The Village of North Hornell, in Steuben County, New York, requires a building permit for most construction work inside village limits1, and the village has its own zoning districts2. The village Code Enforcement Officer issues permits3. Where a public sewer is not available, private septic must meet state DEC requirements4; we could not confirm who issues the septic permit.
At a glance
- Building permit
- Required for work that must meet the state Uniform Code, with listed exemptions; issued by the village Code Enforcement Officer13
- Zoning
- Village zoning with agricultural, residential and commercial districts5
- Inspections and occupancy
- Inspections during construction and a certificate of occupancy are required67
- Sewer
- Connection to the village sewer is required after official notice when the sewer is within 100 feet of the property line8
- Septic
- Private system allowed only where public sewer is unavailable, and it must meet DEC septic requirements; permit issuer not confirmed4
- RV and tiny-home living
- Not confirmed; ask the village before you plan on it3
- Contractor license
- Contractors and plumbers working in the village need a village license3
Who to call
Building permits
Village of North Hornell Code Enforcement Officer
Building permits, village code enforcement and contractor licensing inside the Village of North Hornell; applications are picked up at Village Hall
4 W. Maplewood Ave, North Hornell, NY 14843
Septic permits
New York State Department of Health, Hornell District Office
Environmental health protection, including onsite wastewater review, for Steuben County
107 Broadway, Room 105, Hornell, NY 14843-0430
Contact details are copied from each office’s official page and were checked against it on October 24, 2026.
Off-grid gear
Going off-grid in Village of North Hornell means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in the Village of North Hornell, NY?
Yes, for most work. Inside the Village of North Hornell, a building permit is required for any work that must conform to the state Uniform Code or Energy Code, including construction, enlargement, alteration, removal or demolition of a building or structure1. The village code lists exemptions, and an exemption never authorizes work that breaks the code1. Construction may not start until the Code Enforcement Officer issues the permit1.
The village's Code Enforcement Officer says permits can be picked up at Village Hall, and that starting work without a building permit results in an additional fee3. Call before assuming a small job is exempt. Village building permits apply only inside village limits; for land outside the village, see the Steuben County page.
Who issues building permits in North Hornell, and how do you reach them?
The Village of North Hornell runs its own code enforcement. The village code administers and enforces the New York State Uniform Fire Prevention and Building Code and the Energy Code inside the village9. Reach the Code Enforcement Officer at 607-542-2175 or codeoffice.1957@gmail.com, or visit Village Hall at 4 W. Maplewood Ave3.
Applications must be in writing on an approved form signed by the owner or an authorized agent, and the officer checks compliance with the Uniform Code, Energy Code and local code10. The fee is paid when the application is submitted11; we could not confirm a single dollar figure for a new house, so ask the office for the amount. Contractors and plumbers working in the village need a village license, which costs $10 per year3. Steuben County's own code-enforcement service covers only the Towns of Addison, Campbell and Tuscarora, not North Hornell12.
Does North Hornell have zoning, and what does it mean for RVs, tiny homes and setbacks?
Yes. The Village of North Hornell divides itself into zone districts through its own code2. The districts are AG Agricultural, R Residential and C Commercial, and the Official Zoning Map is filed with the Village Clerk5. Zoning here is a village function; New York counties do not zone, so Steuben County does not set these rules13.
We could not confirm the village's rules on living in an RV, tiny homes, accessory dwellings, minimum lot size, setbacks or building height. Ask the Code Enforcement Officer3 or the Village Clerk before you buy, and get the zoning map for the exact parcel.
How do sewer and septic work inside North Hornell?
In the village, public sewer comes first. An owner of occupied property abutting a street with a village public sanitary sewer must connect within 90 days after official notice, provided the sewer is within 100 feet of the property line8.
Where public sewer is not available, the building sewer lateral must connect to a private wastewater system that meets New York State Department of Environmental Conservation requirements for septic tanks, and the system must be abandoned and filled once public sewer becomes available4. We could not confirm which office issues the septic permit inside the village. Steuben County has no county health department; the state Department of Health's Hornell District Office handles environmental health for the county, so start there14. In New York, alternative systems need plan approval from the state or county health official before construction15.
Building a home in the Village of North Hornell: the steps, in order
- Call the Code Enforcement Officer to confirm your project needs a permit and your parcel's zoning district3.
- Check the sewer: ask Village Hall whether a public sewer serves the lot, since connection is required after notice when one is within 100 feet8.
- If no sewer is available, contact the Hornell District Office of the state Department of Health about the private system14.
- Submit the written building permit application on the approved form and pay the fee1011.
- Wait for the permit before starting; keep work exposed until it is inspected and call the officer when each stage is ready6.
- Get a certificate of occupancy before you move in7.
What to check before you buy land in North Hornell
Ask for the zoning district first, because the AG district is described as lying entirely within the flood boundary5. Floodplain development in New York needs a local permit, usually through the local code enforcement official16. If the lot fronts a state highway, a driveway needs a New York State Department of Transportation permit17; we could not confirm a village driveway rule.
County-level numbers: Steuben County's effective property tax rate is 2.5% and the median property tax bill is $3,245 per year1819. Steuben County's typical home value is about $174,26020.
Watch-outs
- We could not confirm the village's rules on RVs, tiny homes, accessory dwellings, setbacks or minimum lot size; ask the Code Enforcement Officer before you buy3.
- We could not confirm who issues private septic permits inside the village; call the state Department of Health's Hornell District Office14.
- We could not confirm an owner-builder exemption in the village building code; ask the Code Enforcement Officer before doing your own work3.
- The village's rules stop at its limits; land outside the village falls under a town's rules, so use the Steuben County page and ask the town2.
Sources
- Chapter 52: Fire Prevention and Building Construction - Village of North Hornell, NY (Village of North Hornell), quoted and re-checked
- Article II: Establishment of Districts; Zoning Map; Interpretation - Village of North Hornell, NY (Village of North Hornell), quoted and re-checked
- Village of North Hornell Code Enforcement Officer (northhornell.com)
- Chapter 96: Sewers - Village of North Hornell, NY (Village of North Hornell), quoted and re-checked
- Article II: Establishment of Districts; Zoning Map; Interpretation - Village of North Hornell, NY (Village of North Hornell), quoted and re-checked
- Chapter 52: Fire Prevention and Building Construction - Village of North Hornell, NY (Village of North Hornell), quoted and re-checked
- Chapter 52: Fire Prevention and Building Construction - Village of North Hornell, NY (Village of North Hornell), quoted and re-checked
- Chapter 96: Sewers - Village of North Hornell, NY (Village of North Hornell), quoted and re-checked
- Chapter 52: Fire Prevention and Building Construction - Village of North Hornell, NY (Village of North Hornell), quoted and re-checked
- Chapter 52: Fire Prevention and Building Construction - Village of North Hornell, NY (Village of North Hornell), quoted and re-checked
- Chapter 52: Fire Prevention and Building Construction - Village of North Hornell, NY (Village of North Hornell), quoted and re-checked
- Building Permit Applications, quoted and re-checked
- documents.dps.ny.gov (New York statewide rule), quoted and re-checked
- New York State Department of Health, Hornell District Office (steubencountyny.gov)
- NYS Register March 18, 2015 Rule Making Activities — Standards for Individual Onsite Water Supply and Individual Onsite Wastewater Treatment Systems (New York statewide rule), quoted and re-checked
- Floodplain Management - NYSDEC (New York statewide rule), quoted and re-checked
- Residential Driveway Permits (New York statewide rule), quoted and re-checked
- Effective property tax rate: Bolthole Index county data
- Median property tax bill: Bolthole Index county data
- Typical home value (Zillow): Bolthole Index county data
Written October 24, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.