Unincorporated Washington County, Utah requires a written building permit before construction begins1. Washington County zones unincorporated land, while incorporated cities and towns control their own planning23. Off-grid property still needs public sewer or an approved onsite wastewater system, and septic work requires a permit and approved design from the Southwest Utah Public Health Department45.
At a glance
- Building permit
- Required in county-regulated areas before construction begins16
- Zoning
- Yes; county zoning applies outside incorporated cities and towns2
- Septic
- Permit and approved design required through Southwest Utah Public Health Dept.; only 10.9% of soils avoid severe conventional drain-field limits78
- Owner-builder
- Contractor-license exemption: up to 1 home a year and 3 in five years for the owner's noncommercial use; permits still apply9
- Wells
- Statewide permit (Start Card) via the Division of Water Rights; licensed driller required10
- RV living
- Private-land camping is unconfirmed; an RV park is conditional only in the MH zone11
- Tiny home
- A foundation tiny home is 150–1,000 sq. ft.; parcel-specific occupancy approval remains unconfirmed12
- Manufactured home
- The MH district allows manufactured homes; Pine Valley applies a 1,400-square-foot minimum1314
Who to call
Building permits
Washington County Community Development
Building permits, plan review, inspections, zoning and subdivision regulation for unincorporated Washington County; Planning & Zoning and Building have merged into this single department
111 East Tabernacle St., St. George, UT 84770
Roads & driveways
Washington County Public Works
Road, engineering and driveway/access standards for unincorporated Washington County
Septic permits
Southwest Utah Public Health Department — Washington County
Septic (onsite wastewater) permits, plan review and inspections for Washington County
620 South 400 East, St. George, UT 84770
Contact details are copied from each office’s official page and were checked against it on October 10, 2026.
Off-grid gear
Going off-grid in Washington County means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Washington County, Utah?
Yes. Construction in Washington County's county-regulated jurisdiction may not begin until the building inspector issues a written building permit1. Community Development reviews plans, issues building permits and inspects structures through construction15. The statewide construction standards include the 2024 International Building Code and the 2021 International Residential Code, with applicable amendments1617. Building-permit fees are based on project valuation and carry a 1% state surcharge18. Washington County accepts building-permit applications only through its online permitting system19. An agricultural structure may qualify for an exemption only on more than 2 acres in specified unincorporated zones, and the statewide exemption is limited to structures used solely for agriculture and not for human occupancy2021.
Who is the Washington County building department, and how do you reach them?
Washington County Community Development issues building permits, reviews plans and inspects construction through every phase in the county's jurisdiction15. Planning & Zoning and Building merged into Community Development, so the same counter is the starting point for a building-permit or zoning question6. Community Development also administers subdivision regulations15. A preliminary plat must comply with applicable local, state and federal law and pass staff review before moving forward2223. Ask Community Development about floodplain development approval before starting mapped-floodplain work, and direct county road or driveway-access questions to Public Works2425.
Does Washington County have zoning?
Yes. Washington County administers zoning for unincorporated land, while incorporated cities and towns control their own planning and development23. Minimum lot area is district-specific: A-5 requires 5 acres, RA-1 requires 1 acre and R-1-10 requires 10,000 square feet2627. Setbacks are district-specific too; RA-1 uses a 25-foot front setback and 10-foot side and rear setbacks, while RA-2.5 uses 25 feet on each side28. Accessory dwelling units have a 25-foot minimum setback on all sides29. The cited open-space and agricultural districts have a 35-foot height limit30. The MH district recognizes manufactured homes at up to 6 units per acre, while Pine Valley manufactured housing needs at least 1,400 square feet of living area1314.
How do septic permits work in Washington County?
Wastewater must go to a public sewer or an onsite wastewater system, so off-grid land is not exempt from an approved sanitation route4. The Southwest Utah Public Health Department reviews plans, issues septic permits, conducts inspections and keeps septic-system records in its district31. Before installing, replacing or modifying a septic system, obtain a permit and approved design5. Washington County septic review also requires approval from the Washington County Water Conservancy District or Ash Creek Special Service District31. Only about 11% of county soils rate without severe limits for a conventional drain field, so test the site before relying on a conventional system8. The health department must inspect the system before backfilling32.
Can you live in an RV or tiny home on your land in Washington County?
We could not confirm a general rule allowing temporary RV camping on private land in unincorporated Washington County; ask Community Development about the parcel and proposed duration. An RV park may be approved only as a conditional use in the MH zoning district, but that rule does not authorize living in a single RV on private land11. Utah's separate RV-park health rule also does not answer private-land occupancy33. Washington County defines a Tiny Home on Foundation as a dwelling from 150 through 1,000 square feet, but the definition does not establish where residential occupancy is allowed12. We could not confirm the current parcel-specific approval path for occupying a tiny home; ask Community Development before purchase. Manufactured homes are recognized in the MH district, and Pine Valley applies a 1,400-square-foot living-area minimum to manufactured housing1314. Any occupied off-grid setup still needs public sewer or an approved onsite wastewater system5.
Building a home in Washington County: the steps, in order
- Confirm the parcel's jurisdiction, zoning district, minimum lot area, setbacks and height with Community Development before designing6262830.
- If dividing land, complete preliminary-plat review before treating proposed lots as buildable2223.
- Plan driveway access under county standards; adjacent developments may have to share access3425.
- Confirm public sewer service or obtain an approved design, septic permit and required district sign-off4731.
- For a well, secure the water right and Start Card before construction and use a licensed driller10.
- Apply electronically and receive the written county building permit before work begins191.
- Complete required inspections; when a third-party inspection firm completes an inspection and submits its report, state law directs the local regulator to issue the certificate of occupancy35.
What to check before you buy land in Washington County
Confirm the parcel's jurisdiction, zoning district, minimum area, setbacks and height with Community Development before deciding it is buildable6262830. Check whether the parcel is a legal lot because county review considers its creation date, zoning area and approved access36. Check the floodplain map because mapped-floodplain work requires approval before construction starts24. About 77% of Washington County is federal land, so verify boundaries before assuming neighboring ground is privately buildable37. Run septic testing early because only 11% of county soils rate without severe limits for a conventional drain field8. A typical county home carries about a 0.4% effective property-tax rate and a $2,076 annual bill3839.
Watch-outs
- Washington County septic review requires sign-off from the Washington County Water Conservancy District or Ash Creek Special Service District in addition to the Southwest Utah Public Health Department permit31.
- A remodel or addition valued at 50% or more of your structure's pre-work value counts as 'substantially improved' under Washington County's floodplain rules and triggers full new-construction review24.
- Utah's owner-builder exemption is an exemption from contractor licensing, capped at one residential structure per year and three per five years on the owner's property for noncommercial, nonpublic use; building permits, inspections and zoning still apply9.
- Washington County defines a foundation tiny home as 150–1,000 square feet, but we could not confirm where tiny-home occupancy is allowed; ask Community Development for a parcel-specific answer126.
- Lot coverage is overlay-specific: Pine Valley has confirmed limits, while the available New Harmony figures come from a draft; ask Community Development which adopted standard controls the parcel40416.
Sources
- 10-1-6: Building Permit Required, quoted and re-checked
- Zoning Info, quoted and re-checked
- Washington County General Plan, quoted and re-checked
- Septic Systems - Southwest Utah Public Health Department, quoted and re-checked
- Septic Systems - Southwest Utah Public Health Department, quoted and re-checked
- Washington County Community Development (washco.utah.gov)
- Septic Systems - Southwest Utah Public Health Department, quoted and re-checked
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- Utah Code Title 58, Chapter 55, quoted and re-checked
- Water Well Drilling Information - Utah Division of Water Rights, quoted and re-checked
- codelibrary.amlegal.com, quoted and re-checked
- codelibrary.amlegal.com, quoted and re-checked
- Zoning Info, quoted and re-checked
- Pine Valley Overlay Zone, quoted and re-checked
- washco.utah.gov, quoted and re-checked
- Utah Code § 15A-1-204, Adoption of State Construction Code (Utah statewide rule), quoted and re-checked
- Utah Code § 15A-2-103, Specific editions adopted of construction code, quoted and re-checked
- Community Development Fees, quoted and re-checked
- Apply for a Building Permit, quoted and re-checked
- Agricultural Use Exemption, quoted and re-checked
- Utah Code § 15A-1-204 (Utah statewide rule), quoted and re-checked
- Preliminary Plat Checklist | Washington County Community Development, quoted and re-checked
- Preliminary Plat Checklist, quoted and re-checked
- Washington County Construction Design Standards, quoted and re-checked
- Washington County Public Works (washco.utah.gov)
- Zoning Info | Washington County of Utah, quoted and re-checked
- Zoning Info, quoted and re-checked
- Zoning Info | Washington County of Utah, quoted and re-checked
- Zoning Info, quoted and re-checked
- Zoning Info | Washington County of Utah, quoted and re-checked
- Septic Systems - Southwest Utah Public Health Department, quoted and re-checked
- Septic Systems - Southwest Utah Public Health Department, quoted and re-checked
- Utah Administrative Code Rule R392-301, Recreational Vehicle Parks (Utah statewide rule), quoted and re-checked
- Washington County Construction Design Standards, quoted and re-checked
- Utah Code Title 15A, third-party inspection and certificate of occupancy provisions, quoted and re-checked
- Frequently Asked Questions (FAQ), quoted and re-checked
- Federal land share: Bolthole Index county data
- Effective property tax rate: Bolthole Index county data
- Median property tax bill: Bolthole Index county data
- Pine Valley Overlay Zone, quoted and re-checked
- New Harmony Valley Overlay Zone draft, quoted and re-checked
Written October 10, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.