Bolthole Index

Taylor County, Wisconsin

Zoning, building permits and septic rules in the Village of Gilman, Wisconsin

The Village of Gilman, Wisconsin has its own zoning code, and a village building permit is required before any building is erected, structurally altered or moved inside village limits12. Applications go to the Village Clerk for the Zoning Administrator2. Who handles septic permits inside the village is not confirmed, so ask the Taylor County Zoning Department3.

At a glance

Zoning
Yes: the village adopts and administers its own zoning code1
Building permit
Required from the village Zoning Administrator; minor work of $2,000 or less can be exempt2
Where to apply
Village Clerk, who forwards the application to the Zoning Administrator2
Manufactured homes
Allowed on an enclosed permanent foundation on owner-held land4
R-1 minimum lot
13,068 sq ft for existing platted lots; 17,424 sq ft for new lots5
Sewer
R-1 district is to be municipally sewered unless extensions are not available6
Septic permit
Not confirmed inside the village; Taylor County Zoning issues sanitary permits in the county3
Owner-builder
State rule lets an owner who will occupy the home pull the construction permits7

Who to call

Building permits

Village of Gilman Clerk/Treasurer's Office

Receives building permit applications for the village Zoning Administrator and answers village zoning questions

715-447-8650

clerk@gilmanwi.gov

380 E. Main St.

Septic permits

Taylor County Zoning Department

County sanitary (septic) permits, shoreland zoning, floodplain zoning and subdivision control

715.748.1485

224 S 2nd St, Medford, WI 54451

Contact details are copied from each office’s official page and were checked against it on October 15, 2026.

Off-grid gear

Going off-grid in Village of Gilman means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Does Gilman, Wisconsin have zoning, and what does it mean for lots and setbacks?

Yes. The Village of Gilman adopts and administers its own zoning code, so zoning inside village limits is set by the village, not by Taylor County1. The code sorts village land into residential, rural development, commercial, industrial, public/institutional, conservancy and wellhead-protection districts1.

Dimensions depend on the district. In the R-1 Single-Family Residence District, an existing platted lot needs at least 13,068 square feet and a new platted lot needs at least 17,424 square feet5. In the RD Rural Development District, the minimum lot area is 17,424 square feet and the minimum width is 100 feet8. R-1 principal buildings need a 30-foot front yard to the foundation and a 6-foot side yard9. Accessory buildings in RD follow the R-1 accessory-building yard rule10.

Manufactured homes can be used as dwellings in Gilman if they sit on an enclosed permanent foundation on land the home's owner owns, are off their wheels and connected to utilities, and have no tow bars, wheels or axles attached4. We could not confirm village rules on tiny homes, accessory dwellings, RV living or minimum house size, so ask the Village Clerk before you buy.

Do you need a building permit in Gilman, and who issues it?

Yes. Inside the Village of Gilman, no building or structure may be erected, structurally altered or relocated until the village Zoning Administrator has issued a building permit2. Exceptions include re-roofing without a change in roof design, painting, and listed work whose total improvement cost is $2,000 or less2.

Apply through the Village Clerk, who submits the application to the Zoning Administrator, and expect the permit to be tied to compliance with the village zoning code and applicable building codes2. The village's fees for zoning permits, variances, rezonings and conditional uses follow a fee schedule set by the Village Board; the code itself does not list dollar amounts, so ask the Clerk for the current schedule11.

For a new one- or two-family home, Wisconsin's Uniform Dwelling Code also requires a state-code permit, with enforcement by a municipality, county or the state depending on delegation12. We could not confirm which inspector covers new homes inside Gilman or what village inspections are required, so ask the Clerk's office.

Who do you call about building permits in Gilman?

Start with the Village of Gilman Clerk/Treasurer's Office at 715-447-8650 or clerk@gilmanwi.gov; the village hall is at 380 E. Main St.13. The village, not Taylor County, receives building permit applications for land inside village limits2.

The county's rules are for unincorporated land. Taylor County has no comprehensive countywide zoning, and its shoreland zoning applies in unincorporated areas14. For land outside Gilman, see the Taylor County page.

How do septic permits work inside Gilman?

We could not confirm who issues septic permits for a lot inside the Village of Gilman, or whether private systems are allowed there at all. What the village code does say is that the R-1 district is to be municipally sewered unless sewer extensions are not available, and the Village Board may require sewer in the future6. A single-family lot in the village should therefore be assumed to connect to village sewer6, so ask the Village Clerk about sewer availability before you plan a septic system.

If a private system is allowed, Taylor County requires a valid sanitary permit before any private sewage system is installed3. The Taylor County Zoning Department administers those permits and inspections under state administrative code standards15. Its published fee for a conventional system is $30016. Call the Taylor County Zoning Department at 715.748.1485 to confirm whether this applies to your address17.

Building a home in Gilman: the steps, in order

  1. Call the Village Clerk at 715-447-8650 to confirm the zoning district of the lot and whether village sewer is available136.
  2. Check the district's lot size and setback rules, such as the R-1 minimums for lot area and front yard59.
  3. Ask the Clerk, and the Taylor County Zoning Department if a private system might be involved, about septic and sewer before you apply; a building permit cannot be issued for a new dwelling on a private onsite system until a sanitary permit has been issued18.
  4. Submit the building permit application to the Village Clerk for the Zoning Administrator2.
  5. If you will live in the home yourself, Wisconsin lets the owner-occupant take out the construction and erosion-control permits without a certified Dwelling Contractor7.
  6. Call for inspections before covering each phase of work; the state inspector has two business days after your request19.

What stays with Taylor County, and what to check before you buy in Gilman

Septic permits, shoreland zoning, floodplain zoning and subdivision control are the county's lanes, run by the Taylor County Zoning Department17. If the lot sits near a lake or stream, county shoreland rules apply in unincorporated areas, including a 75-foot setback from the ordinary high-water mark20; ask whether any of that reaches a village parcel. A private well also needs a state Well Construction Notification before drilling21. A driveway onto a state highway needs a WisDOT connection permit22.

For cost context, Taylor County's effective property tax rate is 1.4%23, and its median property tax bill is $2,647 per year24.

Watch-outs

  • Septic authority inside Gilman village limits was not confirmed; ask the Taylor County Zoning Department and the Village Clerk before assuming a private system is allowed on a village lot3.
  • The R-1 district is to be municipally sewered unless extensions are not available, and the Village Board may require sewer in the future6.
  • We could not confirm village rules on tiny homes, RV living, accessory dwellings or short-term rentals; ask the Village Clerk before buying with one of those plans25.
  • The county's rules apply to unincorporated Taylor County, not to land inside the village14.

Sources

  1. Gilman, Wisconsin Code of Ordinances (Village of Gilman), quoted and re-checked
  2. § 151.23 Permit required (Village of Gilman), quoted and re-checked
  3. Chapter 32 – Sanitary Code, quoted and re-checked
  4. § 157.078 Manufactured homes exempted (Village of Gilman), quoted and re-checked
  5. § 157.054 R-1 Single-Family Residence District (Village of Gilman), quoted and re-checked
  6. § 157.054 R-1 Single-Family Residence District (Village of Gilman), quoted and re-checked
  7. Wisconsin’s Uniform Dwelling Code (Wisconsin statewide rule), quoted and re-checked
  8. § 157.056 RD Rural Development District (Village of Gilman), quoted and re-checked
  9. § 157.054 R-1 Single-Family Residence District (Village of Gilman), quoted and re-checked
  10. § 157.056 RD Rural Development District (Village of Gilman), quoted and re-checked
  11. § 157.134 Fees for permits, variances, rezonings, conditional uses and signs (Village of Gilman), quoted and re-checked
  12. UDC (Uniform Dwelling Code / One- and Two-Family Dwellings), quoted and re-checked
  13. Village of Gilman Clerk/Treasurer's Office (gilmanwi.gov)
  14. Taylor County Land and Water Resource Management Plan, quoted and re-checked
  15. Zoning | Taylor County, quoted and re-checked
  16. Zoning | Taylor County, quoted and re-checked
  17. Taylor County Zoning Department (co.taylor.wi.us)
  18. Wisconsin’s Uniform Dwelling Code (Wisconsin statewide rule), quoted and re-checked
  19. Wisconsin’s Uniform Dwelling Code (Wisconsin statewide rule), quoted and re-checked
  20. Chapter 31 – Shoreland Zoning, quoted and re-checked
  21. Well and heat exchange notification (Wisconsin statewide rule), quoted and re-checked
  22. State highway connection permits (driveways & more) (Wisconsin statewide rule), quoted and re-checked
  23. Effective property tax rate: Bolthole Index county data
  24. Median property tax bill: Bolthole Index county data
  25. Lodging Establishments (Wisconsin statewide rule), quoted and re-checked

Written October 15, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Answers from the rulebook for Village of Gilman

Village of Gilman’s own rules

  • Building permitRequired

    Building or moving a building or structure inside Gilman village.

    • Exceptions include re-roofing unless the roof design or form changes, painting, and listed work whose total improvement cost does not exceed $2,000.
    • Applications are made to the Village Clerk for submission to the Zoning Administrator.
    • The permit must comply with Chapter 157 and applicable building codes.

    minor-work cost threshold: <= 2000 USD (listed work and total cost of all improvements)

    “No building or structure above or below the ground, shall be erected, structurally altered or relocated within the village until a building permit has been issued by the Zoning Administrator certifying that such building would be in compliance with the provisions of this chapter and all applicable building codes.”
  • Local zoningPresent

    Land inside Gilman village; the village adopts and administers Chapter 157, Zoning.

    • The code identifies residential, rural development, commercial, industrial, public/institutional, conservancy, and wellhead-protection districts.
    “For the purpose and administration of this chapter, the village is hereby organized into the following zoning districts:”
  • Zoning districtsPublished

    Zoning districts inside Gilman village.

    • The code lists R-1, R-2, RD, CD, ID, PI, W, and WP districts.
    “For the purpose and administration of this chapter, the village is hereby organized into the following zoning districts:”
  • Manufactured homesAllowed (with conditions)

    Specific manufactured housing used as a dwelling inside Gilman village.

    • The home must be on an enclosed permanent foundation on land owned by the manufactured-home owner.
    • It must be off its wheels, properly connected to utilities, installed according to manufacturer instructions under a plan certified by a registered architect or engineer, and have no tow bars, wheels, or axles attached.
    “Purpose. To allow specific manufactured housing that is compatible and in character with conventional housing within the village.”
  • Mandatory utility hookupSewer (with conditions)

    Single-family residential land in Gilman's R-1 district.

    • The R-1 district shall be municipally sewered unless sewer extensions are not available.
    • The Village Board may require sewer in the future.
    “The R-1 Single-Family Residence District shall be municipally sewered, unless extensions are not available.”
  • Permit feesPublished (with conditions)

    Fees for zoning permits, variances, rezonings, conditional uses, and signs inside Gilman village.

    • Fees are established by the Village Board in a separate fee schedule; the opened provision does not state the dollar amounts.
    • The provision cross-references § 34.02.
    “The fees for consideration shall be in accordance with the fee schedule established by the Village Board and presented as a separate attachment in support of these regulations.”

Rules another office applies inside Village of Gilman

Village of Gilman does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.

  • Minimum lot sizeSpecified

    R-1 Single-Family Residence District inside Gilman village.

    • Existing platted or CSM lots require 13,068 square feet; new platted or CSM lots require 17,424 square feet.
    • Existing and new lots also have separate minimum-width rules.

    minimum lot area, existing platted or CSM lot: 13068 square feet (99-foot by 132-foot standard minimum lot) · minimum lot area, new platted or CSM lot: 17424 square feet (132-foot by 132-foot standard minimum lot)

    “Existing platted or CSM lots: 13,068 square feet. A 99-foot by 132-foot lot is considered a standard minimum lot.”
    One more reviewed finding on this topic
    • Specified — RD Rural Development District inside Gilman village.
      “Minimum lot area: 17,424 square feet. A 132-foot by 132-foot lot is considered a standard minimum lot.”
  • SetbacksSpecified

    Principal buildings in the R-1 Single-Family Residence District inside Gilman village.

    • Minimum side yard is six feet and 18 feet aggregate, or six feet on the garage side and 12 feet on the dwelling side when a garage is attached.

    minimum front yard: 30 feet (to foundation) · minimum side yard: 6 feet (18 feet aggregate; attached-garage alternative applies)

    “Minimum front yard: 30 feet to foundation.”
    One more reviewed finding on this topic
    • Specified — Principal and accessory buildings in the RD Rural Development District inside Gilman village.
      “Section 157.054 (D)(3) shall apply to all accessory buildings.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Village of Gilman or Taylor County directly.

  • Owner-builder exemption — Owner-builders inside Gilman village.
  • Building code adopted — Building-code adoption inside Gilman village.
  • Inspections — Building inspections inside Gilman village.
  • Certificate of occupancy — Certificates of occupancy inside Gilman village.
  • Minimum dwelling size — Dwellings inside Gilman village zoning districts.
12 more unanswered
  • Lot coverage
  • Camping on your land
  • Tiny homes
  • Accessory dwellings
  • Who permits septic
  • Septic permit
  • Septic inspection
  • Off-grid sanitation
  • Well permit
  • Agricultural exemption
  • Driveway access
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Village of Gilman publishes no rule on the point, not that none exists. Taylor County’s page lists the county offices to call.

← All of Taylor County: county rules, score and offices