Bolthole Index

Steuben County, New York

Building permits, zoning and septic rules in Steuben County, New York

71Index Score / 100
#3 of 62 in New York

Building permits are required in Steuben County, New York for work governed by the statewide Uniform Code or Energy Code, but the issuing office depends on the town1. Steuben County Code Enforcement issues building permits for Addison, Campbell and Tuscarora only; other municipalities use their own code enforcement offices23. Towns and villages, not the county, set zoning4. Septic review for every address in the county goes through the New York State Department of Health's Hornell District Office5.

At a glance

Building permit
Required for work governed by the statewide Uniform Code or Energy Code1
Permit office
The county serves Addison, Campbell and Tuscarora; other municipalities use their own code enforcement office23
Zoning
Varies by town or village; confirm current maps and laws with the municipality6
Septic authority
NYS Department of Health Hornell District Office (not a county health department)5
County-served permit process
Apply, receive the fee amount, then pay by check or cash7
Certificate of occupancy
Required for permitted work and changes in occupancy classification8

Who to call

Building permits

Steuben County Code Enforcement (Towns of Addison, Campbell and Tuscarora only)

Building permits on behalf of Steuben County for the Towns of Addison, Campbell and Tuscarora only; all other towns in the county have their own code enforcement office

607-664-2470

3 E Pulteney Square, Bath, NY 14810

Planning & zoning

Steuben County Planning Department

Advisory review of certain municipal zoning and planning actions under GML Section 239-m; does not zone the county itself

3 East Pulteney Square, Bath, NY 14810

Septic permits

New York State Department of Health, Hornell District Office

Environmental health protection, including septic/onsite wastewater review, for Steuben and Schuyler Counties

607-324-8371

107 Broadway, Room 105, Hornell, NY 14843-0430

Contact details are copied from each office’s official page and were checked against it on October 9, 2026.

Off-grid gear

Going off-grid in Steuben County means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Do you need a building permit in Steuben County, New York?

Yes. In Steuben County, a building permit is required for work that must comply with New York's Uniform Code or Energy Code, though a local code enforcement program may exclude minor items such as certain small detached structures and non-life-safety repairs1. The Uniform Code applies statewide outside New York City without each local government having to adopt it separately9. Steuben County administers permits for the Towns of Addison, Campbell, and Tuscarora; owners elsewhere must use their municipality's code enforcement office23. Do not begin permit-required work before the code enforcement officer issues the permit10. Permitted work is subject to construction inspections, and a certificate of occupancy or compliance is required for permitted work and changes in occupancy classification118.

Who issues building permits in Steuben County, New York, and how do you reach them?

For Addison, Campbell, and Tuscarora, use Steuben County Code Enforcement at 3 E Pulteney Square in Bath or call 607-664-247012. The published process is to complete the applicable application, receive the fee amount, and pay by check or cash; the code enforcement officer may take up to 30 days to review the application before work can start72. Fees depend on the project13. Campbell's application publishes a schedule, including $200 for new construction up to 1,500 square feet and $100 for each additional 1,000 square feet or fraction, but do not apply those amounts to another town without confirmation14. For land outside the three county-served towns, contact the municipality's code enforcement office3.

Does Steuben County, New York have zoning?

Steuben County does not exercise countywide zoning power; zoning is adopted and administered by towns and villages415. Local zoning varies, and the county publishes reference maps showing which municipalities have adopted zoning16. Those county-posted maps and laws may not be current, so obtain the official version from the municipality before committing money17. The applicable local law—not a countywide schedule—controls uses, setbacks, lot size, and dimensional rules6. Subdivision review also varies: the county shows municipalities with subdivision regulations, while New York law allows a town board to authorize its planning board to approve plats outside incorporated villages1819. The Steuben County Planning Department provides technical assistance and reviews certain local actions in an advisory role20. Zoning approval, like building permits, comes from the town or village, while septic review stays with the New York State Department of Health's Hornell District Office wherever the parcel sits521.

How do septic permits work in Steuben County, New York?

Steuben County does not operate a county health department for environmental health; the New York State Department of Health's Hornell District Office serves Steuben County521. A system discharging less than 1,000 gallons per day of ordinary sewage may be exempt from a state SPDES permit, but that exemption does not eliminate other health-department review22. Campbell's building application specifically requires a new or modified onsite wastewater system to be designed by a New York registered engineer or architect, who must inspect the installation and certify that it matches the design23. Ask the Hornell District Office and the parcel's municipality which approvals apply before designing the house. County soil data rates 0% of mapped soils as free of severe limitations for a conventional drain field, making early site evaluation especially important24.

Can you live in an RV or tiny home on your land in Steuben County, New York?

We could not confirm a countywide rule allowing residential RV use or tiny-home occupancy in Steuben County. Zoning varies by town or village, so ask the parcel's municipality whether the proposed use is allowed and what setbacks, lot standards, or time limits apply25. A tiny home that involves work governed by the Uniform Code or Energy Code requires a building permit from the authority serving that municipality1. A manufactured home likewise requires a permit, inspections, and a certificate of occupancy or compliance26. A homeowner who plans to install a manufactured home personally must obtain the applicable installer certification; otherwise, homeowner-completed installation components must be supervised and certified by a certified installer27. Contact the Hornell District Office about wastewater review before relying on either housing option21.

How do you build a home in Steuben County, New York, step by step?

  1. Identify the town or village and obtain its current zoning map and law before committing funds17.
  2. Determine the permit authority: Steuben County serves Addison, Campbell, and Tuscarora; other municipalities use their own code enforcement office23.
  3. Contact the Hornell District Office about onsite wastewater review and arrange the required design work before fixing the house location21.
  4. Complete the applicable building-permit application, obtain the fee amount, and pay the issuing office28.
  5. Do not start permit-required work until the permit is issued, and leave work exposed until required inspections are accepted1029.
  6. Obtain a certificate of occupancy or compliance before using permitted work30.

What should you check before buying land in Steuben County, New York?

Confirm the municipality, its current zoning rules, and its permit office before closing, because both land-use controls and administration vary within Steuben County63. Order a septic site evaluation early: 0% of mapped county soils are rated free of severe limitations for a conventional drain field24. Check flood mapping and ask the municipality about its floodplain permit; private development in mapped floodplains is subject to local permitting, and Campbell publishes a $25 floodplain-development permit for development in a floodplain3132. A new or modified residential driveway on a state highway needs a New York State Department of Transportation permit33. Finally, verify any subdivision review with the municipality, because only some municipalities have adopted subdivision regulations18.

Watch-outs

  • Do not confuse the permit requirement with the issuing office: covered work requires a permit statewide, but Steuben County administers permits only for Addison, Campbell, and Tuscarora12.
  • County-posted zoning maps and laws are reference copies that may not be current; obtain the official version from the town or village before committing funds17.
  • Campbell's published fee, inspection, septic, and floodplain requirements should not be assumed to apply unchanged in another Steuben County municipality34292332.

Sources

  1. Administration and Enforcement of the Uniform Code, quoted and re-checked
  2. Building Permit Applications, quoted and re-checked
  3. Steuben County Building Permit Applications (2026 county census)
  4. Steuben County Planning & Zoning Assistance (2026 county census)
  5. Steuben County Environmental Services (2026 county census)
  6. Planning & Zoning Assistance, quoted and re-checked
  7. Building Permit Applications, quoted and re-checked
  8. Legal Memorandum LG03: NYS Uniform Fire Prevention and Building Code, quoted and re-checked
  9. Administration and Enforcement of the Uniform Code, quoted and re-checked
  10. Building Permit Applications, quoted and re-checked
  11. Part 1203 Uniform Code and the Energy Code: Minimum Standards for Administration and Enforcement (New York statewide rule), quoted and re-checked
  12. Steuben County Code Enforcement (Towns of Addison, Campbell and Tuscarora only) (steubencountyny.gov)
  13. Building Permit Applications, quoted and re-checked
  14. Town of Campbell Building Permit Application, quoted and re-checked
  15. documents.dps.ny.gov (New York statewide rule), quoted and re-checked
  16. Planning & Zoning Assistance, quoted and re-checked
  17. Status of Local Planning, quoted and re-checked
  18. steubencountyny.gov, quoted and re-checked
  19. Town Law § 276: Subdivision review; approval of plats; development of filed plats (New York statewide rule), quoted and re-checked
  20. Steuben County Planning Department (steubencountyny.gov)
  21. New York State Department of Health, Hornell District Office (steubencountyny.gov)
  22. State Pollutant Discharge Elimination System (SPDES) Permit Program (New York statewide rule), quoted and re-checked
  23. Town of Campbell Building Permit Application, quoted and re-checked
  24. Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
  25. Status of Local Planning, quoted and re-checked
  26. Division of Building Standards and Codes Frequently Asked Questions, quoted and re-checked
  27. dos.ny.gov, quoted and re-checked
  28. Building Permit Applications, quoted and re-checked
  29. Town of Campbell Building Permit Application, quoted and re-checked
  30. Administration and Enforcement of the Uniform Code, quoted and re-checked
  31. Floodplain Management - NYSDEC (New York statewide rule), quoted and re-checked
  32. Town of Campbell Building Permit Application, quoted and re-checked
  33. Residential Driveway Permits (New York statewide rule), quoted and re-checked
  34. Town of Campbell Building Permit Application, quoted and re-checked

Written October 9, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Found land here? Start a Property Hunt →

Compared with neighboring counties

Like all 6 of its neighbors, Steuben County requires a building permit for a home.

RuleSteuben CountyYates CountySchuyler CountyLivingston CountyOntario CountyAllegany CountyChemung County
Building permitRequiredRequiredRequiredRequiredRequiredRequiredRequired
County zoningNoNoNoNoNoNoNo
Septic permitsNY State Dept. of HealthNY State Dept. of HealthTown or village code enforcement officeCounty Dept. of HealthTown or village code enforcement officeCounty Dept. of HealthCounty Health Dept.

County locator

Steuben County in New York

71
County map
Steuben County highlighted among the New York counties · colored by Index score

How Steuben County scores

Seclusion65100% ev.
Self-Sufficiency61100% ev.
Admin Boringness5890% ev.
Durability79100% ev.
Property Autonomy33100% ev.
Carry Cost73100% ev.

Evidence strength: 98%. This reports direct-source completeness and fallback use; it is separate from the score and is not a confidence interval. How it works →

$174kTypical home
2.5%Property tax
$3,076Land / acre
36.9"Annual rain
1.6% of yrsSevere drought
0.6 / yr (+0.6)Mid-century 100°F days
9.7 daysMid-century dry spell
1.59" (+8.9%)Mid-century 1-day rain
1.6×Wildfire change factor
100%Forward climate coverage
$917Home insurance / yr
1.1% / yrInsurance growth
0.47%Nonrenewal rate
county median (2+ published ZIPs)Insurance basis
13,757People within 30 min
1,659,760People within 2 hr
40,566Radius comparison (15 mi)
66.3People / sq mi
0.2%Federal land
64.6%Land at 15% slope or less
0%Soils rated "not limited" for septic (strict USDA rating)
0 acWorkable land screen
65.1%Wooded land
63.2 tonsBiomass / forest ac
46.3°FAvg temp

Scout Steuben County

Camp here before you commitBook a few nights nearby on Hipcamp →Already own land here?Earn money hosting campers — get $100 when you become a Hipcamp host →

Some links are affiliate or referral links — we may earn a commission, at no cost to you.

Property hunt

Find land. Bring the promising ones back.

Search live inventory elsewhere, then cost and vet each candidate here. No copied listings, account, or paid data feed.

Each button opens a current land search for Steuben County. Listing sites control their own results and filters.

Analyze a property
Add setup-cost allowances

Use rough quotes or placeholders. Blank fields count as $0.

Working estimate

—land + entered setup costs
Asking $ / acre
—
Setup allowance
—
All-in $ / acre
—

A planning estimate, not a valuation or contractor quote. The USDA benchmark includes farm land and buildings; it is context, not a parcel comp.

Before an offer

Parcel due diligence

0/8 checked

Saved properties and checklist progress stay on this device. Bolthole Index does not receive them.

Cities and towns in Steuben County

Inside a city, town or township here, that government usually sets zoning and may issue its own building permits; the county’s rules above cover land outside them.

Not yet researched: Town of Addison · Village of Addison · Village of Arkport · Town of Avoca · Village of Avoca · Town of Bath · Village of Bath · Town of Bradford · Town of Cameron · Town of Campbell · Town of Canisteo · Village of Canisteo · Town of Caton · Town of Cohocton · Village of Cohocton · Corning · Town of Corning · Town of Dansville · Town of Erwin · Town of Fremont · Town of Greenwood · Town of Hartsville · Town of Hornby · Town of Hornellsville · Town of Howard · Town of Jasper · Town of Lindley · Village of Painted Post · Town of Prattsburgh · Town of Pulteney · Town of Rathbone · Village of Riverside · Village of Savona · Village of South Corning · Town of Thurston · Town of Troupsburg · Town of Tuscarora · Town of Wayland · Village of Wayland · Town of Wayne · Town of West Union · Town of Wheeler · Town of Woodhull

Answers from the rulebook for Steuben County

What the ordinances and state agencies actually say — one answer per question, each quoted from the official source and independently re-checked.

Steuben County rules

  • Building permitRequired

    Building permits administered on behalf of Steuben County in the Towns of Addison, Campbell, and Tuscarora.

    • A permit must be issued before work can start.
    • The county page states that the CEO may take up to 30 days to review the application.
    • The page directs applicants to complete the applicable municipal application and pay the permit fee.

    application review period: <= 30 days

    “No Person shall commence any work for which a Building Permit is required without first having obtained a Building Permit from the Code Enforcement Officer.”
    2 more reviewed findings on this topic
    • Required — Building permits administered by Steuben County on behalf of the Towns of Addison, Campbell, and Tuscarora.
      “Code Enforcement Officer has up to 30 days to review the Application before a Building Permit is issued and work can be started.”
    • Required — Building permits administered on behalf of Steuben County for the Towns of Addison, Campbell, and Tuscarora.
      “before a Building Permit is issued and work can be started.”
  • Building code adoptedPartial

    Steuben County code-enforcement program serving the Towns of Addison, Campbell, and Tuscarora.

    • The county page identifies county code-enforcement officials for these municipalities; municipal arrangements elsewhere may differ.
    • The county Local Laws page lists local laws for designation and administration/enforcement of the Uniform Fire Prevention and Building Code.
    “Uniform Fire Prevention & Building Code Designation of enforcement agency Local Law Number 3 - 1983 Local Law Number 9 - 1984 Administration and Enforcement of Local Law Number 19 - 2006”
  • Local zoningVaries (with conditions)

    Aggregate of municipal zoning in Steuben County; the actual ordinance and map depend on the parcel's town, village, or city.

    • The county page lists zoning maps for individual municipalities.
    • The county states that maps and zoning laws are for general reference and may not be current; contact the municipality for official maps and laws.
    • County review under General Municipal Law §239 applies to qualifying local zoning actions within 500 feet of specified features.

    county referral distance: <= 500 feet (state or county road, municipal boundary, or other statutory criteria)

    “These maps were produced according to the latest data received by the County. For further information, please contact the municipalities using the phone numbers noted on the individual maps.”
    2 more reviewed findings on this topic
    • Varies (with conditions) — Aggregate of municipal zoning within Steuben County; the actual rule-maker is the applicable town, village, or city.
      “View a map where shaded municipalities have adopted Zoning (GIF).”
    • Varies (with conditions) — Aggregate zoning status across municipalities in Steuben County, including towns, villages, cities, and other local governments.
      “View a map where shaded municipalities have adopted Zoning (GIF).”
  • Zoning districtsPublished (with conditions)

    Municipal zoning maps and laws filed with the Steuben County Planning Department.

    • The county states the maps are for general reference only.
    • The county warns that the maps and zoning laws may not be the most up-to-date laws or maps.
    • The municipality must be contacted for official maps and laws before making decisions or committing funds.
    “Disclaimer: The maps and zoning laws posted on this website are the latest versions filed with our department and are posted for general reference only. They may or may not be the most up-to-date laws or maps. Contact the municipality to access official maps and laws before making decisions or committing funds to a project.”
    2 more reviewed findings on this topic
    • Partial — County-maintained reference maps and filed municipal zoning laws for municipalities in Steuben County.
      “Disclaimer: The maps and zoning laws posted on this website are the latest versions filed with our department and are posted for general reference only. They may or may not be the most up-to-date laws or maps.”
    • Partial — Published municipal zoning maps and laws maintained or filed by the Steuben County Planning Department.
      “The maps and zoning laws posted on this website are the latest versions filed with our department and are posted for general reference only. They may or may not be the most up-to-date laws or maps. Contact the municipality to access official maps and laws before making decisions or committing funds to a project. Work in progress. Check back for updates!”
  • Subdividing landLimited

    Subdivision regulation within Steuben County, aggregated across municipalities.

    • The county page identifies municipal subdivision regulations, so requirements vary by municipality.
    • The applicable municipal regulations must be checked for the parcel.
    “Subdivision Regulations: see a map where shaded municipalities have completed subdivision regulations (JPG) .”
  • Permit feesVariable (with conditions)

    Building permits administered by Steuben County on behalf of the Towns of Addison, Campbell, and Tuscarora.

    • The fee amount is provided after the application is submitted or reviewed; the cited page does not publish a numeric fee schedule.
    • Payment is by check or cash.
    • Payment by check is payable to the Steuben County Commissioner of Finance and delivered to Steuben County Public Works, 3 E Pulteney Square, Bath, NY 14810.
    “Step 2. Receive Permit Fee Amount. Step 3. Pay the Permit Fee, check or cash accepted.”
  • Permit processPublished (with conditions)

    Building-permit process for the Towns of Addison, Campbell, and Tuscarora through Steuben County code enforcement.

    • Complete the applicable building permit application.
    • Receive the permit fee amount.
    • Pay the permit fee by check or cash.
    • The CEO may take up to 30 days to review the application before issuance and work can start.

    maximum stated review period: <= 30 days

    “Step 1. Complete the applicable building permit application. If you need assistance, contact the CEO. Step 2. Receive Permit Fee Amount. Step 3. Pay the Permit Fee, check or cash accepted.”
    3 more reviewed findings on this topic
    • Published (with conditions) — Building-permit process administered by Steuben County on behalf of the Towns of Addison, Campbell, and Tuscarora.
      “To Obtain a Town of Addison, Town of Campbell, or Town of Tuscarora Building Permit Step 1. Complete the applicable building permit application. If you need assistance, contact the CEO.”
    • Published (with conditions) — Building-permit application process for the Towns of Addison, Campbell, and Tuscarora.
      “Complete the applicable building permit application. [...] Pay the Permit Fee, check or cash accepted.”
    • Published (with conditions) — Building permits for the Towns of Addison, Campbell, and Tuscarora, where the county provides the code-enforcement official.
      “The Code Enforcement Official (CEO) in the Town of Addison, Town of Campbell, and Town of Tuscarora, on behalf of Steuben County, is Charles Cagle. [...] Code Enforcement Officer has up to 30 days to review the Application before a Building Permit is issued and work can be started.”
  • County-wide zoningAbsent

    New York counties do not zone; zoning is a town/village function, and the Steuben County Planning Department only performs advisory GML 239 referral review of municipal zoning actions.

    Steuben County Planning & Zoning Assistance ↗Scouted from the county site, not yet independently re-checked

New York rules that apply here

  • Owner-builder exemptionConditional

    Owner-performed home-improvement work at an owner’s primary residence in New York, as to a New York State home-improvement-contractor license.

    • New York State does not license home-improvement contractors.
    • A county or local municipality may license home-improvement contractors or particular home-improvement trades.
    • The Department of State identifies New York City; Suffolk, Nassau, Westchester, Putnam, and Rockland Counties; and the City of Buffalo as examples of local jurisdictions requiring a home-improvement-contractor license.
    • This finding concerns home-improvement-contractor licensing only; it does not establish an exemption from locally administered building permits, inspections, or licenses for particular trades.
    “Check your local government licensing requirements: New York State does not license home improvement contractors. However, some counties and local municipalities do, including New York City, Suffolk, Nassau, Westchester, Putnam, and Rockland counties, and the City of Buffalo.”
    One more reviewed finding on this topic
    • Conditional — Owner installation of a manufactured home in Steuben County.
      “19 NYCRR Part 1210 requires a certified installer to be on site while any manufactured home is being installed. “A person who intends to own and occupy a manufactured home may apply for certification as the installer of such manufactured home” pursuant to the requirements contained within Part 1210. Should a homeowner choose to complete a required component of the installation, that work shall be supervised and certified by an installer holding certification issued pursuant to part 1210.”
  • InspectionsRequired

    Construction work for which a building permit has been issued and which is subject to the Uniform Code or Energy Code, administered by the applicable local authority having jurisdiction throughout New York State except New York City.

    • Inspections may be performed in person or remotely when the authority determines the remote inspection can be performed to the same level and quality and provides sufficient information; otherwise an in-person inspection is required.
    • Where applicable, inspections include the worksite before permit issuance, footing and foundation, concrete slab preparation, framing, structural/electrical/plumbing/mechanical/fire-protection systems, fire-resistant construction and penetrations, heating appliances/chimneys/flues/gas vents, Energy Code compliance elements, manufactured buildings or homes, and a final inspection.
    • Permit work must remain accessible and exposed until inspected and accepted; the permit holder must notify the authority when work is ready for inspection.
    • The state minimum standards do not require regular periodic inspections of owner-occupied one- and two-family dwellings or agricultural buildings used directly and solely for agricultural purposes, but this does not limit inspections invited by the owner or required where conditions threaten or present a public-health, safety, or welfare hazard.

    maximum interval for periodic fire-safety and property-maintenance inspections of multiple dwellings and nonresidential occupancies: <= 3 years (This periodic-inspection interval does not apply as a requirement to owner-occupied one- and two-family dwellings or qualifying agricultural buildings.)

    “Each authority having jurisdiction shall include in its code enforcement program provisions requiring the authority having jurisdiction, or an individual or entity contracted by the authority having jurisdiction and satisfying the requirements set forth in section 1203.2 (e)(2), to perform construction inspections required by the Codes including those listed in this paragraph, either in-person or remotely.”
  • Certificate of occupancyRequired

    Work subject to a building permit and the Uniform Code or Energy Code, and structures or portions converted from one use or occupancy classification or subclassification to another, throughout New York State except New York City.

    • Permission to use or occupy covered buildings or portions is granted only by issuance of a certificate of occupancy or certificate of compliance, except as provided for temporary certificates of occupancy.
    • Before issuance, the authority must inspect and determine compliance with applicable Codes and, where applicable, review structural-observation statements, special-inspection reports, flood-hazard certifications, Energy Code test results, and manufactured-building or manufactured-home seals, insignias, and data plates.
    • A temporary certificate may be issued before completion for a specified period and specified portions, subject to safe occupancy, operational fire and life-safety components, required means of egress, and completion of remaining work.

    temporary certificate period: specified period (The permit holder must undertake to bring the structure into full compliance with the Codes.)

    “The code enforcement program shall provide that, except as provided in section 1203.3 (d)(4), permission to use or occupy a building or structure, or portion thereof, for which a building permit was previously issued, or which has been converted from one use or occupancy classification or subclassification to another, shall be granted only by issuance of a certificate of occupancy or a certificate of compliance.”
    2 more reviewed findings on this topic
    • Required — Work for which a building permit is required and changes in general occupancy classification.
      “A certificate of occupancy or a certificate of compliance must be required (1) for all work for which a building permit was required and (2) whenever the general occupancy classification of a building is changed.”
    • Required — Work subject to a building permit and changes in occupancy classification in Steuben County.
      “An authority having jurisdiction’s code enforcement program must provide for the issuance of a certificate of occupancy or certificate of compliance for: • all work which is the subject of a building permit; and • all structures, buildings, or portions thereof, which are converted from one use or occupancy classification or sub-classification to another.”
  • Manufactured homesLimited

    Manufactured-home installation and occupancy in Steuben County.

    • A building permit is required for installation, alteration, and repair subject to the Uniform Code.
    • A certificate of occupancy or compliance is required for work subject to a building permit.
    • More restrictive local zoning or local-law standards may apply.
    “Yes. Pursuant to 19 NYCRR Part 1203 a building permit “shall be required for [all] work which shall comply with the Uniform Code,” including the installation, alteration, and repair (as specified by Appendix J of the 2020 Residential Code of New York State) of a manufactured home. Section AE103 was added to Appendix E, of the 2020 Residential Code of New York State to address the topic of permitting and inspections. Lastly, pursuant to 19 NYCRR Part 1203 issuance of a certificate of occupancy/compliance is “required for any work which is the subject of a building permit.””
  • Who permits septicMixed (with conditions)

    Residential and other septic or cesspool systems statewide in New York.

    • New York State DEC administers SPDES permitting for regulated wastewater discharges.
    • For systems with less than 1,000 gallons per day of sewage-wastewater discharge to groundwater and no industrial or other non-sewage wastes, approval may still be required from the appropriate city health department, county health department, or district office of the New York State Department of Health before construction.
    • The actual local or district health authority depends on the property location.

    groundwater discharge design flow threshold: < 1000 gallons per day (No industrial or other non-sewage wastes)

    “city health department, county health department”
    One more reviewed finding on this topic
  • Septic permitLimited

    Facilities discharging sewage-wastewater to groundwater through septic systems or similar systems statewide.

    • A SPDES permit is not required when total groundwater discharge design flow is less than 1,000 gallons per day and the wastewater contains no industrial or other non-sewage wastes.
    • The exemption does not eliminate possible approval requirements from the appropriate city health department, county health department, or district office of the New York State Department of Health before construction.
    • Other DEC permits or approvals from other agencies may also be required.

    groundwater discharge design flow: < 1000 gallons per day (Sewage-wastewater containing no industrial or other non-sewage wastes)

    “No SPDES permit is required [...] less than 1,000 gallons per day [...] no industrial or other non-sewage wastes”
    One more reviewed finding on this topic
  • Septic inspectionLimited

    Post-construction certification for residential alternative onsite wastewater treatment systems under Appendix 75-A.

    • A design professional must supervise construction.
    • The design professional must certify after construction that supervision occurred and that construction conforms to approved plans.
    • The cited passage establishes certification, not a general periodic inspection schedule for routine operation.
    “a design professional shall provide [...] a certification”
  • Off-grid sanitationAllowed (with conditions)

    Use of an individual onsite wastewater treatment system where a municipal or communal wastewater system is unavailable.

    • The system must comply with statewide Appendix 75-A minimum standards.
    • Alternative systems require prior review and approval by the State or county health department official having jurisdiction.
    • Design must be prepared by or under the supervision of a design professional.
    “when a municipal or communal system is not available”
  • Mandatory utility hookupConditional

    Residential realty subdivisions, including subdivisions of fewer than 50 lots.

    • Community water and/or sewers may be required when public services are available, groundwater quality or quantity is poor, or site conditions are unacceptable for onsite wastewater treatment systems.
    • The source addresses subdivision approval and does not establish a universal statewide connection mandate for every individual residential parcel.
    “Yes, if there is good reason such as: public services are available”
  • Agricultural exemptionConditional

    Farm operations located within a New York agricultural district, including associated land, on-farm buildings, equipment, manure processing and handling facilities, and qualifying agricultural practices.

    • The protection applies only to farm operations in an agricultural district.
    • Local governments must exercise their planning and land-use authority consistently with Article 25-AA of the Agriculture and Markets Law.
    • Local governments may not unreasonably restrict or regulate the covered farm operation unless public health or safety is threatened.
    • Only farm operations are protected; the Department evaluates whether the regulated activity encompasses a farm operation.
    • The reasonableness analysis considers whether the restriction is unreasonable on its face and as applied to the particular situation, and depends on the totality of the circumstances.
    • A farmer, municipality, or other eligible requester may seek a Department opinion concerning the effect of a proposed or existing local law or ordinance.
    • If the Department determines that a local law or ordinance is unreasonably restrictive, it may seek remediation and the Commissioner may issue an order to comply or bring an enforcement action.
    “Local governments, when exercising their powers to enact and administer comprehensive plans and local laws, ordinances, rules or regulations, shall exercise these powers in such manner as may realize the policy and goals set forth in this article, and shall not unreasonably restrict or regulate farm operations within agricultural districts in contravention of the purposes of this article unless it can be shown that the public health or safety is threatened.”
    2 more reviewed findings on this topic
    • Conditional — Farm operations within New York agricultural districts seeking protection from unreasonable local planning, zoning, land-use, or permitting restrictions.
      “shall not unreasonably restrict or regulate farm operations within agricultural districts in contravention of the purposes of this article unless it can be shown that the public health or safety is threatened.”
    • Available (with conditions) — Agricultural uses and agricultural-use structures within the Adirondack Park Agency jurisdiction, including relevant Freshwater Wetlands Act and Wild, Scenic and Recreational Rivers System Act permitting contexts.
      ““Agricultural uses” and “agricultural use structures” are generally exempted from permitting requirements under New York State’s Adirondack Park Agency Act”
  • Driveway accessRequired

    New or modified commercial access to a New York State highway, including changes of use or expansions of existing development on a State highway.

    • A highway work permit from NYSDOT is required.
    • The commercial driveway/access permit review generally consists of initial proposal review, design review, and final submission review.
    • Final submission may require insurance documentation, performance security, permit fees, and additional documentation.
    • A simple commercial driveway project may qualify for a single-stage expedited review if it meets the applicable criteria.
    • The page states that the PERM 33-COM application and checklist is used for commercial highway work permit submissions, including minor or major commercial driveways, minor home business driveways, or subdivision streets.
    “If your commercial property development plans involve new or modified access to a state highway, or involve any change of use or expansion of an existing development on a state highway, you will need a highway work permit from the New York State Department of Transportation (NYSDOT).”
    3 more reviewed findings on this topic
    • Limited — Building or modifying a residential driveway in Steuben County when the residence is on a New York State highway.
      “If your residence is on a State highway, you will need a permit from the NYS Department of Transportation to build or modify a driveway.”
    • Required — A residence located on a New York state highway when building or modifying a driveway
      “If your residence is on a State highway, you will need a permit from the NYS Department of Transportation to build or modify a driveway.”
    • Required — Building or modifying a residential driveway where the residence is on a New York State highway.
      “If your residence is on a State highway, you will need a permit from the NYS Department of Transportation to build or modify a driveway.”
  • Building in a floodplainRequired

    Development in FEMA-mapped Special Flood Hazard Areas in New York State, with local administration by the municipality having jurisdiction.

    • Local communities participating in the National Flood Insurance Program regulate development in Special Flood Hazard Areas.
    • Private development is subject to local floodplain development permits.
    • Development funded and undertaken by the State or Federal government is an exception to the local-permit rule and is regulated by the responsible agency, subject to technical assistance by NYSDEC and FEMA.
    • Each participating community has a designated floodplain administrator, usually the building inspector or code enforcement official.
    • The local laws apply to development undertaken by any county, city, town, village, school district, or public improvement district within the community.
    • The source states that any new structure or structure substantially improved or substantially damaged is subject to floodplain development regulations, with substantial improvement or damage exceeding 50% of the structure’s market value.

    substantial improvement or damage threshold: > 50 percent of structure market value

    “Private development is subject to local floodplain development permits.”
  • Campground & park staysLimited

    Temporary camping at New York State Department of Environmental Conservation campgrounds statewide.

    • All campers must register and obtain a camping permit.
    • Check-in is from 2:00 p.m. to 9:00 p.m.; campers must register and occupy the campsite by 9:00 p.m. on the first reservation night or the campsite may be re-rented and fees may be forfeited.
    • Campers must vacate by 11:00 a.m. on the final day.
    • Camping permits are limited to 14 nights but may be renewed depending on site availability.
    • From July 1 through Labor Day, only 14 cumulative nights of camping can be obtained at any campground.
    • Campsite occupancy is limited to 6 persons, two tents or one hard-wheeled equipment and one tent, and two vehicles; occupancy varies for Family campsites.
    • Violation of any campground rule is grounds for eviction; an evicted person is not entitled to a refund or to return for one week.

    maximum permit duration: <= 14 nights (May be renewed depending upon availability of sites.) · seasonal cumulative camping limit: <= 14 nights (From July 1 through Labor Day, at any campground.) · campsite occupancy: <= 6 persons (Occupancy varies for Family campsites.)

    “All campers must obtain a camping permit. Campers may check in from 2:00 p.m. to 9:00 p.m. but must register and occupy their campsite by 9:00 p.m. on the first night of their reservation or the campsite will be subject to re-rental and fees may be forfeited. Campers must vacate their campsite no later than 11:00 a.m. on the final day. Camping permits will not be issued for more than 14 nights but may be renewed depending upon availability of sites. From July 1 through Labor Day only 14 cumulative nights of camping can be obtained at any campground.”
  • county building authorityLimited

    County administration and enforcement of the Uniform Code and Energy Code within a local government, including unincorporated town areas, when the local government has opted out or when the Secretary of State designates the county.

    • Every local government ordinarily administers and enforces the Uniform Code and Energy Code.
    • A local government may opt out by local law enacted before July 1; the opt-out becomes effective January 1 of the following year.
    • After a local-government opt-out, the county administers and enforces the codes within that local government.
    • The county may itself enact a local law opting out; if both local government and county opt out, the Secretary of State administers and enforces the codes.
    • Counties may charge fees to defray administration and enforcement costs.
    • A responsible county must establish a code-enforcement program by local law, ordinance, or other appropriate regulation.

    local-government opt-out deadline: < July 1 · successor enforcement date: January 1 (the January 1 next succeeding the effective date of the local law)

    “The secretary may designate the county in which such local government is located to administer and enforce the uniform code in such local government.”
    One more reviewed finding on this topic
    • Limited — New York counties' administration and enforcement of the Uniform Fire Prevention and Building Code, and county adoption of higher or more restrictive construction standards affecting residential construction.
      “In such event the county in which said local government is situated shall administer and enforce such codes within such local government [...] unless the county shall have enacted a local law providing that it will not enforce such codes within that county.”
  • county zoning authorityNone

    New York counties' authority to adopt Euclidean zoning regulations for unincorporated land.

    • New York State law authorizes zoning power for cities, towns, and villages, not counties.
    • Counties retain other land-use-related powers under separate statutes and municipal home rule provisions, but those powers are not general county zoning authority.
    “No enabling legislation had been adopted that delegates zoning power to counties.”

Inside cities and towns in Steuben County

Municipal rules found while researching the county. They apply inside that city or town, not to unincorporated land.

  • InspectionsRequired

    Building-permit work under the Town of Campbell application administered by its Building Inspector.

    • The applicant must provide legal consent for required inspections during normal business hours.
    • Work may not be enclosed or concealed without Building Inspector authorization.
    • The applicant may not use the item or area until receiving a Compliance Certificate.
    “Work shall remain accessible and exposed until inspected and accepted by the Building Inspector!”
  • Septic inspectionLimited

    New or modified onsite wastewater systems under the Town of Campbell building-permit program administered through the county.

    • The system must be designed by a New York registered engineer or architect.
    • The designer must inspect installation and certify installation according to the original design.
    • A design print is required with the application and the engineer certification letter after installation.
    “New or modified On-site Wastewater Disposal System (Septic): MUST BE designed by NYS Registered Engineer or Architect. They must also inspect installation and certify system was installed as per original design.”
  • Building in a floodplainRequired

    Development in a floodplain under the Town of Campbell building-permit program.

    • The county-hosted fee schedule states that a floodplain development permit is required for any development in a floodplain.
    • The listed fee is $25.

    floodplain development permit fee: 25 USD

    “Flood Plain Development Permit- Required for any development in a Flood Plain 25”
  • Permit feesPublished (with conditions)

    Town of Campbell building-permit fees shown in the official permit application.

    • The fee schedule is specific to the Town of Campbell application.
    • The application states that fees are exclusive of other fees or charges mandated by state or federal law, rules, or regulations.
    • Some projects may require inspections or testing by others, whose fees are not included.

    new one- or two-family construction up to 1500 square feet: 200 USD (Each additional 1000 square feet or fraction thereof is 100 USD.) · manufactured-home installation, single width: 150 USD · manufactured-home installation, double width: 225 USD · on-site wastewater treatment system installation or repair: 60 USD (For one- or two-family dwelling schedule.)

    “New construction up to 1500 square feet of area 200 Each additional 1000 square feet or fraction thereof 100 Installation of manufactured home - Single width unit 150 Double width unit 225”
    One more reviewed finding on this topic
    • Published (with conditions) — Town of Campbell building-permit fee schedule published in the county-hosted application.
      “Flood Plain Development Permit- Required for any development in a Flood Plain 25 [...] Renewal of Approved Permit— Maximum of two (2) 50% of original Permit Fee”

Set by your town or city, not the county

In New York, zoning is adopted by each town or city, so Steuben County has no county-wide answer on these. Find your town or city in the list of places on this page, or call its clerk or zoning administrator.

  • Minimum dwelling size
  • Minimum lot size
  • Setbacks
  • Lot coverage
  • Building height
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Accessory dwellings
  • Short-term rentals

Still unanswered

We looked and could not find an official answer yet. Silence is not permission — ask the county directly.

  • Well permit — Private or public drinking-water wells in Steuben County.

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Living off-grid in Steuben County, New York

Is Steuben County a good place to live off-grid or homestead?

Steuben County scores 71/100 on the Bolthole Index, a strong county profile. Its strengths: 17 operating mines and manageable long-term carry cost. Watch-outs: a weaker property-autonomy legal backdrop.

Do you need a building permit in Steuben County, New York?

Steuben County generally requires a residential building permit, and it has no county-wide zoning. Onsite septic is permitted by New York State Department of Health - Hornell District Office. Owner-builders may act as their own contractor to build their home. These answers are quoted from official sources and independently re-checked. Rules change and cities within the county differ — always confirm with the county before you buy or build.

How much does land cost in Steuben County, New York?

Land in Steuben County runs about $3,076 per acre, based on the latest county data.

What is the water situation in Steuben County?

Steuben County gets about 36.9" of rain a year, with severe drought in roughly 1.6% of years.

How remote is Steuben County?

A representative private-land location has about 13,757 people within a 30-minute drive and 1,659,760 within two hours. The road-network catchments count population across county lines and clusters of smaller cities; straight-line radius values remain available as a comparison.

How Steuben compares in New York

Compare side-by-side →See all 62 New York counties ranked →