Unincorporated Willacy County, Texas has no zoning ordinance, so the county sets no minimum lot size, setback or use restriction through zoning12. Building permits come from the Willacy County Permits Department, which will not issue one until the lot has a recorded plat3. Septic permits are separate and also come from the Permits Department, as the state's local authorized agent45.
At a glance
- Building permit
- Required through the county Permits Department; a recorded plat must come first3
- Zoning
- None at the county level; no zoning-based lot size, setback or use rule12
- Septic permit
- Separate permit from the county Permits Department, which acts for the state45
- RV, tiny home or manufactured home
- No zoning-based occupancy limit; a manufactured home still needs a county permit26
- Residential permit fee
- $0.18 per square foot plus a $5 processing fee7
- Owner-builder
- State licensing exemption for your own homestead's electrical and plumbing; county exemption unconfirmed8
- Septic-favorable soils
- About 36.7% of the county's land is rated free of severe limits for a conventional drain field9
- Property tax
- About 1.9% effective rate; median bill around $1,164/year1011
Who to call
Building permits
Willacy County Permits Department
Issues residential and commercial building permits, electrical, plumbing/gas and mechanical permits, manufactured-home and moving permits, demolition permits and underground/utility permits, and administers the county's Flood Plains Ordinance and Subdivision Rules and Regulations for unincorporated Willacy County
576 W. Main Ave, Raymondville, Texas 78580
Septic permits
Willacy County Permits Department - On-Site Sewage Facility (OSSF) Program
Issues on-site sewage facility (OSSF) permits for new construction and system modification, as the Texas Commission on Environmental Quality's authorized agent for unincorporated Willacy County
576 W. Main Ave, Raymondville, Texas 78580
Contact details are copied from each office’s official page and were checked against it on October 9, 2026.
Off-grid gear
Going off-grid in Willacy County means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Willacy County, Texas?
Yes: building permits in unincorporated Willacy County come from the county Permits Department, which accepts applications for residential and commercial construction, manufactured homes, electrical, plumbing/gas and mechanical work, and demolition6. The first hurdle is the plat: the county's checklist says a building permit application cannot be issued if the plat is not recorded3. Starting construction before approval doubles the approved application fee3. Residential new construction is priced at $0.18 per square foot, with a $5 processing fee and a 25 percent plan review fee on top of the permit fee7. We could not confirm which building-code edition the county enforces, so ask the Permits Department what your plans will be reviewed against6.
Who issues building permits in Willacy County, and how do you reach them?
The Willacy County Permits Department issues building, electrical, plumbing/gas, mechanical, demolition, manufactured-home and moving permits, and is reached at (956) 689-3393 at 576 W. Main Ave, Raymondville, Texas 785806. Applications are posted on the county site as downloadable forms, and permits are submitted to the Tax Office Monday through Friday, 8:00am to 11:30am and 1:00pm to 4:00pm612. Permit fees are cash or check only6. The initial checklist asks for a recorded plat, a completed application, a deed and a tax statement12. Septic permits come from the same office13.
Does Willacy County have zoning?
Unincorporated Willacy County has no county zoning ordinance: the county's Permits page lists a Flood Plains Ordinance and Subdivision Rules and Regulations but no zoning code16. With no zoning, the county sets no minimum lot size, setback, lot-coverage or height limit through zoning, and none restricts an accessory dwelling, RV, tiny home or manufactured home2. That does not mean no setbacks at all: the residential permit application says no construction is allowed over an easement, and building setbacks must be met before the foundation is poured14. Cities such as Raymondville may have their own rules inside city limits, so ask city hall if your parcel is inside one; the county's rules above cover unincorporated land only.
How do septic permits work in Willacy County?
Septic permits in Willacy County are separate from building permits: the residential building application says a separate permit is required for septic tank installation4. The Permits Department handles them as the state's local authorized agent for on-site sewage facilities135. The application asks for site, soil, water-supply and design information, including suitable soil at least 24 inches deep beneath the drain field and at least 2 borings or backhoe pits at opposite ends of the absorption area4. After installation, a permit to operate is granted following successful inspection15. The local agent sets the permit and inspection fees, plus a $10 state fee per permit; we could not confirm the county's fee amount, so ask the Permits Department16. Texas exempts a single-family home on at least 10 acres only if every listed condition is met, including keeping all parts of the system at least 100 feet from the property line17. About 36.7% of the county's land is rated free of severe limits for a conventional drain field9.
Can you live in an RV or tiny home on your land in Willacy County?
Unincorporated Willacy County has no zoning ordinance, so no county zoning rule limits living in an RV, a tiny home or a manufactured home on private land2. A manufactured home still needs a county manufactured-home permit, with a $150 permit fee67. Any home that needs sewage disposal needs a septic permit whatever type of dwelling it is4. In a flood zone, the county requires a floodplain development permit and elevation documentation3. We could not confirm a county rule on short-term rentals; ask the Permits Department.
Building a home in Willacy County: what are the steps?
- Confirm the lot has a recorded plat and check whether it is in a flood zone, because a building permit cannot be issued without the plat and flood-zone projects need a floodplain development permit3.
- Apply for the septic permit through the Permits Department if no sewer serves the lot4.
- Submit the residential building application, plus electrical, plumbing/gas and mechanical applications as needed, to the Permits Department at 576 W. Main Ave, Raymondville, (956) 689-33936.
- Pay the permit fees in cash or by check6.
- Do not start work before approval, because that doubles the approved application fee3.
- Contact the Inspection Department 48 hours before the foundation pour so setbacks and finished floor elevation can be checked14.
- If a driveway meets a state highway, submit TxDOT Form 1058 and wait for the executed permit18; a county driveway fee of $45 appears on the county fee schedule19.
What should you check before buying land in Willacy County, Texas?
Willacy County has about 20,037 residents at roughly 33.9 people per square mile, and the nearest city of 100,000 or more is about 35 miles away202122. Land is flat, with all of it at 15% slope or less23. Rainfall averages about 25.3 inches a year, with severe drought in roughly 20.2% of years, so plan your water supply; we could not confirm a county well-permit rule, so ask the Permits Department2425. Federal land covers about 11.9% of the county, so check whether a parcel borders it26. Farmland has recently valued around $2,789 an acre and a typical home around $174,196, against a roughly 1.9% effective property tax rate272810. Typical home insurance runs about $2,219 a year29.
Watch-outs
- A building permit cannot be issued in Willacy County until the plat is recorded, so confirm a parcel's plat status before you close3.
- Starting construction before the county approves your application doubles the approved application fee3.
- We could not confirm which building code the county enforces or any owner-builder exemption from county permits; ask the Permits Department before assuming either8.
Sources
- Willacy County Permits Department (2026 county census)
- Texas law on county zoning and building authority
- Checklist for Initial Application Residential / Commercial, quoted and re-checked
- Residential Building Permit Application, quoted and re-checked
- Application for On-Site Sewage Facility New Construction and Modification, quoted and re-checked
- Willacy County Permits Department (co.willacy.tx.us)
- Residential Building Permit Application, quoted and re-checked
- Exemptions to Electrician Licensing (2026 county census)
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- Effective property tax rate: Bolthole Index county data
- Median property tax bill: Bolthole Index county data
- Permits, quoted and re-checked
- Willacy County Permits Department - On-Site Sewage Facility (OSSF) Program (co.willacy.tx.us)
- Residential Building Permit Application, quoted and re-checked
- On-Site Sewage New Construction and Modification, quoted and re-checked
- On-Site Sewage Facility Rules Compilation, quoted and re-checked
- Getting a Permit for an OSSF - Such as a Septic System (Texas statewide rule), quoted and re-checked
- Section 4: Driveway Permits, Design, and Materials (Texas statewide rule), quoted and re-checked
- Residential Building Permit Application, quoted and re-checked
- County population: Bolthole Index county data
- Population density: Bolthole Index county data
- Straight-line distance from the county center to the nearest city of 100,000+ people: Bolthole Index county data
- Share of land at 15% slope or less: Bolthole Index county data
- Annual precipitation: Bolthole Index county data
- Share of years in severe drought: Bolthole Index county data
- Federal land share: Bolthole Index county data
- Farmland value per acre (USDA census): Bolthole Index county data
- Typical home value (Zillow): Bolthole Index county data
- Typical home insurance premium: Bolthole Index county data
Written October 9, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.