Building permits, zoning and septic rules in Wright, Wyoming

The Town of Wright, Wyoming requires building permits for construction on new and existing structures inside town limits1, and the Town keeps its own zoning regulations2. Septic permits for every address in Wright come from Campbell County, which holds delegated state authority3. Land outside town limits follows Campbell County's rules, not the Town's.

At a glance

Building permit
Required inside Wright town limits; the exact permit depends on the work1
Building code
2018 International Building Code, with Town amendments4
Zoning
Yes, the Town maintains Title 11 Zoning Regulations2
Septic permit
Required; issued by Campbell County, not the Town35
Final inspection
Required on all Town permits6
Certificate of occupancy
Required before a building is used or occupied7

Who to call

Building permits

Town of Wright Building Official

Building permits and inspections inside Wright town limits; works with the planning and zoning commission

buildingofficial@wrightwyoming.com

Codes & inspections

Town of Wright Forms & Permits

Building permit applications, permit fees, curb cut permits and contractor licenses inside Wright

Septic permits

Campbell County small wastewater (septic) program

Septic permits and inspections for systems under 2,000 gallons per day, including inside Wright

Contact details are copied from each office’s official page and were checked against it on October 15, 2026.

Off-grid gear

Going off-grid in Town of Wright means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Does Wright, Wyoming have zoning?

Yes. The Town of Wright maintains Title 11 Zoning Regulations for land inside town limits2. The code sets out established zoning districts, a zoning map and district regulations8, and what you can build on a lot depends on its district.

We could not confirm the district rules for RV living, tiny homes, accessory dwellings, minimum lot size, setbacks or height. Ask the Town of Wright Building Official9 which district a parcel sits in and what it allows before you make an offer.

Do you need a building permit in Wright, and who issues it?

Wright requires permits for construction on new and existing structures inside town limits10. The Town adopted the 2018 International Building Code with appendix chapters C, E, H, I and J4. The Town of Wright Building Official oversees building permits and inspections9.

A final inspection is required on all permits6, and no building may be used or occupied until the Building Official issues a certificate of occupancy7. We could not confirm an owner-builder exemption inside Wright, so ask the Building Official before you plan to build your own home.

What do Wright building permits cost?

Wright's building permit fee depends on square footage: $30 for 0 to 500 square feet, $60 for 500 to 1000, $100 for 1000 to 2000, and $150 for 2000 to 5000 square feet11. Larger buildings pay $150 plus 0.04 per square foot11. Electrical, plumbing, mechanical and other permits carry separate fees, the first two inspections are free, and later reinspections cost $60 each11.

How do septic permits work inside Wright?

The Town does not issue septic permits. Campbell County has delegated authority from the Wyoming Department of Environmental Quality to permit septic systems with design flows under 2,000 gallons per day3. Permits and inspections are required for all small wastewater systems, regardless of zoning5.

We could not confirm how Wright handles private wells or off-grid sanitation inside town limits. Ask the Town and the county septic program12 before you plan either.

Building a home in Wright: the steps, in order

  1. Ask the Town of Wright Building Official9 which zoning district the parcel is in and what it allows2.
  2. Prepare the application items the Town requires: a plot plan, property-line verification by a licensed surveyor, and construction plans prepared by a licensed professional13.
  3. Apply for the building permit and pay the fee11.
  4. Get a septic permit from Campbell County5.
  5. Schedule the required inspections, including the final6.
  6. Obtain the certificate of occupancy before anyone moves in7.

If you are splitting a parcel into two or more parts, the Town's subdivision rules require a plat, and layout or construction cannot begin before Town Council approval14.

What stays with Campbell County (and what to check before you buy)?

Septic permits come from Campbell County for every address in Wright3. Land outside town limits is covered by the county's rules, which differ from the Town's; see the Campbell County page for unincorporated land.

For driveways, the Town site lists a curb cut permit form10, but we could not confirm when it is required. We also could not confirm flood-hazard permit rules inside town limits, so ask the Building Official about floodplain status before you buy. Campbell County's effective property tax rate is 0.5%15.

Watch-outs

  • Wright's town rules stop at town limits; a parcel just outside is under Campbell County's rules instead, so confirm the parcel is inside the Town before relying on this page2.
  • Septic permits are a separate county permit; a Town building permit does not cover them5.
  • We could not confirm Wright's rules for RV occupancy, tiny homes, accessory dwellings, lot size or setbacks; call the Town Building Official9 before you buy.

Sources

  1. Forms & Permits (Town of Wright), quoted and re-checked
  2. Chapter 3 Zoning Districts (Town of Wright), quoted and re-checked
  3. Small Wastewater (Septic) Systems (Town of Wright), quoted and re-checked
  4. 9-1-1: Adoption (Town of Wright), quoted and re-checked
  5. Small Wastewater (Septic) Systems (Town of Wright), quoted and re-checked
  6. New Construction Requirements (Town of Wright), quoted and re-checked
  7. New Construction Requirements (Town of Wright), quoted and re-checked
  8. Chapter 3 Zoning Districts (Town of Wright), quoted and re-checked
  9. Town of Wright Building Official (wrightwyoming.com)
  10. Town of Wright Forms & Permits (wrightwyoming.com)
  11. 9-1-3: Building Permit Fees (Town of Wright), quoted and re-checked
  12. Campbell County small wastewater (septic) program (campbellcountywy.gov)
  13. New Construction Requirements (Town of Wright), quoted and re-checked
  14. 10-1-9: Application and Exemption (Town of Wright), quoted and re-checked
  15. Effective property tax rate: Bolthole Index county data

Written October 15, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Answers from the rulebook for Town of Wright

Town of Wright’s own rules

  • Building permitRequired

    Construction on new and existing structures inside Wright town limits.

    • The Town states that a variety of permits are required; exact permit type depends on the work.
    “A variety of permits are required for construction on new and existing structures within the Town limits.”
  • Building code adoptedAdopted (with conditions)

    Buildings and structures inside Wright town limits.

    • The Town adopted the 2018 International Building Code with appendix chapters C, E, H, I and J.
    • Town amendments are in section 9-1-2.

    code edition: 2018 International Building Code (including appendix chapters C, E, H, I and J)

    “The Town of Wright, Wyoming, hereby adopts that certain publication known and designated as the 2018 edition of the International Building Code, including appendix chapters C, E, H, I and J, as the Building Code for the Town of Wright, Wyoming”
  • InspectionsRequired

    Work performed under Wright building permits.

    • A final inspection is required on all permits.
    • Commercial electrical inspection requirements also apply before certificate of occupancy issuance.
    “A Final Inspection is required on all permits (see attached Schedule of Inspections)”
  • Certificate of occupancyRequired

    Use or occupancy of buildings and changes in occupancy classification inside Wright town limits.

    • The source quotes Section 110 of the 2006 International Building Code and International Residential Code.
    • Commercial structures require a final electrical inspection record on file before a certificate may be issued.
    “No building or structure shall be used or occupied, and no change in the existing occupancy classification of a building or structure or portion thereof shall be made until the Building Official has issued a certificate of occupancy therefore as provided herein.”
  • Local zoningPresent (with conditions)

    Land inside Wright town limits; the Town maintains Title 11 Zoning Regulations.

    • Specific development rights depend on the applicable zoning district and district regulations.
    “TITLE 11 ZONING REGULATIONS [...] CHAPTER 3 ZONING DISTRICTS”
  • Zoning districtsPublished (with conditions)

    Zoning districts and zoning map inside Wright town limits.

    • The code identifies an established-district section, zoning-map section, and district-regulations section; the district-specific dimensional text was not retrievable in this run.
    “CHAPTER 3 ZONING DISTRICTS [...] 11-3-1: Established [...] 11-3-2: Zoning Map [...] 11-3-3: District Regulations”
  • Who permits septicCounty (with conditions)

    Small wastewater systems serving property inside Wright town limits; Campbell County is the delegated permitting authority.

    • Campbell County authority is delegated by the Wyoming Department of Environmental Quality.
    • Applies to systems with design flows under 2,000 gallons per day of domestic wastewater.

    design flow threshold: < 2000 gallons per day (domestic wastewater)

    “Campbell County has delegated authority from the Wyoming Department of Environmental Quality to permit residential and commercial small wastewater (septic) systems with design flows of less than 2000 gallons per day of domestic wastewater.”
  • Septic permitRequired

    Small wastewater systems inside Wright town limits.

    • Applies to all small wastewater systems regardless of zoning classification.
    • The County page does not state a different rule for incorporated town land.
    “Permits and inspections are required for all small wastewater (septic) systems. This regulation applies to all properties, regardless of zoning classifications and even if the properties have agriculture or coal-oil-gas exemptions from other building permits.”
  • Septic inspectionRequired

    Small wastewater systems inside Wright town limits.

    • Applies to all small wastewater systems.
    • Campbell County administers the delegated program.
    “Permits and inspections are required for all small wastewater (septic) systems.”
  • Subdividing landRegulated (with conditions)

    Subdivision and resubdivision of land inside Wright town limits; county plats within one mile of the corporate limits are also addressed by the Town's regulations.

    • Every owner subdividing or resubdividing into two or more parts for sale, lease, building development or redevelopment must submit a subdivision plat.
    • Physical layout or construction of a subdivision cannot begin before Town Council approval.
    • Exemptions include cemetery lots, state or political-subdivision sales, railroad rights of way, and certain unchanged lots in recorded subdivisions.

    minimum resulting parts: >= 2 parts (for immediate or future sale, lease, building development or redevelopment)

    “Every owner or proprietor of any tract or parcel of land who shall hereafter subdivide or resubdivide his land into two (2) or more parts for the immediate or future purpose of sale, lease, building development or redevelopment for any residential, recreational, industrial, commercial, public or other use, shall submit a subdivision plat or plats in accordance with these regulations.”
  • Permit feesPublished (with conditions)

    Town building permits and related permits inside Wright town limits.

    • Building permit fee depends on building square footage.
    • Plans are required for one- and two-family dwellings, with no charge for plan review.
    • The code lists separate electrical, plumbing, mechanical, gas-pipefitting, reinspection, demolition, foundation, and other fees.
    • The first two inspections are free; later reinspections cost $60 each.

    building permit fee, 0-500 square feet: 30 USD · building permit fee, 500-1000 square feet: 60 USD · building permit fee, 1000-2000 square feet: 100 USD · building permit fee, 2000-5000 square feet: 150 USD · building permit fee, over 5000 square feet: 150 + 0.04 per square foot USD · reinspection fee after first two inspections: 60 USD (same type of work found incorrect after second inspection)

    “Building Permit Fees: The fee for each building permit including additions shall be as set forth in the following schedule:”
  • Permit processPartial

    Building-permit applications for new construction, additions, and accessory buildings inside Wright town limits.

    • The Town requires a plot plan, property-line verification by a licensed surveyor, and construction plans including floor, foundation, elevation, framing, roof-truss, and other applicable plans.
    • Plans must be prepared by a licensed professional in accordance with Wyoming law and Town ordinances.
    • A final inspection is required on all permits.
    “The following is a list of needed items to be submitted with your Building Permit application:”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Town of Wright or Campbell County directly.

  • Owner-builder exemption — Owner-builder work inside Wright town limits.
  • Minimum dwelling size — Residential districts inside Wright town limits.
  • Minimum lot size — Residential districts inside Wright town limits.
  • Setbacks — Residential districts inside Wright town limits.
  • Lot coverage — Residential districts inside Wright town limits.
13 more unanswered
  • Building height
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Off-grid sanitation
  • Well permit
  • Mandatory utility hookup
  • Agricultural exemption
  • Driveway access
  • Building in a floodplain
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Town of Wright publishes no rule on the point, not that none exists. Campbell County’s page lists the county offices to call.