Bolthole Index

Dickson County, Tennessee

Building permits, zoning and septic rules in Dickson County, Tennessee

65Index Score / 100
#71 of 95 in Tennessee

Dickson County, Tennessee requires a building permit for home construction in the unincorporated county, issued by the county Planning, Zoning & Codes Department, and the application needs a recorded deed, a site plan, a 911 address and either a septic permit or proof of sewer1. County zoning applies in unincorporated Dickson County, while the City of Dickson and other incorporated municipalities run their own zoning and building rules23. Septic permits for every address, city or county, come from the state: TDEC, not Dickson County, issues them4.

At a glance

Building permit
Required in unincorporated areas; issued by the county Planning, Zoning & Codes Department (cities run their own)536
Zoning
Yes, a Zoning Resolution applies to unincorporated Dickson County; incorporated cities zone separately23
Septic permit
Required for installation, modification or repair; handled by TDEC78
Septic soil suitability
About 26.6% of county soils rate free of severe limits for a conventional drain field9
Owner-builder exemption
Yes, one owner-built residence every two years for your own use; no resale, lease or rent10
Driveway permit (county road)
Required before building a driveway that connects to a county road; minimum 20 feet wide11
Driveway permit (state highway)
A separate TDOT permit is required before building a driveway onto a state highway12

Who to call

Building permits

Dickson County Planning, Zoning & Codes Department

Building permits, zoning enforcement and code administration for unincorporated Dickson County

(615) 789-6740

5 Court Square, Charlotte, TN 37036

Building permits

Dickson County Planning, Zoning & Codes Department

Publishes the county's building permit requirements, fee schedule, septic/911-address prerequisites and floodplain elevation requirement

(615) 789-6740

Roads & driveways

Dickson County Highway Department

Maintenance of Dickson County roads: paving, grading, ditching, and driveway permits onto county roads

(615) 446-2638

4010 Hwy 48 N, Charlotte, TN 37036

Roads & driveways

Dickson County Highway Department

Issues the driveway permit required before building a driveway that connects to the county road system

615-446-2638

Online permits →

Zoning

Dickson County Planning, Zoning & Codes Department

Publishes the Dickson County Zoning Resolution, including its Temporary Use Permit rules for a temporary mobile home dwelling

Septic permits

TDEC Nashville Environmental Field Office

The Tennessee Department of Environment and Conservation field office serving Dickson County for water-resources matters, including Subsurface Sewage Disposal System (septic) permits

(615) 687-7000

711 R.S. Gass Blvd, Nashville, TN 37216

Online permits →

Contact details are copied from each office’s official page and were checked against it on October 9, 2026.

Off-grid gear

Going off-grid in Dickson County means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Do you need a building permit in Dickson County, Tennessee?

Yes. Dickson County requires a building permit for home construction, including mobile, manufactured and modular homes where the county process applies1. Permits go only to the landowner or contractor, and an owner applying directly must first have the deed recorded in the owner's name1. The application also requires a site plan, a 911 address, and either a septic permit or proof of sewer1. Permit fees follow the county's valuation-based schedule, whose valuation figures may change13. The county also charges an Adequate Facilities Tax of $1.00 per square foot of heated and cooled living area and a $60.00 plumbing fee13. Call Planning, Zoning & Codes at (615) 789-6740 for the current valuation and total146.

Who issues building permits in Dickson County, and how do you reach them?

The Dickson County Planning, Zoning & Codes Department issues building permits for unincorporated Dickson County and is at 5 Court Square, Charlotte, TN 37036, phone (615) 789-67406. Inside the City of Dickson, the city's own Planning and Zoning Department handles building permits, inspections and municipal codes, so a city parcel does not start at the county office3. Septic permits stay with TDEC either way4. The county department is the contact for the recorded deed, site plan, 911 address, septic-or-sewer documentation and valuation information required for a county building permit14. For a building site in a floodplain, the application must show the proposed lowest floor's elevation relative to mean sea level under the county Floodplain Zoning Resolution15. Because valuation figures may change, call the department for the current permit total rather than relying on an old estimate1314.

Does Dickson County have zoning?

Yes. Dickson County has adopted a Zoning Resolution governing land use in unincorporated areas, and the county publishes its Planning & Zoning map and forms216. Incorporated municipalities such as the City of Dickson maintain their own planning and zoning departments and ordinances, and county zoning should not be assumed to apply inside them; septic permits remain with TDEC in both places34. Tennessee law gives counties zoning authority outside municipal corporations17. State law generally exempts a structure on agricultural land when it is incidental to the agricultural enterprise, but that exemption has exceptions near state or federal-aid highways, public airports, public parks and within the mapped floodplain18. We could not confirm a general parcel setback or minimum lot size. The subdivision rules do require plats to show building setback lines, and they specify transmission-line setbacks where easement widths are not established, so ask Planning, Zoning & Codes for the standards tied to the parcel and project196.

How do septic permits work in Dickson County?

TDEC, not Dickson County and not the City of Dickson, handles septic site evaluations and permits for every address in the county7. Dickson County is not one of the contract counties that run their own septic programs4. A permit is required to install, modify or repair a septic system, and it should be obtained before dirt work, the building pad or other building construction begins8. A TDEC Environmental Scientist evaluates the site to determine the required system type7. After installation, the installer must arrange a final inspection before covering the system; TDEC issues a Certificate of Completion if the work is approved20. The Nashville Environmental Field Office serving Dickson County is at 711 R.S. Gass Blvd, Nashville, TN 37216, phone (615) 687-700021. Only about 26.6% of county soils rate free of severe limitations for a conventional drain field, so make the site evaluation an early contingency9. The county requires the septic permit or proof of sewer in its building-permit materials22.

Can you live in an RV or tiny home on your land in Dickson County?

We could not confirm a general rule allowing residential or long-term RV occupancy, temporary camping or tiny-home occupancy on private land in Dickson County. County zoning applies in unincorporated areas, so ask Planning, Zoning & Codes how the parcel's zoning district treats the proposed dwelling before buying or moving one onto the land26. The county resolution describes a narrow Temporary Use Permit for a mobile home, excluding double-wides, when a principal home was destroyed by fire, explosion or natural phenomenon23. That hardship permit may be renewed for up to six months at a time, with all permits totaling no more than 21 months23. That provision does not answer whether an RV or tiny home may serve as a residence on otherwise vacant land, so get a parcel-specific answer from the department6.

Building a home in Dickson County: the steps, in order

  1. Confirm the deed is recorded in your name; Dickson County issues a building permit only to the landowner or contractor1.
  2. Confirm zoning and whether the parcel was lawfully created. Land in the Dickson County Planning Region cannot be subdivided until a plat has Planning Commission approval and is filed with the county register24.
  3. Apply to TDEC for the required septic permit before dirt work or building construction, or obtain proof of sewer; the county requires one of those documents for its building permit825.
  4. Get a 911 address and prepare the site plan and valuation information; a floodplain site also requires the proposed lowest-floor elevation relative to mean sea level1415.
  5. Apply through Planning, Zoning & Codes, budgeting for the valuation-based permit fee, the $1.00-per-square-foot Adequate Facilities Tax and the $60.00 plumbing fee13.
  6. An owner-builder may construct one single residence once every two years for personal use, not for resale, lease or rent, and hired work of $25,000 or more must go to a licensed contractor; the owner still needs the permits and inspections1026.
  7. Before building a driveway, obtain the county permit for a county-road connection or the separate TDOT permit for a state-highway connection1112.
  8. Have the septic installer arrange TDEC's final inspection before covering the system20.

What to check before you buy land in Dickson County

Dickson County is heavily wooded and only about half gently sloped: roughly 70.8% of the land is forested, and about 47.7% sits at 15% slope or less2728. Only about 26.6% of county soils rate free of severe limits for a conventional drain field, so make the TDEC site evaluation an early contract contingency97. Before closing, confirm that the parcel is a recorded, approved lot: subdivisions in the Dickson County Planning Region require an approved plat filed with the county register24. Ask whether sewer is reasonably accessible, because subdivision approval can require the subdivider to serve every lot and connect to the public system25. Also confirm the zoning district, applicable setback lines, floodplain status and road-access permit with Planning, Zoning & Codes and the Highway Department1915629. Farmland has averaged around $5,919 an acre, while the typical property tax bill is about $1,369 a year3031.

Watch-outs

  • Dickson County's building-permit fee is only part of the cost: budget separately for the $1.00-per-square-foot Adequate Facilities Tax and the $60.00 plumbing fee on top of the valuation-based permit fee13.
  • We could not confirm Dickson County's rules for residential RV use, temporary camping, tiny-home occupancy, general parcel setbacks or minimum lot size; ask Planning, Zoning & Codes for a parcel-specific answer6.
  • If land is being divided in the Dickson County Planning Region, the plat needs Planning Commission approval and filing with the county register before the subdivision occurs24.
  • If your driveway connects to a county road you need a Highway Department driveway permit (minimum 20 feet wide) before building it; a driveway onto a state highway needs a separate TDOT permit instead1112.
  • A parcel inside the City of Dickson or another incorporated town follows that municipality's zoning and building rules, not the county's, while TDEC still issues the septic permit34.

Sources

  1. How to Obtain a Building Permit in Dickson County, Tennessee, quoted and re-checked
  2. Dickson County, TN (2026 county census)
  3. Dickson County, TN, quoted and re-checked
  4. Online Application for Subsurface Sewage Disposal System Related Services, quoted and re-checked
  5. How to Obtain a Building Permit in Dickson County, Tennessee (2026 county census)
  6. Dickson County Planning, Zoning & Codes Department (dicksoncountytn.gov)
  7. Nashville Environmental Field Office, quoted and re-checked
  8. Subsurface Sewage Disposal System (SSDS) Frequently Asked Questions, quoted and re-checked
  9. Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
  10. Residential Permit FAQs, quoted and re-checked
  11. Dickson County Highway Department (dicksoncountytn.gov)
  12. Highway Entrance Permits (Tennessee statewide rule), quoted and re-checked
  13. How to Obtain a Building Permit in Dickson County, quoted and re-checked
  14. How to Obtain a Building Permit in Dickson County, Tennessee, quoted and re-checked
  15. How to Obtain a Building Permit in Dickson County, Tennessee, quoted and re-checked
  16. Dickson County Helpful Links, quoted and re-checked
  17. Tennessee Attorney General Opinion No. 10-108 (Tennessee statewide rule), quoted and re-checked
  18. Exemption from County Zoning Regulation for Buildings on Land Used for Agriculture, Opinion No. 22-07 (Tennessee statewide rule), quoted and re-checked
  19. Subdivision Regulations of Dickson County, Tennessee, quoted and re-checked
  20. Subsurface Sewage Disposal System Frequently Asked Questions, quoted and re-checked
  21. TDEC Nashville Environmental Field Office (tn.gov)
  22. Dickson County Planning, Zoning & Codes Department (dicksoncountytn.gov)
  23. Dickson County Planning, Zoning & Codes Department (dicksoncountytn.gov)
  24. Subdivision Regulations of Dickson County, Tennessee, quoted and re-checked
  25. How to Obtain a Building Permit in Dickson County, Tennessee, quoted and re-checked
  26. How to Obtain a Building Permit in Dickson County, Tennessee, quoted and re-checked
  27. Wooded share of land: Bolthole Index county data
  28. Share of land at 15% slope or less: Bolthole Index county data
  29. Dickson County Highway Department (dicksoncountytn.gov)
  30. Farmland value per acre (USDA census): Bolthole Index county data
  31. Median property tax bill: Bolthole Index county data

Written October 9, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Found land here? Start a Property Hunt →

Compared with neighboring counties

Like 4 of the 5 neighbors with published rules, Dickson County has countywide zoning.

RuleDickson CountyCheatham CountyHumphreys CountyHouston CountyHickman CountyMontgomery CountyWilliamson County
Building permitRequiredRequiredNot requiredNot requiredLimitedRequiredRequired
County zoningYesYesNot publishedNoYesYesYes
Septic permitsTDECTDECTN Dept. of Env. & ConservationTDECTDECTDECWilliamson County

County locator

Dickson County in Tennessee

65
County map
Dickson County highlighted among the Tennessee counties · colored by Index score

How Dickson County scores

Seclusion32100% ev.
Self-Sufficiency70100% ev.
Admin Boringness46100% ev.
Durability73100% ev.
Property Autonomy71100% ev.
Carry Cost75100% ev.

Evidence strength: 100%. This reports direct-source completeness and fallback use; it is separate from the score and is not a confidence interval. How it works →

$366kTypical home
0.5%Property tax
$5,919Land / acre
52.3"Annual rain
3.1% of yrsSevere drought
13.2 / yr (+12)Mid-century 100°F days
14.9 daysMid-century dry spell
2.55" (+8.5%)Mid-century 1-day rain
1.58×Wildfire change factor
100%Forward climate coverage
$1,818Home insurance / yr
2.4% / yrInsurance growth
0.98%Nonrenewal rate
county median (2+ published ZIPs)Insurance basis
73,736People within 30 min
3,506,232People within 2 hr
73,332Radius comparison (15 mi)
115.8People / sq mi
0.3%Federal land
47.7%Land at 15% slope or less
26.6%Soils rated "not limited" for septic (strict USDA rating)
81,038 acWorkable land screen
70.8%Wooded land
60.5 tonsBiomass / forest ac
58.4°FAvg temp

Scout Dickson County

Camp here before you commitBook a few nights nearby on Hipcamp →Already own land here?Earn money hosting campers — get $100 when you become a Hipcamp host →

Some links are affiliate or referral links — we may earn a commission, at no cost to you.

Property hunt

Find land. Bring the promising ones back.

Search live inventory elsewhere, then cost and vet each candidate here. No copied listings, account, or paid data feed.

Each button opens a current land search for Dickson County. Listing sites control their own results and filters.

Analyze a property
Add setup-cost allowances

Use rough quotes or placeholders. Blank fields count as $0.

Working estimate

—land + entered setup costs
Asking $ / acre
—
Setup allowance
—
All-in $ / acre
—

A planning estimate, not a valuation or contractor quote. The USDA benchmark includes farm land and buildings; it is context, not a parcel comp.

Before an offer

Parcel due diligence

0/8 checked

Saved properties and checklist progress stay on this device. Bolthole Index does not receive them.

Cities and towns in Dickson County

Inside a city or town, that city usually issues building permits and sets zoning; the county’s rules above cover unincorporated land. Septic, wells and floodplain rules usually stay with the county or state everywhere.

Town of Burns · Town of Charlotte · Dickson · Town of Slayden · Town of Vanleer · Town of White Bluff

Answers from the rulebook for Dickson County

What the ordinances and state agencies actually say — one answer per question, each quoted from the official source and independently re-checked.

Dickson County rules

  • Building permitRequired

    Building construction requiring a Dickson County building permit, including mobile, manufactured, and modular homes where the county permit process applies.

    • Permits are issued to the land owner or contractor only.
    • The deed must be recorded in the owner's name before the owner can apply.
    • A copy of the septic permit or proof of sewer is required.
    • A site plan and 911 address are required.
    • Floodplain sites require the proposed lowest-floor elevation in relation to mean sea level per the Dickson County Floodplain Zoning Resolution.
    “Required items needed in order to obtain a building permit:”
  • Owner-builder exemptionAvailable (with conditions)

    A land owner applying for a Dickson County building permit as owner rather than through a contractor.

    • The permit is issued to the land owner or contractor only.
    • The deed must be recorded in the owner's name before the owner can apply.
    • The document separately lists license and workers' compensation requirements for contractors.
    “Permits are issued to the Land Owner or Contractor only. The deed must be recorded in the owner’s name before the owner can apply for a building permit.”
  • County-wide zoningPresent (with conditions)

    The county's official planning and zoning materials, including its Zoning Resolution, for areas administered by Dickson County.

    • Incorporated municipalities may administer their own zoning ordinances and building rules.
    • The linked zoning resolution PDF was not text-fetchable because of its large file size, so district-specific numeric controls are not asserted here.
    “Planning & Zoning Forms & Map [...] Zoning Resolution”
  • Local zoningVaries (with conditions)

    Countywide aggregate of zoning administration: Dickson County publishes county planning and zoning materials, while incorporated municipalities such as the City of Dickson maintain separate planning and zoning departments and municipal zoning ordinances.

    • County zoning controls should not be assumed to apply inside incorporated municipalities.
    • The applicable rule depends on whether the parcel is in unincorporated county territory or an incorporated municipality.
    “The Planning and Zoning Department maintains records of all approved plans for subdivisions, commercial developments, and rezoning. Issuance of building permits, inspections of construction projects, and enforcement of all municipal codes pertaining to health and safety are also handled by the Planning and Zoning Department.”
  • Zoning districtsPublished

    Dickson County's official Planning & Zoning materials; the county website publishes a link to its Zoning Resolution.

    • The opened county webpage confirms publication of a Zoning Resolution link but does not itself enumerate the district schedule.
    • Exact district applicability by Rural Area, Planned Growth Area, or Urban Growth Boundary should be taken from the linked resolution.
    “Planning & Zoning Forms & Map [...] Subdivision Regulations [...] Zoning Resolution [...] Planning & Zoning Map”
  • SetbacksSpecified

    Building setback lines for subdivision lots and electric transmission lines in the Dickson County Planning Region.

    • The cited numeric setbacks apply where electric-transmission easement widths are not definitely established.
    • The subdivision regulations also require setback lines to be shown on subdivision plats.

    7.2 KV transmission-line setback: 15 feet · 13 KV transmission-line setback: 25 feet · 46 KV transmission-line setback: 37.5 feet · 69 KV transmission-line setback: 50 feet · 161 KV transmission-line setback: 75 feet

    “In the case of electric transmission lines where easement widths are not definitely established, a minimum building setback line from the center of the transmission line shall be established as follows:”
  • Mandatory utility hookupConditional

    Residential building and subdivision utility service in Dickson County.

    • The county building-permit guide requires a copy of the septic permit or proof of sewer.
    • For subdivisions, when public sanitary sewers are within reasonable access as determined by the Planning Commission, the subdivider must provide sanitary sewer facilities to each lot and connect them to the public system.
    “When public sanitary sewers are within reasonable access of the subdivision, as determined by the Planning Commission, the subdivider shall provide sanitary sewer facilities to each lot therein and shall connect the facilities to the public system.”
    One more reviewed finding on this topic
  • Subdividing landRegulated (with conditions)

    All subdivisions located within the Dickson County Planning Region.

    • The subdivider must submit a plat, obtain Planning Commission approval, and file the approved plat with the county register before land is subdivided.
    • Additional rules address roads, drainage, water, sewerage, utilities, erosion control, and flood-prone areas.
    “These subdivision regulations shall apply to all subdivisions, as herein defined, located within the Dickson County Planning Region. No land shall be subdivided within the planning region until the subdivider submits a plat as required by these regulations, obtains Planning Commission approval of the plat, and files the approved plat with the county register.”
    One more reviewed finding on this topic
    • Regulated (with conditions) — All subdivisions located within the Dickson County Planning Region.
      “These subdivision regulations shall apply to all subdivisions, as herein defined, located within the Dickson County Planning Region. No land shall be subdivided within the planning region until the subdivider submits a plat as required by these regulations, obtains Planning Commission approval of the plat, and files the approved plat with the county register.”
  • Driveway accessRequired

    Lots within the Dickson County Planning Region where a building or structure is proposed.

    • No building permit may be issued and no building or structure may be erected unless the public way giving access to the lot has been accepted, opened, or otherwise received legal public-way status, or the lot fronts on a conforming permanent easement.
    • A permanent access easement must be at least fifty feet wide for its entire distance from the public way to the lot, subject to the stated statutory exception and possible greater widths required by the Planning Commission.
    • The regulations do not establish a countywide rule for all county territory; the quoted provision applies within the jurisdictional area.

    minimum permanent access easement width: >= 50 feet (A court-awarded or court-declared easement under Tennessee Code Annotated § 54-14-101 et seq. may satisfy the width requirement; the Planning Commission may require greater widths for special conditions.)

    “No building permit shall be issued and no building or structure shall be erected on any lot within the jurisdictional area, unless the public way giving access to the lot upon which the building or structure is proposed to be placed shall have been accepted or opened or shall have otherwise received the legal status of a public way as provided by law, or unless such lot fronts upon a permanent easement which conforms to the provisions set forth in these regulations.”
  • Building in a floodplainLimited

    Building-permit applications for sites located in a floodplain in Dickson County.

    • The site plan must show the elevation of the building site relative to mean sea level of the proposed lowest floor.
    • The requirement is stated to apply under the Dickson County Floodplain Zoning Resolution.
    “The elevation of the building site in relation to mean sea level of the proposed lowest floor if said building site is located in a floodplain per the Dickson County Floodplain Zoning Resolution”
    2 more reviewed findings on this topic
    • Limited — Building sites in a floodplain within Dickson County's building-permit process.
      “The elevation of the building site in relation to mean sea level of the proposed lowest floor if said building site is located in a floodplain per the Dickson County Floodplain Zoning Resolution”
    • Limited — Subdivision development containing flood-prone land within the Dickson County Planning Region.
      “Whenever a plat is submitted for an area which is subject to flooding, the Planning Commission may approve such subdivision; provided, that the applicant fills the affected floodway fringe area of said subdivision to place public way elevations at no more than twelve (12) inches below the regulatory flood elevation and first floor elevations (including basements) at no less than one (1) foot above the regulatory flood elevation.”
  • Permit feesPublished

    Dickson County building-permit valuation fees.

    • The county fee schedule is based on total valuation.
    • The building-permit requirements document states that the construction-cost figures supplied by the International Code Council are subject to change.
    • The building-permit document also states there is an Adequate Facilities Tax of $1.00 per square foot of heated and cooled living area and a $60.00 plumbing fee.

    valuation fee for $1-$500: 24 USD · valuation fee for $501-$2,000: 24 for first $500 plus $3 for each additional $100 or fraction thereof USD (up to and including $2,000) · valuation fee for $2,001-$40,000: 69 for first $2,000 plus $11 for each additional $1,000 or fraction thereof USD (up to and including $40,000) · adequate facilities tax: 1 USD per square foot (heated and cooled living area) · plumbing fee: 60 USD

    “$1 to $500 $24 $501 to $2000 $24 for the first $500; plus $3 for each additional $100 or fraction thereof, up to and including $2,000 $2001 to $40,000 $69 for the first $2,000; plus $11 for each additional $1,000 or fraction thereof, up to and including $40,000”
    One more reviewed finding on this topic
    • Published (with conditions) — County building-permit fees and related charges described in the Dickson County permit guide.
      “There will also be a charge for an Adequate Facilities Tax of $1.00 per square foot of the heated and cooled (living area), and a $60.00 Plumbing Fee.”
  • Permit processPublished (with conditions)

    Obtaining a building permit in Dickson County.

    • The applicant must be the land owner or contractor.
    • Contractors must provide a license copy and proof of workers' compensation insurance.
    • A recorded deed, septic permit or proof of sewer, site plan, 911 address, and valuation information are required.
    • The county Planning, Zoning & Codes Department is the contact office.
    “Permits are issued to the Land Owner or Contractor only.”

Tennessee rules that apply here

  • Building code adoptedPartial

    Tennessee State Fire Marshal's Office residential building-code standards for one- and two-family dwellings and townhomes statewide, except where a qualifying local government enforces its own current residential code or has opted out.

    • The State Fire Marshal's Office has adopted the 2018 International Residential Code with amendments.
    • For one- and two-family dwellings and townhomes, the adopted energy code is the 2018 International Energy Conservation Code with amendments.
    • The statewide program applies only in areas that have not received an exemption from the State Fire Marshal's Office because local building codes are enforced by the local government or opted out of state residential building codes and enforcement by a two-thirds vote of the city or county legislative body.
    • A qualifying local jurisdiction may continue operating its own program if its building code is current within seven years of the most recent edition; other versions may be approved in writing by the State Fire Marshal's Office.
    • A county legislative body may vote to remove unincorporated areas of the county from the state program, and a city legislative body may vote to remove the city from the state program.
    • A city or county may opt out by passage, by a two-thirds vote, of a resolution exempting the city or county; the opt-out resolution expires 180 days following the date of the election for the city or county's legislative body.
    • If the subsequent legislative body does not vote to opt out before the resolution expires, the State Fire Marshal's Office begins enforcing the residential building-code requirements until the city or county enforces residential building codes or passes another opt-out resolution.
    • The State Fire Marshal's Office enforces only the codes it adopts; local governments enforce other locally adopted codes or requirements.
    • The state residential building permit is a building permit only and is not grading or fill approval, floodplain compliance, a septic or sewer permit, an electrical permit, or zoning approval.
    • The permit fee is based on the cost of construction and covers all required inspections and one free re-inspection; additional re-inspections cost $100 each.

    International Residential Code edition: 2018 (with amendments) · International Energy Conservation Code edition for one- and two-family dwellings and townhomes: 2018 (with amendments) · local-code currency window: <= 7 years (other versions can be approved in writing by the State Fire Marshal's Office) · opt-out vote: two-thirds vote (resolution expires 180 days following the date of the election for the city or county's legislative body) · additional re-inspection fee: 100 USD (one re-inspection per permit is free)

    “The codes currently adopted by the Tennessee State Fire Marshal’s Office are: [...] International Residential Code (IRC), 2018 edition, published by the ICC, with amendments;”
    One more reviewed finding on this topic
    • Adopted (with conditions) — Tennessee building-code adoption relevant to residential and commercial construction, subject to local-government exemptions and opt-outs.
      “International Building Code (IBC), 2021 edition [...] International Residential Code (IRC), 2018 edition [...] For one- and two-family dwellings and townhomes, the IECC, 2018 edition”
  • Certificate of occupancyLimited

    Certificates of occupancy for one- and two-family dwellings in Tennessee opt-out or non-code jurisdictions when the State Fire Marshal's Office inspects the dwelling during construction.

    • The owner or contractor may obtain a state building permit to request the inspection.
    • The Certificate of Occupancy is released only if the dwelling is determined to meet statewide building construction safety standards.
    • The source describes this process for opt-out or non-code jurisdictions and for new construction or additions to existing homes.
    “determined to meet the statewide building construction safety standards, the State Fire Marshal’s Office will release a Certificate of Occupancy”
  • Camping on your landLimited

    Overnight camping on Tennessee Wildlife Resources Agency-controlled Wildlife Management Areas and related lands where overnight camping is allowed.

    • Overnight camping may be permitted only in designated areas and by permission from the area manager, park ranger, lake manager, park superintendent, or national forest supervisor.
    • Camping is subject to limitations prescribed in the permit if required.
    • Camping may not exceed three weeks from the beginning to the end of the camping stay.
    • Owner contact information or a TWRA ID number and date of arrival must be displayed on a camper, tent, vehicle, or similar item at all times.
    • Where overnight camping is allowed, firearms and archery equipment must remain in camp except during legal hunting hours.

    maximum camping stay: <= 3 weeks

    “May be permitted in designated areas by permission from the area manager, park ranger, lake manager, park superintendent, or national forest supervisor. Such camping is subject to the limitations prescribed in the permit if required.”
    One more reviewed finding on this topic
    • Limited — Camping and use of trailers or other camper units in Tennessee state forests administered by the Tennessee Department of Agriculture, Division of Forestry.
      “Camping and the use of trailers or other camper units are allowed only at designated locations. The district forester will issue written permits to persons to camp in backcountry or other isolated sections of a forest area.”
  • Who permits septicMixed (with conditions)

    Tennessee subsurface sewage disposal system construction permitting and related SSDS administration statewide.

    • The Tennessee Division of Water Resources administers SSDS permitting in non-contract counties.
    • Permit packages and Certificate of Completion packages for sites in contract counties are submitted directly to the contract county.
    • The listed contract counties are Blount, Davidson, Hamilton, Jefferson, Knox, Madison, Sevier, Shelby, and Williamson.
    • Installer permits are valid statewide, but contract counties may require an additional permit.
    “Permit packages and Certificate of Completion Packages for sites located in the contract counties listed below should be submitted directly to the contract county.”
    3 more reviewed findings on this topic
    • State — Subsurface sewage disposal systems serving property in Dickson County, which is listed in the TDEC Nashville Environmental Field Office service area.
      “Counties Served Cheatham, Davidson, Dickson, Houston, Humphreys, Montgomery, Robertson, Rutherford, Stewart, Sumner, Trousdale (Division of Water Resources served by Cookeville EFO), Williamson, Wilson”
    • State (with conditions) — Subsurface sewage disposal system permitting and final inspection applicable in Dickson County.
      “NOTE: Some counties provide ground water protection services for their own areas. The online application form is not to be submitted for services requested in the following metropolitan or contact counties: Blount County, Davidson County/Nashville, Hamilton County, Jefferson County, Knox County, Madison County, Sevier County, Shelby County, Williamson County”
    • Mixed (with conditions) — Statewide subsurface sewage disposal system permitting and assistance, with specified contract counties providing ground water protection services in their own areas.
      “NOTE: Some counties provide ground water protection services for their own areas. The online application form is not to be submitted for services requested in the following metropolitan or contact counties: Blount County, Davidson County/Nashville, Hamilton County, Jefferson County, Knox County, Madison County, Sevier County, Shelby County, Williamson County.”
  • Septic permitRequired

    Construction, installation, modification, or repair of residential, commercial, or industrial septic systems in Tennessee.

    • A permit is required before construction, modification, or repair.
    • A septic system permit should be obtained before starting dirt work or construction of any building, including the building pad.
    • Repair permits have no permit fee.
    • Alternative systems require an extra-high intensity soils map prepared by a Tennessee-licensed soils consultant.
    • Contract counties may require an additional permit.

    new conventional SSDS permit fee: 400 USD up to 1000 gallons per day design flow ($100 for each additional 1000 gpd flow) · new alternative SSDS permit fee: 500 USD up to 1000 gallons per day design flow ($150 for each additional 1000 gpd flow) · experimental SSDS permit fee: 500 USD · repair permit fee: 0 USD (Repair construction inspection fee is $100)

    “A septic system permit is required for the construction, modification or repair of a septic system. This permit ensures that the septic system design complies with state regulations and safeguards your health by properly managing wastewater.”
    One more reviewed finding on this topic
  • Septic inspectionRequired

    Installation of subsurface sewage disposal systems in Tennessee.

    • The installer must notify the Division when installation is complete.
    • A final inspection is scheduled before the system is covered.
    • TDEC inspects each SSDS installation for compliance with permit conditions and regulatory requirements.
    • Inspection fees vary by system type: $100 for new conventional or large-diameter graveless pipe systems, $200 for alternative systems, and $100 for repair construction inspections.

    new conventional construction inspection fee: 100 USD · alternative construction inspection fee: 200 USD · repair construction inspection fee: 100 USD

    “The applicant or SSDS installer must notify the Division when a system has been installed so that it can be inspected and approved.”
    2 more reviewed findings on this topic
    • Required — Final inspection of septic installations in Dickson County.
      “When installation is complete, the installer will contact the local Environmental Scientist to schedule a final inspection before the system is covered. If the septic system installation is approved, the Environmental Scientist will issue a Certificate of Completion.”
    • Required — Final inspection of septic installations in Dickson County.
      “When installation is complete, the installer will contact the local Environmental Scientist to schedule a final inspection before the system is covered. If the septic system installation is approved, the Environmental Scientist will issue a Certificate of Completion.”
  • Agricultural exemptionConditional

    Buildings or structures on land used for agricultural purposes and subject to county zoning regulation in Tennessee.

    • The building or structure must be located on lands devoted to agricultural uses.
    • The building or structure must be incidental to the agricultural enterprise.
    • The exemption does not apply to agricultural lands adjacent or in proximity to state or federal-aid highways, public airports, or public parks.
    • The exemption does not apply to land located within the one-hundred-year flood plain.
    • The Attorney General opinion states that the provision applies to counties only and has no application to municipalities.
    • There is no blanket exemption for cotton gins, grain elevators, slaughterhouses, processing plants, or milk bottling plants; those structures qualify only when the statutory conditions are met.
    “it must be located on lands “devoted to agricultural uses;” and (2) it must be “incidental to the agricultural enterprise.””
  • county zoning authorityGeneral

    County legislative bodies adopting zoning regulations for portions of Tennessee counties outside municipal corporations.

    • The authority is exercised under the conditions and procedures in Tennessee Code Annotated §§ 13-7-101 through 13-7-119.
    • The grant applies to portions of counties outside municipal corporations.
    • County zoning authority does not authorize county building permits or regulation of buildings or structures on agricultural land when the building or structure is incidental to the agricultural enterprise, except on agricultural lands adjacent or in proximity to state federal-aid highways, public airports or public parks.
    • The agricultural-land limitation applies to counties only and has no application to municipalities.
    “Under Tenn. Code Ann. § 13-7-101, et seq., the General Assembly has expressly delegated the authority to county legislative bodies to enact zoning regulations and create a board of zoning appeals.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission — ask the county directly.

  • Inspections — Building inspections in Dickson County.
  • Minimum dwelling size — Minimum dwelling size in Dickson County.
  • Minimum lot size — Minimum lot-size requirements in Dickson County.
  • Lot coverage — Lot coverage limits in Dickson County.
  • Building height — Building-height limits in Dickson County.
7 more unanswered
  • Living in an RV
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Off-grid sanitation
  • Well permit
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Living off-grid in Dickson County, Tennessee

Is Dickson County a good place to live off-grid or homestead?

Dickson County scores 65/100 on the Bolthole Index, a strong county profile. Its strengths: manageable long-term carry cost and mixed durability signals. Watch-outs: about 73,736 people within a 30-minute drive.

Do you need a building permit in Dickson County, Tennessee?

Dickson County generally requires a residential building permit, and it enforces county zoning. Onsite septic is permitted by Tennessee Department of Environment and Conservation (TDEC), Division of Water Resources. Owner-builders may act as their own contractor to build their home. These answers are quoted from official sources and independently re-checked. Rules change and cities within the county differ — always confirm with the county before you buy or build.

How much does land cost in Dickson County, Tennessee?

Land in Dickson County runs about $5,919 per acre, based on the latest county data.

What is the water situation in Dickson County?

Dickson County gets about 52.3" of rain a year, with severe drought in roughly 3.1% of years.

How remote is Dickson County?

A representative private-land location has about 73,736 people within a 30-minute drive and 3,506,232 within two hours. The road-network catchments count population across county lines and clusters of smaller cities; straight-line radius values remain available as a comparison.

How Dickson compares in Tennessee

Compare side-by-side →See all 95 Tennessee counties ranked →