and road-centerline setbacks.
    • CO and IN have no minimum setbacks except 100 feet from the centerline of an abutting federal, state, county, or township road.
    • RE specifies 20-foot front and rear lot-line setbacks, 6-foot side lot-line setbacks, and 50-foot shoreline setbacks, subject to stated exceptions.

    AG setback from section lines/township/county roads: 150 feet (State and federal highways require 250 feet from centerline) · AG setback from state/federal highways: 250 feet · RR side setback: 6 feet (Larger setbacks apply from section lines, property lines, water sources, and roads) · RR front/rear setback: 20 feet (Larger setbacks apply from section lines, property lines, water sources, and roads) · CO/IN road setback: 100 feet (Applies from centerline of abutting federal, state, county, or township road) · RE shoreline setback: 50 feet (Boathouses, ramps, docks, or retaining walls excepted)

    “Building and Structure Setbacks - One hundred fifty (150) feet from all section lines and the centerlines of all township and county roads; or two hundred fifty (250) feet from the centerline of all state and federal highways.”
    2 more reviewed findings on this topic
    • Specified — Buildings in Renville County zoning districts and county road/highway setback controls.
      “The minimum setback for buildings from the centerline of county roads shall be one hundred fifty (150) feet.”
    • District specific (with conditions) — Building and structure setbacks under Renville County zoning regulations.
      “The minimum setback for buildings from the centerline of county roads shall be one hundred fifty (150) feet.”
  • Lot coverageDistrict specific (with conditions)

    Lot coverage in Rural Residential and Recreational zoning districts.

    • RR and RE limit principal and accessory building coverage to 50 percent.
    • CO and IN state no requirements other than possible fire-protection requirements.

    RR/RE maximum building coverage: <= 50 percent of lot (CO and IN have no requirements other than possible fire-protection requirements)

    “Lot coverage by buildings: Not more than fifty percent of the lot shall be covered by the principal building and all accessory buildings.”
    One more reviewed finding on this topic
    • District specific (with conditions) — Building lot coverage in the Renville County Recreational District.
      “Lot coverage by buildings: Not more than fifty percent of the lot shall be covered by the principal building and all accessory buildings.”
  • Living in an RVLimited

    Recreational-vehicle parks and commercial recreational-vehicle campground use in the Recreational District.

    • The Recreational District is intended for recreational-vehicle parks for short-term or seasonal parking.
    • Commercial campgrounds involving recreational vehicles require a conditional use permit.
    • This claim does not establish permission for long-term residential RV occupancy outside the Recreational District.
    “This district is intended to provide areas for rural recreational development and those land uses associated with rural vacation or seasonal residential developments and recreational vehicle parks for short-term or seasonal parking.”
  • Camping on your landLimited

    Commercial campgrounds and institutional or nonprofit camps in the Recreational District.

    • Commercial campgrounds and camps operated by nonprofit, charitable, or religious institutions require a conditional use permit.
    • The ordinance does not establish unrestricted private camping throughout the county.
    “CONDITIONAL USES: The following uses shall be considered conditional uses and shall be permitted only after a conditional use permit has been obtained in accordance with these zoning regulations. [...] c. Commercial campgrounds (tent and/or recreational vehicle). [...] e. Camps and campgrounds operated by nonprofit, charitable or religious institutions.”
    One more reviewed finding on this topic
    • Limited — Commercial tent or recreational-vehicle campgrounds in the county Recreational (RE) zoning district.
      “Commercial campgrounds (tent and/or recreational vehicle).”
  • Tiny homesLimited

    A tiny home used as a residential dwelling in the county-administered zoning areas of Renville County.

    • The ordinance defines a dwelling as any building or portion of a building designed and used exclusively for residential purposes.
    • District treatment depends on classification and location: single-family dwellings are permitted in the Rural Residential District; mobile home parks are conditional uses in the Agricultural and Rural Residential Districts; recreational-vehicle parks and manufactured homes are conditional uses in the Recreational District.
    • Uses not listed as permitted or conditional are prohibited without amendment or variance procedures.
    • A building permit is required before a building or structure is erected, moved, added to, or structurally altered, except for structures associated with normal incidents of agriculture and non-structural maintenance.
    “Except hereinafter provided, no building structure or land shall be used, occupied, erected, constructed, moved, reconstructed or structurally altered except in conformity with all of the regulations for the district in which it is located.”
  • Manufactured homesLimited

    Manufactured homes in the Recreational District and mobile-home parks in the Agricultural and Rural Residential districts.

    • Manufactured homes in the Recreational District require a conditional use permit.
    • Mobile home parks are conditional uses in the Agricultural and Rural Residential districts.
    • Uses not listed as permitted or conditional are prohibited in the applicable district unless amendment or variance procedures are followed.
    “CONDITIONAL USES: The following uses shall be considered conditional uses and shall be permitted only after a conditional use permit has been obtained in accordance with these zoning regulations. [...] d. Manufactured homes.”
    One more reviewed finding on this topic
    • Limited — Manufactured homes in the county Recreational (RE) zoning district.
      “d. Manufactured homes. e. Camps and campgrounds operated by nonprofit, charitable or religious institutions. f. Commercial retail operations, such as grocery, eating, drinking and fuel businesses.”
  • Who permits septicLocal (with conditions)

    Onsite sewage treatment systems in Renville County and the other counties served by First District Health Unit.

    • FDHU serves Renville, Bottineau, Burke, McHenry, McLean, Sheridan, and Ward Counties.
    • North Dakota Department of Environmental Quality licensing requirements apply to septic contractors.
    • A certified property owner may perform work under the stated conditions.
    “First District Health Unit (FDHU) requires a permit for the installation and/or repair of any part of an onsite sewage treatment system in Bottineau, Burke, McHenry, McLean, Renville, Sheridan, or Ward Counties.”
    2 more reviewed findings on this topic
    • Local (with conditions) — Onsite sewage treatment systems in Renville County.
      “First District Health Unit (FDHU) requires a permit for the installation and/or repair of any part of an onsite sewage treatment system in Bottineau, Burke, McHenry, McLean, Renville, Sheridan, or Ward Counties.”
    • Local — Onsite sewage treatment systems in Renville County, which is within First District Health Unit's seven-county service area.
      “First District Health Unit (FDHU) requires a permit for the installation and/or repair of any part of an onsite sewage treatment system in Bottineau, Burke, McHenry, McLean, Renville, Sheridan, or Ward Counties.”
  • Septic permitRequired

    Construction of a building producing sewage or wastewater in Renville County when no existing community septic system is available, and installation or repair of any part of an onsite sewage system.

    • Permit must be obtained before work begins.
    • The application requires utilities to be flagged and building corners, stub-out location, well sites, and property lines or corners to be marked before submission.
    • FDHU conducts a site evaluation, takes soil samples, and determines the system location and design.
    • All septic designs must be done or approved by FDHU.
    “A septic permit must be obtained from First District Health Unit when constructing a building that will produce sewage or wastewater, and no existing community septic system is available.”
    One more reviewed finding on this topic
    • Required — Installation of an onsite wastewater treatment system in Renville County.
      “*Septic and Holding Tanks require a permit from the ND First District Health Unit.”
  • Septic inspectionRequired

    New onsite sewage treatment systems in Renville County.

    • A final inspection must be scheduled before backfilling or covering the new system.
    • The owner or contractor must contact First District to schedule it.
    • Without final inspection and approval, the system is considered unapproved and illegal.
    • The installer must submit an As-Built Form after installation.
    “A final inspection must be scheduled prior to backfilling or covering the new system.”
    One more reviewed finding on this topic
    • Required — New onsite sewage systems in Renville County before backfilling or covering.
      “A final inspection must be scheduled prior to backfilling or covering the new system. Either the property owner or contractor must contact First District to schedule the inspection. Without final inspection and approval, the septic system will be considered unapproved and illegal.”
  • Off-grid sanitationLimited

    Onsite wastewater sanitation where no existing community septic system is available.

    • A septic permit is required before work.
    • FDHU must perform or approve the site evaluation and design.
    • Final inspection and approval are required before backfilling or covering.
    “After the application is processed an Environmental Health Practitioner will conduct a site evaluation of the property, take soil samples, and determine a location and design for your septic system. All septic system designs need to be done or approved by FDHU.”
  • Agricultural exemptionConditional

    Agricultural buildings or structures associated with the normal incidents of agriculture.

    • The building-permit ordinance excludes structures associated with the normal incidents of agriculture from its general permit requirement.
    • The Agricultural District states that all new construction requires contacting Planning & Zoning and paying a filing fee before construction begins.
    • Setback distances and other applicable regulations still apply.
    “Nothing in this ordinance shall be applied for the purpose of preventing or restricting the use of land or buildings for agricultural or any of the normal incidents of agriculture.”
    One more reviewed finding on this topic
    • Available (with conditions) — Structures associated with the normal incidents of agriculture and agricultural uses in the Agricultural District.
      “Nothing in this ordinance shall be applied for the purpose of preventing or restricting the use of land or buildings for agricultural or any of the normal incidents of agriculture.”
  • Subdividing landRegulated (with conditions)

    Division or conveyance of tracts and lots governed by Renville County plat requirements.

    • Irregularly shaped tracts or lots described only by metes and bounds must be platted or replatted.
    • A tract under ten acres whose precise location cannot be accurately ascertained must be surveyed and platted.
    • The plat must be approved by the county auditor and recorder and recorded before conveyance may be recorded.

    tract-size threshold: < 10 acres (Applies where precise location cannot be accurately ascertained)

    “If any tract or lot is divided into irregular shapes which can be described only by metes and bounds, or if the tract is less than 10 acres and its precise location cannot be accurately ascertained the owner of such tract or tracts, shall have such land platted or replatted, as the case may be.”
    One more reviewed finding on this topic
    • Regulated (with conditions) — Division of tracts or lots requiring platting or replatting.
      “If any tract or lot is divided into irregular shapes which can be described only by metes and bounds, or if the tract is less than 10 acres and its precise location cannot be accurately ascertained the owner of such tract or tracts, shall have such land platted or replatted, as the case may be.”
  • Permit feesPublished (with conditions)

    Fees for Renville County zoning permits, appeals, hearings, and related applications.

    • The County Commission establishes the fee schedule.
    • The schedule is posted in the County Auditor's office and may be altered or amended only by the County Commission.
    • No action is taken on an application or appeal until applicable fees are paid in full.
    • A $150 non-refundable filing fee plus an additional $50 after approval applies to listed amendments, zoning changes, conditional-use permits, variance permits, and other advertised public-hearing activities.

    building permit fee: 50 USD · tax-exempt filing fee: 10 USD · fence permit fee: 50 USD · other permit/hearing filing fee: 150 USD (Additional $50 after Planning & Zoning Board approval) · commercial waste tipping fee: 1 USD per ton (Quarterly)

    “1. Building Permit Fee: $50.00 2. Tax Exempt Filing Fee: $10.00 3. Fence Permit Fee:$50.00 [...] A non-refundable fee of $150.00 shall be paid by the applicant upon filing an application for an amendment, zoning request change, conditional use permit, variance permit or any other activity which requires an advertised public hearing. An additional fee of $50.00 will apply once the permit is approved by the Planning & Zoning Board.”
    One more reviewed finding on this topic
    • Published (with conditions) — Fees for county zoning and building-permit matters.
      “The schedule of fees shall be posted in the office of the County Auditor and may be altered or amended only by the County Commission. Until all applicable fees, charges and expenses have been paid in full, no action shall be taken on any application or appeal. 1. Building Permit Fee: $50.00 2. Tax Exempt Filing Fee: $10.00 3. Fence Permit Fee:$50.00”
  • Permit processPublished (with conditions)

    Renville County building-permit and zoning-approval process.

    • Applicants apply to the Planning Commission or designated Zoning Administrator.
    • Conforming plans may be issued a permit after applicable fees are collected.
    • Nonconforming plans may use amendment, variance, conditional-use, or appeals procedures.
    • Construction must begin within one year or the building permit expires.
    • The county website provides the building permit application and ordinance.
    “RETURN COMPLETED FORM TO: RENVILLE COUNTY ZONING ADMINISTRATOR PO BOX 68 MOHALL, ND 58761”
    One more reviewed finding on this topic
    • Published (with conditions) — Renville County building-permit application and zoning-review process.
      “All applicants who wish to build or alter any structure as defined in these zoning regulations must apply to the Planning Commission for a permit. If the applicant's plans meet district regulations as prescribed in these zoning regulations and any other applicable ordinances, the Planning Commission or designated Zoning Administrator collects any applicable fees and issues the building permit.”

North Dakota rules that apply here

  • Owner-builder exemptionConditional

    An individual who builds that individual’s own single-family residence and seeks the North Dakota builder property-tax exemption.

    • The exemption is discretionary and requires the governing city or county to pass a resolution allowing it.
    • For property within a city, the city governing body has jurisdiction; for property outside an incorporated city, the county has jurisdiction.
    • The property must remain owned by the builder and unoccupied.
    • The exemption applies for the taxable year in which construction began and the next two taxable years.
    • The governing body may impose conditions, including limits on the exemption period and dollar value.
    • A builder may receive the exemption for no more than ten properties in a taxable year within each jurisdiction that approved the exemption.
    • General taxes and installments of special assessments may not be delinquent.
    • This is a property-tax exemption, not a building-permit or building-inspection exemption.

    exemption period: taxable year in which construction began and next two taxable years · maximum properties per builder per jurisdiction per taxable year: 10 properties

    “Whether or not to offer the exemption is at the discretion of the governing body. [...] “Builder” includes an individual who builds that individual’s own residence.”
  • Building code adoptedPartial

    North Dakota's state building code and its adoption and enforcement by cities, townships, and counties statewide; state and local government buildings and schools are also addressed by the administrative code.

    • The state building code is administered and updated by North Dakota Commerce, but enforcement is the responsibility of jurisdictions that elect to adopt and enforce building codes.
    • A city, county, or township that elects to adopt and enforce a building code must adopt and enforce the State Building Code.
    • Cities, townships, and counties may amend the State Building Code to conform to local needs.
    • Fully chartered home rule cities may adopt something other than the State Building Code; the official Commerce page states that, at present, all jurisdictions enforcing a building code have adopted the same individual codes comprising the State Building Code.
    • The State Building Code consists of the International Building Code, International Residential Code, International Mechanical Code, and International Fuel Gas Code; Commerce also states that the 2024 updates and proposed amendments were adopted on September 11, 2025 and that the new State Building Code went into effect January 1, 2026.
    • The state statute separately exempts buildings that are neither heated nor cooled, certain low-energy-use buildings, qualifying restored or reconstructed historic buildings, and agricultural buildings unless used for human habitation or by the public.
    • The administrative code states that its chapter applies to cities, townships, and counties that elect to adopt and enforce building codes within their jurisdictional boundaries, and to all state and local government buildings and public and private schools.

    new state building code effective date: 2026-01-01 · state code components: IBC, IRC, IMC, and IFGC

    “If a city, county, or township elects to adopt and enforce building codes, it must adopt and enforce the State Building Code.”
    2 more reviewed findings on this topic
    • Adopted (with conditions) — The North Dakota State Building Code, consisting of the IBC, IRC, IMC, and IFGC, with the 2024 updates and stated amendments effective statewide as the state code framework.
      “adopted the 2024 updates to the IBC, IRC, IMC, and IFGC and the proposed amendments.”
    • Adopted — The North Dakota State Building Code, including residential construction covered by the state residential code.
      “The new North Dakota State Building Code will go into effect Jan. 1, 2026.”
  • Minimum dwelling sizeDistrict specific (with conditions)

    City zoning regulations governing the size of residential buildings in North Dakota; the actual minimum, if any, is established by the applicable local zoning ordinance.

    • The authority is permissive and applies to governing bodies of cities that adopt zoning regulations.
    • The regulation is subject to North Dakota Century Code chapter 54-21.3.
    • A local board of adjustment may determine and vary application of the regulations under the local regulations.
    “For the purpose of promoting health, safety, morals, or the general welfare of the community, the governing body of any city may, subject to the provisions of chapter 54-21.3, regulate and restrict the height, number of stories, and the size of buildings and other structures, the percentage of lot that may be occupied, the size of yards, courts, and other open spaces, the density of population, and the location and use of buildings, structures, and land for trade, industry, residence, or other purposes.”
  • Building heightDistrict specific (with conditions)

    Local city zoning regulations governing building height and number of stories.

    • The actual height or story limit is established by the applicable local zoning regulation.
    • The authority is permissive and applies to city zoning regulations.
    • A local board of adjustment may vary application of the regulations under the local regulations.
    “For the purpose of promoting health, safety, morals, or the general welfare of the community, the governing body of any city may, subject to the provisions of chapter 54-21.3, regulate and restrict the height, number of stories, and the size of buildings and other structures, the percentage of lot that may be occupied, the size of yards, courts, and other open spaces, the density of population, and the location and use of buildings, structures, and land for trade, industry, residence, or other purposes.”
  • Well permitLimited

    Private water-supply wells statewide in North Dakota.

    • A water appropriation permit from the North Dakota Department of Water Resources is required when annual withdrawal exceeds 12.5 acre-feet.
    • A permit is not needed for wells drawing less than 12.5 acre-feet per year, according to the official private-well guide.
    • For domestic, livestock, fish and wildlife, and recreational uses below 12.5 acre-feet per year, the location and capacity of constructed works must be reported to the Department of Water Resources.
    • Anyone hired to construct, install, or repair a well, pump, or pitless unit must be licensed; individuals may install or repair wells on their own property without a license.

    annual water withdrawal threshold: > 12.5 acre-feet per year (Domestic, livestock, fish and wildlife, and recreational uses below this threshold do not require a water appropriation permit but must be reported.) · annual water withdrawal threshold: > 4073137 gallons per year (Equivalent threshold stated by the Department of Water Resources.)

    “Domestic, municipal, public, livestock, fish and wildlife, and recreational water use exceeding 12.5 acre-feet (4,073,137 gallons or 96,979 barrels) per year.”
  • Driveway accessLimited

    Driveway and other access connections involving the North Dakota State Highway System, including controlled-access facilities and driveways within state highway right-of-way.

    • The North Dakota statute applies specifically to controlled-access facilities; access is available only at designated points and on terms and conditions specified from time to time.
    • NDDOT maintains access control on the State Highway System, and proposed changes to access require contact with the District Engineer for coordination.
    • For a driveway on state highway right-of-way, the NDDOT driveway permit must be granted before the permitted work proceeds; failure to construct the drive approach as permitted may result in cancellation and removal or correction at the landowner's expense.
    • A driveway is not complete until checked and approved by NDDOT; surfacing may be omitted on field entrances if specified in the application.
    • The driveway may be used only to provide entrance to and exit from the landowner's property.
    • A driveway or improvement on the highway right-of-way may not be altered or relocated without permission of the NDDOT District Engineer.
    • NDDOT supervises the location, construction, and maintenance of driveways and may direct future removal, relocation, or maintenance; NDDOT may diminish or expand use as required for highway-traffic safety.
    “No driveway, or improvement constructed on the highway right-of-way shall be altered or relocated without permission of the District Engineer of NDDOT.”
  • Building in a floodplainRequired

    Construction or modification of North Dakota water-control structures regulated by the Department of Water Resources.

    • A DWR construction permit is required when a water-control structure is capable of retaining, diverting, or obstructing more than 50 acre-feet for dikes, other devices, and low-hazard dams.
    • The threshold is more than 25 acre-feet for medium-hazard and high-hazard dams.
    • This claim does not establish the separate local floodplain-development-permit requirements administered by local floodplain administrators.

    retention/diversion/obstruction threshold for dikes, other devices, and low-hazard dams: > 50 acre-feet · retention/diversion/obstruction threshold for medium- and high-hazard dams: > 25 acre-feet

    “A construction permit is required from the DWR if a water control structure is constructed or modified”
  • Short-term rentalsLimited

    Transient lodging rentals held out to the public for a charge in North Dakota.

    • A lodging license applies to buildings or structures held out to the public where sleeping accommodations are furnished to transient guests for a charge.
    • The lodging license does not apply to a single structure with five or fewer guest rooms and ten or fewer total occupants.
    • The lodging license also does not apply to a series or group of buildings or structures containing five or fewer guest rooms and ten or fewer total occupants.
    • License applications must be submitted at least 30 days before beginning construction or acquiring new ownership; new construction, renovation, or remodeling also requires the Section 3 Plan Review Checklist; after payment, review may take up to 30 calendar days.

    guest-room exemption threshold: <= 5 guest rooms or fewer (Only when total occupants are ten or fewer.) · occupant exemption threshold: <= 10 occupants or fewer (Only when the structure has five or fewer guest rooms.)

    “The lodging license does not apply to: Single structures with five or fewer guest rooms and ten or fewer total occupants.”
  • Campground & park staysLimited

    Campsite occupancy in North Dakota state parks.

    • The limit applies to campsite and cabin occupancy in state parks.
    • All vehicles entering a state park must have a valid daily or annual vehicle entrance permit, including overnight stays and day visits.
    • Campers must check in at 4:00 p.m. on the first reservation day and check out by 3:00 p.m. on the last day.

    maximum campsite or cabin occupancy: <= 14 nights in any 30-day period

    “Campsite and cabin occupancy is limited to no more than 14 nights in any 30-day period.”
  • county zoning authorityGeneral

    North Dakota counties adopting zoning regulations for land and buildings within the county, including unincorporated areas.

    • The authority is exercised by the board of county commissioners.
    • Regulation is subject to North Dakota Century Code chapter 54-21.3.
    • The authority covers the location and use of buildings and structures and the use, condition of use, or occupancy of lands for residence, recreation, and other purposes.
    • County zoning regulations must be made in accordance with a comprehensive plan.
    • A county may divide all or any parts of the county into districts, and regulations must be uniform within each district but may differ between districts.
    • County zoning regulations must account for the statutory limitations governing farming, ranching, and animal feeding operations in section 11-33-02.1.
    • The board must state the grounds for approving or disapproving zoning amendments or variances, and written findings must be included in the records.
    • The board must establish zoning requirements for solid waste disposal and incineration facilities before July 1, 1994.
    • The board may impose tipping or other fees on solid waste management and incineration facilities, but may not impose a fee under this section on an energy conversion facility or coal mining operation that disposes of its waste onsite.
    • The board may establish institutional controls addressing environmental concerns with the department of environmental quality under section 23.1-10-16.
    “For the purpose of promoting health, safety, morals, public convenience, general prosperity, and public welfare, the board of county commissioners of any county may regulate and restrict within the county, subject to chapter 54-21.3, the location and the use of buildings and structures and the use, condition of use, or occupancy of lands for residence, recreation, and other purposes.”
    One more reviewed finding on this topic
    • General — North Dakota county boards of commissioners adopting zoning regulations, including regulation of unincorporated county land.
      “the board of county commissioners of any county may regulate and restrict within the county”
  • county building authorityGeneral

    County authority to administer and enforce the state building code, including the residential code, and to provide for building permits for buildings or structures subject to county zoning in unincorporated areas of North Dakota.

    • A county that elects to administer and enforce a building code must adopt and enforce the state building code; it may amend that code to conform to local needs.
    • A county may administer and enforce the state building code only in areas where a city or township does not administer it. A city or township may relinquish that authority to its county under N.D.C.C. § 54-40.5-03; local governments may also agree to joint administration and enforcement or contract for private enforcement.
    • County permit authority under N.D.C.C. § 11-33-18 applies to a building or structure otherwise subject to the County Zoning chapter.
    • If the county provides for permits, it must require the applicant to state whether the structure is reasonably anticipated to have a significant transportation-system impact. A structure has such impact if it will average at least twenty-five motor vehicles per day during one year with gross weight exceeding sixty thousand pounds [27215.54 kilograms].
    • For a structure with significant transportation-system impact, the county must notify the director of the department of transportation and allow an opportunity to comment; director approval is not required.
    • The county may establish and collect reasonable permit fees, which must be credited to the county general fund.
    • A county-adopted building code may not require fire sprinklers in a single-family dwelling or a residential building containing no more than two dwelling units.

    significant transportation-system impact threshold: >= 25 motor vehicles per day (Over a period of one year; vehicles must have gross weight exceeding sixty thousand pounds [27215.54 kilograms].) · fire-sprinkler requirement: false (A county building code may not require sprinklers in a single-family dwelling or residential building with no more than two dwelling units.)

    “The governing body of a city, township, or county that elects to administer and enforce a building code shall adopt and enforce the state building code. However, the state building code may be amended by cities, townships, and counties to conform to local needs.”

Set by your township or city, not the county

In North Dakota, zoning is adopted by each township or city, so Renville County has no county-wide answer on these. Find your township or city in the list of places on this page, or call its clerk or zoning administrator.

  • Accessory dwellings

Still unanswered

We looked and could not find an official answer yet. Silence is not permission — ask the county directly.

  • Mandatory utility hookup — Required connection to public water or sewer for development in Renville County.

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Living off-grid in Renville County, North Dakota

Is Renville County a good place to live off-grid or homestead?

Renville County scores 49/100 on the Bolthole Index, a solid county profile. Its strengths: deep seclusion — about 2,484 people within 15 miles and manageable long-term carry cost. Watch-outs: thin water margin (17.1″/yr rainfall).

Do you need a building permit in Renville County, North Dakota?

Renville County generally requires a residential building permit, and it enforces county zoning. Onsite septic is permitted by First District Health Unit. Owner-builders may act as their own contractor to build their home. These answers are quoted from official sources and independently re-checked. Rules change and cities within the county differ — always confirm with the county before you buy or build.

How much does land cost in Renville County, North Dakota?

Land in Renville County runs about $2,334 per acre, based on the latest county data.

What is the water situation in Renville County?

Renville County gets about 17.1" of rain a year, with severe drought in roughly 13.6% of years.

How remote is Renville County?

A typical private-land location has about 2,484 people within 15 miles and 210,361 within 100 miles. These radius catchments are the published fallback where road routing is unavailable.

How Renville compares in North Dakota

Compare side-by-side →See all 53 North Dakota counties ranked →