Ward County, North Dakota

Building permits, zoning and septic rules in Ward County, North Dakota

46Index Score / 100
#35 of 53 in North Dakota

Ward County, North Dakota requires building permits in townships zoned by the county, and the Tax Equalization Office charges $4.50 per $1,000 of estimated construction cost1. Ward County uses four zoning resolutions for county-jurisdiction land, while 16 of its 57 townships regulate their own zoning23. First District Health Unit approval is required for sewer and water when a property will not connect to municipal service4.

At a glance

Building permit
Required in county-zoned townships; $4.50 per $1,000 of cost15
Zoning
Four county resolutions; 16 of 57 townships zone themselves23
Septic permits
Required before installation, alteration, repair or extension6
Owner-builder
No permit exemption confirmed; North Dakota's owner-builder break is a discretionary property-tax exemption only7
Septic soil suitability
29.5% of soils have no severe limit for a conventional drain field8
Septic inspection
Required before a new or modified system is covered9
Accessory dwelling
One per residential site under county zoning10
Floodplain manufactured home
Permit required for placement longer than 5 days11
Private wells
No state permit below 12.5 acre-feet a year, but the well's location and capacity must be reported12

Who to call

Building permits

Ward County Tax Equalization Office - Building Permits

Building permits, permit fees and building inspections for townships zoned by Ward County

701-857-6429

Ward County Courthouse, 225 SE Third St., Second Floor, Minot, ND 58701

Zoning

Ward County Planning & Zoning

County zoning administration and the Planning Commission

701-857-6405

Planning.Zoning@co.ward.nd.us

225 3rd Street SE, Minot, ND 58702

Also useful

Ward County Planning & Zoning - Township Zoning Ordinances list

The published count and list of Ward County townships that regulate their own zoning instead of the county

Septic permits

First District Health Unit - Environmental Health Division

Septic (onsite wastewater) system permits, site evaluations and design approval for Ward County and six neighboring counties

701-852-1376

801 11th Ave. SW, Minot, ND 58701

Contact details are copied from each office’s official page and were checked against it on October 9, 2026.

Off-grid gear

Going off-grid in Ward County means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Do you need a building permit in Ward County, North Dakota?

Yes, in townships zoned by the county. Ward County, North Dakota issues building permits through the Tax Equalization Office for construction in townships the county zones1. The published building and alteration permit fee is $4.50 per $1,000 of estimated construction cost5. North Dakota's state building code took effect January 1, 2026, but state Community Services does not enforce it; cities, townships and counties elect whether to administer it, and county enforcement cannot displace city or township enforcement1314. Buildings used only for agricultural purposes are exempt from the state building-code chapter unless used for human habitation or by the public15.

Who is the Ward County building department, and how do you reach them?

Ward County's building permits go through the Tax Equalization Office16. Reach the office at the Ward County Courthouse, 225 SE Third St., Second Floor, Minot, North Dakota 58701, or call 701-857-642916. For property not connected to municipal sewer or water, the building-permit application requires First District Health Unit approval for sewer and water4. Variances and special-use permits need Ward County Planning Commission approval at public hearings held the third Thursday of each month17. The application also asks for the name and license number of contractors for the listed trades16. We could not confirm a building-permit exemption for an owner doing the work; ask the Tax Equalization Office how to complete the contractor fields if you plan to build for yourself. North Dakota's owner-builder provision is a discretionary property-tax exemption, not a permit or inspection exemption7.

Does Ward County have zoning?

Yes, but the applicable ordinance depends on location. Ward County's four zoning resolutions cover the Air Force Base area, rural areas, the Souris River Floodplain and areas surrounding cities; municipal and extraterritorial jurisdictions may have separate rules218. Of Ward County's 57 townships, 16 regulate their own zoning3. County materials identify agricultural production, rural residential, community residential, recreational, rural industrial, highway commercial and Air Base Protection district labels, so a parcel's district matters as much as its township18. Dimensional rules differ by district: in the Rice Lake Recreational District, for example, the minimum lot is 7,500 square feet and building front setbacks are 18 feet on lakeside lots and 25 feet elsewhere19. North Dakota law allows county zoning districts to have different rules, while requiring uniform rules within each district20. Ask Ward County Planning & Zoning at 701-857-6405 to identify the controlling jurisdiction and district before relying on a setback, use or occupancy assumption21.

How do septic permits work in Ward County?

First District Health Unit requires a permit before installing, altering, repairing or extending an onsite sewage treatment system in Ward County6. The permit is also required when a building will produce sewage or wastewater and no community septic system is available6. Work must be completed by an NDDEQ-licensed septic contractor or certified property owner22. A new or modified system must receive final inspection before it is backfilled or covered, and the installer must submit an as-built form after installation; without final approval, the system is unapproved and illegal9. Reach the district's Minot office at 801 11th Ave. SW, Minot, ND 58701, phone 701-852-137622. Only 29.5% of Ward County soils lack severe limitations for a conventional drain field, making septic feasibility an early due-diligence item8.

Can you live in an RV or tiny home on your land in Ward County?

Ward County materials do not confirm a countywide rule specifically allowing full-time RV or tiny-home occupancy, so ask the zoning authority for the parcel's township and district2. Ward County zoning allows no more than one accessory dwelling per residential site and limits an accessory dwelling to no more than five non-family residents, with additional district-specific use rules possible10. In a regulated floodplain, a manufactured home needs a county permit before it remains at a site for more than five days, and additional anchoring and elevation rules apply11. New residential manufactured homes statewide must use state-licensed installers and inspectors, with at least two inspections for a double-wide and one for a single-wide23. A dwelling that produces wastewater without community septic service also triggers the local septic-permit requirement6.

Building a home in Ward County: the steps, in order

  1. Ask Planning & Zoning which township, zoning authority and district control the parcel221.
  2. Confirm that the intended home and any accessory dwelling are allowed in that district before ordering plans1810.
  3. If municipal sewer or water is unavailable, obtain First District Health Unit approval for the sewer and water plan4.
  4. Secure the septic permit before any onsite-system work begins6.
  5. Apply through the Tax Equalization Office for the building permit and budget $4.50 per $1,000 of estimated construction cost5.
  6. Arrange the required septic final inspection before the system is covered and submit the as-built form after installation9.
  7. If the property is in the floodplain, account for the county's elevation requirements before construction16.

What to check before you buy land in Ward County

Start with jurisdiction: the county uses four zoning resolutions, some cities have separate or extraterritorial rules, and 16 of Ward County's 57 townships regulate their own zoning23. Check water too: North Dakota requires no state water permit for a domestic well below 12.5 acre-feet a year, but the well's location and capacity must be reported to the Department of Water Resources12. Check septic feasibility before closing because only 29.5% of Ward County soils lack severe limitations for a conventional drain field8. If the parcel lacks municipal sewer or water, First District Health Unit approval becomes part of the building-permit process4. The terrain is generally gentle and open, with 90.3% of land at a slope of 15% or less and 2.5% wooded2425. Ward County averages 17.6 inches of precipitation annually, and severe drought occurs in 11.2% of years2627. The effective property-tax rate is about 1.1%, with a median annual bill of $2,7852829.

Watch-outs

  • Ward County zoning is location-specific: four county resolutions cover different areas, 16 of the county's 57 townships regulate their own zoning, and municipal or extraterritorial rules may apply23.
  • Do not cover a new or modified septic system before First District Health Unit's final inspection; without final inspection and approval, the system is unapproved and illegal9.
  • Ward County does not confirm a separate owner-builder exemption; ask the Tax Equalization Office how its contractor-information requirements apply to self-performed work30.

Sources

  1. Ward County Building Permits (2026 county census)
  2. Ward County Zoning Ordinance, quoted and re-checked
  3. Ward County Planning & Zoning - Township Zoning Ordinances list (co.ward.nd.us)
  4. Building Permits, quoted and re-checked
  5. Building Permits, quoted and re-checked
  6. Septic (Onsite Wastewater) Systems, quoted and re-checked
  7. Property Tax Exemption for Builders of Certain New Single Family Residential Properties (North Dakota statewide rule), quoted and re-checked
  8. Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
  9. Septic (Onsite Wastewater) Systems, quoted and re-checked
  10. Ward County Land Zoning Ordinance, quoted and re-checked
  11. Ward County Floodplain Zoning Ordinance, quoted and re-checked
  12. Water Appropriation Permits (North Dakota statewide rule), quoted and re-checked
  13. Building Codes | Commerce | North Dakota (North Dakota statewide rule), quoted and re-checked
  14. Building Codes (North Dakota statewide rule), quoted and re-checked
  15. North Dakota Century Code Chapter 54-21.3, State Building Code (North Dakota statewide rule), quoted and re-checked
  16. Ward County Tax Equalization Office - Building Permits (co.ward.nd.us)
  17. Building Permits, quoted and re-checked
  18. Ward County Zoning Ordinance, quoted and re-checked
  19. Ward County Land Zoning Ordinance, quoted and re-checked
  20. North Dakota Century Code, Chapter 11-33, County Zoning (North Dakota statewide rule), quoted and re-checked
  21. Ward County Planning & Zoning (co.ward.nd.us)
  22. First District Health Unit - Environmental Health Division (fdhu.org)
  23. Manufactured Home Installation Program (North Dakota statewide rule), quoted and re-checked
  24. Share of land at 15% slope or less: Bolthole Index county data
  25. Wooded share of land: Bolthole Index county data
  26. Annual precipitation: Bolthole Index county data
  27. Share of years in severe drought: Bolthole Index county data
  28. Effective property tax rate: Bolthole Index county data
  29. Median property tax bill: Bolthole Index county data
  30. Property Tax Exemption for Builders of Certain New Single Family Residential Properties (2026 county census)

Written October 9, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Found land here? Start a Property Hunt →

Compared with neighboring counties

Like all 6 of its neighbors, Ward County has countywide zoning.

RuleWard CountyMcHenry CountyRenville CountyMountrail CountyMcLean CountyBottineau CountyBurke County
Building permitRequiredLimitedRequiredLimitedRequiredLimitedRequired
County zoningYesYesYesYesYesYesYes
Septic permitsFirst District Health UnitFDHUFirst District Health UnitUpper Missouri District Health UnitFirst District Health UnitFirst District Health UnitFirst District Health Unit

County locator

Ward County in North Dakota

46
County map
Ward County highlighted among the North Dakota counties · colored by Index score

How Ward County scores

Seclusion60100% ev.
Self-Sufficiency1999% ev.
Admin Boringness4390% ev.
Durability57100% ev.
Property Autonomy73100% ev.
Carry Cost78100% ev.

Evidence strength: 98%. This reports direct-source completeness and fallback use; it is separate from the score and is not a confidence interval. How it works →

$287kTypical home
1.1%Property tax
$2,272Land / acre
17.6"Annual rain
11.2% of yrsSevere drought
3.1 / yr (+2.8)Mid-century 100°F days
20.3 daysMid-century dry spell
1.27" (+3.6%)Mid-century 1-day rain
1.5×Wildfire change factor
100%Forward climate coverage
$1,940Home insurance / yr
1.9% / yrInsurance growth
0.68%Nonrenewal rate
county median (2+ published ZIPs)Insurance basis
54,079People within 30 min
196,916People within 2 hr
4,102Radius comparison (15 mi)
33.9People / sq mi
23.2%Federal land
90.3%Land at 15% slope or less
29.5%Soils rated "not limited" for septic (strict USDA rating)
371,980 acWorkable land screen
2.5%Wooded land
17.6 tonsBiomass / forest ac
40.5°FAvg temp

Scout Ward County

Camp here before you commitBook a few nights nearby on Hipcamp →Already own land here?Earn money hosting campers — get $100 when you become a Hipcamp host →

Some links are affiliate or referral links — we may earn a commission, at no cost to you.

Property hunt

Find land. Bring the promising ones back.

Search live inventory elsewhere, then cost and vet each candidate here. No copied listings, account, or paid data feed.

Each button opens a current land search for Ward County. Listing sites control their own results and filters.

Analyze a property
Add setup-cost allowances

Use rough quotes or placeholders. Blank fields count as $0.

Working estimate

—land + entered setup costs
Asking $ / acre
—
Setup allowance
—
All-in $ / acre
—

A planning estimate, not a valuation or contractor quote. The USDA benchmark includes farm land and buildings; it is context, not a parcel comp.

Before an offer

Parcel due diligence

0/8 checked

Saved properties and checklist progress stay on this device. Bolthole Index does not receive them.

Cities and towns in Ward County

Inside a city, town or township here, that government usually sets zoning and may issue its own building permits; the county’s rules above cover land outside them.

Not yet researched: Afton Township · Anna Township · Baden Township · Berthold · Berthold Township · Brillian Township · Burlington · Burlington Township · Burt Township · Cameron Township · Carbondale Township · Carpio · Carpio Township · Denmark Township · Des Lacs · Des Lacs Township · Donnybrook · Douglas · Elmdale Township · Eureka Township · Evergreen Township · Foxholm Township · Freedom Township · Gasman Township · Greely Township · Greenbush Township · Harrison Township · Hiddenwood Township · Hilton Township · Iota Flat Township · Kenmare · Kenmare Township · Kirkelie Township · Linton Township · Lund Township · Makoti · Mandan Township · Margaret Township · Maryland Township · Mayland Township · McKinley Township · Nedrose Township · New Prairie Township · Newman Township · Orlien Township · Passport Township · Ree Township · Rice Lake Township · Rolling Green Township · Ryder · Ryder Township · Sauk Prairie Township · Sawyer · Sawyer Township · Shealy Township · Spencer Township · Spring Lake Township · St. Marys Township · Sundre Township · Surrey · Surrey Township · Tatman Township · Tolgen Township · Torning Township · Vang Township · Waterford Township · Willis Township

Answers from the rulebook for Ward County

What the ordinances and state agencies actually say — one answer per question, each quoted from the official source and independently re-checked.

Ward County rules

  • Building code adoptedPartial

    Residential, commercial, and industrial construction within the zoned areas of Ward County.

    • The adopted code is the North Dakota State Building Code identified in NDCC section 54-21.3-03, including amendments.
    • The ordinance states that the code is controlling within the zoned areas of Ward County; it does not establish countywide application to every parcel or incorporated municipality.
    “This Ordinance applies to all buildings, structures, lands, and uses over which the Ward County Board of County Commissioners has jurisdiction under the constitution and laws of the State of North Dakota and of the United States, except for land within the corporate limits of any municipality or land within the area of application of extraterritorial zoning pursuant to §40-47-01.1 of the North Dakota Century Code. [...] For the purpose of establishing rules and regulations for the construction, alteration, equipment and maintenance of all residential structures and accessory buildings, constructed or reconstructed within the zoned area of Ward County, that certain building code shall be the same as the North Dakota State Building Code as identified in Section §54-21.3-03 of the NDCC and amendments thereto”
  • County-wide zoningPresent (with conditions)

    Ward County zoning resolutions within county jurisdiction.

    • Four zoning resolutions regulate the Air Force Base area, rural areas, Souris River Floodplain, and areas surrounding cities.
    • Municipal and extraterritorial jurisdictions may have separate rules.
    “Ward County's Zoning Ordinances are made up of four different Zoning Resolutions.”
  • Local zoningVaries (with conditions)

    Local land-use regulation across Ward County, aggregating county zoning and township zoning authorities.

    • Ward County identifies four county zoning districts: Air Force Base surroundings, rural areas, the Souris River Floodplain, and areas surrounding cities.
    • Ward County states that 17 of its 56 townships regulate their own zoning.
    • This aggregate does not establish the contents of incorporated-municipality ordinances.
    “Of the 56 Townships within Ward County, 17 Regulate their own Zoning.”
  • Zoning districtsPublished (with conditions)

    Ward County zoning districts and district boundaries.

    • The county identifies four zoning resolutions: Air Force Base area, rural area, Souris River Floodplain, and areas surrounding cities.
    • The county zoning page separately lists district labels including agricultural production, rural residential, community residential, recreational, rural industrial, highway commercial, and Air Base Protection districts.
    “Ward County's Zoning Ordinances are made up of four different Zoning Resolutions. Zoning District 1 regulates the land use surrounding Minot Air Force Base. Zoning District 2 regulates the land use within the rural areas of the County and is known as the "Rural Zone". Zoning District 4 regulates the land use within the Souris River Floodplain. Zoning District 6 regulates the land use surrounding Cities. All four are contained within a single document. Each district boundary is shown within the Zoning District Map.”
  • Minimum lot sizeDistrict specific (with conditions)

    Lots in the unincorporated Ward County zoning districts covered by the Ward County Land Zoning Ordinance.

    • Minimum lot area varies by district.
    • The ordinance provides, among other standards, 2 acres for Rural Residential, 1 acre for Residential Transition, one-half acre for Community Residential, 7,500 square feet for Rice Lake Recreational, and 2 acres for Rural Industrial and Highway Commercial districts.
    • Lot dimensions and areas follow the district where the parcel is located unless a variance is granted.

    Rural Residential minimum lot area: 2 acres · Residential Transition minimum lot area: 1 acre · Community Residential minimum lot area: ½ acre · Rice Lake Recreational minimum lot area: 7500 square feet

    “a. Minimum Lot Area = 2 acres [...] a. Minimum Lot Area = 1 acre [...] a. Minimum Lot Area = ½ acre [...] a. Minimum Lot Area = 7,500 square feet”
    2 more reviewed findings on this topic
    • District specific (with conditions) — Lots in Ward County zoning districts.
      “Section 4.09 Community Residential District [...] a. Minimum Lot Area = ½ acre [...] Section 4.10 Rice Lake Recreational District [...] All residential lots within the Rice Lake Recreational District, that are less than two (2) acres in size shall provide a potable supply of cold water and a public sanitary sewer system. Septic systems shall not be permitted on lots below this size threshold. [...] a. Minimum Lot Area = 7,500 square feet”
    • District specific (with conditions) — Lots in Ward County's Agricultural Production 10 District.
      “Minimum Lot Area = 10 acres b. Minimum Lot Width = 150 feet”
  • SetbacksDistrict specific (with conditions)

    Buildings and specified fences, trees, and shrubs in Ward County's Agricultural Production 10 District.

    • The quoted standards apply specifically to the Agricultural Production 10 District.
    • The front-yard measurement is from the center line of a township, section, county, state, or federal road.
    • Flag lots have a 10-foot front-yard setback measured from the dominant front property line.
    • The 100-foot fence, tree, and shrub setback has an exception for barbed-wire or electric fences.
    • Accessory-building side and rear setbacks apply when the accessory building is smaller than the primary building.

    minimum front yard setback for buildings: 125 feet · minimum flag-lot front yard setback: 10 feet (measured from the dominant front property line) · minimum setback for fences, trees, and shrubs: 100 feet (except barbed-wire or electric fences; measured from township or county road centerline) · minimum side yard setback for primary building: 10 feet · minimum side and rear yard setback for smaller accessory buildings: 10 feet (accessory building must be smaller than the primary building) · minimum rear yard setback for primary building: 10 feet

    “Minimum Side Yard Setback for primary building = 10 feet”
    One more reviewed finding on this topic
    • District specific (with conditions) — Buildings and specified site features in Ward County zoning districts, including the Rice Lake Recreational District.
      “Section 4.10 Rice Lake Recreational District [...] c. Minimum Front Yard Setback for all buildings from front property line of lakeside properties = 18 feet d. Minimum Front Yard Setback for all buildings from front property line of non-lake side properties = 25 feet [...] f. Minimum Side Yard Setback for primary building = 5 feet g. Minimum Side Yard Setback for accessory buildings smaller than the primary building = 5 feet h. Minimum Rear Yard Setback for primary and accessory buildings on non-waterfront lots = 10 feet i. Impervious surfaces shall not cover in excess of 50% of lot.”
  • Manufactured homesLimited

    Manufactured-home placement in Ward County floodplain areas.

    • A permit is required before a manufactured home is moved into or placed in the regulated floodplain area for more than five days.
    • Additional floodplain anchoring and elevation rules apply.

    maximum unpermitted placement duration: 5 days (permit required for longer placement)

    “On or after the date this ordinance is approved, no manufactured home shall be (a) moved into or within the geographical area to which this chapter applies and (b) placed at a site or location therein for more than five days unless a permit shall first have been obtained from the Ward County Planning/ Zoning Administrator.”
  • Accessory dwellingsLimited

    Accessory dwellings regulated by Ward County zoning.

    • No more than five non-family residents are allowed in an accessory dwelling.
    • No more than one accessory dwelling is permitted per residential site.
    • District-specific permitted or conditional-use rules may also apply.

    maximum non-family residents: <= 5 residents · accessory dwellings per residential site: <= 1 dwelling

    “Accessory dwelling residency limit to no more than 5 non-family residents allowed and no more than 1 accessory dwelling is permitted per residential site.”
  • Who permits septicLocal (with conditions)

    Installation or repair of onsite sewage treatment systems in Ward County, including systems serving buildings that produce sewage or wastewater where no existing community septic system is available.

    • First District Health Unit requires a permit before any work on the system.
    • All work must be completed by an NDDEQ-licensed septic contractor or a certified property owner.
    • A homeowner installing or repairing their own system must obtain the permit, complete NOWRA online education, and submit the completion certificate to FDHU before installing.
    • FDHU conducts the site evaluation, determines the system location and design, and must do or approve the design.
    • A final inspection is required before backfilling or covering the system; the installer must submit an As-Built Form.
    “First District Health Unit (FDHU) requires a permit for the installation and/or repair of any part of an onsite sewage treatment system in Bottineau, Burke, McHenry, McLean, Renville, Sheridan, or Ward Counties. A permit must be received prior to any work done on the system. All work must be completed by a NDDEQ- licensed septic contractor or certified property owner.”
  • Septic permitRequired

    Installation, alteration, repair, or extension of onsite sewage treatment systems in Ward County.

    • A permit is required before work begins.
    • A permit is required when constructing a building that produces sewage or wastewater and no existing community septic system is available.
    • The permit is issued by the adopting authority with jurisdiction.
    “A permit must be received prior to any work done on the system.”
  • Septic inspectionRequired

    New or modified onsite sewage treatment systems in Ward County.

    • Final inspection must occur before backfilling or covering the system.
    • Without final inspection and approval, the system is unapproved and illegal.
    • The installer must submit an as-built form after installation.
    “A final inspection must be scheduled prior to backfilling or covering the new system.”
  • Off-grid sanitationLimited

    Sewer and water service for building projects in Ward County that are not connected to municipal service.

    • Ward County's building-permit process requires First District Health Unit approval when the project is not hooking to municipal service.
    • North Dakota DEQ states that onsite wastewater installers must obtain a state license and a permit from the local public health unit before beginning work and must follow local codes.
    • The reviewed sources establish approval and permitting requirements but do not establish that every off-grid sanitation method is allowed.
    “All installers must obtain a license from the department [...] and secure a permit from their local public health unit before beginning work on a system.”
  • Mandatory utility hookupConditional

    Building permit applications where the property is not connected to municipal sewer or water.

    • First District Health Unit approval for sewer and water is required if not connecting to municipal service.
    “First District Health Unit approval for sewer and water if not hooking to municipal service.”
  • Permit feesPublished (with conditions)

    Ward County building and alteration permits in county-permitted areas.

    • The published fee is based on estimated construction cost.

    building and alteration permit fee: per 4.5 USD per $1,000 estimated construction cost

    “Fees for a building and alteration permits are $4.50 per $1,000 of the estimated construction costs”
  • Permit processPublished (with conditions)

    Ward County's published building-permit application process for townships zoned by the county.

    • The process is administered through the Tax Equalization Office.
    • Applicants must provide the listed application, design, site, health, contractor, property, floodplain, and address materials.
    • Floodplain living areas must be 1 foot above the flood elevation.
    • Variances and special-use permits require Ward County Planning Commission approval and public hearings on the third Thursday of each month.
    • Fees for building and alteration permits are $4.50 per $1,000 of estimated construction costs.

    building and alteration permit fee: per 4.5 USD per $1,000 of estimated construction costs

    “To get a building permit you will need to submit the following:”
  • Building permitRequired

    Ward County requires building permits for construction in townships zoned by the county, issued through the Tax Equalization Office; the county has a Building Inspector and a fee of $4.50 per $1,000 of estimated construction cost.

    Ward County Building Permits ↗Scouted from the county site, not yet independently re-checked

North Dakota rules that apply here

  • Owner-builder exemptionConditional

    An individual who builds that individual’s own single-family residence and seeks the North Dakota builder property-tax exemption.

    • The exemption is discretionary and requires the governing city or county to pass a resolution allowing it.
    • For property within a city, the city governing body has jurisdiction; for property outside an incorporated city, the county has jurisdiction.
    • The property must remain owned by the builder and unoccupied.
    • The exemption applies for the taxable year in which construction began and the next two taxable years.
    • The governing body may impose conditions, including limits on the exemption period and dollar value.
    • A builder may receive the exemption for no more than ten properties in a taxable year within each jurisdiction that approved the exemption.
    • General taxes and installments of special assessments may not be delinquent.
    • This is a property-tax exemption, not a building-permit or building-inspection exemption.

    exemption period: taxable year in which construction began and next two taxable years · maximum properties per builder per jurisdiction per taxable year: 10 properties

    “Whether or not to offer the exemption is at the discretion of the governing body. [...] “Builder” includes an individual who builds that individual’s own residence.”
  • InspectionsRequired

    Factory-built modular residential or commercial structures manufactured in North Dakota or intended for placement in North Dakota, where the manufacturer produces two or more modular residential or commercial structures per year.

    • The manufacturer must contract with a third party for inspection during the manufacturing process in the factory.
    • The third-party inspector must be approved as a certified third-party inspector by the Division of Community Services.
    • The inspection covers applicable building, electrical, fire, and plumbing codes and standards.
    • When a certified third-party inspector monitors compliance during factory manufacturing, no further inspection by state or local building, electrical, fire, or plumbing inspectors may be required for that structure during the manufacturing process in the factory.
    • The statutory provision does not apply to a factory manufacturing fewer than two residential or commercial structures per year; the Commerce program page states that manufacturers producing less than two modular structures per year are exempt but must submit a yearly certification of exemption.

    annual modular structures produced: >= 2 structures/year (Factories producing fewer than two residential or commercial structures per year are exempt from the statutory provision; the Commerce program page requires a yearly certification of exemption.)

    “shall contract with a third party for the inspection of the structure for compliance with all applicable building, electrical, fire, and plumbing codes and standards”
    One more reviewed finding on this topic
    • Limited — Factory-built modular residential or commercial structures manufactured in North Dakota.
      “The manufacturer of a modular residential or commercial structure that is built in a factory shall contract with a third party for the inspection [...]”
  • Minimum dwelling sizeDistrict specific (with conditions)

    City zoning regulations governing the size of residential buildings in North Dakota; the actual minimum, if any, is established by the applicable local zoning ordinance.

    • The authority is permissive and applies to governing bodies of cities that adopt zoning regulations.
    • The regulation is subject to North Dakota Century Code chapter 54-21.3.
    • A local board of adjustment may determine and vary application of the regulations under the local regulations.
    “For the purpose of promoting health, safety, morals, or the general welfare of the community, the governing body of any city may, subject to the provisions of chapter 54-21.3, regulate and restrict the height, number of stories, and the size of buildings and other structures, the percentage of lot that may be occupied, the size of yards, courts, and other open spaces, the density of population, and the location and use of buildings, structures, and land for trade, industry, residence, or other purposes.”
  • Lot coverageDistrict specific (with conditions)

    Local city zoning regulations governing the percentage of a lot that may be occupied.

    • The actual lot-coverage percentage is established by the applicable local zoning regulation.
    • The authority is permissive and applies to city zoning regulations.
    • The regulation is subject to chapter 54-21.3.
    “the percentage of lot that may be occupied”
  • Building heightDistrict specific (with conditions)

    Local city zoning regulations governing building height and number of stories.

    • The actual height or story limit is established by the applicable local zoning regulation.
    • The authority is permissive and applies to city zoning regulations.
    • A local board of adjustment may vary application of the regulations under the local regulations.
    “For the purpose of promoting health, safety, morals, or the general welfare of the community, the governing body of any city may, subject to the provisions of chapter 54-21.3, regulate and restrict the height, number of stories, and the size of buildings and other structures, the percentage of lot that may be occupied, the size of yards, courts, and other open spaces, the density of population, and the location and use of buildings, structures, and land for trade, industry, residence, or other purposes.”
  • Well permitLimited

    Private water-supply wells statewide in North Dakota.

    • A water appropriation permit from the North Dakota Department of Water Resources is required when annual withdrawal exceeds 12.5 acre-feet.
    • A permit is not needed for wells drawing less than 12.5 acre-feet per year, according to the official private-well guide.
    • For domestic, livestock, fish and wildlife, and recreational uses below 12.5 acre-feet per year, the location and capacity of constructed works must be reported to the Department of Water Resources.
    • Anyone hired to construct, install, or repair a well, pump, or pitless unit must be licensed; individuals may install or repair wells on their own property without a license.

    annual water withdrawal threshold: > 12.5 acre-feet per year (Domestic, livestock, fish and wildlife, and recreational uses below this threshold do not require a water appropriation permit but must be reported.) · annual water withdrawal threshold: > 4073137 gallons per year (Equivalent threshold stated by the Department of Water Resources.)

    “Domestic, municipal, public, livestock, fish and wildlife, and recreational water use exceeding 12.5 acre-feet (4,073,137 gallons or 96,979 barrels) per year.”
  • Agricultural exemptionAvailable (with conditions)

    Buildings used for agricultural purposes under North Dakota's state building code chapter.

    • Agricultural purposes include agriculture, farming, ranching, dairying, pasturage, horticulture, floriculture, viticulture, and animal and poultry husbandry.
    • The exemption does not apply when the building is a place of human habitation or is for use by the public.
    • The exemption is from Chapter 54-21.3; other applicable state, local, zoning, floodplain, septic, or land-use requirements may still apply.
    • Buildings subject to the federal Americans with Disabilities Act must conform to the 2010 ADA standards notwithstanding the chapter exemption.
    “Any building used for agricultural purposes, unless a place of human habitation or for use by the public, is exempt from this chapter.”
    One more reviewed finding on this topic
    • Available — Land and buildings used for farming, and the normal incidents of farming, when regulated under a county subdivision resolution adopted under N.D.C.C. chapter 11-33.2.
      “Additionally, no resolution, regulation, or restriction adopted pursuant to the provisions of this chapter shall prohibit or prevent the use of land or buildings for farming or any of the normal incidents of farming.”
  • Subdividing landRegulated (with conditions)

    Subdivision of land in North Dakota counties that adopt and enforce subdivision regulations under N.D.C.C. chapter 11-33.2; the statute does not apply to subdivisions within city corporate limits or areas of extraterritorial zoning jurisdiction.

    • A county board of commissioners is empowered, but not required, to regulate subdivision.
    • A county subdivision resolution may provide for plat submission and preliminary and final approval.
    • A county may require public improvements and surety or other security as a condition of final plat approval.
    • A county may approve plats as a prerequisite to subdivision and may establish and collect reasonable fees credited to the county general fund.
    • If plat approval is required, final approval or disapproval requires recommendations from both the county planning commission and the township supervisors, although those recommendations are not binding; if township supervisors do not respond within sixty days after notification, the county may take final action.
    • Subdivision rules may not prohibit or prevent farming or the normal incidents of farming.
    • The statute separately requires floodplain and water-feature information on plats where applicable.

    township recommendation response period: 60 days (If the county does not receive the township supervisors' recommendation by certified mail within sixty days after notification, it may take final action.) · plat approval fee: reasonable fees text (The statute authorizes fees but does not set a statewide amount.)

    “For the purpose of promoting health, safety, morals, public convenience, general prosperity, and public welfare, the board of county commissioners of any county is hereby empowered to regulate and restrict within the county the subdivision of land.”
    3 more reviewed findings on this topic
    • Regulated (with conditions) — Subdivision of land in North Dakota, subject to county adoption and administration of subdivision regulations; the statute excludes subdivisions within city corporate limits and areas subject to a city's extraterritorial zoning jurisdiction.
      “For the purpose of promoting health, safety, morals, public convenience, general prosperity, and public welfare, the board of county commissioners of any county is hereby empowered to regulate and restrict within the county the subdivision of land.”
    • Regulated (with conditions) — North Dakota's statewide statutory framework authorizing county regulation of land subdivision; actual regulation depends on county action and does not apply within city corporate limits or applicable extraterritorial zoning areas.
      “the board of county commissioners of any county is hereby empowered to regulate and restrict within the county the subdivision of land.”
    • Regulated (with conditions) — County subdivision regulation authority throughout North Dakota, subject to exclusions for city corporate limits and applicable city extraterritorial zoning jurisdiction.
      “the board of county commissioners of any county is hereby empowered to regulate and restrict within the county the subdivision of land.”
  • Driveway accessLimited

    Driveway and other access connections involving the North Dakota State Highway System, including controlled-access facilities and driveways within state highway right-of-way.

    • The North Dakota statute applies specifically to controlled-access facilities; access is available only at designated points and on terms and conditions specified from time to time.
    • NDDOT maintains access control on the State Highway System, and proposed changes to access require contact with the District Engineer for coordination.
    • For a driveway on state highway right-of-way, the NDDOT driveway permit must be granted before the permitted work proceeds; failure to construct the drive approach as permitted may result in cancellation and removal or correction at the landowner's expense.
    • A driveway is not complete until checked and approved by NDDOT; surfacing may be omitted on field entrances if specified in the application.
    • The driveway may be used only to provide entrance to and exit from the landowner's property.
    • A driveway or improvement on the highway right-of-way may not be altered or relocated without permission of the NDDOT District Engineer.
    • NDDOT supervises the location, construction, and maintenance of driveways and may direct future removal, relocation, or maintenance; NDDOT may diminish or expand use as required for highway-traffic safety.
    “No driveway, or improvement constructed on the highway right-of-way shall be altered or relocated without permission of the District Engineer of NDDOT.”
  • Building in a floodplainRequired

    Construction or modification of North Dakota water-control structures regulated by the Department of Water Resources.

    • A DWR construction permit is required when a water-control structure is capable of retaining, diverting, or obstructing more than 50 acre-feet for dikes, other devices, and low-hazard dams.
    • The threshold is more than 25 acre-feet for medium-hazard and high-hazard dams.
    • This claim does not establish the separate local floodplain-development-permit requirements administered by local floodplain administrators.

    retention/diversion/obstruction threshold for dikes, other devices, and low-hazard dams: > 50 acre-feet · retention/diversion/obstruction threshold for medium- and high-hazard dams: > 25 acre-feet

    “A construction permit is required from the DWR if a water control structure is constructed or modified”
  • Short-term rentalsLimited

    Transient lodging rentals held out to the public for a charge in North Dakota.

    • A lodging license applies to buildings or structures held out to the public where sleeping accommodations are furnished to transient guests for a charge.
    • The lodging license does not apply to a single structure with five or fewer guest rooms and ten or fewer total occupants.
    • The lodging license also does not apply to a series or group of buildings or structures containing five or fewer guest rooms and ten or fewer total occupants.
    • License applications must be submitted at least 30 days before beginning construction or acquiring new ownership; new construction, renovation, or remodeling also requires the Section 3 Plan Review Checklist; after payment, review may take up to 30 calendar days.

    guest-room exemption threshold: <= 5 guest rooms or fewer (Only when total occupants are ten or fewer.) · occupant exemption threshold: <= 10 occupants or fewer (Only when the structure has five or fewer guest rooms.)

    “The lodging license does not apply to: Single structures with five or fewer guest rooms and ten or fewer total occupants.”
  • Campground & park staysLimited

    Campsite occupancy in North Dakota state parks.

    • The limit applies to campsite and cabin occupancy in state parks.
    • All vehicles entering a state park must have a valid daily or annual vehicle entrance permit, including overnight stays and day visits.
    • Campers must check in at 4:00 p.m. on the first reservation day and check out by 3:00 p.m. on the last day.

    maximum campsite or cabin occupancy: <= 14 nights in any 30-day period

    “Campsite and cabin occupancy is limited to no more than 14 nights in any 30-day period.”
  • county zoning authorityGeneral

    North Dakota counties adopting zoning regulations for land and buildings within the county, including unincorporated areas.

    • The authority is exercised by the board of county commissioners.
    • Regulation is subject to North Dakota Century Code chapter 54-21.3.
    • The authority covers the location and use of buildings and structures and the use, condition of use, or occupancy of lands for residence, recreation, and other purposes.
    • County zoning regulations must be made in accordance with a comprehensive plan.
    • A county may divide all or any parts of the county into districts, and regulations must be uniform within each district but may differ between districts.
    • County zoning regulations must account for the statutory limitations governing farming, ranching, and animal feeding operations in section 11-33-02.1.
    • The board must state the grounds for approving or disapproving zoning amendments or variances, and written findings must be included in the records.
    • The board must establish zoning requirements for solid waste disposal and incineration facilities before July 1, 1994.
    • The board may impose tipping or other fees on solid waste management and incineration facilities, but may not impose a fee under this section on an energy conversion facility or coal mining operation that disposes of its waste onsite.
    • The board may establish institutional controls addressing environmental concerns with the department of environmental quality under section 23.1-10-16.
    “For the purpose of promoting health, safety, morals, public convenience, general prosperity, and public welfare, the board of county commissioners of any county may regulate and restrict within the county, subject to chapter 54-21.3, the location and the use of buildings and structures and the use, condition of use, or occupancy of lands for residence, recreation, and other purposes.”
    One more reviewed finding on this topic
    • General — North Dakota county boards of commissioners adopting zoning regulations, including regulation of unincorporated county land.
      “the board of county commissioners of any county may regulate and restrict within the county”
  • county building authorityGeneral

    County authority to administer and enforce the state building code, including the residential code, and to provide for building permits for buildings or structures subject to county zoning in unincorporated areas of North Dakota.

    • A county that elects to administer and enforce a building code must adopt and enforce the state building code; it may amend that code to conform to local needs.
    • A county may administer and enforce the state building code only in areas where a city or township does not administer it. A city or township may relinquish that authority to its county under N.D.C.C. § 54-40.5-03; local governments may also agree to joint administration and enforcement or contract for private enforcement.
    • County permit authority under N.D.C.C. § 11-33-18 applies to a building or structure otherwise subject to the County Zoning chapter.
    • If the county provides for permits, it must require the applicant to state whether the structure is reasonably anticipated to have a significant transportation-system impact. A structure has such impact if it will average at least twenty-five motor vehicles per day during one year with gross weight exceeding sixty thousand pounds [27215.54 kilograms].
    • For a structure with significant transportation-system impact, the county must notify the director of the department of transportation and allow an opportunity to comment; director approval is not required.
    • The county may establish and collect reasonable permit fees, which must be credited to the county general fund.
    • A county-adopted building code may not require fire sprinklers in a single-family dwelling or a residential building containing no more than two dwelling units.

    significant transportation-system impact threshold: >= 25 motor vehicles per day (Over a period of one year; vehicles must have gross weight exceeding sixty thousand pounds [27215.54 kilograms].) · fire-sprinkler requirement: false (A county building code may not require sprinklers in a single-family dwelling or residential building with no more than two dwelling units.)

    “The governing body of a city, township, or county that elects to administer and enforce a building code shall adopt and enforce the state building code. However, the state building code may be amended by cities, townships, and counties to conform to local needs.”

Set by your township or city, not the county

In North Dakota, zoning is adopted by each township or city, so Ward County has no county-wide answer on these. Find your township or city in the list of places on this page, or call its clerk or zoning administrator.

  • Living in an RV
  • Tiny homes

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Living off-grid in Ward County, North Dakota

Is Ward County a good place to live off-grid or homestead?

Ward County scores 46/100 on the Bolthole Index, a marginal county profile. Its strengths: manageable long-term carry cost and a stronger property-autonomy legal backdrop. Watch-outs: thin water margin (17.6″/yr rainfall).

Do you need a building permit in Ward County, North Dakota?

Ward County generally requires a residential building permit, and it enforces county zoning. Onsite septic is permitted by First District Health Unit (Environmental Health Division). Owner-builders may act as their own contractor to build their home. These answers are quoted from official sources and independently re-checked. Rules change and cities within the county differ — always confirm with the county before you buy or build.

How much does land cost in Ward County, North Dakota?

Land in Ward County runs about $2,272 per acre, based on the latest county data.

What is the water situation in Ward County?

Ward County gets about 17.6" of rain a year, with severe drought in roughly 11.2% of years.

How remote is Ward County?

A representative private-land location has about 54,079 people within a 30-minute drive and 196,916 within two hours. The road-network catchments count population across county lines and clusters of smaller cities; straight-line radius values remain available as a comparison.