The Village of Malcolm, Nebraska requires a building permit for all construction, remodeling and repairs inside village limits, and the Village Board approves each one after a Planning Commission recommendation12. Septic and lagoon permits are not issued by the village: the Village form sends applicants to the Lancaster County Health Department3. Zoning questions go to the Village Clerk's office, and land outside village limits falls under Lancaster County's rules.
At a glance
- Building permit
- Required inside village limits for residential and commercial work1
- Who approves it
- Planning Commission recommendation, then Village Board approval2
- Inspection fee
- $50 for plan review and for each required inspection4
- Septic permit
- Lancaster County Health Department, not the village3
- Well permit
- Village well permit required; $50 Village fee5
- Owner-builder
- Allowed on residential work with a separate Homeowner Acting as Contractor form6
Who to call
Building permits
Village of Malcolm (Village Hall)
Building permit applications, Planning Commission and Village Board review, inspection fees, and village well permits for property inside Malcolm
137 East 2nd Street, PO Box 228, Malcolm, Nebraska 68402
Septic permits
Lincoln-Lancaster County Health Department
Septic and lagoon permitting for Malcolm addresses, per the Village's own forms
Contact details are copied from each office’s official page and were checked against it on October 24, 2026.
Off-grid gear
Going off-grid in Village of Malcolm means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Malcolm, Nebraska?
Yes. The Village of Malcolm states that all construction, remodeling, repairs or other work on residential or commercial real property inside the village requires a building permit under Village Code §9-1021. The application packet lists new construction, sheds, accessory buildings, decks, fences and other work as permit types7.
Permit fees follow the value of the work. The village's fee schedule starts at $18 for construction valued from $1 to $2,000 and reaches $231.30 plus $3.00 per $1,000 for work of $50,000 and over8. On top of that, the packet adds a $50 fee for plan review and for each required inspection4.
Who issues building permits in Malcolm, and how does approval work?
The Village of Malcolm issues its own building permits; Lancaster County's building office does not handle addresses inside the village. Applicants submit the completed application, blueprints and supporting documents, and full payment of the permit fee by noon on the Wednesday before the Planning Commission meeting2.
The Planning Commission reviews the permit and recommends approval or denial, and the Village Board only considers permits that carry that recommendation unless its chair declares an emergency2. After approval the village sends an approval letter listing inspection fees, and those fees must be paid before construction begins2. The Planning Commission meets on the last Wednesday of each month at Village Hall7.
Does Malcolm have zoning, and what does it mean for RVs, tiny homes and setbacks?
Malcolm's permit packet says the proposed use or structure must align with existing zoning regulations, and that a conditional use permit, variance or rezoning may be needed if it does not7. Splitting a lot or creating new lots must also meet subdivision and zoning requirements such as minimum lot size, setbacks and frontage, and a survey and formal platting may be required9.
We could not confirm the village's rules on long-term RV living, tiny homes, accessory dwellings, minimum house size, setbacks, lot coverage or building height. Ask the Village Clerk at Village Hall before you buy a lot or order a home. Lancaster County's zoning resolution covers only the unincorporated parts of the county, so the county's special-permit and accessory-dwelling rules do not apply inside Malcolm10.
How do septic permits work inside Malcolm?
Septic and lagoon permits for property in Malcolm run through the Lancaster County Health Department, not the village; the Village's own well-permit form directs applicants there3. The county's on-site wastewater regulation says no one may build a new on-site wastewater treatment system without a construction permit issued by the Health Director11.
A lagoon also needs a state permit, according to the village's building permit packet12. Statewide, most Nebraska on-site systems are built under "Authorization by Rule" without a state construction permit, but some systems still require one13. We could not confirm whether connecting to village sewer is mandatory or how close a sewer line must be to trigger it. Lancaster County soils matter too: only about 0.3% rate "not limited" for a conventional drain field, so expect a site evaluation or an engineered system on a vacant lot14.
Do you need a well permit in Malcolm?
Yes. The Village requires a well permit for wells inside village limits, and the form limits wells to domestic use, not irrigation5. The Village fee is $50, and a late permit costs $250 if construction starts before approval5. Wells that pump more than 50 gallons per minute also need a Lower Platte South Natural Resources District permit, and the contractor must register a new water well with the Nebraska Department of Natural Resources within 60 days of completion5.
Can you build your own house in Malcolm?
Owner-builders are allowed on residential work, but the village requires a separate "Homeowner Acting as Contractor" form, and the option is not available for commercial property6. Nebraska's contractor-registration exemption for work on your own property does not by itself exempt you from permits or inspections15. Electrical permits and inspections are completed by the State of Nebraska, and proof must reach the village within 10 days after completion4.
Building a home in Malcolm: the steps, in order
- Ask the Village Clerk about zoning and setbacks for your lot before you design anything7.
- Complete the building permit application with blueprints and the fee, and submit it by noon on the Wednesday before the Planning Commission meeting2.
- If you are self-performing the work, add the Homeowner Acting as Contractor form6.
- Apply to the Lancaster County Health Department for a septic or lagoon permit, or confirm a village sewer connection3.
- Get the village well permit if you will drill5.
- After Village Board approval, pay the inspection fees in the approval letter before you start2.
- Schedule each required inspection: footing and foundation, plumbing, HVAC, framing, insulation and final4.
What stays with Lancaster County, and what to check before you buy
Septic permitting stays with the Lancaster County Health Department even for lots inside Malcolm3. For land outside village limits, the rules are different; see the Lancaster County page for unincorporated Lancaster County. Lancaster County's effective property tax rate is 1.6%16. Before you buy, confirm the lot's zoning with the village, whether the parcel is inside village limits or only within its one-mile jurisdiction, and whether any floodplain applies, since we could not confirm a Malcolm floodplain rule; state law requires a permit for all development in a floodplain17.
Watch-outs
- The Planning Commission meets only on the last Wednesday of each month, so a permit submitted after the Wednesday-noon deadline waits for the next month7. We could not confirm which building code edition Malcolm enforces or whether it requires a certificate of occupancy; ask the Village Clerk.
- Malcolm's well permit applies to wells in the village and its one-mile jurisdiction, so ask the village before drilling near the edge of town5.
- Inspection fees are due before construction begins, and a late well permit costs $25025.
- Do not assume Lancaster County's rules apply in Malcolm: county zoning covers only unincorporated land10.
Sources
- Village of Malcolm Building Permit Application Packet (Village of Malcolm), quoted and re-checked
- Village of Malcolm Building Permit Application Packet (Village of Malcolm), quoted and re-checked
- Village of Malcolm Well Permit Application (Village of Malcolm), quoted and re-checked
- Permits & Inspections | Village of Malcolm (Village of Malcolm), quoted and re-checked
- Village of Malcolm Well Permit Application (Village of Malcolm), quoted and re-checked
- Village of Malcolm Building Permit Application Packet (Village of Malcolm), quoted and re-checked
- Village of Malcolm (Village Hall) (malcolm.ne.gov)
- Building Permits; fee schedule (Village of Malcolm), quoted and re-checked
- Village of Malcolm Building Permit Application Packet (Village of Malcolm), quoted and re-checked
- Lancaster County Zoning Resolution, quoted and re-checked
- Village of Malcolm Well Permit Application (Village of Malcolm), quoted and re-checked
- Village of Malcolm Well Permit Application (Village of Malcolm), quoted and re-checked
- Onsite Wastewater Program (Nebraska statewide rule), quoted and re-checked
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- Nebraska Revised Statute 48-2104 — Registration required (Nebraska statewide rule), quoted and re-checked
- Effective property tax rate: Bolthole Index county data
- Floodplain Management Q&A: Permits (Nebraska statewide rule), quoted and re-checked
Written October 24, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.