The Town of St. Paul, Texas (Collin County) requires a building permit for construction, remodeling or improvement inside town limits, applied for through the Town Secretary1. St. Paul has its own zoning ordinance2. Septic permits, where one is required, are approved by the county, not the town3. Land outside town limits falls under Collin County's rules instead.
At a glance
- Building permit
- Required inside town limits; apply to the Town Secretary1
- Zoning
- Town has its own zoning ordinance and zoning map2
- Septic
- County sanitarian or other county official approves the septic permit first, if one is required3
- Inspections
- Required to finalize a building permit4
- Certificate of occupancy
- Required before occupying vacant land or buildings, except for agricultural purposes5
- R1.5 minimum lot
- 1.5 acres6
- R1.5 minimum home size
- 1,800 sq ft7
- Manufactured home while building (R1.5)
- By permit only, up to 18 months as a temporary residence; mobile homes not permitted8
Who to call
Building permits
Town of St. Paul Town Hall (Town Secretary)
Building permit applications inside St. Paul town limits, and the town's zoning map and ordinances.
2505 Butscher's Block, St Paul, Texas 75098
Septic permits
Collin County Development Services (On-Site Sewage Facilities / OSSF Program)
Septic (OSSF) permitting for Collin County property outside city limits; for addresses inside St. Paul, confirm with Town Hall which county official issues the permit.
4690 Community Ave., McKinney, Texas, 75071
Contact details are copied from each office’s official page and were checked against it on October 24, 2026.
Off-grid gear
Going off-grid in Town of St. Paul means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in St. Paul, Texas?
Yes. Anyone who wants to construct, refurbish, remodel or improve a building or structure inside the corporate limits of the Town of St. Paul must apply for a building permit with the Town Secretary1. The Town Secretary issues the permit once the building official approves it, and only when the project complies with the town's ordinances9.
St. Paul has adopted its own building code article10. Required inspections must be completed to finalize a permit, and failing to finalize is a violation4. The town may set fee schedules by resolution, no permit is issued until the fee is paid11, and work started without a required permit costs an additional 100 percent of the usual permit fees11. Ask Town Hall for the current schedule.
Who issues building permits in St. Paul, and how do you reach them?
The Town Secretary takes building permit applications, and the town's building official approves them1. Reach Town Hall at 972-442-7212, townhall@stpaultexas.us, or 2505 Butscher's Block, St Paul, Texas 7509812. The town's website also lists a permits and applications page and a schedule of fees.
The application must include the listed survey and plans, and it also has to satisfy septic, platting, zoning, subdivision-control and building-code requirements9. Subdividing land inside town limits is regulated by the town's subdivision ordinance13.
Does St. Paul have zoning, and what does it mean for lot size and setbacks?
Yes. The Town of St. Paul has a zoning ordinance with districts, and the official zoning map is on file with the Town Secretary2. Rules differ by district, so find your parcel's district before you plan anything.
In the R1.5 Single-Family Residential District, no building may be built on a lot under 1.5 acres6. A dwelling must have at least 1,800 square feet of floor area, and a two-story house needs at least 1,200 square feet on the first floor7. The front yard must be at least 50 feet deep, with side and rear yards of at least 20 feet14. Main and accessory buildings together may cover no more than 30 percent of the lot15. Other districts have different numbers; we did not confirm them.
How do septic permits work inside St. Paul?
The town will not issue a building permit until a required septic permit is approved by the county sanitarian or other county official in charge of issuance3. In practice, septic comes first, then the town building permit.
Collin County Development Services runs the county's septic (OSSF) program as an authorized agent for properties outside city limits16. We could not confirm septic inspection rules inside St. Paul, so ask Town Hall and Collin County Development Services at (972) 548-5585 which office handles your address17. Septic permits expire after 365 days of no activity17. Conventional drain fields may be hard to site here: only 1% of Collin County soils rate as not limited for a conventional drain field, so expect a site evaluation and possibly an engineered system18.
Can you live in an RV, tiny home or manufactured home in St. Paul?
Mobile homes are not permitted in the R1.5 district8. A HUD-Code manufactured home of at least 600 square feet may serve as a lot owner's temporary residence, by permit only, for no more than 18 months while the owner builds a permanent home; it must then be removed from town or moved to a Manufactured Home District8.
We could not confirm any rule on long-term RV living, temporary camping, tiny homes or accessory dwellings inside St. Paul. Call Town Hall at 972-442-7212 before parking an RV or placing a tiny home12. Do not assume Collin County's lack of zoning applies: that rule covers only unincorporated land19.
Building a home in St. Paul: the steps, in order
- Ask Town Hall which zoning district your lot is in and read that district's lot, size and setback rules2.
- If you plan a septic system, get the septic permit approved by the county first3.
- Apply for a building permit with the Town Secretary, with survey and plans9.
- Apply for a certificate of occupancy when you apply for the building permit5.
- Build, and complete the required inspections to finalize the permit4.
- Do not occupy the building until the certificate of occupancy is issued5.
What stays with Collin County, and what to check before you buy
Septic permits come from the county, as covered above3. Whether a parcel is inside town limits matters: outside them, Collin County requires a development permit for projects that disturb ground or add footprint in the unincorporated county20, and the county has no zoning there19. See the Collin County page for land outside town limits.
County figures: the effective property tax rate is 1.7%21, and the median property tax bill is $7,432 a year22. The county center is about 6 miles from the nearest city of 100,000 or more23. We could not confirm floodplain rules, private well rules or utility connection rules inside St. Paul; ask Town Hall.
Watch-outs
- Verify your parcel is inside St. Paul town limits before relying on this page; outside them, Collin County's rules apply instead19.
- We could not confirm whether an owner-builder exemption exists inside St. Paul; ask Town Hall at 972-442-7212 before planning to build without a contractor12.
- Starting work without a required permit adds 100 percent of the usual permit fees11.
- A certificate of occupancy is required before anyone uses or occupies a new building, except for agricultural purposes5.
Sources
- ecode360.com (Town of St. Paul), quoted and re-checked
- Exhibit 14A, Article 4: Establishment of Districts and Boundaries (Town of St. Paul), quoted and re-checked
- ecode360.com (Town of St. Paul), quoted and re-checked
- ecode360.com (Town of St. Paul), quoted and re-checked
- ecode360.com (Town of St. Paul), quoted and re-checked
- Exhibit 14A, Article 6: R1.5 Single-Family Residential District (Town of St. Paul), quoted and re-checked
- Exhibit 14A, Article 6: R1.5 Single-Family Residential District (Town of St. Paul), quoted and re-checked
- Exhibit 14A, Article 6: R1.5 Single-Family Residential District (Town of St. Paul), quoted and re-checked
- Chapter 3, Article 3.02, Division 1: Generally (Town of St. Paul), quoted and re-checked
- Chapter 3, Article 3.02, Division 1: Generally (Town of St. Paul), quoted and re-checked
- ecode360.com (Town of St. Paul), quoted and re-checked
- Town of St. Paul Town Hall (Town Secretary) (stpaultexas.us)
- Chapter 10: Subdivision Regulation (Town of St. Paul), quoted and re-checked
- Exhibit 14A, Article 6: R1.5 Single-Family Residential District (Town of St. Paul), quoted and re-checked
- Exhibit 14A, Article 6: R1.5 Single-Family Residential District (Town of St. Paul), quoted and re-checked
- Development Services: On Site Sewage Facilities (2026 county census)
- Collin County Development Services (On-Site Sewage Facilities / OSSF Program) (collincountytx.gov)
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- collincountytx.gov, quoted and re-checked
- collincountytx.gov, quoted and re-checked
- Effective property tax rate: Bolthole Index county data
- Median property tax bill: Bolthole Index county data
- Straight-line distance from the county center to the nearest city of 100,000+ people: Bolthole Index county data
Written October 24, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.