St. George, Utah, in Washington County, adopts the Utah state construction codes and runs its own building department and planning and zoning office, so city-limits projects do not go to the county. Septic permits in Washington County come from the Southwest Utah Public Health Department.1234
At a glance
- Building codes
- City adopts the most recent Utah-adopted construction codes1
- Building permits
- Issued by the City of St. George building department; apply through its CityInspect portal2
- Zoning
- City zoning code with agricultural, single-family residential, mobile-home, commercial and manufacturing districts5
- Certificate of occupancy
- Required after final inspection before a new building is occupied6
- Accessory dwellings
- Permitted with required standards in the single-family residential zones7
- Septic
- Southwest Utah Public Health Department for Washington County; city-limits rules not confirmed4
- RV or tiny-home living
- Not confirmed; ask the city planning office3
Who to call
Building permits
City of St. George Building Department
Building permits and inspections inside St. George city limits; permit requests go through the CityInspect portal
61 S Main St, St. George, UT 84770
Planning & zoning
City of St. George Planning and Zoning
Zoning, plats, site plans and development review inside St. George city limits
61 S Main St, St. George, UT 84770
Septic permits
Southwest Utah Public Health Department — Washington County
Septic (onsite wastewater) plan review, permits and inspections for Washington County
620 South 400 East, St. George, UT 84770
Contact details are copied from each office’s official page and were checked against it on October 24, 2026.
Off-grid gear
Going off-grid in St. George means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in St. George, Utah?
St. George adopts the most recent construction codes Utah has adopted, along with the state's amendments1. Under state law a local compliance agency issues construction permits, and the state division that administers the codes does not issue permits itself8. Inside St. George, that local agency is the city's building department, which takes permit requests through its CityInspect portal2.
The city's permit ordinance spells out that business, commercial and industrial buildings need a permit before work starts, secured from the city council or its appointed agent9. We could not confirm a separate written rule for single-family homes, so ask the building department before you assume any residential project is exempt.
After the work, a certificate of occupancy is required before a new or altered building is occupied, and it issues only after final inspection6.
Who issues building permits in St. George, and how do you reach them?
The City of St. George Building Department issues building permits and handles inspections inside city limits. It is at 61 S Main St, St. George, UT 84770, phone 435-627-41002. Permit requests are made online through the city's CityInspect portal2.
Fees are paid in advance, and the amount is set by resolution of the city council rather than in the code itself10. Ask the building department for the current fee schedule for your project.
Washington County's Community Development department handles building permits only for unincorporated land. See the Washington County page if your parcel lies outside city limits.
Does St. George have zoning, and what does it mean for RVs, tiny homes and lot size?
Yes. St. George publishes its own zoning code, which sets agricultural zones, single-family residential zones, mobile-home zones, commercial and manufacturing zones, airport-vicinity zones, open-space zones and overlay zones5. The Planning and Zoning office at 435-627-4206 is where development starts: the city asks applicants to book a development staff review before beginning3.
Accessory dwelling units are permitted with required standards in the city's single-family residential zones, so check the standards for your zone before planning a casita or guest unit7. Short-term residential rentals carry the same permitted-with-standards status in those zones11.
We could not confirm the city's rules on RV living, tiny homes, minimum lot size, setbacks or building height, because they vary by district. Ask Planning and Zoning for your parcel's district before you buy.
How do septic permits work in St. George?
Septic permits in Washington County are handled by the Southwest Utah Public Health Department, which reviews plans, issues permits, inspects systems and keeps septic records within its district4. The department sits at 620 South 400 East, St. George, UT 84770, phone (435) 673-352812.
Utah law requires wastewater to go to either a public sewer connection or an onsite septic system13. Before installing, replacing or modifying a septic system, a permit and approved design are required14.
We could not confirm whether a given lot inside St. George city limits can connect to city sewer or may use septic at all. Ask the building department and the health department together before you buy.
Soils matter too: USDA rates only about 11% of Washington County's soils as not limited for a conventional drain field, so expect a site evaluation, and possibly an engineered system, on septic lots15.
Can you live in an RV or tiny home on your land in St. George?
We could not confirm a general rule for living in an RV or a tiny home on private land inside St. George. The city's mobile-home zone refers to an existing recreational-vehicle subdivision, but that does not amount to a citywide RV-occupancy rule5.
Before you move any RV or tiny home onto a St. George lot, call Planning and Zoning at 435-627-4206 and ask what the lot's zoning district allows3. Occupancy also depends on the certificate of occupancy, which the city requires before a building is used6.
Building a home in St. George: the steps, in order
- Ask Planning and Zoning which zoning district your parcel is in and what it allows, and book a development staff review if your project needs one3.
- Confirm how the lot handles wastewater. Utah law requires a public sewer connection or an onsite system13. If septic is possible, the Southwest Utah Public Health Department reviews plans and issues the permit4.
- If you plan a private well, a shallow water well owner must hold a valid water right before the well is built16.
- Apply for a building permit through the CityInspect portal and pay the fee set by city council resolution210.
- Build to the adopted Utah construction codes and pass inspections1.
- Get the certificate of occupancy after final inspection before anyone moves in6.
Owner-builders: Utah lets a sole owner build one residential structure per year and up to three per five years on their own property without a contractor license, but that exemption does not remove permit and inspection requirements17.
What stays with Washington County, and what to check before you buy
Washington County's rules for unincorporated land do not apply inside St. George. Outside city limits, a building permit is required from the county18, and the county administers its own zoning19. See the Washington County page for that side.
Septic and wells are not city decisions: septic runs through the Southwest Utah Public Health Department, and wells are regulated by the State Engineer regardless of depth416.
County-level numbers to weigh: Washington County's effective property tax rate is about 0.4%20, and farmland sells for about $8,684 per acre21. A typical home is valued around $531,49622, and annual precipitation is about 15.2 inches23.
Watch-outs
- We could not confirm the city's setbacks, minimum lot sizes, height limits or flood-zone requirements; ask Planning and Zoning for your parcel's district before closing3.
- A lot inside city limits may or may not be able to use septic; confirm sewer availability with the city and septic eligibility with the Southwest Utah Public Health Department13.
- Utah's owner-builder exemption covers contractor licensing only and does not waive permits or inspections17.
Sources
- § 9-1-1 Building Code Adopted (St. George), quoted and re-checked
- City of St. George Building Department (sgcityutah.gov)
- City of St. George Planning and Zoning (sgcityutah.gov)
- Septic Systems - Southwest Utah Public Health Department, quoted and re-checked
- Title 10 Zoning Regulations (St. George), quoted and re-checked
- § 9-1-3 Certificates Of Occupancy (St. George), quoted and re-checked
- Article B. Single-Family Residential Zones (St. George), quoted and re-checked
- Utah Code Title 15A, State Construction and Fire Codes Act (Utah statewide rule), quoted and re-checked
- § 9-1-2 Building Permit; Fee (St. George), quoted and re-checked
- § 9-1-2 Building Permit; Fee (St. George), quoted and re-checked
- Article B. Single-Family Residential Zones (St. George), quoted and re-checked
- Southwest Utah Public Health Department — Washington County (swuhealth.gov)
- Septic Systems - Southwest Utah Public Health Department, quoted and re-checked
- Septic Systems - Southwest Utah Public Health Department, quoted and re-checked
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- Water Well Drilling Information - Utah Division of Water Rights, quoted and re-checked
- Utah Code Title 58, Chapter 55, Construction Trades Licensing Act exemptions (Utah statewide rule), quoted and re-checked
- 10-1-6: Building Permit Required (2026 county census)
- Zoning Info (2026 county census)
- Effective property tax rate: Bolthole Index county data
- Farmland value per acre (USDA census): Bolthole Index county data
- Typical home value (Zillow): Bolthole Index county data
- Annual precipitation: Bolthole Index county data
Written October 24, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.