Georgetown County, South Carolina

Building permits, zoning and septic rules in Georgetown County, South Carolina

65Index Score / 100
#7 of 46 in South Carolina

Unincorporated Georgetown County, South Carolina requires building permits for new homes through the Georgetown County Building Department.1 County zoning governs unincorporated areas designated on the official zoning maps.2 Inside Andrews, the town handles building permits and zoning; septic approval remains with the state.345 Where public or community sewer is unavailable, South Carolina Department of Environmental Services septic approval must precede the county building permit.67

At a glance

Building permit
Required for residential and commercial construction in unincorporated areas1
Zoning
County zoning applies in mapped unincorporated areas; standards vary by district28
Septic permit
SC DES approval required where public or community sewer is unavailable69
Owner-builder exemption
Licensing exemption for an owner's or family's home; building permits and codes still apply10
Building code
2021 IRC for one- and two-family homes, with South Carolina modifications11
Manufactured homes
Allowed only in eligible districts and require a mobile-home permit12
Minimum lot size
Varies by zoning district and use13
Residential well
$70 Notice of Intent fee before construction14

Who to call

Building permits

Georgetown County Building Department

Residential and commercial building permit issuance and inspections for Georgetown County; inspection requests go to a separate line

843-545-3116

129 Screven Street, Room 249, Georgetown, SC 29440

Zoning

Georgetown County Zoning Department

Zoning ordinance enforcement, and review of building, mobile-home, sign, tree-removal and vendor permits for Georgetown County

843-545-3602

129 Screven Street, Georgetown, SC 29440

Septic permits

South Carolina Department of Environmental Services (SC DES)

Statewide septic (private sewage disposal) permitting, including for Georgetown County; applications are filed online through the ePermitting portal

(803) 898-3432

info@des.sc.gov

2600 Bull St., Columbia, SC 29201

Online permits →

Contact details are copied from each office’s official page and were checked against it on October 11, 2026.

Off-grid gear

Going off-grid in Georgetown County means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Do you need a building permit in Georgetown County, South Carolina?

Unincorporated Georgetown County requires completed building-permit applications for new residential and commercial construction, with supporting documents and applicable approvals due before issuance.1 One- and two-family dwellings use the 2021 International Residential Code with South Carolina modifications; commercial and multifamily structures use the 2021 International Building Code with state modifications.11 Construction inspections are required, but the inspection types depend on the project.15 A new Georgetown County residence cannot be occupied until its certificate of occupancy is issued after all necessary inspections pass; septic-connected waste plumbing also needs state approval on file.16 South Carolina’s farm-structure code exemption excludes homes and attached structures, requires a preconstruction affidavit, and preserves local building-permit authority and flood standards.17

Who issues building permits in Georgetown County, South Carolina, and how do you reach them?

The Georgetown County Building Department issues building permits for unincorporated-area projects.18 The office is at 129 Screven Street, Room 249, Georgetown, SC 29440; call 843-545-3116, and request inspections at 843-545-3261.19 Call Georgetown County Zoning at 843-545-3602 for zoning review of residential, commercial and mobile-home applications.20 Inside Andrews, the town administers building permits, with an exemption for qualifying owner-performed work that does not waive inspections; state septic approval still applies where sewer is unavailable.35 County building applications need plans, a site plan, water or sewer approval and applicable project-specific approvals.21 Published residential fees can include building-permit, plan-review, fire-impact, impact and construction-sign charges.22

Does Georgetown County have zoning?

Georgetown County regulates land use in unincorporated areas designated on its official zoning maps; county GIS depicts the official district boundaries.232 Inside Andrews, town zoning applies, while septic approval remains with the state where sewer is unavailable.45 Georgetown County publishes district documents and a land-use/zoning designations chart; use the parcel’s district to find its standards.248 Minimum lot area and setbacks vary by district and use.1325 The ordinary cited height limit is 35 feet from grade, with conditional industrial exceptions.26 Along Highway 701 from Black River north to the Horry County boundary, the front setback is 90 feet.27 The schedule also requires 30% pervious surface for applicable lots; ask Zoning which district entry governs your parcel.28 We could not confirm a minimum dwelling floor area; ask Georgetown County Zoning about the proposed home’s dimensions.20

How do septic permits work in Georgetown County?

The South Carolina Department of Environmental Services approves residential septic systems in Georgetown County where public or community sewer is unavailable; the county building permit depends on that approval.67 Apply through state ePermitting; the application fee is $150 and the Permit to Construct lasts 5 years, with renewal requiring a new application and fee.299 Before covering the system, the installer must schedule an inspection; if the state inspector does not arrive within 30 minutes of the scheduled time, a licensed installer may self-inspect using the approved form and submit final documentation.30 Only 0.4% of Georgetown County soils avoid a severe-limitation rating for conventional drain fields, so make septic feasibility a purchase contingency.31 Where public sewer is accessible, an onsite wastewater permit cannot be issued.32

Can you live in an RV or tiny home on your land in Georgetown County?

Georgetown County's Destination Park District allows short-term camper occupancy for leisure activities near natural attractions, but that rule does not authorize long-term RV living elsewhere.33 We could not confirm a complete rule for long-term RV living, temporary camping or tiny-home occupancy, so ask the Zoning Department at 843-545-3602 about the parcel and proposed use before placing a unit.20 County zoning also bars parking or storing a travel trailer without current license plates on residentially zoned property unless it is in a completely enclosed building; that rule covers storage, not whether you may live in an RV.34 Manufactured homes require a county mobile-home permit and zoning review, and eligibility varies by district.12 The mobile-home process runs from Building to Zoning, then to the Assessor for registration and a sticker, and back to Building for fees; water and sewer proof or a state septic permit is also required.35 A permanent tiny home still faces the county's zoning controls and residential building code, but we could not confirm a separate tiny-home category.211

Building a home in Georgetown County: the steps, in order

  1. Ask Zoning to confirm the use, district, lot area, setbacks, height and pervious-surface rule for the parcel.13272628
  2. Confirm water and sewer service; where public or community sewer is unavailable, obtain state septic approval.6
  3. Obtain the driveway encroachment permit from SCDOT or Public Works, as applicable.36
  4. Prepare the plans, site plan, completed application and any applicable flood, fire, stormwater or other project-specific approvals.21
  5. File the building-permit application and plan-review payment with the Georgetown County Building Department.122
  6. If using the owner-builder exemption, appear and sign personally, supervise the work, use licensed trades where required and record the required notice.10
  7. Request each applicable inspection and wait for the certificate of occupancy before moving in.1516

What to check before you buy land in Georgetown County

Check Georgetown County zoning and septic feasibility before buying: lot standards vary by district, and only 0.4% of county soils avoid severe limitations for conventional drain fields.1331 Flood-zone residential projects need an elevation certificate and recorded non-conversion agreement where applicable; the original elevation certificate must be approved before final inspection can be scheduled.3738 New-home applications identify a driveway encroachment permit from SCDOT or Public Works.36 A private residential well requires a state Notice of Intent and $70 fee before construction.14 Composting or incinerating toilets are a conditional state permitting option for unsuitable sites, requiring engineered plans and approval to operate; pressurized-water graywater needs separate wastewater approval.3940

Watch-outs

  • South Carolina adopted a newer set of 2024 building codes on August 26, 2025, but local jurisdictions including Georgetown County don't have to implement them until January 1, 2027, so expect a code change if you build after that date.41
  • Georgetown County mobile-home applications require proof of water and sewer approval or a state septic permit; manufactured homes also face district eligibility rules.4212
  • Do not occupy a new residence before its certificate of occupancy; all necessary inspections must pass, and septic-connected waste plumbing needs state approval on file.16
  • South Carolina’s owner-builder exemption does not waive Georgetown County building permits, codes or zoning; personal supervision and a recorded notice are required, and sale or rent within 2 years creates a statutory presumption against the exemption.10

Sources

  1. Building Department, quoted and re-checked
  2. gtcountysc.gov, quoted and re-checked
  3. Town of Andrews: Code of Ordinances: Sec. 8-5. Exemption from building permit requirement (Georgetown County), quoted and re-checked
  4. Town of Andrews: Code of Ordinances: Sec. 4-142. Location restrictions (Georgetown County), quoted and re-checked
  5. Town of Andrews: Code of Ordinances: Sec. 40-47. Septic tanks; when permitted (Georgetown County), quoted and re-checked
  6. Septic Tanks - Residential, Single Home Builder, quoted and re-checked
  7. Septic Tanks - Residential, Single Home Builder, quoted and re-checked
  8. Land Development & Zoning Ordinances, quoted and re-checked
  9. Septic Tanks - Residential, Single Home Builder, quoted and re-checked
  10. South Carolina Code § 40-59-260, quoted and re-checked
  11. Building Department, quoted and re-checked
  12. Building Department, quoted and re-checked
  13. Land Development & Zoning Ordinances, quoted and re-checked
  14. Private Drinking Water Wells, quoted and re-checked
  15. Building Department, quoted and re-checked
  16. Residential Permit Inspections, quoted and re-checked
  17. South Carolina Code Title 6, Chapter 9 — Building Codes (South Carolina statewide rule), quoted and re-checked
  18. Building Department, quoted and re-checked
  19. Georgetown County Building Department (gtcountysc.gov)
  20. Georgetown County Zoning Department (gtcountysc.gov)
  21. Building Permit Checklist, quoted and re-checked
  22. Georgetown County Frequently Asked Questions, quoted and re-checked
  23. Building, Planning & Zoning, quoted and re-checked
  24. Land Development & Zoning Ordinances, quoted and re-checked
  25. gtcountysc.gov, quoted and re-checked
  26. Article VII Area, Yard, and Height Requirements, quoted and re-checked
  27. Article VII Area, Yard, and Height Requirements, quoted and re-checked
  28. gtcountysc.gov, quoted and re-checked
  29. South Carolina Department of Environmental Services (SC DES) (des.sc.gov)
  30. Septic Tanks - Residential, Single Home Builder, quoted and re-checked
  31. Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
  32. Professional Soil Classifiers - Sewer Accessibility Verification (South Carolina statewide rule), quoted and re-checked
  33. Land Use/Zoning Designations Chart, quoted and re-checked
  34. Article IV: General Provisions, quoted and re-checked
  35. Building Department FAQs, quoted and re-checked
  36. Building Permit Checklist, quoted and re-checked
  37. gtcountysc.gov, quoted and re-checked
  38. gtcountysc.gov, quoted and re-checked
  39. South Carolina State Register Vol. 45, Issue 5 — Regulation 61-56 (South Carolina statewide rule), quoted and re-checked
  40. South Carolina State Register Vol. 45, Issue 5 — Regulation 61-56 (South Carolina statewide rule), quoted and re-checked
  41. 2024 Building Code Modification Index (South Carolina statewide rule), quoted and re-checked
  42. Building Permit Checklist, quoted and re-checked

Written October 11, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Found land here? Start a Property Hunt →

Compared with neighboring counties

Like all 6 of its neighbors, Georgetown County requires a building permit for a home.

RuleGeorgetown CountyWilliamsburg CountyBerkeley CountyMarion CountyHorry CountyFlorence CountyClarendon County
Building permitRequiredRequiredRequiredRequiredRequiredRequiredRequired
County zoningYesNoYesYesYesYesYes
Septic permitsSC Dept. of Env. ServicesSCDESSCDESSCDESSCDESSCDESSC DES

County locator

Georgetown County in South Carolina

65
County map
Georgetown County highlighted among the South Carolina counties · colored by Index score

How Georgetown County scores

Seclusion63100% ev.
Self-Sufficiency62100% ev.
Admin Boringness45100% ev.
Durability50100% ev.
Property Autonomy46100% ev.
Carry Cost78100% ev.

Evidence strength: 100%. This reports direct-source completeness and fallback use; it is separate from the score and is not a confidence interval. How it works →

$389kTypical home
0.4%Property tax
$2,960Land / acre
52.6"Annual rain
2.8% of yrsSevere drought
5.3 / yr (+4.6)Mid-century 100°F days
13.4 daysMid-century dry spell
3" (+7.1%)Mid-century 1-day rain
1.22×Wildfire change factor
100%Forward climate coverage
$2,781Home insurance / yr
-0.1% / yrInsurance growth
2.1%Nonrenewal rate
county median (2+ published ZIPs)Insurance basis
1,236,769People within 2 hr
43,965Radius comparison (15 mi)
80.8People / sq mi
2.6%Federal land
100%Land at 15% slope or less
0.4%Soils rated "not limited" for septic (strict USDA rating)
1,916 acWorkable land screen
72%Wooded land
47.3 tonsBiomass / forest ac
64.4°FAvg temp

Scout Georgetown County

Camp here before you commitBook a few nights nearby on Hipcamp →Already own land here?Earn money hosting campers — get $100 when you become a Hipcamp host →

Some links are affiliate or referral links — we may earn a commission, at no cost to you.

Property hunt

Find land. Bring the promising ones back.

Search live inventory elsewhere, then cost and vet each candidate here. No copied listings, account, or paid data feed.

Each button opens a current land search for Georgetown County. Listing sites control their own results and filters.

Analyze a property
Add setup-cost allowances

Use rough quotes or placeholders. Blank fields count as $0.

Working estimate

—land + entered setup costs
Asking $ / acre
—
Setup allowance
—
All-in $ / acre
—

A planning estimate, not a valuation or contractor quote. The USDA benchmark includes farm land and buildings; it is context, not a parcel comp.

Before an offer

Parcel due diligence

0/8 checked

Saved properties and checklist progress stay on this device. Bolthole Index does not receive them.

Cities and towns in Georgetown County

Inside a city or town, that city usually issues building permits and sets zoning; the county’s rules above cover unincorporated land. Septic, wells and floodplain rules usually stay with the county or state everywhere.

Answers from the rulebook for Georgetown County

What the ordinances and state agencies actually say — one answer per question, each quoted from the official source and independently re-checked.

Georgetown County rules

  • Building permitRequired

    New residential and commercial construction permit applications in unincorporated Georgetown County.

    • The residential and commercial checklists require completed building permit applications and identify documents required before permit issuance.
    • Flood-zone requirements apply when applicable.
    • Driveway encroachment approval is required where applicable.
    “For projects located in the unincorporated areas of Georgetown County, the division: Issues building permits”
    One more reviewed finding on this topic
    • Limited — County building-permitting functions for projects located in the unincorporated areas of Georgetown County.
      “For projects located in the unincorporated areas of Georgetown County, the division: Issues building permits”
  • Building code adoptedAdopted (with conditions)

    One- and two-family dwellings and other structures in unincorporated Georgetown County.

    • 2021 IRC applies to one- and two-family dwellings with South Carolina modifications.
    • 2021 IBC applies to commercial and multifamily structures with South Carolina modifications.
    • Fire, plumbing, HVAC, electrical, gas, flood-zone, and other regulations also apply as adopted.

    residential code: 2021 IRC with South Carolina modifications · commercial and multifamily code: 2021 IBC with South Carolina modifications

    “2021 (IRC) International Residential Code with South Carolina modifications”
  • InspectionsLimited

    Residential development inspections administered by Georgetown County in the unincorporated area.

    • The county publishes footing, slab plumbing, slab-poly/wire, bond beam, framing, sheathing, brick, rough-in, insulation, electrical compliance, and final inspection procedures.
    • The source expressly states that not all listed inspections or points apply to every construction project.
    • A Certificate of Occupancy is issued after all necessary inspections are completed and passed.
    • For septic-connected waste plumbing, DHEC approval must be submitted before issuance of the Certificate of Occupancy.
    “A Certificate of Occupancy will be issued after all necessary inspections have been completed and passed. If the waste plumbing is connected to a septic tank, a copy of the DHEC approval must be submitted prior to issuance of the Certificate of Occupancy. PLEASE NOTE THAT NOT ALL INSPECTIONS OR POINTS MENTIONED APPLY TO EVERY CONSTRUCTION PROJECT.”
    2 more reviewed findings on this topic
    • Required — Residential construction inspections in unincorporated Georgetown County.
      “Inspects construction projects for compliance with all adopted building codes”
    • Required — Residential and commercial construction in unincorporated Georgetown County.
      “Inspects construction projects for compliance”
  • Certificate of occupancyRequired

    Residential construction in unincorporated Georgetown County when a certificate of occupancy is required for the project.

    • A certificate is issued after all necessary inspections are completed and passed.
    • If waste plumbing connects to a septic tank, DHEC approval must be submitted before issuance.
    • Not all listed inspections or points apply to every construction project.
    “no occupancy of the structure may occur until issuance of the Certificate of Occupancy.”
    One more reviewed finding on this topic
  • County-wide zoningPresent (with conditions)

    Georgetown County zoning regulation in unincorporated portions designated on official zoning maps.

    • The ordinance applies to unincorporated portions of Georgetown County designated on official zoning maps.
    • Sections 620.107 and 804 contain private-airfield restrictions applying to all unincorporated portions of the county.
    “THIS ORDINANCE TO BE EFFECTIVE IN THOSE UNINCORPORATED PORTIONS OF GEORGETOWN COUNTY AS DESIGNATED ON THE OFFICIAL ZONING MAPS”
  • Local zoningVaries (with conditions)

    Aggregate local zoning status across Georgetown County: the county zoning ordinance governs designated unincorporated portions, while incorporated areas are outside the cited county ordinance scope and require separate municipal review.

    • The cited county zoning ordinance is expressly effective in designated unincorporated portions of Georgetown County.
    • This aggregate claim does not assert that Georgetown County administers zoning inside incorporated municipalities.
    “Review applications for rezonings, new development and redevelopment in the unincorporated areas of Georgetown County”
    2 more reviewed findings on this topic
    • Present — County-administered zoning for unincorporated Georgetown County; incorporated municipalities may have separate authority.
      “regulate the location and use of buildings, structures, and land”
    • Present (with conditions) — County zoning regulation of the location and use of buildings, structures, and land in the unincorporated portions of Georgetown County, as designated on the official zoning maps.
      “The depiction of zoning boundaries as shown on GIS shall constitute the Official Zoning Map for the County’s zoning of unincorporated areas.”
  • Zoning districtsPublished

    Georgetown County zoning-district listings and district requirements.

    • The county publishes a zoning ordinance table of contents, district-specific ordinance documents, and a land-use/zoning designations chart.
    “Establishment of Zoning Districts [...] Requirements by District”
    One more reviewed finding on this topic
    • Published (with conditions) — Georgetown County zoning-district classifications and district-specific ordinance documents.
      “5) Establishment of Zoning Districts and Rules for the Interpretation of District Boundaries [...] 6) Requirements by District [...] 613 Limited Industrial District (LI) [...] 615 Mobile Home Park District (MHP) [...] 633 Neighborhood Amenity District (NA)”
  • Minimum lot sizeDistrict specific (with conditions)

    Lots subject to Georgetown County zoning districts.

    • The county definitions state that lots created through development must meet minimum size requirements specified in the zoning ordinance.
    • The applicable minimum varies by zoning district.
    “Requirements by District [...] One Acre Residential District [...] One Half Acre Residential District [...] 10,000 Square Feet Residential District [...] Five Acre Residential District”
  • SetbacksSpecified

    County zoning districts and specified overlay/highway corridors.

    • Highway 701 front setback is 90 feet from Black River north to the Georgetown County/Horry County boundary.
    • Industrial district exceptions allow specified increased heights only if setbacks are increased to match building height; minimum front setback is 50 feet in the stated industrial exceptions.
    • Commercial development in the cited district must meet a 90-foot front setback off Highway 17.

    Highway 701 front setback: 90 feet (specified corridor) · industrial exception minimum front setback: >= 50 feet (LI/HI height exceptions)

    “The front setback along Hwy. 701 [...] is 90 feet.”
    One more reviewed finding on this topic
    • Specified — County zoning districts listed in Article VII.
      “The front setback along Hwy. 701 [...] is 90 feet.”
  • Lot coverageSpecified

    Lots in applicable Georgetown County zoning districts.

    • The cited zoning schedule states that each lot must maintain 30% pervious surface; the applicable district and other zoning controls must be checked.

    pervious surface: >= 30 percent (applicable zoning schedule)

    “Each lot shall maintain 30% of pervious surface.”
    One more reviewed finding on this topic
    • District specific (with conditions) — District-specific lot coverage or pervious-surface requirements in Georgetown County zoning.
      “Each lot shall maintain 30% of pervious surface.”
  • Building heightSpecified

    County zoning districts, including stated LI and HI exceptions.

    • The ordinary maximum cited is 35 feet from grade.
    • LI structures may reach 50 feet to roof peak if applicable building/fire codes are met and setbacks are increased to match height; minimum front setback remains 50 feet.
    • HI structures may reach 70 feet to roof peak under the cited conditions; minimum front setback remains 50 feet.

    ordinary maximum height: 35 feet (district schedule) · LI exception height: 50 feet (building/fire codes and increased setbacks required) · HI exception height: 70 feet (building/fire codes and increased setbacks required)

    “The maximum building height of 35 feet from grade”
    One more reviewed finding on this topic
    • District specific (with conditions) — Maximum structure heights in Georgetown County zoning districts.
      “The maximum building height of 35 feet from grade may be exempt for structures in the LI Zoning District. Structures within this district may be constructed 50 feet from grade to the peak of the roof if they”
  • Living in an RVLimited

    Parking or storage of automotive vehicles or travel trailers without current license plates on residentially zoned property in the county zoning jurisdiction.

    • The prohibition applies to vehicles or travel trailers without current license plates.
    • Parking or storage is allowed when the vehicle or travel trailer is in a completely enclosed building.
    • This provision addresses parking or storage, not whether a person may occupy an RV as a dwelling.
    “Automotive vehicles or travel trailers of any kind or type without current license plates shall not be parked or stored on any residentially zoned property other than in a completely enclosed building.”
    One more reviewed finding on this topic
    • Temporary only (with conditions) — Camper occupancy in Georgetown County's Destination Park District.
      “Further, the Destination Park District is intended for short-term occupancy and is to be used primarily for leisure time activities at or near natural attractions”
  • Manufactured homesLimited

    Placement and occupancy of manufactured/mobile homes in the county zoning jurisdiction.

    • The county building division issues mobile-home permits and the zoning department reviews mobile-home permits.
    • Utility service to a mobile home requires a valid mobile-home permit signed by the Building Inspector.
    • District-specific zoning requirements may apply.
    “Mobile homes on individual lots shall be permitted in all residential districts except Resort Residential Districts, R-6, R-8 and R-10 Districts, General Resort Residential Districts, Neighborhood Amenity and Medical Districts, provided that:”
  • Mandatory utility hookupConditional

    Residential and commercial permit applications in unincorporated Georgetown County.

    • Water/sewer approval is required through a water/sewer receipt or DHEC septic permit.
    • Mobile-home applications require proof of water and sewer; public systems require proof of paid fees, while septic requires a DHEC permit.
    “WATER/SEWER APPROVAL (Water/Sewer receipt or DHEC Permit)”
  • Driveway accessRequired

    New residential and commercial building applications in unincorporated Georgetown County.

    • The checklist identifies the driveway encroachment permit as issued by SCDOT or Public Works.
    • The requirement appears on both residential and commercial checklists.
    “DRIVEWAY ENCROACHMENT PERMIT (Issued by SCDOT or Public Works)”
  • Building in a floodplainRequired

    Projects located in applicable flood zones in unincorporated Georgetown County.

    • Flood-zone requirements apply when the project is located in a flood zone.
    • Commercial final inspection requires a finished-construction elevation certificate where applicable.
    • Residential final inspection requires an elevation certificate and recorded non-conversion agreement where applicable.

    commercial maximum mean roof height: 35 feet (measured from base flood elevation in checklist)

    “If located in flood zone complete Flood Zone Requirements below”
    One more reviewed finding on this topic
    • Limited — Construction and occupancy in flood zones in unincorporated Georgetown County.
      “if your project is in a flood zone; [...] before we can schedule your final inspection.”
  • Permit feesPublished (with conditions)

    Residential building permits administered by Georgetown County; the county publishes a permit fee schedule and describes additional residential permit-related fees.

    • Building permit fees are listed in Section 1 on page 1 of the permit fee schedule.
    • Plans review fees equal one-half of the building permit fee.
    • An initial plans review fee of $0.10 per square foot is due when plans are submitted; credit is given toward final plans review fees when the permit is issued.
    • Fire impact fees are listed on page 3 of the permit fee schedule.
    • A construction sign, if used, has a $20 sign permit fee.
    • Recreation, law-enforcement, and transportation impact fees use the impact-fee calculation schedule.

    initial plans review fee: 0.1 USD per square foot (Credit is given toward final plans review fees when the permit is issued.) · construction sign permit fee: 20 USD (Applies if a construction sign is placed on the job site.)

    “Building permit fees - See page 1 of the permit fee schedule (PDF) (Section 1)”
  • Permit processPartial

    Georgetown County building and mobile-home permit process.

    • A permit application checklist is provided.
    • Mobile-home applications go to the Building Department, then Zoning approval, then the Assessor for registration and sticker, then return to Building Department for fees.
    • Water/sewer proof or DHEC septic permit documentation is required for the mobile-home process.
    “take the application to the Zoning Department for approval.”
    One more reviewed finding on this topic
    • Published (with conditions) — Residential and commercial building-permit process in unincorporated Georgetown County.
      “NEW ONE & TWO FAMILY DWELLING APPLICATION CHECKLIST”

South Carolina rules that apply here

  • Owner-builder exemptionConditional

    An owner of residential property who builds or improves structures or appurtenances for the owner’s or family’s sole occupancy, statewide in South Carolina.

    • The owner must do the work personally, with the owner’s own employees, or with licensed contractors or registered entities or individuals.
    • The structure or improvements must be intended for the owner’s sole occupancy or occupancy by the owner’s family and must not be intended for sale or rent.
    • The general public must not have access to the structure.
    • The owner must personally appear and sign the building permit application.
    • The owner must supervise construction and may build or improve a one-family or two-family residence.
    • The owner may not hire an unlicensed person as a residential builder or specialty contractor.
    • Construction must comply with all applicable laws, ordinances, building codes, and zoning regulations.
    • If the owner sells or rents the building within two years after construction is complete, the law presumes it was built for sale or rent unless otherwise approved by the commission.
    • The owner must promptly file a public notice with the register of deeds stating that the residential building or structure was constructed by the owner as an unlicensed builder; failure to do so revokes the statutory exemption.
    • The exemption does not authorize hiring a person or entity that is not licensed or registered under the Residential Home Builders Act.

    sale-or-rent presumption period: 2 years after construction is complete (unless otherwise approved by the commission)

    “This chapter does not apply to an owner of residential property who improves the property or who builds or improves structures or appurtenances on the property if: (1) the owner does the work himself, with his own employees, or with licensed contractors or registered entities or individuals; (2) the structure, group of structures, or appurtenances, including the improvements, are intended for the owner's sole occupancy or occupancy by the owner's family and are not intended for sale or rent; and (3) the general public does not have access to this structure.”
    3 more reviewed findings on this topic
    • Conditional — Owner construction or improvement of residential property in South Carolina, including Georgetown County.
      “This chapter does not apply to an owner of residential property who improves the property or who builds or improves structures or appurtenances on the property if:”
    • Available (with conditions) — Owner-builder exemption for qualifying residential property projects in Georgetown County under South Carolina law.
      “This chapter does not apply to an owner of residential property”
    • Conditional — An owner-builder improving residential property or building or improving structures or appurtenances on that property for the owner's or the owner's family's occupancy.
      “This chapter does not apply to an owner of residential property who improves the property or who builds or improves structures or appurtenances on the property if:”
  • Who permits septicState (with conditions)

    Residential septic-system approvals and permits serving Georgetown County properties.

    • SCDES administers the cited residential septic approval and permit process.
    • Local government should be contacted to determine water and sewer availability.
    “If you are planning to build a home or place a manufactured home on property not served by a public or community sewer system, you must first obtain SCDES's approval and a permit to install a septic system.”
    2 more reviewed findings on this topic
    • State (with conditions) — Residential septic permitting and inspection administered by the South Carolina Department of Environmental Services.
      “If you are planning to build a home or place a manufactured home on property not served by a public or community sewer system, you must first obtain SCDES's approval and a permit to install a septic system. Without this permit, your county will not be able to issue you a building permit.”
    • State — Statewide permitting and administration of individual onsite wastewater and septic systems in South Carolina.
      “South Carolina law requires site approvals and permits for all septic systems. If you are planning to build a home or place a manufactured home on property not served by a public or community sewer system, you must first obtain SCDES's approval and a permit to install a septic system.”
  • Septic permitRequired

    Homes or manufactured homes on property not served by public or community sewer.

    • SCDES approval and permit are required before installation.
    • Without the septic permit, the county cannot issue a building permit.
    • Application fee is $150.
    • Permit to Construct is valid for five years; renewal or modifications require a new application and fee.

    application fee: 150 USD · permit validity: 5 years (renewal or modification requires a new application and fee)

    “requires site approvals and permits for all septic systems.”
    2 more reviewed findings on this topic
    • Required — New homes and manufactured homes on property in Georgetown County not served by public or community sewer.
      “Incorrectly installed septic systems can harm water quality and make people sick, which is why South Carolina law requires site approvals and permits for all septic systems. [...] Application Fee: $150 [...] Permits to Construct are good for five years.”
    • Required — Construction of a home or placement of a manufactured home on property not served by a public or community sewer system.
      “If you are planning to build a home or place a manufactured home on property not served by a public or community sewer system, you must first obtain SCDES's approval and a permit to install a septic system. Without this permit, your county will not be able to issue you a building permit.”
  • Septic inspectionRequired

    Residential septic installations in Georgetown County.

    • Installer must contact SCDES before the system is covered.
    • If an SCDES inspector does not arrive within 30 minutes, a licensed installer may self-inspect using the approved form.
    • Final inspection documentation must be provided to SCDES.

    inspector arrival grace period: 30 minutes (licensed installer may self-inspect if inspector does not arrive)

    “schedule a time for the inspection of the septic system before it is covered.”
    2 more reviewed findings on this topic
    • Required — Septic system installation in Georgetown County.
      “Before completing the installation of the septic system, the installer must contact SCDES to schedule a time for the inspection of the septic system before it is covered. If a SCDES inspector does not arrive within 30 minutes of the scheduled time, a licensed installer has the option to proceed with a self-inspection of the installation.”
    • Limited — Existing septic systems and new-home construction using a septic system statewide in South Carolina.
      “While S.C. law does not require property owners to have existing systems inspected, some towns have passed ordinances that require their local residents to have their septic systems inspected regularly (See next question). If you live in an area that does not have a local inspection ordinance in place, the only time you would be required to have your septic system inspected is when you're building a new home that will use a septic system.”
  • Off-grid sanitationLimited

    A nonwater-carried sewage treatment system used for toilet wastes where water under pressure will be connected to the structure and gray water is generated statewide in South Carolina.

    • The applicant must submit plans from a Registered Professional Engineer licensed in South Carolina meeting Appendix S paragraph (2)(a) through (f) requirements for all toilet wastes.
    • The applicant must apply for and obtain a Department permit to construct and approval to operate an onsite wastewater system for gray-water treatment.
    • The gray-water system must meet all permit, licensing, and onsite wastewater-system requirements under Regulation 61-56.
    • The initial gray-water system size may be reduced by twenty-five percent.

    initial gray-water system size reduction: 25 percent (The system must otherwise meet all permit, licensing, and onsite wastewater-system requirements under Regulation 61-56.)

    “the initial system size may be reduced by twenty-five (25) percent.”
    One more reviewed finding on this topic
    • Limited — Nonwater-carried sewage treatment systems, including biological, composting, or incinerating toilets, for toilet wastes statewide in South Carolina.
      “The permitting of nonwater-carried sewage treatment systems, such as a biological, composting, or incinerating toilet, may be considered for toilet wastes”
  • Well permitRequired

    Construction of individual residential wells and irrigation wells statewide in South Carolina.

    • Before construction, the owner, owner's agent, or well driller must submit a Notice of Intent for coverage under the General Permit.
    • A $70 fee applies to each individual residential well and a $50 fee applies to each irrigation well.
    • The Department reviews a completed NOI within 48 hours.
    • The driller must notify SCDES 48 hours before installation with the exact date, time, and location.
    • The permit does not authorize public water-supply wells or wells prohibited by another regulation, local ordinance, or law.
    • Wells serving multiple households or a small business follow public-water-supply permitting procedures.
    • Withdrawals exceeding 3 million gallons in any month require a Groundwater Withdrawal Permit.

    individual residential well NOI fee: 70 USD · irrigation well NOI fee: 50 USD · NOI review period: 48 hours (The General Permit states the period excludes weekends and legal state holidays.) · installation notice: 48 hours (Notice must provide exact date, time, and location.) · monthly withdrawal threshold: > 3000000 gallons (A Groundwater Withdrawal Permit is required under R.61-113.)

    “Prior to construction of any individual residential well or irrigation well, a Notice of Intent (NOI) to obtain coverage under the General Permit is submitted by the well owner, agent of the well owner, or well driller.”
    One more reviewed finding on this topic
    • Required — Individual residential and irrigation wells in South Carolina, including Georgetown County.
      “Prior to construction of any individual residential well or irrigation well, a Notice of Intent (NOI) to obtain coverage under the General Permit is submitted by the well owner, agent of the well owner, or well driller.”
  • Agricultural exemptionConditional

    Exemption from the federal Produce Safety Rule administered through the South Carolina Department of Agriculture for qualifying growers.

    • The grower must meet an exemption category and submit an application to SCDA.
    • The application requires information about the operation and certification of compliance; SCDA then issues a certificate of exemption.
    • Recognized categories include produce rarely consumed raw; produce for personal or on-farm consumption; produce receiving qualifying commercial processing; and average produce sales below $25,000 over the previous three years, adjusted for inflation.
    • A qualified exemption requires annual food sales below $500,000 adjusted for inflation and more than 50% of annual food sales to qualified end-users located in South Carolina, the same Indian Reservation, or within 275 miles of the farm.

    previous three-year average produce sales threshold: < 25000 USD (Adjusted for inflation using 2018 as the baseline year.) · previous three-year annual food sales threshold for qualified exemption: < 500000 USD (Adjusted for inflation.) · sales to qualified end-users: > 50 percent (Qualified end-users must be in South Carolina, the same Indian Reservation, or within 275 miles of the farm.)

    “In South Carolina, if a grower meets the requirements for an exemption they must submit an application to secure that exemption.”
    2 more reviewed findings on this topic
    • Available (with conditions) — Construction or improvement of qualifying farm structures in South Carolina.
      “may not enforce that portion of a nationally recognized building code which regulates the construction or improvement of a farm structure.”
    • Available (with conditions) — Construction or improvement of qualifying farm structures in South Carolina, other than residences or structures attached to residences.
      “may not enforce that portion of a nationally recognized building code which regulates the construction or improvement of a farm structure.”
  • Subdividing landRegulated (with conditions)

    Subdivision and land-development plans in South Carolina jurisdictions that have adopted land-development regulations under Title 6, Chapter 29.

    • The statutory definition covers divisions of a tract or parcel into two or more lots, building sites, or other divisions for sale, lease, or building development, including divisions involving new streets or changes to existing streets.
    • The combination or recombination of previously platted lots with no increase in total lots and resultant lots meeting governing-authority standards is included only for notice and record purposes.
    • Division into parcels of five acres or more where no new street is involved is included only for notice and record purposes; plats must be received as information by the planning agency and marked accordingly.
    • Combination or recombination of entire lots of record with no new street or change in existing streets is included only for notice and record purposes.
    • Local regulations must require that land-development plans, including subdivision plats, are not approved unless building sites can be used safely without danger from flood, inundation, or other threats to health, safety, or public welfare.
    • Local regulations may require streets, water, sewers, septic tanks, and other utilities or facilities as conditions precedent to plan approval.
    • After local land-development regulations are adopted, no subdivision plat or land-development plan may be filed or recorded, and no building permit may be issued, until the plan or plat bears the required approval stamp and signature.
    • The governing authority may adopt or amend land-development regulations only after a public hearing with at least thirty days' published notice.
    “the local planning commission may prepare and recommend to the governing body or bodies for adoption regulations governing the development of land within the jurisdiction.”
    2 more reviewed findings on this topic
    • Regulated (with conditions) — Subdivision and land-development approval within municipalities or counties that have adopted land-development regulations under South Carolina law.
      “no subdivision plat or other land development plan within the jurisdiction of the regulations may be filed or recorded”
    • Regulated (with conditions) — Subdivision plats and other land-development plans in South Carolina jurisdictions that have adopted local land-development regulations under the state statutory framework.
      “After the local governing authority has adopted land development regulations, no subdivision plat or other land development plan”
  • Campground & park staysLimited

    Camping at South Carolina state-park campsites.

    • Camping is subject to state-park facility rules and department permission.
    • A campsite may not be occupied for more than fourteen consecutive days without permission from the Department of Parks, Recreation and Tourism.
    • The rule concerns state parks and does not establish a statewide rule for private land or locally administered campgrounds.

    maximum consecutive campsite occupancy without department permission: <= 14 days (Longer occupancy requires permission from the department.)

    “No person or persons shall occupy a campsite for a consecutive period longer than fourteen days without permission from the department.”
  • county zoning authorityGeneral

    South Carolina counties may adopt zoning ordinances for all or specific portions of their unincorporated areas when the statutory comprehensive-plan prerequisite is satisfied.

    • A local planning commission must have prepared and recommended the land-use element of the comprehensive plan.
    • The county governing body must have adopted at least the land-use element of the comprehensive plan before adopting a zoning ordinance.
    • A county may exercise the chapter's powers in the total unincorporated area or in specific parts of the unincorporated area.
    • Adjacent unincorporated areas may be placed under municipal jurisdiction only through ordinances and a formally approved agreement between the municipality and county councils, with boundaries, authority limitations, and representation specified.
    • Zoning regulations must be made in accordance with the comprehensive plan.
    • Regulations must generally be uniform for each class or kind of building, structure, or use within each district, although regulations may differ between districts.
    • The statute expressly permits regulation of building and land use, density, building size, location, height, bulk, number of stories, land dimensions, yards, courts, and other open spaces.
    “When the local planning commission has prepared and recommended and the governing body has adopted at least the land use element of the comprehensive plan as set forth in this chapter, the governing body of a municipality or county may adopt a zoning ordinance to help implement the comprehensive plan.”
  • county building authorityGeneral

    South Carolina counties' authority and duty to administer building-code enforcement and require building permits for new construction and renovation, including in unincorporated areas.

    • Each county must appoint a building official or contract with another political subdivision so that its unincorporated area is under the jurisdiction of a building official.
    • A county may prescribe fees for construction permits and inspections.
    • A county may submit an affidavit for exemption if it cannot arrange services for an annual period at costs totally within the schedule of fees recommended in the building codes; the exemption lasts until services become financially feasible or for five years, whichever is less, and may be renewed at five-year intervals after another determination.
    • Counties may establish agreements with other governmental entities to issue permits and enforce building codes.
    • All counties must require by law or ordinance that building permits be issued for persons engaging in new construction or renovation, and permits must correspond to minimum Department of Revenue requirements.
    • Counties and municipalities must enforce only the national building and safety codes provided in Chapter 9.
    • A county may not enforce the adopted fire-prevention-code portion regulating outdoor burning for forestry, wildlife, and agricultural purposes as regulated by the South Carolina Forestry Commission.
    • A permit is not required for a wheelchair-access ramp built with Medicare or Medicaid dollars when construction is performed, overseen, or inspected by an Americans with Disabilities Act inspector.

    permit-copy delivery to county assessor: <= 10 days (After issuance of each building permit)

    “All counties shall require by law or ordinance that building permits be issued to persons engaging in new construction or renovation and such permits shall correspond to minimum requirements of the department. The county shall furnish a copy of the building permit to the assessor within ten days after such issuance.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission — ask the county directly.

  • Minimum dwelling size — Minimum dwelling size in Georgetown County zoning districts.
  • Camping on your land — Temporary camping on private property in Georgetown County.
  • Tiny homes — Tiny-home occupancy in Georgetown County.
  • Accessory dwellings — Accessory dwelling occupancy in Georgetown County.
  • Short-term rentals — Short-term rental use in Georgetown County.

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Water rights & wells in Georgetown County

Whether a new home can legally get its own water here — the sub-state groundwater regime, from South Carolina’s water agency.

Actively managed

This basin is under active state management — new water use is scrutinized, though a domestic well is usually still allowed.

Household wellExempt — no permit or water right

S.C. Code 49-5-70(A)(4) exempts a person withdrawing groundwater at a single-family residence for noncommercial use; no withdrawal permit for a household well anywhere in SC, including inside a Capacity Use Area.

Limit: single-family/household use exempt; permit only >=3 MG/month (~100,000 gpd)

SC Groundwater Use and Reporting Act, S.C. Code 49-5-70(A)(4) ↗

Regulated-riparian state (large uses permitted). Groundwater rules change and basin boundaries follow the aquifer, not the county line — confirm current well and appropriation rules with the South Carolina state water agency before you buy or drill.Groundwater governance as of Jul 2026, cited to each administering agency.

Living off-grid in Georgetown County, South Carolina

Is Georgetown County a good place to live off-grid or homestead?

Georgetown County scores 65/100 on the Bolthole Index, a strong county profile. Its strengths: manageable long-term carry cost and about 43,965 people within 15 miles.

Do you need a building permit in Georgetown County, South Carolina?

Georgetown County generally requires a residential building permit, and it enforces county zoning. Onsite septic is permitted by South Carolina Department of Environmental Services (SC DES, formerly DHEC). Owner-builders may act as their own contractor to build their home. These answers are quoted from official sources and independently re-checked. Rules change and cities within the county differ — always confirm with the county before you buy or build.

Can you live in an RV or tiny home on your land in Georgetown County?

Living in an RV on your own land in Georgetown County is limited to specific cases: Parking or storage of automotive vehicles or travel trailers without current license plates on residentially zoned property in the county zoning jurisdiction. The prohibition applies to vehicles or travel trailers without current license plates. Parking or storage is allowed when the vehicle or travel trailer is in a completely enclosed building. Confirm with the county before relying on it.

How much does land cost in Georgetown County, South Carolina?

Land in Georgetown County runs about $2,960 per acre, based on the latest county data.

What is the water situation in Georgetown County?

Georgetown County gets about 52.6" of rain a year, with severe drought in roughly 2.8% of years. On water rights, Georgetown County lies in the Waccamaw Capacity Use Area — SC's first CUA (1979) over a stressed coastal aquifer; withdrawals >=3 MG/month require a permit. A new single-family domestic well is exempt..

How remote is Georgetown County?

A typical private-land location has about 43,965 people within 15 miles and 3,088,646 within 100 miles. These radius catchments are the published fallback where road routing is unavailable.

How Georgetown compares in South Carolina

Compare side-by-side →See all 46 South Carolina counties ranked →