Arlington County, Virginia requires building permits for residential building work, with applications submitted online through Permit Arlington12. Countywide zoning applies, but lot size, coverage, height and other standards vary by district34. Building permits and zoning come from Arlington County; septic and private-well permits for any parcel that uses them come from the Virginia Department of Health56.
At a glance
- Building permit
- Required for residential building work, subject to state-code exemptions; applications go through Permit Arlington1
- Zoning
- Yes — countywide, with standards that vary by zoning district and special planning area34
- Septic permit
- Required where onsite sewage is used; administered by the Virginia Department of Health56
- Owner-builder exemption
- Virginia exempts a qualifying owner-builder from contractor licensing for one primary residence for personal use in a 24-month period; permits and code rules still apply7
- Floodplain permit
- Required in the 100-year floodplain or a county-required flood buffer zone8
- Private well permit
- Required for private-well construction or abandonment where a private well is used9
- Certificate of occupancy
- Required before occupancy when applicable; apply separately from the building permit10
- Short-term rental
- Allowed as a regulated accessory homestay in a primary dwelling; a permit is required11
Who to call
Building permits
Arlington County Permit Arlington (Inspection Services Division)
Residential and commercial building permit applications, review and inspections for all of Arlington County
2100 Clarendon Boulevard, Arlington, VA 22201
Zoning
Arlington County Zoning Division
Zoning compliance, nonconformity determinations, and zoning review of building permit applications across Arlington County
2100 Clarendon Boulevard, Arlington, VA 22201
Floodplain permits
Arlington County Department of Environmental Services – Permitting & Inspections Counter
Floodplain, Resource Protection Area (RPA), easement, and land-disturbance/stormwater permitting for construction projects in Arlington County
2100 Clarendon Boulevard, Arlington, VA 22201
Septic permits
Virginia Department of Health – Division of Onsite Water and Wastewater Services
Statewide onsite sewage (septic) system permitting, oversight and technical resources, including for the rare unsewered parcel in Arlington County
Contact details are copied from each office’s official page and were checked against it on October 9, 2026.
Off-grid gear
Going off-grid in Arlington County means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Arlington County, Virginia?
Arlington County requires a building permit for residential building work, subject to the exemptions in the Virginia Uniform Statewide Building Code1. Residential applications must be submitted online through Permit Arlington2. New residential construction must complete the applicable building, mechanical, electrical, plumbing, demolition and possible fire or elevator inspections12. A new single-family dwelling cannot be occupied before Arlington County issues its certificate of occupancy10. A person may qualify to build or supervise one personally owned primary residence for personal use during a 24-month period without a contractor license, but that exemption does not waive permits or code compliance7. Fees are not a single number: Arlington County publishes separate fee schedules for the Inspection Services Division, the Zoning Division and the Department of Environmental Services, and some permits involve more than one schedule13.
Who issues building permits in Arlington County, and how do you reach them?
Arlington County's building permit office operates as Permit Arlington, housed at the Bozman Government Center, 2100 Clarendon Boulevard2. Call the Permit Arlington Center at 703-228-3800 with general building permit questions2. For questions about easements, floodplain review, resource protection areas or land-disturbance permits, contact the Department of Environmental Services Permitting & Inspections Counter at 703-228-3629 instead14. If your project might create or worsen a zoning nonconformity, contact the Zoning Division at 703-228-3883 before you submit15.
Does Arlington County have zoning?
Yes. Arlington County's Zoning Ordinance and Zoning Map regulate use and development throughout the county1617. The practical answer depends on the parcel's district or special planning area: allowed uses, minimum lot size, lot coverage, building height, bulk, siting, parking and density can vary, and some projects may need a site-plan or use-permit exception4181920. Setbacks also vary by structure and zoning district21. Ask the Zoning Division to identify the parcel's district and any legal nonconformity before relying on a neighboring property's design15. Building permits, zoning review and floodplain review sit with different Arlington County offices, so a parcel can clear one and still need another21514.
How do septic permits work in Arlington County?
The Virginia Department of Health administers onsite sewage permitting for an Arlington County parcel that uses septic5. A construction permit is required for an onsite sewage system, and the published fee for a construction permit without engineer or soil-evaluator documentation is $4256. Private wells are separate: a private-well construction or abandonment permit is required where a well is used, at $3009. Septic and well permits stay with the Virginia Department of Health, not the county building office5. Applicants for new construction are advised to seek a certification letter determining whether the land is suitable22. Installation ordinarily must be inspected and approved by the local health department unless a licensed professional engineer or onsite soil evaluator designed and certified it under the state exception23. About 53.1% of Arlington's soils are rated without severe limits for a conventional drain field, but a parcel-level evaluation still controls feasibility24. Confirm public-sewer availability first because Arlington is served almost entirely by public sewer25.
Can you live in an RV, tiny home or manufactured home on your land in Arlington County?
We could not confirm an Arlington County rule allowing long-term RV occupancy, temporary camping on private property or a distinct tiny-home use, so ask the Zoning Division before placing one26. Countywide zoning applies, and allowed uses plus lot size, coverage, height and siting vary by district34. Virginia's campground rules do not establish a general right to occupy an RV as a residence outside a regulated campground27. Virginia law conditionally protects qualifying manufactured homes, subject to the district and specified real-property, individual-lot and certificate-of-occupancy conditions28. Short-term lodging is separately allowed as a regulated accessory homestay in a primary dwelling, with an accessory-homestay permit required11.
How do you build a home in Arlington County, step by step?
- Confirm the zoning district, allowed use, lot size, setbacks, lot coverage, height and any nonconformity with the Zoning Division41821192015.
- Check whether the parcel is in the 100-year floodplain, a county-required flood buffer or a Resource Protection Area with the DES Permitting & Inspections Counter814.
- If public sewer or water is unavailable, secure the applicable state septic or private-well approval69.
- Submit residential plans online through Permit Arlington and complete the published review process229.
- If the lot connects to a state-maintained road, a new or modified driveway entrance needs a Virginia Department of Transportation land use permit, which is separate from the county building permit30.
- Complete every inspection applicable to the work12.
- For a new single-family dwelling, submit the final survey and obtain the certificate of occupancy before moving in10.
What should you check before you buy land in Arlington County?
Arlington County has about 9,007 people per square mile, so parcel constraints matter more here than assumptions drawn from rural Virginia31. Verify the zoning district and its allowed use, minimum lot size, lot coverage, height, siting and setback rules before buying418192021. Check whether a floodplain permit or Resource Protection Area review applies8. Confirm public sewer and water availability; a parcel using onsite sewage or a private well needs the applicable Virginia Department of Health permit69. The effective property tax rate is about 0.9%, the median annual bill is about $7,774, and typical annual homeowner's insurance is about $1,647323334.
Watch-outs
- Arlington County zoning is countywide, but lot size, coverage, building height and allowed uses vary by district or special planning area34.
- A floodplain permit is required in the 100-year floodplain or a county-required flood buffer zone, and a Resource Protection Area requires separate review material8.
- Short-term rentals are limited to the county's regulated accessory-homestay framework; do not assume any dwelling can be rented by the night35.
Sources
- Residential Building Permit, quoted and re-checked
- Arlington County Permit Arlington (Inspection Services Division) (arlingtonva.us)
- Zoning Ordinance, quoted and re-checked
- Planning, quoted and re-checked
- Division of Onsite Water and Wastewater Services, quoted and re-checked
- Onsite Sewage Forms and Application Fees - Environmental Health, quoted and re-checked
- § 54.1-1101. Exemptions; failure to obtain certificate of occupancy; penalties (Virginia statewide rule), quoted and re-checked
- Residential Building Permit, quoted and re-checked
- Onsite Sewage Forms and Application Fees - Environmental Health, quoted and re-checked
- Residential Building Permit, quoted and re-checked
- Short-Term Residential Rentals, quoted and re-checked
- Residential Building Permit, quoted and re-checked
- Permit Arlington Center Fee Schedules, quoted and re-checked
- Arlington County Department of Environmental Services – Permitting & Inspections Counter (arlingtonva.us)
- Arlington County Zoning Division (arlingtonva.us)
- Zoning Ordinance, quoted and re-checked
- Zoning Ordinance, quoted and re-checked
- Planning, quoted and re-checked
- Residential Building Permit, quoted and re-checked
- Residential Building Permit, quoted and re-checked
- Residential Building Permit, quoted and re-checked
- Division of Onsite Water and Wastewater Services, quoted and re-checked
- 12VAC5-610-320. Inspection and correction (Virginia statewide rule), quoted and re-checked
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- Virginia Department of Health - Division of Onsite Water and Wastewater Services (2026 county census)
- Zoning Ordinance (2026 county census)
- Code of Virginia, Title 35.1 — Hotels, Restaurants, Summer Camps, and Campgrounds (Virginia statewide rule), quoted and re-checked
- § 15.2-2290. Uniform regulations for manufactured housing (Virginia statewide rule), quoted and re-checked
- Residential Building Permit, quoted and re-checked
- Land use permits (Virginia statewide rule), quoted and re-checked
- Population density: Bolthole Index county data
- Effective property tax rate: Bolthole Index county data
- Median property tax bill: Bolthole Index county data
- Typical home insurance premium: Bolthole Index county data
- Short-Term Housing Rentals, quoted and re-checked
Written October 9, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.