Unincorporated Bon Homme County, South Dakota requires a county building permit from the Zoning Administrator before most buildings or structures are erected, moved, enlarged, removed, demolished, burned or put to a different use.1 County zoning applies outside Avon, Scotland, Springfield, Tabor and Tyndall, where each town's own rules must be checked.2 Septic permits are not a county function: South Dakota DANR sets the minimum onsite wastewater standards for every address, town or not, and local rules may be stricter.3
At a glance
- Building permit
- Required for most regulated work in unincorporated areas14
- Zoning
- Applies in unincorporated areas; district rules vary256
- Septic
- State minimum standards; local rules may be stricter3
- RV living
- Private RV occupancy is unconfirmed; campgrounds are regulated by district789
- Tiny homes
- No tiny-home-specific rule or minimum floor area confirmed9
- Manufactured homes
- Permitted in AG, RR and PTR districts, subject to district standards101112
- Owner electrical work
- Allowed for a qualifying owner-occupied residence or farmstead with a homeowner permit13
- Private well
- A state water-right permit may be required before drilling14
Who to call
Building permits
Bon Homme County Building Permits
Bon Homme County building permits and zoning questions
300 W. 18th Ave., Tyndall, SD 57066
Septic permits
South Dakota DANR On-Site Wastewater Systems
State onsite wastewater requirements and septic-system questions
523 E Capitol Ave, Pierre, SD 57501-3182
Roads & driveways
Bon Homme County Highway Department
County-road access questions
300 W. 18th Ave., Tyndall, SD 57066
Contact details are copied from each office’s official page and were checked against it on October 9, 2026.
Off-grid gear
Going off-grid in Bon Homme County means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Bon Homme County, South Dakota?
Yes. In unincorporated Bon Homme County, a permit from the Zoning Administrator is required before a regulated building or structure is erected, moved, enlarged, removed, demolished, burned or put to a different use.1 Concrete flatwork under 500 square feet is exempt when it is at or immediately above grade.1
The owner of record must sign or approve the application in writing, and the Zoning Administrator may require a site plan and details about the proposed buildings, uses, units and lot.15 The fee schedule is posted in the Zoning Administrator's office, and no application or appeal moves forward until all fees, charges and expenses are paid.16 Ask the Bon Homme County building-permit office for the current form, fee and submittal instructions.9
Who issues building permits in Bon Homme County, and how do you reach them?
The Bon Homme County office listed for building permits is at the county courthouse in Tyndall and can be reached at the phone number shown above.9 The Zoning Administrator administers and enforces the county zoning ordinance for unincorporated land.5 The Planning Commission serves as the Board of Adjustment for conditional uses, variances and zoning appeals.17
The current fee schedule is kept in the Zoning Administrator's office and may be changed only by the County Commission.16 The Zoning Administrator has enforcement inspection authority, but we could not confirm a routine construction-inspection schedule or certificate-of-occupancy rule.18 Ask the county building-permit office which drawings, inspections and completion documents apply before work begins.9 Electrical and plumbing approvals are separate state-regulated parts of a project.1920
Does Bon Homme County have zoning?
Bon Homme County zoning covers unincorporated land but excludes Avon, Scotland, Springfield, Tabor and Tyndall, where municipal rules must be checked separately.2 The county ordinance establishes Agricultural, Rural Residential, Platted Town Site Residential and Rural Commercial districts, and the official zoning map controls a parcel's current classification.6
For a single-family, manufactured or modular home, AG generally requires 5 acres and 250 feet of frontage; RR requires 1 acre and 150 feet of width; and PTR requires 2,500 square feet, 25 feet of width and 100 feet of depth.212223 RR setbacks are 75 feet in front and 25 feet at the rear and each side; PTR setbacks are 25 feet in front and 5 feet at the rear and each side.24 In the Rural Commercial district, the minimum lot is 1 acre and 150 feet wide, with 75-foot front and 25-foot rear and side setbacks.2526 No general minimum dwelling floor area was confirmed.
How do septic permits work in Bon Homme County?
South Dakota DANR administers statewide minimum standards for onsite wastewater systems, and local governments may impose stricter requirements.3 DANR says to contact the department before installing a new onsite system except a conventional system serving an individual residence; other systems require state review, and works of sanitary significance require plans at least 30 days before construction.27 Septic rules stay with the state and any stricter local rule even inside Avon, Scotland, Springfield, Tabor and Tyndall; the DANR On-Site Wastewater Systems contact is listed above.283
Only about 6.1% of county soils are rated without severe limitations for a conventional septic drain field, so a buyer should make septic feasibility part of the purchase investigation rather than assuming a standard drain field will work.29 State rules also allow certain unconventional sanitation systems where water or electricity is unavailable, but systems other than vault privies are experimental and require approval before installation.30
Can you live in an RV or tiny home in Bon Homme County?
We could not confirm a Bon Homme County rule that directly allows or prohibits long-term residential occupancy of one RV on private land. In AG, premises with 2 or more camping units count as a campground and unlisted uses are prohibited; in RC, a campground requires conditional-use approval from the Board of Adjustment.78 Ask the building-permit office about one RV, utility hookups and temporary occupancy during construction.9
Bon Homme County permits manufactured homes as principal uses in AG, RR and PTR, subject to each district's lot, yard, permit and other requirements.101112 A tiny house has no confirmed county-specific classification or minimum floor area, but moving or erecting a structure still triggers the broad permit rule.1 For commercial or other nonresidential buildings, South Dakota's default design standard is the 2024 International Building Code where the local government has not adopted its own, but that default excludes residential structures, manufactured homes and farmsteads.31 South Dakota's 2009 residential energy code is voluntary and does not establish a comprehensive county residential building code.32
Building a home in Bon Homme County: what are the steps?
- Call the Bon Homme County building-permit office with the parcel location and proposed use; confirm the zoning district, lot standards, setbacks, current fee and required plans.9616
- Have the owner of record sign or approve the application in writing and prepare the requested site plan and project information.15
- Resolve wastewater early by confirming whether the system is conventional and whether DANR review is required.27
- Determine whether the planned well use needs a water-right permit before drilling; a new domestic well also requires water sampling.33
- Obtain the county permit before starting regulated building work.1
- Arrange state electrical and plumbing requirements; electrical rough-in must be inspected before covering and final electrical inspection is required before occupancy.1920
- Start within 180 days and substantially complete the work within 2 years to avoid permit expiration.15
What should you check before buying land in Bon Homme County?
Confirm whether the parcel is inside the county jurisdiction and identify its zoning district before closing, because lot sizes and setbacks differ sharply by district.26 A Rural Commercial lot requires at least 1 acre and 150 feet of width, with 75 feet in front and 25 feet at the rear and each side for buildings and structures.2526 Test septic feasibility early because only about 6.1% of county soils avoid a severe conventional-drain-field limitation.29
For water, determine whether the intended use requires a state water-right permit before drilling, and plan to sample a new domestic well.33 For county-road access, ask the highway office what approval or culvert standard applies because we could not confirm a county driveway-permit rule.34 A South Dakota state-highway driveway requires state permission before construction starts.35 Ask the building-permit office about the local floodplain process if mapping shows flood risk.9
Watch-outs
- A Bon Homme County permit can expire if work does not begin within 180 days or is not substantially complete within two years.4
- Owner-performed electrical work is a limited licensing exemption, not an exemption from the homeowner permit or inspection requirements.13
- A state-highway driveway needs South Dakota Department of Transportation permission before construction starts.35
- Bon Homme County's rule for one occupied RV, tiny-home classification and general minimum dwelling size remain unconfirmed; ask the county building-permit office before purchase.9
- County zoning does not govern Avon, Scotland, Springfield, Tabor or Tyndall; ask the relevant municipality about rules inside those communities.2
Sources
- Bon Homme County Zoning Ordinance No. 99-1, as amended, quoted and re-checked
- Bon Homme County Zoning Ordinance No. 99-1, as amended, quoted and re-checked
- One-Stop Permitting and Regulation Guide (2025 Edition), quoted and re-checked
- Bon Homme County Zoning Ordinance No. 99-1, quoted and re-checked
- Bon Homme County Zoning Ordinance No. 99-1, as amended, quoted and re-checked
- Bon Homme County Zoning Ordinance No. 99-1, as amended, quoted and re-checked
- Bon Homme County Zoning Ordinance No. 99-1, as amended, quoted and re-checked
- Bon Homme County Zoning Ordinance No. 99-1, as amended, quoted and re-checked
- Bon Homme County Building Permits (tyndallsd.org)
- Bon Homme County Zoning Ordinance No. 99-1, as amended, quoted and re-checked
- puc.sd.gov, quoted and re-checked
- puc.sd.gov, quoted and re-checked
- South Dakota Electrical Commission - Homeowner Wiring (South Dakota statewide rule), quoted and re-checked
- South Dakota Water Rights - Drilling a Well, quoted and re-checked
- Bon Homme County Zoning Ordinance No. 99-1, quoted and re-checked
- Bon Homme County Zoning Ordinance No. 99-1, quoted and re-checked
- Bon Homme County Zoning Ordinance, administrative provisions, quoted and re-checked
- Bon Homme County Zoning Ordinance No. 99-1, as amended, quoted and re-checked
- South Dakota Electrical Commission - Homeowner Wiring (South Dakota statewide rule), quoted and re-checked
- South Dakota Plumbing Commission - Inspections (South Dakota statewide rule), quoted and re-checked
- Bon Homme County Zoning Ordinance No. 99-1, as amended, quoted and re-checked
- puc.sd.gov, quoted and re-checked
- puc.sd.gov, quoted and re-checked
- puc.sd.gov, quoted and re-checked
- puc.sd.gov, quoted and re-checked
- puc.sd.gov, quoted and re-checked
- One-Stop Permitting and Regulation Guide (2025 Edition), quoted and re-checked
- South Dakota DANR On-Site Wastewater Systems (danr.sd.gov)
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- Administrative Rule 74:53:01 — Individual and Small On-Site Wastewater Systems (South Dakota statewide rule), quoted and re-checked
- South Dakota Codified Law 11-10-6, quoted and re-checked
- South Dakota Codified Law Chapter 11-10, Building Codes and Standards, quoted and re-checked
- South Dakota Water Rights - Drilling a Well, quoted and re-checked
- Bon Homme County Highway Department (tyndallsd.org)
- Instructions: Applying for permission for driveway or intersection on a South Dakota state highway (South Dakota statewide rule), quoted and re-checked
Written October 9, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.