Madison County, Nebraska does not issue building permits, but a zoning permit is required before erecting, enlarging, altering or constructing a structure larger than 100 square feet, including an agricultural or portable structure.1 The Madison/Pierce County Planning Department issues those zoning permits for unincorporated Madison County and for Battle Creek, Madison, Newman Grove, Tilden and Meadow Grove.21 Septic permits for every Madison County address, city or country, come from Nebraska's statewide onsite-wastewater program, not the county.34
At a glance
- Building permit
- No county building permit; the county Planning Department issues a zoning permit for structures larger than 100 square feet1
- Zoning
- Yes, but jurisdiction and ordinances vary between unincorporated land and local governments5
- Septic
- State-regulated; most systems use the general authorization, while some need a construction permit36
- RV living
- A general private-land occupancy rule could not be confirmed; ask Planning before relying on an RV as a dwelling2
- Tiny home
- No specific county occupancy rule was confirmed; district standards and wastewater approval still matter78
- Owner-builder
- Nebraska exempts work on your own property from contractor registration, not from permits or other approvals9
- Lot splits
- The county minimum is generally 3 acres excluding road right-of-way; district exceptions can apply10
- Rural driveway
- Contact the county road foreman or Highway Superintendent; the road department installs new-driveway culverts11
Who to call
Planning & zoning
Madison/Pierce County Planning Department
Zoning, subdivisions, land-use permits, zoning permits, inspections and floodplain-development applications
jointzoneplan@madisoncountyne.gov
1112 Bonita Dr. Norfolk, NE 68701
Septic permits
Nebraska Department of Water, Energy, and Environment Onsite Section
State onsite-wastewater professional certification and information
245 Fallbrook Blvd., Ste. 100 Lincoln, NE 68521
Roads & driveways
Madison County Highway Department
County-road access questions, driveway coordination and new-driveway culverts
1909 Vicki Lane, Ste. 100 Norfolk, NE 68701
Contact details are copied from each office’s official page and were checked against it on October 13, 2026.
Off-grid gear
Going off-grid in Madison County means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Madison County, Nebraska?
Madison County does not issue building permits, but a county zoning permit is required before erecting, enlarging, altering or constructing any structure larger than 100 square feet, including an agricultural or portable structure.1 The zoning permit requirement applies in Battle Creek, Madison, Meadow Grove, Newman Grove and Tilden as well as in the unincorporated county.1 Zoning permits are subject to inspection, but that language does not establish a structural building-code inspection program.12 The minimum zoning-permit fee is $50 for every structure, and work discovered without a permit is charged at five times the standard fee.13 The posted 2021 fee schedule adds $0.20 per square foot for residential, commercial and industrial buildings on top of the $50 base fee, so a larger house costs more than the minimum.14
Nebraska has adopted a state building code, with rules governing when it applies in a local jurisdiction and an exception for construction on a farm or for farm purposes.15 We could not confirm whether unincorporated Madison County has separately adopted a structural code, so ask the Planning Department what code review, trade permits or inspections apply before ordering plans.
Who issues zoning permits and handles inspections in Madison County?
The Madison/Pierce County Planning Department handles zoning, subdivision of land into building lots, land-use permits, zoning permits and inspections.1617 The department serves unincorporated Madison and Pierce Counties and the Madison County communities of Battle Creek, Madison, Newman Grove, Tilden and Meadow Grove.2 Septic permits are not part of that office's work; they stay with the state onsite-wastewater program for every address.3 Zoning authority can rest with a county, city or village, and a city or village regulation supersedes the county's where that city or village exercises zoning jurisdiction, so confirm which ordinance controls the parcel.518 Newman Grove has adopted its own zoning ordinance and subdivision regulations for land inside city limits.19 Septic permits for Newman Grove addresses still come from the state program.20
Call the Planning Department at 402-370-3577 or visit 1112 Bonita Drive in Norfolk before starting covered work.16 Submit the applicable published form and allow at least two weeks for zoning-permit processing; construction cannot begin before approval.21 Describe the parcel, current use, proposed structure and intended occupancy so staff can identify the zoning district and any separate lot-split, subdivision, conditional-use or floodplain application.22
Does Madison County, Nebraska have zoning?
Yes. Madison County zoning rules vary by jurisdiction and district, so a rule for unincorporated land or one district should not be carried over to another parcel.5 The county generally requires a lot split to contain at least 3 acres excluding road right-of-way, while the Rural Residential district has a conditional-use path for a 10,000-square-foot lot subject to density and other conditions.10 Published setbacks include 50 feet from the right-of-way or 83 feet from the road centerline, with a 15-foot side setback and a 25-foot rear setback, or 10 feet on the side and rear for parcels under 20 acres.23 Structures intended for human occupancy are generally limited to 35 feet, although district tables can differ.24
Other standards are district-specific. The Industrial District requires at least 1 acre excluding road right-of-way and 150 feet of lot width,25 allows buildings to cover no more than 50% of the lot,26 and sets separate principal- and accessory-building height limits.27 Residential land buyers should ask for the standards of the parcel's own district, not the Industrial District's. An agricultural building on a farmstead of 20 acres or more that produces at least $1,000 of farm products each year is exempt from the county's non-farm-building zoning rules, but not from basic setbacks from a county road or highway.28
Confirm the parcel's jurisdiction, district, use, setbacks, coverage and height with the Planning Department before designing the site.
How do septic permits work in Madison County?
Madison County septic systems fall under Nebraska's statewide Onsite Wastewater Program, while any local city or county requirements apply in addition to the state rules.3 Most Nebraska onsite systems proceed under the general authorization without a state construction permit, but a construction permit is required when wastewater quantity, wastewater quality or site conditions fail the general requirements.6 Work associated with onsite wastewater systems must be performed by a state-certified professional.29
Start with a certified onsite professional for soils, siting, design and registration, and call the DWEE Onsite Section at (402) 471-4285 for state-program questions.3029 Only 28.5% of county soils are rated without severe limits for a conventional septic drain field, so make the site evaluation a purchase contingency rather than assuming a standard layout will work.31 Any system you build or change must also be registered with the state, and local city or county requirements apply on top of the state rules.324 A dwelling that generates wastewater needs a compliant onsite system or a connection to a public wastewater system.8
Can you live in an RV or tiny home in Madison County?
Madison County's published materials do not confirm a general rule allowing full-time RV occupancy or temporary camping on private land, so ask the Planning Department about the parcel's district and proposed duration before moving an RV onsite. County zoning governs land use in unincorporated Madison County, and municipal rules may apply inside the communities served by the joint department.2 Nebraska's public-property camping rule does not answer whether someone may occupy an RV on private land.33
A specific tiny-home occupancy rule and a general minimum dwelling size could not be confirmed. Nebraska permits a county board to impose a 900-square-foot minimum on manufactured homes, but that is discretionary and does not establish a minimum for every Madison County dwelling.34 An accessory building cannot become a dwelling without a certificate of occupancy, and its use is otherwise limited to 12 months unless the main building is in use or under construction.35
Building a home in Madison County: what are the steps?
- Confirm whether county, city or village zoning controls the parcel, then ask the Madison/Pierce County Planning Department for the district and allowed residential use.5
- Check lot size, setbacks, height, coverage and whether a lot split or subdivision review is needed.10232417
- Submit the zoning-permit application before covered construction and allow at least two weeks for processing.121
- If the site lies in a mapped special flood hazard area, obtain the separate floodplain-development permit before development.36
- Have a certified onsite professional evaluate and design wastewater service, then complete state registration or construction permitting as required.630
- Coordinate county-road access with the Highway Department or obtain a state driveway permit for state-highway access.1137
- Arrange the zoning inspection and confirm any separate structural-code or trade requirements.12
What should you check before buying land in Madison County?
Verify zoning jurisdiction, the district, permitted residential use, setbacks, floodplain status, legal road access, water and wastewater feasibility before closing. Madison County requires a separate development permit for work in mapped special flood hazard areas.36 For a county-road driveway, the Highway Department directs owners to the road foreman or Highway Superintendent and says the road department installs the culvert at the landowner's cost.11
Pay particular attention to septic suitability because only 28.5% of Madison County soils are rated without severe limitations for a conventional drain field.31 The county receives about 27.7 inches of precipitation per year, and severe drought occurs in about 19.6% of years, which makes a documented water source more valuable than an assumption about future well performance.3839 The effective property-tax rate is about 1.3%, with a median annual property-tax bill of $2,619; obtain the parcel's actual assessment and tax history from the county before budgeting.4041
For a well, Madison County parcels in the Lower Elkhorn Natural Resources District need a district permit before a new or replacement well that would pump more than 50 gallons per minute, with a $250 late fee when the permit was skipped, and every well must also be registered with the state within 60 days of completion.42 A single well designed to pump 50 gallons per minute or less is generally exempt unless district rules say otherwise.43 We could not confirm which natural resources district covers a given parcel, so confirm that before drilling.
Watch-outs
- Madison County requires zoning-permit approval before covered construction, asks applicants to allow at least two weeks and charges five times the standard fee when work is discovered without a permit.21
- A separate floodplain-development permit is required before development in mapped special flood hazard areas.36
- RV occupancy, temporary camping, tiny-home occupancy and a general minimum dwelling size remain parcel-specific questions for the Planning Department.2
- An owner working on personal property is exempt from Nebraska contractor registration, but that exemption does not remove zoning, code, wastewater or trade approvals.9
Sources
- Frequently Asked Questions - Madison County Courthouse Nebraska, quoted and re-checked
- Planning and Zoning - Madison County Courthouse Nebraska, quoted and re-checked
- Onsite Wastewater Program - DWEE Nebraska, quoted and re-checked
- Onsite Wastewater Program (Nebraska statewide rule), quoted and re-checked
- Planning and Zoning - Madison County Courthouse Nebraska, quoted and re-checked
- Permits - DWEE Nebraska, quoted and re-checked
- Madison County, Nebraska, Zoning Regulations 2003, quoted and re-checked
- Onsite Wastewater Treatment Facilities: Just for Homeowners (Nebraska statewide rule), quoted and re-checked
- Nebraska Revised Statute 48-2104 — Registration required (Nebraska statewide rule), quoted and re-checked
- Planning and Zoning FAQs, quoted and re-checked
- Madison County Highway Department (madisoncountyne.gov)
- Madison County Planning Department Fee Schedule, quoted and re-checked
- Planning and Zoning FAQs, quoted and re-checked
- Madison County Planning Department Fee Schedule, quoted and re-checked
- Nebraska Revised Statute 71-6403: State building code; adopted; amendments (Nebraska statewide rule), quoted and re-checked
- Madison/Pierce County Planning Department (madisoncountyne.gov)
- Planning and Zoning - Madison County Courthouse Nebraska, quoted and re-checked
- Planning and Zoning - Madison County Courthouse Nebraska, quoted and re-checked
- Newman Grove: §11-101 Zoning and Subdivision Regulations; Adopted by Reference (Madison County), quoted and re-checked
- Newman Grove: Onsite Wastewater Program (Madison County), quoted and re-checked
- Planning and Zoning FAQs, quoted and re-checked
- Planning and Zoning - Madison County Courthouse Nebraska, quoted and re-checked
- Planning and Zoning FAQs, quoted and re-checked
- Madison County, Nebraska, Zoning Regulations, quoted and re-checked
- Madison County, Nebraska, Zoning Regulations 2003, quoted and re-checked
- Madison County, Nebraska, Zoning Regulations 2003, quoted and re-checked
- Madison County, Nebraska, Zoning Regulations 2003, quoted and re-checked
- Madison County, Nebraska, Zoning Regulations 2003, quoted and re-checked
- Nebraska Department of Water, Energy, and Environment Onsite Section (dwee.nebraska.gov)
- Nebraska Revised Statute 81-15,248 (Nebraska statewide rule), quoted and re-checked
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- Onsite Wastewater Program (Nebraska statewide rule), quoted and re-checked
- Nebraska Revised Statute 39-312 — Camping; permitted; where; violation; penalty (Nebraska statewide rule), quoted and re-checked
- Nebraska Revised Statute 23-114 (Nebraska statewide rule), quoted and re-checked
- Madison County, Nebraska, Zoning Regulations 2003, quoted and re-checked
- madisoncountyne.gov, quoted and re-checked
- Title 410, Chapter 2 - Driveway and Approach Road Permits (Nebraska statewide rule), quoted and re-checked
- Annual precipitation: Bolthole Index county data
- Share of years in severe drought: Bolthole Index county data
- Effective property tax rate: Bolthole Index county data
- Median property tax bill: Bolthole Index county data
- Groundwater Management - Lower Elkhorn NRD, quoted and re-checked
- Nebraska Revised Statute 46-735 (Nebraska statewide rule), quoted and re-checked
Written October 13, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.