Unincorporated Camp County, Texas has no county building permit and no county zoning ordinance.12 Unincorporated land therefore has no county-set minimum dwelling size, setback, or restriction on RV, tiny-home or manufactured-home occupancy.3 Septic permits are still required: Camp County appears in TCEQ's list of local authorized agents for septic systems, though the office that takes applications is not identified, so ask the County Judge's Office.45 Inside Pittsburg, city building codes and permits apply.6
At a glance
- Building permit
- Not required outside Pittsburg city limits1
- Zoning
- No county zoning; the City of Pittsburg zones within its own limits27
- RV, tiny-home and manufactured-home occupancy
- Unrestricted by the county on unincorporated land3
- Septic
- Permit required; Camp County is a local authorized agent, so ask the County Judge's Office which office takes applications48
- Septic soils
- Only 5.3% of county soils are free of severe limits for a conventional drain field9
- Owner-builder (septic)
- May self-install an OSSF for your own single-family home if the permitting authority allows it10
- Subdivision plats
- County review and a $48 filing fee generally apply, but qualifying agricultural divisions are exempt1112
- Private well
- No state registration unless groundwater-district rules apply13
Who to call
Also useful
General Camp County government; receives subdivision plat and replat submissions for placement on the Commissioners Court agenda
126 Church Street, Room 303, Pittsburg, TX 75686
Also useful
Files approved subdivision plats and replats in the County Clerk's Office after Commissioners Court approval
126 Church Street, Room 102, Pittsburg, TX 75686
Contact details are copied from each office’s official page and were checked against it on October 9, 2026.
Off-grid gear
Going off-grid in Camp County means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Camp County, Texas?
Unincorporated Camp County requires no county building permit for a typical home1. That fits with the county's own record: its hazard mitigation plan states plainly that "Camp County does not have zoning, a comprehensive plan, a capital improvements program"2. Texas lets some counties adopt a fire code or residential building standard, but only counties over 250,000 people (or adjacent to one) qualify, and Camp County's population of about 13,000 is far below that threshold, so it never applies here regardless of what the county decides1415. One statewide exception reaches everyone: industrialized housing, modules and modular components must meet current state code editions as of July 1, 2024, wherever they're installed in Texas16. Inside the City of Pittsburg, it's a different picture: the city has adopted the International Building Code (2012), National Electrical Code (2011), International Plumbing Code (2012) and International Residential Code (2015) by reference, and requires a permit to build6.
Who do you contact for county government matters in Camp County?
Camp County has no confirmed dedicated building or zoning department; the County Judge's Office is the practical first call for county construction questions and receives subdivision plat and replat submissions for the Commissioners Court agenda511. After approval, the plat or replat is filed with the Camp County Clerk for a $48 filing fee1711. Qualifying divisions of land outside municipal limits for agricultural, farm, ranch, wildlife-management or timber-production use are exempt from county platting while that use continues12. Septic permits are handled locally rather than by a county building department; the County Judge's Office is the place to ask who accepts septic applications.54
Does Camp County have zoning?
No: Camp County's own hazard mitigation plan states the county has no zoning ordinance2. Because Texas law hands zoning power only to counties the legislature specifically authorizes, and Camp County has none, unincorporated Camp County sets no minimum dwelling size, no setback, no lot-coverage limit, no building-height limit, and no restriction on RV, tiny-home, manufactured-home or accessory-dwelling occupancy, and no restriction on temporary camping3. That's a real, confirmed answer, not just an absence of information. It changes at the City of Pittsburg's limits, where the city administers its own zoning ordinance separately from the county7.
How do septic permits work in Camp County?
Camp County appears as an authorized agent in TCEQ's 2025 report on septic (on-site sewage facility) systems, which means septic permits are handled locally rather than by a TCEQ regional office; the specific county office that accepts applications is not identified, so ask the County Judge's Office.45 A permit and approved plan are generally required to construct, install, alter, extend, repair or operate a system, and the permitting authority inspects the installation.818 Local programs can be stricter than state minimums, so ask before you design.8 Only 5.3% of Camp County soils are free of severe limits for a conventional drain field, so obtain the site evaluation before settling on a house site or system budget.9 The 10-acre exemption removes planning materials, the permit and inspection only when every condition is met, including a single-family dwelling, at least 100 feet from each property line, no nuisance or groundwater pollution, on-site effluent disposal and no second dwelling.19 Boreholes, cesspools and seepage pits cannot be installed or used for off-grid sewage disposal.19 Owner installation may be allowed for your own single-family home if the permitting authority allows it and no part of the property is developed for sale or lease.10
Can you live in an RV or tiny home on your land in Camp County?
Yes, on unincorporated Camp County land: because the county has no zoning ordinance, it places no restriction on RV occupancy, tiny-home occupancy or manufactured-home occupancy3. Wastewater rules still apply regardless of the dwelling type, and almost all off-grid septic systems (OSSFs) need a permit before construction or alteration.19 A qualifying single-family home on at least 10 acres can avoid OSSF planning materials, a permit and inspection only when every condition is met19. Inside the City of Pittsburg, the city's own zoning applies instead and may restrict what the county does not7.
What are the steps to build a home in Camp County, Texas?
- Confirm with the County Judge's Office whether your parcel is unincorporated or inside the City of Pittsburg, since the rules differ sharply5.
- If you're inside Pittsburg, apply for a city building permit under the city's adopted building codes before starting work6.
- Ask the County Judge's Office who accepts septic (OSSF) applications for Camp County, get the permit and approved plan, then obtain any required inspection before using the system5418.
- If you're dividing land outside municipal limits, first determine whether the agricultural-use exemption applies; otherwise submit the required plats and tax certificate to the County Judge's Office, then file the approved plat with the County Clerk for a $48 fee121117.
- Before burying any utility line near a county road, give formal written notice and get Commissioners Court approval; never run a line through a road or driveway culvert20.
- If your access is onto a state highway, file TxDOT Form 1058 and give TxDOT 24 hours' notice before construction21.
What should you check before you buy land in Camp County, Texas?
Soils and septic: only 5.3% of Camp County soils are free of severe septic limitations, so get a site evaluation before committing to a house site or system budget9. Flood exposure: Camp County says its regulations prohibit building in an area prone to flooding, but the available county plan does not define the boundary, enforcement process or exceptions, so ask the County Judge's Office before placing improvements on low ground225. Water: Texas generally does not require state registration of a private well, but a groundwater conservation district may require registration, permitting or spacing, and every new well requires a State of Texas Water Well Report13. Access: utility work in a county-road right-of-way needs written notice and Commissioners Court approval, while a driveway onto a state highway requires TxDOT's process2021. Jurisdiction: confirm whether the parcel is unincorporated or inside Pittsburg, where city building permits and zoning apply67.
Watch-outs
- Camp County is a local authorized agent for septic permits, but the office that takes applications is not identified; ask the County Judge's Office before designing a system.45
- Camp County prohibits building in areas prone to flooding, but the available county plan does not define the regulated boundary, process or exceptions; ask the County Judge's Office before buying or building on low ground225.
- Rules change sharply inside the City of Pittsburg, which has adopted its own building codes and zoning that the county does not apply6.
Sources
- TCEQ OSSF Information for Homeowners (2026 county census)
- 2023 Camp County Hazard Mitigation Action Plan, quoted and re-checked
- Texas law on county zoning and building authority
- Types of Systems Installed by Time Period, quoted and re-checked
- Camp County Judge's Office (co.camp.tx.us)
- 2023 Camp County Hazard Mitigation Action Plan, quoted and re-checked
- 2023 Camp County Hazard Mitigation Action Plan, quoted and re-checked
- Getting a Permit for an OSSF - Such as a Septic System, quoted and re-checked
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- Getting a Permit for an OSSF - Such as a Septic System, quoted and re-checked
- Camp County Subdivision Plat/Replat Submission Requirements, quoted and re-checked
- Texas Local Government Code Chapter 232, County Regulation of Subdivisions, quoted and re-checked
- General Groundwater and Private Water Well Frequently Asked Questions, quoted and re-checked
- Local Government Code Chapter 233, County Regulation of Housing and Other Structures (Texas statewide rule), quoted and re-checked
- County population: Bolthole Index county data
- Industrialized Housing and Buildings – Adoption of New Code Editions (Texas statewide rule), quoted and re-checked
- Camp County Clerk (co.camp.tx.us)
- Basics for Septic Systems, quoted and re-checked
- Getting a Permit for an OSSF - Such as a Septic System, quoted and re-checked
- Camp County Road & Bridge Department Rules and Regulations for Underground Utility Lines, quoted and re-checked
- Section 4: Driveway Permits, Design, and Materials (Texas statewide rule), quoted and re-checked
- 2023 Camp County Hazard Mitigation Action Plan, quoted and re-checked
Written October 9, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.