The Village of Gilman, Wisconsin has its own zoning code, and a village building permit is required before any building is erected, structurally altered or moved inside village limits12. Applications go to the Village Clerk for the Zoning Administrator2. Who handles septic permits inside the village is not confirmed, so ask the Taylor County Zoning Department3.
At a glance
- Zoning
- Yes: the village adopts and administers its own zoning code1
- Building permit
- Required from the village Zoning Administrator; minor work of $2,000 or less can be exempt2
- Where to apply
- Village Clerk, who forwards the application to the Zoning Administrator2
- Manufactured homes
- Allowed on an enclosed permanent foundation on owner-held land4
- R-1 minimum lot
- 13,068 sq ft for existing platted lots; 17,424 sq ft for new lots5
- Sewer
- R-1 district is to be municipally sewered unless extensions are not available6
- Septic permit
- Not confirmed inside the village; Taylor County Zoning issues sanitary permits in the county3
- Owner-builder
- State rule lets an owner who will occupy the home pull the construction permits7
Who to call
Building permits
Village of Gilman Clerk/Treasurer's Office
Receives building permit applications for the village Zoning Administrator and answers village zoning questions
380 E. Main St.
Septic permits
Taylor County Zoning Department
County sanitary (septic) permits, shoreland zoning, floodplain zoning and subdivision control
224 S 2nd St, Medford, WI 54451
Contact details are copied from each office’s official page and were checked against it on October 15, 2026.
Off-grid gear
Going off-grid in Village of Gilman means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Does Gilman, Wisconsin have zoning, and what does it mean for lots and setbacks?
Yes. The Village of Gilman adopts and administers its own zoning code, so zoning inside village limits is set by the village, not by Taylor County1. The code sorts village land into residential, rural development, commercial, industrial, public/institutional, conservancy and wellhead-protection districts1.
Dimensions depend on the district. In the R-1 Single-Family Residence District, an existing platted lot needs at least 13,068 square feet and a new platted lot needs at least 17,424 square feet5. In the RD Rural Development District, the minimum lot area is 17,424 square feet and the minimum width is 100 feet8. R-1 principal buildings need a 30-foot front yard to the foundation and a 6-foot side yard9. Accessory buildings in RD follow the R-1 accessory-building yard rule10.
Manufactured homes can be used as dwellings in Gilman if they sit on an enclosed permanent foundation on land the home's owner owns, are off their wheels and connected to utilities, and have no tow bars, wheels or axles attached4. We could not confirm village rules on tiny homes, accessory dwellings, RV living or minimum house size, so ask the Village Clerk before you buy.
Do you need a building permit in Gilman, and who issues it?
Yes. Inside the Village of Gilman, no building or structure may be erected, structurally altered or relocated until the village Zoning Administrator has issued a building permit2. Exceptions include re-roofing without a change in roof design, painting, and listed work whose total improvement cost is $2,000 or less2.
Apply through the Village Clerk, who submits the application to the Zoning Administrator, and expect the permit to be tied to compliance with the village zoning code and applicable building codes2. The village's fees for zoning permits, variances, rezonings and conditional uses follow a fee schedule set by the Village Board; the code itself does not list dollar amounts, so ask the Clerk for the current schedule11.
For a new one- or two-family home, Wisconsin's Uniform Dwelling Code also requires a state-code permit, with enforcement by a municipality, county or the state depending on delegation12. We could not confirm which inspector covers new homes inside Gilman or what village inspections are required, so ask the Clerk's office.
Who do you call about building permits in Gilman?
Start with the Village of Gilman Clerk/Treasurer's Office at 715-447-8650 or clerk@gilmanwi.gov; the village hall is at 380 E. Main St.13. The village, not Taylor County, receives building permit applications for land inside village limits2.
The county's rules are for unincorporated land. Taylor County has no comprehensive countywide zoning, and its shoreland zoning applies in unincorporated areas14. For land outside Gilman, see the Taylor County page.
How do septic permits work inside Gilman?
We could not confirm who issues septic permits for a lot inside the Village of Gilman, or whether private systems are allowed there at all. What the village code does say is that the R-1 district is to be municipally sewered unless sewer extensions are not available, and the Village Board may require sewer in the future6. A single-family lot in the village should therefore be assumed to connect to village sewer6, so ask the Village Clerk about sewer availability before you plan a septic system.
If a private system is allowed, Taylor County requires a valid sanitary permit before any private sewage system is installed3. The Taylor County Zoning Department administers those permits and inspections under state administrative code standards15. Its published fee for a conventional system is $30016. Call the Taylor County Zoning Department at 715.748.1485 to confirm whether this applies to your address17.
Building a home in Gilman: the steps, in order
- Call the Village Clerk at 715-447-8650 to confirm the zoning district of the lot and whether village sewer is available136.
- Check the district's lot size and setback rules, such as the R-1 minimums for lot area and front yard59.
- Ask the Clerk, and the Taylor County Zoning Department if a private system might be involved, about septic and sewer before you apply; a building permit cannot be issued for a new dwelling on a private onsite system until a sanitary permit has been issued18.
- Submit the building permit application to the Village Clerk for the Zoning Administrator2.
- If you will live in the home yourself, Wisconsin lets the owner-occupant take out the construction and erosion-control permits without a certified Dwelling Contractor7.
- Call for inspections before covering each phase of work; the state inspector has two business days after your request19.
What stays with Taylor County, and what to check before you buy in Gilman
Septic permits, shoreland zoning, floodplain zoning and subdivision control are the county's lanes, run by the Taylor County Zoning Department17. If the lot sits near a lake or stream, county shoreland rules apply in unincorporated areas, including a 75-foot setback from the ordinary high-water mark20; ask whether any of that reaches a village parcel. A private well also needs a state Well Construction Notification before drilling21. A driveway onto a state highway needs a WisDOT connection permit22.
For cost context, Taylor County's effective property tax rate is 1.4%23, and its median property tax bill is $2,647 per year24.
Watch-outs
- Septic authority inside Gilman village limits was not confirmed; ask the Taylor County Zoning Department and the Village Clerk before assuming a private system is allowed on a village lot3.
- The R-1 district is to be municipally sewered unless extensions are not available, and the Village Board may require sewer in the future6.
- We could not confirm village rules on tiny homes, RV living, accessory dwellings or short-term rentals; ask the Village Clerk before buying with one of those plans25.
- The county's rules apply to unincorporated Taylor County, not to land inside the village14.
Sources
- Gilman, Wisconsin Code of Ordinances (Village of Gilman), quoted and re-checked
- § 151.23 Permit required (Village of Gilman), quoted and re-checked
- Chapter 32 – Sanitary Code, quoted and re-checked
- § 157.078 Manufactured homes exempted (Village of Gilman), quoted and re-checked
- § 157.054 R-1 Single-Family Residence District (Village of Gilman), quoted and re-checked
- § 157.054 R-1 Single-Family Residence District (Village of Gilman), quoted and re-checked
- Wisconsin’s Uniform Dwelling Code (Wisconsin statewide rule), quoted and re-checked
- § 157.056 RD Rural Development District (Village of Gilman), quoted and re-checked
- § 157.054 R-1 Single-Family Residence District (Village of Gilman), quoted and re-checked
- § 157.056 RD Rural Development District (Village of Gilman), quoted and re-checked
- § 157.134 Fees for permits, variances, rezonings, conditional uses and signs (Village of Gilman), quoted and re-checked
- UDC (Uniform Dwelling Code / One- and Two-Family Dwellings), quoted and re-checked
- Village of Gilman Clerk/Treasurer's Office (gilmanwi.gov)
- Taylor County Land and Water Resource Management Plan, quoted and re-checked
- Zoning | Taylor County, quoted and re-checked
- Zoning | Taylor County, quoted and re-checked
- Taylor County Zoning Department (co.taylor.wi.us)
- Wisconsin’s Uniform Dwelling Code (Wisconsin statewide rule), quoted and re-checked
- Wisconsin’s Uniform Dwelling Code (Wisconsin statewide rule), quoted and re-checked
- Chapter 31 – Shoreland Zoning, quoted and re-checked
- Well and heat exchange notification (Wisconsin statewide rule), quoted and re-checked
- State highway connection permits (driveways & more) (Wisconsin statewide rule), quoted and re-checked
- Effective property tax rate: Bolthole Index county data
- Median property tax bill: Bolthole Index county data
- Lodging Establishments (Wisconsin statewide rule), quoted and re-checked
Written October 15, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.