Bolthole Index

Washington County, Ohio

Building permits, zoning and land rules in Washington County, Ohio

67Index Score / 100
#10 of 88 in Ohio

Building permits for covered residential work in Washington County, Ohio come from the Southeast Ohio Building Department1. Zoning is set locally by the township, city or village that governs the parcel, not by a single countywide rule2. Septic permits and installation inspections come from the Washington County Health Department, whichever township or city the parcel is in3.

At a glance

Building permit
Required for covered work through the Southeast Ohio Building Department1
Zoning
Varies by township, city or village2
Septic permit
Required through the Washington County Health Department4
Owner-builder
Owners may build their own home, but plan approval and inspections still apply5
Building inspections
Required according to the project and approved plans6
Manufactured home
Occupancy requires a state inspection seal7
Private well
Board-of-health permit required before drilling8
Property tax
About 1.0% effective rate; median bill about $1,665 per year910

Who to call

Building permits

Southeast Ohio Building Department (Washington County)

Building plan review, permits and inspections for Washington County

740-374-4185

340 Muskingum Drive, Marietta, OH 45750

Health department

Washington County Health Department (Environmental Health / Sewage Program)

Permits and inspects qualifying residential and commercial sewage treatment systems in Washington County

740-374-2782

healthadmin@wcgov.org

340 Muskingum Drive, Suite B, Marietta, OH 45750

Planning & zoning

Washington County Planning Commission

Subdivision approval and rights-of-way for access across private property

740-373-6623

223 Putnam Street, Marietta, OH 45750

Contact details are copied from each office’s official page and were checked against it on October 9, 2026.

Off-grid gear

Going off-grid in Washington County means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Do you need a building permit in Washington County, Ohio?

Washington County, Ohio requires a residential permit for covered construction before work starts1. Permits are required for listed work including additions, garages or carports, finished basements, structural alterations and accessory buildings over 200 square feet1. Listed ordinary repairs and residential sheds of 200 square feet or less do not require a permit, but the work still must comply with code1. Washington County projects in the Southeast Ohio Building Department's jurisdiction use Ohio's adopted residential and commercial codes11. The published residential schedule lists a $125 structural processing fee plus $10 per 100 square feet, with a 1% state surcharge; confirm the current total for the project before applying12.

Who issues building permits and septic permits in Washington County, Ohio?

Washington County routes building permits, septic permits and subdivision approval to three separate offices131415. The Southeast Ohio Building Department is at 340 Muskingum Drive, Marietta, OH 45750, phone 740-374-4185, and accepts electronic drawings through Dropbox1316. Separate applications are required for each dwelling unit, building or structure, and most permits have a stated turnaround of 1 to 14 days with a 30-day maximum17. The Washington County Health Department is at 340 Muskingum Drive, Suite B, Marietta, OH 45750, phone 740-374-2782, email healthadmin@wcgov.org14. The Planning Commission is at 223 Putnam Street, Marietta, OH 45750, phone 740-373-662315.

Does Washington County have zoning?

Zoning in Washington County varies by local jurisdiction: Marietta regulates zoning inside the city, properties outside Marietta go to the applicable township trustees, and properties in another city or village go to that municipality2. We could not confirm a countywide zoning resolution, so ask the authority governing the parcel about minimum home size, lot coverage, building height and allowed uses2. Zoning approval from a township, city or village does not replace the county septic permit or the Southeast Ohio Building Department permit, which are separate approvals31. Subdivision is a separate county review in unincorporated Washington County18. For single- or two-family lots in a subdivision where no county or township zoning resolution applies, county tables set minimum lot area at 9,450 or 20,000 square feet depending on water and sewer availability, with front setbacks of 35 feet on arterial streets and 30 feet on collector, local or cul-de-sac streets1920.

How do septic permits work in Washington County, Ohio?

The Washington County Health Department permits and inspects residential sewage systems and commercial systems with flows of 1,000 gallons per day or less21. The stated process includes an application, plat or survey map, fee, soil survey and Permit To Install4. A registered installer leaves the system uncovered until a county Environmental Health Specialist performs the cover-up inspection; the Health Department issues the final permit after installation22. A homeowner may self-install only after passing the STS exam and giving the certificate to the Health Department before work begins4. The Health Department does not require a pre-sale septic inspection, although a buyer or lender may require one23. Only about 1.1% of Washington County soils are rated without severe limits for a conventional drain field, so settle septic feasibility before choosing a homesite24.

Can you live in an RV or tiny home on your land in Washington County?

We could not confirm a Washington County rule that generally allows long-term RV living or tiny-home occupancy on private land. The applicable zoning authority is the township, city or village governing the parcel, so ask that office about the proposed structure and residential use before buying or building2. A manufactured home generally cannot be occupied in Ohio until the state inspector issues the inspection seal7. Ohio's campground rules govern licensed campgrounds but do not answer residential RV use on a private parcel25. For land in Marietta, contact the City Engineering Department; elsewhere, contact the relevant township trustees, city or village2.

Building a home in Washington County: the steps, in order

  1. Identify the township, city or village governing the parcel and ask that authority about zoning before designing the home2.
  2. If the project creates subdivision lots, secure Planning Commission approval and confirm access requirements1826.
  3. Begin the sewage application, soil survey and Permit To Install process with the Washington County Health Department4.
  4. Submit a separate building application for each dwelling unit, building or structure to the Southeast Ohio Building Department17.
  5. Keep approved documents at the jobsite and schedule the project-specific inspections listed with plan approval1727.
  6. Complete every required inspection before the final certificate of occupancy is issued for an occupied building28.

What to check before you buy land in Washington County, Ohio

Only about 1.1% of Washington County soils are rated without severe limits for a conventional septic drain field, so obtain the soil survey and settle septic feasibility before treating a homesite as buildable244. About 43.6% of Washington County land has a slope of 15% or less, and about 69.9% is wooded, making driveway grade, clearing and grading parcel-specific cost questions2930. Confirm legal access and the governing township or municipality before closing312. Development in the unincorporated floodplain requires county review administered by Washington County Soil & Water32. Washington County's effective property-tax rate is about 1.0%, its median annual bill is about $1,665, and farmland value is about $4,671 per acre91033.

Watch-outs

  • Washington County zoning varies by location; confirm the rules with the township, city or village governing the parcel2.
  • A manufactured home cannot be legally occupied in Ohio until the state inspector issues the inspection seal7.
  • An agricultural building is exempt from specified building-code sections only when the county or township zoning inspector issues a certificate declaring its agricultural use; other requirements may still apply34.
  • A septic system must remain uncovered until the Environmental Health Specialist completes the cover-up inspection35.

Sources

  1. Permits, quoted and re-checked
  2. Zoning Information, quoted and re-checked
  3. Sewage Program, quoted and re-checked
  4. Sewage Program, quoted and re-checked
  5. Section 3791.04 | Submission of plan - approvals - prohibition - fine (Ohio statewide rule), quoted and re-checked
  6. Required Inspections Check List and Guide for Inspector, quoted and re-checked
  7. Chapter 4781-7 | Manufactured home inspections (Ohio statewide rule), quoted and re-checked
  8. Chapter 3701-28 | Private water systems (Ohio statewide rule), quoted and re-checked
  9. Effective property tax rate: Bolthole Index county data
  10. Median property tax bill: Bolthole Index county data
  11. Building Department, quoted and re-checked
  12. Application for Residential Building Plan Approval, quoted and re-checked
  13. Southeast Ohio Building Department (Washington County) (washingtongov.org)
  14. Washington County Health Department (Environmental Health / Sewage Program) (washingtongov.org)
  15. Washington County Planning Commission (washingtongov.org)
  16. Building Department, quoted and re-checked
  17. Application for Residential Building Plan Approval, quoted and re-checked
  18. Planning Commission, quoted and re-checked
  19. Washington County Planning Commission Regulations, quoted and re-checked
  20. Washington County Planning Commission Regulations, quoted and re-checked
  21. Sewage Program, quoted and re-checked
  22. Sewage Program, quoted and re-checked
  23. Sewage Program, quoted and re-checked
  24. Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
  25. Rule 3701-26-04 | Campground requirements (Ohio statewide rule), quoted and re-checked
  26. Washington County Planning Commission Regulations, quoted and re-checked
  27. Required Inspections Check List and Guide for Inspector, quoted and re-checked
  28. Application for Residential Building Plan Approval, quoted and re-checked
  29. Share of land at 15% slope or less: Bolthole Index county data
  30. Wooded share of land: Bolthole Index county data
  31. Planning Commission, quoted and re-checked
  32. Floodplain Information, quoted and re-checked
  33. Farmland value per acre (USDA census): Bolthole Index county data
  34. Section 3781.061 | Exemption for building or structure used in agriculture, quoted and re-checked
  35. Sewage Program, quoted and re-checked

Written October 9, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Found land here? Start a Property Hunt →

Compared with neighboring counties

Unlike all 6 of its neighbors, Washington County requires a building permit for a home.

RuleWashington CountyMorgan CountyNoble CountyAthens CountyMonroe CountyMeigs CountyGuernsey County
Building permitRequiredNot requiredLimitedLimitedNot requiredLimitedNot required
County zoningNoNoNoNoNot publishedNoNo
Septic permitsCounty Health Dept.County Health Dept.Cambridge-Guernsey County Health Dept.Athens City-County Health Dept.County Health Dept.County Health Dept.Cambridge-Guernsey County Health Dept.

County locator

Washington County in Ohio

67
County map
Washington County highlighted among the Ohio counties · colored by Index score

How Washington County scores

Seclusion54100% ev.
Self-Sufficiency60100% ev.
Admin Boringness5590% ev.
Durability76100% ev.
Property Autonomy35100% ev.
Carry Cost80100% ev.

Evidence strength: 98%. This reports direct-source completeness and fallback use; it is separate from the score and is not a confidence interval. How it works →

$191kTypical home
1%Property tax
$4,671Land / acre
44.1"Annual rain
2.2% of yrsSevere drought
3.7 / yr (+3.6)Mid-century 100°F days
11.6 daysMid-century dry spell
1.7" (+7.8%)Mid-century 1-day rain
1.9×Wildfire change factor
100%Forward climate coverage
$1,174Home insurance / yr
-0.2% / yrInsurance growth
1.46%Nonrenewal rate
county median (2+ published ZIPs)Insurance basis
38,692People within 30 min
1,945,763People within 2 hr
66,146Radius comparison (15 mi)
92.7People / sq mi
9.7%Federal land
43.6%Land at 15% slope or less
1.1%Soils rated "not limited" for septic (strict USDA rating)
4,474 acWorkable land screen
69.9%Wooded land
55.3 tonsBiomass / forest ac
53.4°FAvg temp

Scout Washington County

Camp here before you commitBook a few nights nearby on Hipcamp →Already own land here?Earn money hosting campers — get $100 when you become a Hipcamp host →

Some links are affiliate or referral links — we may earn a commission, at no cost to you.

Property hunt

Find land. Bring the promising ones back.

Search live inventory elsewhere, then cost and vet each candidate here. No copied listings, account, or paid data feed.

Each button opens a current land search for Washington County. Listing sites control their own results and filters.

Analyze a property
Add setup-cost allowances

Use rough quotes or placeholders. Blank fields count as $0.

Working estimate

—land + entered setup costs
Asking $ / acre
—
Setup allowance
—
All-in $ / acre
—

A planning estimate, not a valuation or contractor quote. The USDA benchmark includes farm land and buildings; it is context, not a parcel comp.

Before an offer

Parcel due diligence

0/8 checked

Saved properties and checklist progress stay on this device. Bolthole Index does not receive them.

Cities and towns in Washington County

Inside a city, town or township here, that government usually sets zoning and may issue its own building permits; the county’s rules above cover land outside them.

Not yet researched: Adams Township · Aurelius Township · Barlow Township · Belpre Township · Village of Beverly · Decatur Township · Dunham Township · Fairfield Township · Fearing Township · Grandview Township · Independence Township · Lawrence Township · Liberty Township · Village of Lowell · Village of Lower Salem · Ludlow Township · Village of Macksburg · Marietta Township · Village of Matamoras (New Matamoras) · Muskingum Township · Newport Township · Palmer Township · Salem Township · Warren Township · Waterford Township · Watertown Township · Wesley Township

Answers from the rulebook for Washington County

What the ordinances and state agencies actually say — one answer per question, each quoted from the official source and independently re-checked.

Washington County rules

  • Building permitRequired

    Residential construction, alterations, additions, and listed regulated work in the SEOBD jurisdiction in Washington County.

    • Residential projects include one-family and two-family dwellings and townhouses; apartment buildings, condominiums, and similar buildings are treated as commercial projects.
    • A permit is always required for listed work, including additions, garages or carports, finishing basements, accessory buildings over 200 square feet, and other listed work.
    • Work begun before permit issuance incurs a double permit fee under the Washington County Fee Structure Resolution.

    accessory building permit threshold: > 200 square feet (Residential accessory buildings of 200 square feet or less are listed as not requiring permits.) · deck elevation permit threshold: >= 16.5 inches above finished grade

    “A permit is always required for any of the following work: Porches or Decks (where the floor is 16.5 inches or more above the finished grade) Additions Garages or Carports Finishing a Basement Accessory Buildings (Sheds) (greater than 200 square feet in area)”
    2 more reviewed findings on this topic
    • Required — Residential and other listed projects in Washington County within the Southeast Ohio Building Department jurisdiction
      “A permit is always required for any of the following work:”
    • Required — Residential and other covered construction projects served by SEOBD in Washington County.
      “A permit is always required for any of the following work:”
  • Building code adoptedAdopted

    Residential and commercial construction within the Southeast Ohio Building Department jurisdiction serving Washington County

    • The listed residential code is for one-, two-, and three-family dwellings.
    • The current-code PDF states it was updated 2024-05-06; that update date is not treated as an effective date.
    “Residential Codes 2019 RCO Residential Code of Ohio for 1, 2 and 3 Family Dwellings”
  • InspectionsRequired

    Building-plan approvals in the SEOBD jurisdiction in Washington County.

    • The inspection list is provided when plan approval is issued.
    • Inspections are performed in part or in whole depending on the project and approved construction documents.
    • Residential checklist items include lot-line marking, excavation, foundation, slab and under-floor, and lowest-floor-elevation inspections.
    “A list of inspection(s) shall be provided at the time the plan approval is issued per RCO 108.2. The list indicates which inspections are required for the project and the items an inspector should be verifying at a minimum to ensure work constructed is in compliance with the Approved construction documents. The following are those inspections listed in Chapter 1 that must occur and be included on the list for the project.”
    2 more reviewed findings on this topic
    • Required — Projects receiving plan approval under the Residential Code of Ohio in the Southeast Ohio Building Department jurisdiction
      “A list of inspection(s) shall be provided at the time the plan approval is issued per RCO 108.2. The list indicates which inspections are required for the project and the items an inspector should be verifying at a minimum to ensure work constructed is in compliance with the Approved construction documents.”
    • Required — Building inspections for projects requiring plan approval in the Southeast Ohio Building Department service area.
      “The list indicates which inspections are required for the project”
  • Certificate of occupancyLimited

    Occupied buildings after completion of required building inspections in the SEOBD jurisdiction.

    • All inspections must be obtained before issuance.
    • The source specifically states issuance for occupied buildings; it does not establish a universal C-of-O requirement for every structure.
    “Once all inspections have been obtained a final Certificate of Occupancy will be issued for occupied buildings.”
  • Local zoningVaries (with conditions)

    Countywide aggregate of local zoning: the applicable zoning authority depends on whether property is in Marietta, outside Marietta in a township, or in another city or village.

    • The county page states that Marietta zoning is regulated by the City of Marietta Engineering Department.
    • For property outside the City of Marietta, the page directs the property owner to the township trustees of the township where the property is located.
    • For property in a city or village, the page directs the property owner to that city or village for zoning information.
    • This claim aggregates township and municipal zoning and does not assert that Washington County administers each local ordinance.
    “The City of Marietta, Engineering Department is responsible for regulating the City of Marietta Zoning Ordinances. If your property is located outside the City of Marietta, you should contact the township trustees of the township in which your property is located. If you are located in a City or Village, you must contact that city or village for zoning information.”
    One more reviewed finding on this topic
    • Varies (with conditions) — Aggregate local zoning across Washington County; zoning authority varies by municipality, village, and township.
      “The City of Marietta, Engineering Department is responsible for regulating the City of Marietta Zoning Ordinances. If your property is located outside the City of Marietta, you should contact the township trustees of the township in which your property is located. If you are located in a City or Village, you must contact that city or village for zoning information.”
  • Minimum lot sizeSpecified

    Residential subdivisions in unincorporated Washington County where no county or township zoning resolution is in effect; Table 1's single- or two-family rows.

    • The regulations apply to subdivisions located in the unincorporated area of Washington County.
    • Where a county or township zoning resolution is in effect, the subdivision must meet that zoning resolution as well as the county subdivision regulations.
    • For single- or two-family development, Table 1 provides different lot areas and widths based on public-water and central-sewage-treatment availability.
    • Lot area does not include right-of-way.
    • Lot areas may increase on recommendation of the County Health Department; for slope areas with average slope 15 percent or greater, hillside regulations apply.
    • If soil conditions may impair proper operation of wells and septic tanks, the Planning Commission may increase lot sizes or deny subdivision approval upon Health Department recommendation.

    single-or-two-family minimum lot area with public water and no central sewage: 20000 square feet (Table 1) · single-or-two-family minimum lot area without public water and with central sewage: 20000 square feet (Table 1) · single-or-two-family minimum lot area with public water and central sewage: 9450 square feet (Table 1) · single-or-two-family minimum lot area without public water and without central sewage: 20000 square feet (Table 1) · single-or-two-family minimum lot width with public water and no central sewage: 90 feet (Table 1) · single-or-two-family minimum lot width without public water and with central sewage: 80 feet (Table 1) · single-or-two-family minimum lot width with public water and central sewage: 70 feet (Table 1) · single-or-two-family minimum lot width without public water and without central sewage: 90 feet (Table 1)

    “Where a county or township zoning resolution is not in effect, the minimum lot size, width and frontage shall be as specified in Table 1.”
    One more reviewed finding on this topic
    • Specified — Subdivisions of land in the unincorporated area of Washington County where a county or township zoning resolution is not in effect.
      “Single or Two Families [...] 20,000 sf 20,000 sf 9,450 sf 20,000 sf”
  • SetbacksSpecified

    Residential subdivisions in unincorporated Washington County where no county or township zoning resolution is in effect; Table 1's single- or two-family rows.

    • The regulations apply to subdivisions located in the unincorporated area of Washington County.
    • Where a county or township zoning resolution is in effect, the subdivision must meet that zoning resolution as well as the county subdivision regulations.
    • The table varies by public-water availability, central-sewage-treatment availability, and street classification.
    • The stated setbacks are measured from the street right-of-way line.
    • Corner lots must observe the minimum front-yard setback from both streets.
    • Lot areas may increase on recommendation of the County Health Department; for slope areas with average slope 15 percent or greater, hillside regulations apply.
    • If soil conditions may impair proper operation of wells and septic tanks, the Planning Commission may increase lot sizes or deny subdivision approval upon Health Department recommendation.

    single-or-two-family front setback on arterial street: 35 feet (Table 1) · single-or-two-family front setback on collector street: 30 feet (Table 1) · single-or-two-family front setback on local or cul-de-sac street: 30 feet (Table 1)

    “Minimum Front Setback Requirements Development (feet from street roght-of-way line) type Public Water Available Central Sewage Treatment Available Minimum Lot Width (feet) Lot Area (per family or business) Arterial Street Collector Street Local and Cul-de-Sac Single or Two Families Yes No Yes No No Yes Yes No 90 80 70 90 20,000 sf 20,000 sf 9,450 sf 20,000 sf 35 35 35 35 30 30 30 30 30 30 30 30”
    One more reviewed finding on this topic
    • Specified — Minimum front setbacks for subdivisions in unincorporated Washington County where Table 1 of the county subdivision regulations applies.
      “Arterial Street Collector Street Local and Cul-de-Sac [...] 35 [...] 30 [...] 30”
  • Who permits septicCounty

    Residential and commercial sewage treatment systems with flow of 1,000 gallons per day or less in Washington County.

    • The Washington County Health Department permits and inspects installation.
    • A Permit To Install is issued before installation proceeds.
    • Registered installers are required unless the homeowner qualifies for self-installation after passing the STS exam and supplying the certificate before work.

    covered flow: <= 1000 gallons per day or less

    “We permit and inspect the installation of residential and commercial (1000 gallons a day or less flow) sewage treatment systems within Washington County.”
    2 more reviewed findings on this topic
    • County — Residential and commercial sewage treatment systems with flow of 1,000 gallons per day or less within Washington County
      “We permit and inspect the installation of residential and commercial (1000 gallons a day or less flow) sewage treatment systems within Washington County.”
    • County (with conditions) — Residential and commercial sewage treatment systems with flow of 1,000 gallons per day or less within Washington County.
      “We permit and inspect the installation of residential and commercial (1000 gallons a day or less flow) sewage treatment systems within Washington County.”
  • Septic permitRequired

    Installation of residential and commercial sewage treatment systems with flow of 1,000 gallons per day or less.

    • Permit application, plat or survey map, fee, soil survey, Permit To Install, cover-up inspection, and final permit are part of the stated process.
    • A registered installer must install the system but may not perform the cover-up.
    • Self-installation requires an STS Exam certificate before work begins.

    maximum flow: <= 1000 gallons per day

    “Fill out the permit application (plat or survey map) and pay the fee”
    One more reviewed finding on this topic
    • Required — Installation of covered residential and commercial sewage treatment systems in Washington County.
      “Fill out the permit application (plat or survey map) and pay the fee Schedule a soil survey with the Environmental Health Specialist Environmental Health Specialist conducts on-site soil survey Environmental Health Specialist designs a system based on soil survey or you choose your own contractor. Permit To Install (PTI) is issued”
  • Septic inspectionRequired

    Installation of sewage treatment systems in Washington County.

    • The registered installer installs the system but does not cover it.
    • The Environmental Health Specialist performs the cover-up inspection before the system is covered.
    • The Health Department may conduct periodic inspections and may charge a service fee.
    “Registered Installer installs septic system (but NOT cover-up) Environmental Health Specialist performs cover-up inspection”
    4 more reviewed findings on this topic
    • Required — Installation of covered sewage treatment systems in Washington County.
      “Registered Installer installs septic system (but NOT cover-up) Environmental Health Specialist performs cover-up inspection Registered Installer covers system up WCHD issues the final permit”
    • Not required — Inspection of household sewage treatment systems before sale of a home or property.
      “We also inspect household sewage treatment systems on homes or properties that are being sold. NOTE: It is not required by the Health Department that a system be inspected prior to a property being sold. It may be required by the buyer and/or lending agency.”
    • Required — Installation of covered residential and commercial sewage treatment systems and county O&M-program systems.
      “Environmental Health Specialist performs cover-up inspection”
    • Not required — Pre-sale inspection of a household sewage treatment system in Washington County.
      “It is not required by the Health Department that a system be inspected prior to a property being sold.”
  • Subdividing landRegulated (with conditions)

    Subdivision approval and subdivision infrastructure in Washington County.

    • Before land is subdivided, the owner or authorized agent must apply for and secure approval.
    • The Planning Commission approves subdivisions and may require public improvements, performance guarantees, inspections, fees, and compliance with applicable county or township zoning, health, state, and ODOT rules.

    final plat filing deadline: <= 1 year after preliminary-plan approval (Unless an extension is requested and granted in writing.) · final plat filing lead time: >= 20 days before meeting · planning commission action period: 30 days after filing (Unless extended by agreement, withdrawal, or granted delay.)

    “Before any land is subdivided the owner of the property, or his authorized agent, shall apply for and secure approval of the proposed subdivision in accordance with the following procedures:”
    2 more reviewed findings on this topic
    • Regulated (with conditions) — Subdivision of land in the unincorporated area of Washington County.
      “The Planning Commission is responsible for the approval of all subdivisions in Washington County, and any right-of-way for access across private property.”
    • Regulated (with conditions) — Subdivision of land in the unincorporated area of Washington County, Ohio, including qualifying lot splits, minor subdivisions, major subdivisions, cluster developments, planned unit developments, streets, common open spaces, and utility easements.
      “These Regulations shall be applicable to all subdivisions of land located within the unincorporated area of Washington County.”
  • Driveway accessRequired

    Driveways and access points for subdivisions in Washington County.

    • A driveway permit or approved-access letter must come from the county engineer, township trustees, or ODOT.
    • Proof must be submitted with the final plat, or the plat must require lot owners to obtain permits before development.
    • Driveway grade may not exceed 15 percent; side-lot-line spacing is at least 3 feet.

    maximum driveway grade: <= 15 percent · minimum driveway distance from side lot line: >= 3 feet

    “A driveway permit or letter indicating the access point as approved shall be obtained from the office of the county engineer, township trustees, or Ohio Department of Transportation. Proof of such permit shall be submitted with the final plat, or plat dedication shall include a statement requiring all lot owners to apply for a driveway permit prior to development”
    One more reviewed finding on this topic
    • Limited — Rights-of-way for access across private property in Washington County subdivisions
      “The Planning Commission is responsible for the approval of all subdivisions in Washington County, and any right-of-way for access across private property.”
  • Building in a floodplainRequired

    Floodplain development in unincorporated Washington County.

    • Washington County Flood Damage Prevention Regulations are administered by Washington County Soil & Water.
    • The building department permit page lists floodplain development for the City of Marietta and unincorporated areas of Washington County.
    “Floodplain development (City of Marietta & unincorporated areas of Wash Co)”
  • Permit processPublished (with conditions)

    Building permit and plan-approval process in the SEOBD jurisdiction.

    • Separate applications are required for each dwelling unit, building, or structure.
    • Approved documents must remain at the jobsite for scheduled inspections.
    • Most permits have a stated turnaround of 1 to 14 days, with a 30-day maximum.
    • Applications not approved because of code, zoning, floodplain, or changed plans do not receive refunds.

    typical turnaround: 1-14 days (30 days maximum)

    “A separate application is required for each individual dwelling unit, building or structure. All approved documents from permit issuance or subsequent modifications, must be available at the project jobsite for any scheduled inspection.”
    One more reviewed finding on this topic
    • Partial — Building permit and plan-approval process for Washington County projects handled by the Southeast Ohio Building Department
      “We accept electronic drawings via Dropbox”
  • County-wide zoningAbsent

    Washington County has no countywide zoning resolution; the county Planning Commission administers only subdivision regulations, and zoning where it exists is adopted at the township level.

    Washington County - Planning Commission ↗Scouted from the county site, not yet independently re-checked

Ohio rules that apply here

  • Owner-builder exemptionConditional

    Electrical and heating, ventilating, and air-conditioning work performed as contracting within an Ohio county; the statute authorizes, but does not itself impose, county licensing rules.

    • A board of county commissioners may adopt licensing rules by resolution for electrical and HVAC contractors not required to hold a valid and unexpired Chapter 4740 license.
    • County rules may be enforced in unincorporated areas and in municipalities that contract with the county for enforcement.
    • A county rule may require examinations, technical-skill demonstrations, fees, and additional licensing requirements.
    • A county board may accept a valid and unexpired Chapter 4740 license for construction, replacement, maintenance, or repair of one-, two-, or three-family dwellings or incidental accessory structures.
    • The statute does not establish a statewide owner-builder electrical or HVAC contractor-license exemption; county and municipal rules must be checked for the specific location.
    “Each board of county commissioners may adopt, by resolution, rules establishing standards and providing for the licensing of electrical and heating, ventilating, and air conditioning contractors who are not required to hold a valid and unexpired license pursuant to Chapter 4740. of the Revised Code.”
    2 more reviewed findings on this topic
    • Conditional — An owner-builder constructing, erecting, altering, or equipping a building covered by Ohio Revised Code section 3781.06, including residential buildings, where a certified municipal, township, or county building department has jurisdiction.
      “No owner shall proceed with the construction, erection, alteration, or equipment of any building until the plans or drawings, specifications, and data have been approved as this section requires, or the industrialized unit inspected at the point of origin.”
    • Conditional — An owner performing contractor-regulated construction, improvement, or renovation on the owner's own primary residential building in Ohio.
      “(F) "Construction project" means a construction project involving a building or structure subject to Chapter 3781. of the Revised Code and the rules adopted under that chapter, but not an industrialized unit or a residential building as defined in section 3781.06 of the Revised Code.”
  • Building heightDistrict specific (with conditions)

    Township zoning regulation of height for agricultural buildings or structures on lots greater than one acre but not greater than five acres in qualifying platted subdivisions or qualifying areas of fifteen or more contiguous lots.

    • The local regulation must arise under a township zoning resolution or amendment.
    • The subdivision or area must meet the statutory qualification in section 519.21(B).
    • The statute does not provide a statewide numeric height limit.
    • Township zoning may not regulate agriculture, agricultural buildings or structures, or dairying and animal and poultry husbandry on lots greater than five acres under division (B).

    lot size lower threshold: > 1 acre · lot size upper threshold: <= 5 acres

    “Buildings or structures incident to the use of land for agricultural purposes [...] height;”
  • Manufactured homesLimited

    Occupancy of manufactured homes installed in Ohio and regulated under Chapter 4781 of the Revised Code and implementing rules.

    • A manufactured home generally may not be occupied until the inspector issues the inspection seal.
    • The inspection seal must be paid for when the permit is issued.
    • A temporary occupancy permit may provide the applicable exception under Rule 4781-7-01(C).
    • The home must meet Ohio manufactured-home installation standards; local ordinances and other regulations may also apply to site placement.
    “Except as provided in paragraph (C) of this rule, no manufactured home shall be occupied until the inspector has issued the inspection seal.”
  • Well permitRequired

    Construction, alteration, sealing, or decommissioning of private water systems, including private wells and test wells, in Ohio.

    • A valid permit must be issued by the board of health before construction, alteration, or sealing, except that a person sealing a well or decommissioning a private water system not being replaced must apply no later than five business days afterward.
    • Except where specified exceptions apply, no work may begin until the permit is issued and approved.
    • Applications require the applicable permit fee, required information, and a fee for at least one water sample for alteration, conversion, or new construction.
    • An application becomes a permit upon validation by the local health district.
    • Plans are additionally required for specified systems, including systems serving a building, non-one/two/three-family dwellings, cisterns, springs or ponds, flowing-well areas, drive-point wells, buried pressure tanks, gasoline-powered pumps, continuous disinfection or filtration, and certain point-of-entry treatment systems.

    post-sealing/decommissioning application deadline: <= 5 business days (Applies when the well or private water system is not being sealed or decommissioned because it is being replaced.)

    “No person shall construct, alter or seal a private water system, test well or part thereof, unless a valid permit for the system has been issued”
  • Mandatory utility hookupSewer (with conditions)

    Disposal of sewage where an existing publicly owned or regional sanitary sewer is accessible and available.

    • The sewer connection may not conflict with an areawide waste-treatment plan, approved regional sewage-service and treatment plan, or connection ban.
    • The receiving disposal system must have or be expected to have capacity to collect and treat the sewage.
    • For an existing structure, any part of the structure generating waste must be within 300 feet of the nearest sanitary-sewer right-of-way boundary.
    • For a proposed structure outside a larger common plan, any lot property line must be within 300 feet.
    • For two or more proposed structures, the threshold is 200 feet multiplied by the number of proposed structures, up to 5,000 feet.
    • The director may grant an exemption when technical, financial, environmental, legal, or physical barriers prevent connection and the alternative will not adversely affect human health or the environment.
    • When a sewer later becomes accessible and available, a non-public or non-regional disposal system must generally be abandoned and connection made within three years unless the director authorizes another timeframe.

    existing structure sewer-distance threshold: <= 300 feet (Measured to the nearest boundary of the sanitary-sewer right-of-way.) · proposed structure sewer-distance threshold: <= 300 feet (Measured from any property line of the lot.) · multiple proposed structures threshold: 200 feet multiplied by the number of proposed structures (Maximum distance is 5,000 feet.) · connection deadline after accessibility becomes available: 3 years (Unless an alternative timeframe is authorized by the director.)

    “Connection into existing publicly owned or regional sanitary sewers is required for the disposal of sewage when said sewers are accessible and available.”
  • Agricultural exemptionConditional

    Buildings or structures incident to agricultural use of the land, and a specific building or structure declared by a county or township zoning inspector to be used in agriculture.

    • The exemption in section 3781.06 applies to buildings or structures incident to agricultural use of the land.
    • The buildings or structures must not be used in the business of retail trade.
    • A building or structure is not considered used in the business of retail trade if fifty per cent or more of gross income from sales of products in the building or structure comes from products produced or raised in a normal crop year on farms owned or operated by the seller.
    • Under section 3781.061, a county zoning inspector under section 303.16 or township zoning inspector under section 519.16 must issue a zoning certificate declaring the specific building or structure is to be used in agriculture for the additional exemption described there.
    • The cited section 3781.06 is effective January 1, 2025; section 3781.061 is effective October 17, 2019.

    retail-sales agricultural-product threshold: >= 50 percent of gross income (Products must be produced or raised in a normal crop year on farms owned or operated by the seller.)

    “issues a zoning certificate that declares a specific building or structure is to be used in agriculture, such building is not subject to sections”
    3 more reviewed findings on this topic
    • Conditional — Agricultural buildings or structures in Ohio, including Washington County
      “Whenever a county zoning inspector under section 303.16 of the Revised Code, or a township zoning inspector under section 519.16 of the Revised Code, issues a zoning certificate that declares a specific building or structure is to be used in agriculture, such building is not subject to sections 3781.06 to 3781.20, 3781.40, or 3791.04 of the Revised Code.”
    • Available (with conditions) — Qualifying parcel divisions processed under rules adopted pursuant to Ohio Revised Code section 711.133.
      “Rules adopted under this section shall exempt from the approval requirements of this section parcels of land to be used only for agricultural”
    • Available (with conditions) — Buildings or structures incident to agricultural use of the land in Ohio.
      “incident to the use for agricultural purposes [...] provided those buildings or structures are not used in the business of retail trade.”
  • Permit feesPublished (with conditions)

    Construction documents and inspections required to be submitted to the Ohio Division of Industrial Compliance.

    • The certificate of occupancy or certificate of completion will not be issued until applicable fees are paid.
    • The schedule includes a $275 processing fee for structural, mechanical, electrical, fire alarm, and sprinkler scopes; plan-examination fees vary by scope and area or device count.
    • One initial plan review and up to two resubmission plan reviews are included; additional resubmissions cost $100 each.
    • Additional inspections cost $150 per inspection; reinspections cost $150.
    • Certificates of occupancy or completion cost $65, except existing-building certificates issued under rule 111.4 have no fee.
    • The rule was effective January 1, 2019 and was last updated July 14, 2026.

    structural processing fee: 275 USD · certificate of occupancy or completion fee: 65 USD (No fee for existing-building certificates issued under rule 111.4)

    “The fees for examination and processing of construction documents when required to be submitted to the division of industrial compliance, except medical gas piping systems and temporary structures, shall be in accordance with Table B1.”
    One more reviewed finding on this topic
    • Variable (with conditions) — Construction-document submissions and inspections handled by certified municipal, township, or county building departments in Ohio.
      “Fees for construction documents submitted to and inspections made by certified building departments shall be in accordance with the locally adopted fee schedule.”
  • Campground & park staysLimited

    Roadside camping at designated Ohio state forests along public roads maintained by the division of forestry.

    • Permitted only at designated state forests, along public roads maintained by the division of forestry, during certain legally established hunting seasons.
    • The chief of the division of forestry must authorize the applicable season.
    • Only self-contained camping units meeting Rule 1501:3-3-04 are permitted unless restroom facilities are available.
    • Vehicles must be parked sufficiently far off the roadway not to present a hazard and may not block roads, trails, or gated access areas.
    • Other restrictions in Rule 1501:3-3-06 apply.
    “Roadside camping is permitted at designated state forests, along public roads maintained by the division of forestry, during certain legally established hunting seasons as authorized by the chief of the division of forestry.”
    2 more reviewed findings on this topic
    • Limited — Occupancy and placement of recreational vehicles in Ohio-licensed campgrounds and temporary campgrounds.
      “Recreational vehicles or portable camping units shall be parked only on sites that have been verified as complying with plans approved by the director, or in the case of a temporary campground, by the licensor;”
    • Prohibited — Camping in Ohio state forests outside areas, sites, or campgrounds designated by the chief of the division of forestry or an authorized agent.
      “No person shall camp in a state forest except in areas, sites or campgrounds designated by the chief of the division of forestry or authorized agent.”
  • county zoning authorityGeneral

    County commissioners may adopt zoning resolutions regulating building, structures, land uses, and districts or zones in unincorporated territory statewide.

    • The authority is exercised by resolution and must be in accordance with a comprehensive plan.
    • The authority applies to unincorporated territory of the county.
    • The statute begins with the exception phrase “Except as otherwise provided in this section,” so the limitations in ORC Chapter 303 apply.
    • For nonresidential property only, the county may regulate height, bulk, number of stories, size, lot coverage, yards, courts, open spaces, and population density.
    • Agricultural uses and agricultural buildings are subject to the limitations in ORC 303.21; the statute also contains limitations for public utilities, railroads, telecommunications towers, alcoholic-beverage sales, oil and gas drilling, and permanently sited manufactured homes.
    • Activities regulated under ORC Chapters 1513 and 1514 may be regulated only in the interest of public health or safety, and Chapter 1514 activities must be provided for as permitted or conditional uses as specified by ORC 303.02.
    “the board of county commissioners may regulate by resolution, in accordance with a comprehensive plan”
  • county building authorityGeneral

    County commissioners may adopt and enforce local residential building regulations in unincorporated areas and may operate certified county building departments that enforce state residential and nonresidential building codes, accept and approve plans, and conduct inspections.

    • Local residential building regulations may be enforced within the unincorporated area or within districts established in the unincorporated area.
    • A local residential building regulation may not differ from the state residential building code unless it addresses subject matter not addressed by that code or is adopted under ORC 3781.01.
    • An existing structures code must concern subject matter not addressed by, and may not conflict with, the state residential building code.
    • County building departments may enforce state codes only for the types of buildings and subject matters for which they are certified.
    • Certification permits enforcement authority, plan approval, and inspections; the certification application identifies whether it covers residential or nonresidential buildings and whether residential certification covers new construction only or also repair and alteration.
    • The board may adopt flood-hazard, Lake Erie coastal-erosion, and drainage regulations, subject to the statutory limits and exceptions in ORC 307.37.
    • Local regulations, codes, or amendments require public hearings at not fewer than two regular or special board sessions; they take effect on the thirty-first day after adoption.
    • Regulations adopted under ORC 307.37 generally do not affect buildings or structures existing, or under construction, before adoption, except as provided for an existing structures code.
    • The state residential building code is effective as a uniform requirement in areas with a building department certified to enforce it.
    “The board of county commissioners may adopt local residential building regulations governing residential buildings as defined in section 3781.06 of the Revised Code”
    One more reviewed finding on this topic
    • General — Ohio boards of county commissioners adopting and enforcing local residential building regulations in unincorporated county areas, including districts established within those areas, and administering state building codes when certified.
      “The board of county commissioners may adopt local residential building regulations governing residential buildings”

Inside cities and towns in Washington County

Municipal rules found while researching the county. They apply inside that city or town, not to unincorporated land.

  • Permit feesPublished

    Residential building-plan approval fees published by the Southeast Ohio Building Department for projects within its service jurisdictions.

    • The cited residential application is dated 4/13/2021; the page does not state that date as an effective date.
    • Lineal and square-footage figures are rounded up to the next 100 square or lineal feet.
    • Fees include a 1% State of Ohio surcharge.
    • Other permits may be required in incorporated cities, villages, and counties.
    • Up-front fees are not refundable except for Washington County clerical error.

    structural processing fee: 125 USD · structural fee: per 10 USD per 100 square feet · mechanical processing fee: 125 USD · mechanical fee: per 10 USD per 100 square feet · electrical/service entrance processing fee: 125 USD · electrical/service entrance fee: per 10 USD per 100 square feet · fire suppression processing fee: 100 USD · fire detection and alarms processing fee: 100 USD · re-roofing fee: 50 USD for 400 square feet or more · siding fee: 50 USD for 400 square feet or more · decks processing fee: 50 USD · decks fee: per 10 USD per 100 square feet · field inspection: 50 USD (Structural/Mechanical/Electrical) · resubmittal fee: per 75 USD per resubmittal · preliminary review: per 75 USD per submittal · permit renewal: 25 USD (One time renewal) · non-compliance fee: 2X permit fee · state surcharge: 1 percent (State of Ohio surcharge)

    “F E E S C H E D U L E STRUCTURAL $125.00 Processing Fee $10.00 per 100 Square Feet”

Set by your township or city, not the county

In Ohio, zoning is adopted by each township or city, so Washington County has no county-wide answer on these. Find your township or city in the list of places on this page, or call its clerk or zoning administrator.

  • Zoning districts
  • Minimum dwelling size
  • Lot coverage
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Accessory dwellings
  • Short-term rentals

Still unanswered

We looked and could not find an official answer yet. Silence is not permission — ask the county directly.

  • Off-grid sanitation — Off-grid sanitation systems in Washington County

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Living off-grid in Washington County, Ohio

Is Washington County a good place to live off-grid or homestead?

Washington County scores 67/100 on the Bolthole Index, a strong county profile. Its strengths: manageable long-term carry cost and a durable current and mid-century hazard profile. Watch-outs: a weaker property-autonomy legal backdrop.

Do you need a building permit in Washington County, Ohio?

Washington County generally requires a residential building permit, and it has no county-wide zoning. Onsite septic is permitted by Washington County Health Department (Environmental Health). Owner-builders may act as their own contractor to build their home. These answers are quoted from official sources and independently re-checked. Rules change and cities within the county differ — always confirm with the county before you buy or build.

How much does land cost in Washington County, Ohio?

Land in Washington County runs about $4,671 per acre, based on the latest county data.

What is the water situation in Washington County?

Washington County gets about 44.1" of rain a year, with severe drought in roughly 2.2% of years.

How remote is Washington County?

A representative private-land location has about 38,692 people within a 30-minute drive and 1,945,763 within two hours. The road-network catchments count population across county lines and clusters of smaller cities; straight-line radius values remain available as a comparison.

How Washington compares in Ohio

Compare side-by-side →See all 88 Ohio counties ranked →