Unincorporated Horry County, South Carolina requires a building permit before most construction, alteration, repair, demolition or regulated trade work begins1. Horry County is zoned throughout, but parcel standards and the administering authority vary; municipal zoning may differ from the county ordinance23. The South Carolina Department of Environmental Services (SCDES) approves and permits septic systems where public or community sewer is unavailable4.
At a glance
- Building permit
- Required for most regulated work in unincorporated areas1
- Zoning
- Countywide; standards vary by zoning district25
- Septic
- SCDES permit required before the county building permit where sewer is unavailable6
- Owner-builder exemption
- Available under South Carolina law, with conditions7
- RV living
- General private-land occupancy rule not confirmed; ask Planning & Zoning89
- Lot standards
- Lot size, setbacks, height and coverage depend on zoning district10111213
- Floodplain building
- Additional information required in an identified floodplain14
- Septic soil suitability
- Only 1.8% of soils rate free of severe limits for a conventional drain field15
Who to call
Building permits
Building permits and inspections for construction in unincorporated Horry County; fax (843) 915-6090; phone in inspection requests at 843-915-5090
1301 Second Avenue Ste. 1D09, Conway, SC 29526
Zoning
Horry County Planning & Zoning Department
Administers and enforces the zoning ordinance and land development regulations; reviews rezoning, variance and special exception requests; fax (843) 915-6340
1301 Second Avenue Ste. 1D09, Conway, SC 29526
Floodplain permits
Horry County Code Enforcement, Building Inspection Branch
Manages National Flood Insurance Program (NFIP) compliance and flood-related building requirements in unincorporated Horry County
1301 Second Avenue Ste. 1D09, Conway, SC 29526
Roads & driveways
Horry County Engineering Department
Issues encroachment permits (at no charge) for placing items, including a driveway, within county road right-of-way; road and drainage issues go to the hotline at (843) 381-8000; fax (843) 365-2170
4401 Privetts Road, Conway, SC 29526
Septic permits
South Carolina Department of Environmental Services (SCDES)
Statewide septic (OWTS) and private well permitting, including for Horry County; the county cannot issue a building permit until SCDES approves the septic system
2600 Bull St., Columbia, SC 29201
Contact details are copied from each office’s official page and were checked against it on October 11, 2026.
Off-grid gear
Going off-grid in Horry County means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Horry County, South Carolina?
Yes. Unincorporated Horry County requires a permit before constructing, enlarging, altering, repairing, moving or demolishing a building, changing its occupancy, or doing regulated electrical, gas, mechanical or plumbing work1. Under the residential-code exemption, certain one-story detached accessory structures of 200 square feet or less are exempt, although zoning compliance may still apply1. Horry County charges residential one- and two-family projects $0.20 per square foot for plan review and $0.50 per square foot for the permit, with a $50 permit minimum plus $25 in zoning fees; revisions cost $2516. Code Enforcement inspects new construction and building improvements in unincorporated Horry County under the locally implemented state building codes1718. A qualifying owner-builder must personally appear to sign the permit application, supervise the work, use licensed contractors where required and record the required notice7.
Who issues building permits in Horry County, and how do you reach them?
Horry County Code Enforcement issues building permits and inspects construction in unincorporated Horry County; call (843) 915-5090 or visit 1301 Second Avenue Ste. 1D09 in Conway1917. Inside Conway, Surfside Beach and Briarcliffe Acres, municipal authorities handle building permits202122. Septic approval remains with SCDES where public or community sewer is unavailable4. The county online portal supports invoice payments and inspection scheduling for listed building-permit types; other types use telephone inspection requests23. Planning & Zoning answers county zoning questions at (843) 915-53409. For a driveway or other work within county road right-of-way, Engineering reviews requests and issues approved encroachment permits at no charge; call (843) 915-516024.
Does Horry County have zoning?
Horry County has been zoned throughout since April 17, 2001, but the county ordinance governs unincorporated land and municipalities may administer their own zoning23. Myrtle Beach, North Myrtle Beach, Surfside Beach and Briarcliffe Acres administer municipal zoning25262728. Septic approval remains with SCDES where sewer is unavailable4. For unincorporated Horry County, identify zoning by tax map number; district standards control uses, density, height, floor-area ratio, setbacks, coverage and parking329. Minimum lot area also varies by district10. Ask Planning & Zoning for the applicable ordinance standards before choosing a house plan or siting improvements59. Subdivision approval is separate: a subdivision plat generally cannot be recorded and a building permit cannot issue until the required plan approval30.
How do septic and well permits work in Horry County?
SCDES approval and a septic installation permit are required for a home or manufactured home on Horry County property without public or community sewer, and Horry County cannot issue the building permit first6. The septic application costs $150, a Permit to Construct is valid for 5 years, and renewal or modification requires a new application and fee6. Before Horry County issues a residential building permit, the applicant must provide sewer-service verification from the appropriate sewer company or environmental agency31. If sewer is accessible, SCDES cannot issue an onsite wastewater permit32. The installer must schedule an SCDES inspection before covering a new system33. Only about 1.8% of Horry County soils rate free of severe limitations for a conventional drain field, so settle septic feasibility before choosing a building location15. Private residential and irrigation wells require a Notice of Intent to SCDES before construction34.
Can you live in an RV or tiny home on your land in Horry County?
Horry County's RV rule for temporary vending locations is narrow: an RV used or stored for vending or overnight purposes must remain on the permitted lot, and the county identifies the Destination Park Zoning District for that use8. The vending rule does not decide whether someone may occupy or store an RV on ordinary private land, and we could not confirm a broader residential or temporary-camping rule; ask Planning & Zoning about the parcel's district before relying on an RV for housing89. We also could not confirm complete tiny-home occupancy rules. A tiny home used as a dwelling must still fit the district's allowed uses, lot size, setbacks, height and coverage standards, and regulated construction requires county permitting5101112131.
Building a home in Horry County: the steps, in order
- Ask Planning & Zoning to identify the parcel's district by tax map number and confirm its allowed use, minimum lot area, setbacks, height and coverage limits335.
- Verify sewer availability; if public or community sewer is unavailable, obtain SCDES approval and a septic installation permit before seeking the county building permit316.
- Confirm flood status with Code Enforcement: buildings or additions in an identified 100-year floodplain require additional information, and flood-zone elevation rules vary by designation361437.
- Arrange road access with Horry County Engineering for a county right-of-way or SCDOT for a state highway2438.
- Submit plans and pay the applicable plan-review, permit and zoning fees to Code Enforcement1619.
- Complete required inspections as construction proceeds, including the septic inspection before the system is covered1733.
What to check before you buy land in Horry County
Start with sewer and soils: only 1.8% of Horry County soils rate free of severe limitations for a conventional drain field, and sewer availability determines whether SCDES may issue an onsite wastewater permit1532. Confirm the zoning district by tax map number and check its allowed use, lot-area, setback, height and coverage standards before relying on a listing description335. Ask Code Enforcement about the parcel's flood-zone designation because flood-zone construction and improvements can trigger permits and elevation requirements1437. Verify legal access and any county right-of-way permit with Engineering24. Horry County is largely gentle terrain, with 100% of land at 15% slope or less, but 69.6% is wooded, so inspect drainage and clearing needs on the actual parcel3940.
Watch-outs
- A permit-exempt accessory structure may still require Horry County zoning compliance1.
- Horry County residential permit charges include separate plan-review, building-permit and zoning fees16.
- The Destination Park rule for RVs at temporary vending locations does not answer general residential RV occupancy; ask Planning & Zoning before planning to live in an RV on a private parcel89.
Sources
- How to know if you need a building Permit, quoted and re-checked
- Current Planning & Zoning, quoted and re-checked
- Current Planning & Zoning, quoted and re-checked
- Septic Tanks - Residential, Single Home Builder, quoted and re-checked
- Current Planning & Zoning, quoted and re-checked
- Septic Tanks - Residential, Single Home Builder, quoted and re-checked
- South Carolina Code § 40-59-260, quoted and re-checked
- horrycountysc.gov, quoted and re-checked
- Horry County Planning & Zoning Department (horrycountysc.gov)
- Current Planning & Zoning, quoted and re-checked
- Current Planning & Zoning, quoted and re-checked
- Current Planning & Zoning, quoted and re-checked
- Current Planning & Zoning, quoted and re-checked
- Build Responsibly, quoted and re-checked
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- Cost of Building Permit, quoted and re-checked
- Code Enforcement, quoted and re-checked
- South Carolina Code Adoptions, quoted and re-checked
- Horry County Code Enforcement (horrycountysc.gov)
- Conway: Sec. 5-1-32 - Building code (Horry County), quoted and re-checked
- Town of Surfside Beach: Town building and zoning ordinance (Horry County), quoted and re-checked
- Town of Briarcliffe Acres: Code of Ordinances, § 32-136, Building permit required (Horry County), quoted and re-checked
- How to know if you need a building Permit, quoted and re-checked
- Horry County Engineering Department (horrycountysc.gov)
- Myrtle Beach: official source (Horry County), quoted and re-checked
- North Myrtle Beach: Chapter 23 - Zoning | Code of Ordinances | North Myrtle Beach, SC (Horry County), quoted and re-checked
- Town of Surfside Beach: Ordinances (Horry County), quoted and re-checked
- Town of Briarcliffe Acres: Code of Ordinances, § 32-25, Establishment of zoning districts; boundaries (Horry County), quoted and re-checked
- Current Planning & Zoning - Horry County SC.Gov, quoted and re-checked
- South Carolina Local Land Development Regulation Provisions (South Carolina statewide rule), quoted and re-checked
- What you need for a Building Permit, quoted and re-checked
- Professional Soil Classifiers - Sewer Accessibility Verification (South Carolina statewide rule), quoted and re-checked
- Septic Tanks - Residential, Single Home Builder, quoted and re-checked
- Private Drinking Water Wells, quoted and re-checked
- Current Planning & Zoning, quoted and re-checked
- What you need for a Building Permit, quoted and re-checked
- Horry County Code Enforcement, Building Inspection Branch (horrycountysc.gov)
- Engineering Directive ED-16: Driveway Entrances (South Carolina statewide rule), quoted and re-checked
- Share of land at 15% slope or less: Bolthole Index county data
- Wooded share of land: Bolthole Index county data
Written October 11, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.