Unincorporated Chaffee County, Colorado requires residential building permits and applies its Land Use Code zoning to private property outside municipal limits12. Salida and Poncha Springs issue their own building permits, and Salida and Buena Vista run their own zoning3456. County septic (OWTS) approval must come before the county building permit7. Start with Planning & Zoning8.
At a glance
- Building permit
- Required for residential construction in unincorporated Chaffee County1
- Zoning
- Yes; district and use standards apply in unincorporated areas29
- Septic
- County OWTS approval comes before the building permit; final inspection is required before use710
- RV living
- Temporary camping is allowed, but an RV cannot be a permanent home1112
- Tiny home
- Long-term occupancy is conditional on state approval and local zoning13
- Owner-builder
- No county exemption could be confirmed; ask Building Safety14
- Private well
- A state well permit is generally required, with proof required for applicable county zoning approvals1516
Who to call
Building permits
Chaffee County Building Safety Department
County building permits and building-safety questions
104 Crestone Ave., Room 125
Planning & zoning
Chaffee County Planning & Zoning
Zoning, land-use applications, subdivisions and development review in unincorporated Chaffee County
Septic permits
Chaffee County Building Department, Development Services / Environmental Health
County OWTS questions and permits
104 Crestone Ave., Room 125
Contact details are copied from each office’s official page and were checked against it on October 16, 2026.
Off-grid gear
Going off-grid in Chaffee County means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Chaffee County, Colorado?
Yes. Chaffee County requires a residential building permit in the unincorporated county.1 Inside Salida the city requires building permits under its own code3, and inside Poncha Springs the town does the same4; the county rules below cover unincorporated land. The county currently enforces the 2021 residential, building, fire, plumbing, mechanical, fuel-gas, energy-conservation and existing-building codes, along with the 2025 Colorado Wildfire Resiliency Code and local amendments.17
A zoning signoff is required before the county issues a building permit18. Use the current application because the county warns that an outdated form may lead to denial.19 The county lists separate residential, commercial and on-site wastewater applications and accepts submissions by mail or email.19 Building Safety is the contact for the building-permit side of the project.20 Colorado's county-contractor licensing law exempts an owner working on the owner's property only for repair or maintenance; it does not create a blanket exemption for building a new home.21 Ask Building Safety what inspections and owner-builder documents apply.20
Who issues Chaffee County building permits, and how do you reach them?
Chaffee County Building Safety handles county building permits and building-safety questions from its Development Services office in Salida.20 The office is at 104 Crestone Ave., Room 125; call (719) 539-2124 or email bdepartment@chaffeecounty.org.20
Planning & Zoning should be the first land-use stop because development in unincorporated Chaffee County must comply with the Land Use Code.8 The county publishes land-use application fees and escrows by application type, so confirm the required application and current charge before budgeting.22 For the building package, download the current residential or commercial form and follow the county's mail, email and credit-card instructions.19 Building Safety also provides an online permit search for existing records.20
Does Chaffee County have zoning?
Yes. Chaffee County's Land Use Code applies to private property in the unincorporated county, and the current zoning plan took effect in 2025.2 The county publishes district-specific use and dimensional tables.9
Residential zones in unincorporated Chaffee County require a front setback of 50 feet on major roads and 25 feet on other roads, a 20-foot rear setback and a 15-foot side setback, and some subdivision plats set stricter setbacks23. Setbacks for nonresidential and mixed-use lots vary by district, and a larger use-specific setback controls when standards conflict24. Height also depends on district and use, with a 35-foot maximum listed for multifamily buildings on urban and suburban lot types25.
The county Land Use Code covers unincorporated land only. Salida and the Town of Buena Vista set zoning under their own codes56, and the county reports that Salida, Poncha Springs and Buena Vista administer their own zoning and approval requirements18. Ask Planning & Zoning to confirm jurisdiction, the mapped district and any plat restrictions before designing the site8.
How do septic permits work in Chaffee County?
Chaffee County administers on-site wastewater treatment systems under county regulations, and an OWTS permit must be approved before a building permit can be issued.267 Engineer design is required for listed situations including commercial systems, floodplain sites, shallow groundwater or bedrock, certain subdivision conditions, some soil types and lots smaller than one acre.7
Colorado law has the local public health agency issue the OWTS permit under local board-of-health rules27. Septic stays with the county even inside Poncha Springs, whose code points private sewage work to the county28. For a parcel inside Salida or Buena Vista, ask the county contact below which authority covers septic, since the towns' zoning does not decide that26. The county contact is (719) 539-2124 and bdepartment@chaffeecounty.org.29 Colorado requires a final inspection after permitted work and before the system is used.10 Site feasibility deserves early attention because only about 0.5% of mapped county soils avoid a “very limited” rating for conventional drain fields.30 Treat that countywide soil figure as an early warning and obtain the parcel evaluation before fixing the house site or budget.7
Can you live in an RV or tiny home in Chaffee County?
An RV cannot be used as permanent habitation on private land in unincorporated Chaffee County, though it may serve as temporary camping equipment.11 Camping on vacant property is allowed for up to 90 cumulative days in a calendar year without prior county approval; a longer stay requires a landowner camping permit with a six-month term that may be renewed twice.12
A tiny home intended for long-term living follows a different route. Colorado-regulated tiny homes need state plan approval before construction and must satisfy local zoning and applicable codes.13 Chaffee County treats a tiny home not installed to Colorado Division of Housing requirements as camping equipment rather than a permanent dwelling.11 A short-term rental is another regulated use: the county's current code includes a licensing program, but the available material does not establish its caps, fees or occupancy limits.31
Building a home in Chaffee County: what are the steps?
- Confirm that the parcel is in unincorporated Chaffee County and ask Planning & Zoning for its district, allowed use, setbacks, height limit and development review.22425
- Establish legal access; driveway/access permits are required on all single-family dwellings in unincorporated Chaffee County, a connection to a county road needs a right-of-way or driveway permit from Road and Bridge, and direct residential access to a state highway needs a state access permit.323334
- Document water service; a well permit is accepted for the residential building package, as is proof of municipal or central water service, and every new well in Colorado needs a state well permit.3515
- Obtain county OWTS approval before applying for the building permit when the site will use septic.7
- Submit the current residential application to Building Safety by the county's listed mail or email route.1920
- Complete the required OWTS final inspection before use.10
What should you check before buying land in Chaffee County?
Check zoning, recorded plat restrictions, legal access, water, wastewater and flood status before treating a parcel as buildable. Residential setbacks in unincorporated areas run 50 feet on major roads and 25 feet on other roads in front, 20 feet in the rear and 15 feet at the sides, and a county-road connection requires a right-of-way or driveway permit through Road and Bridge.2333 Major subdivisions proceed through sketch-plan, preliminary-plan and final-plat or development-agreement stages unless a minor process or exemption applies.36 An agricultural subdivision exemption can create one new lot when the property remains in agricultural or ranching use, but the retained agricultural tract must be at least 35 acres and the new lot must meet applicable area, setback, easement and access requirements.37
Floodplain construction requires an elevation certificate and foundation plans stamped by a Colorado-licensed architect or engineer.38 About 23.3% of the county is at a slope of 15% or less, while about 79.3% is federal land.3940 Only about 0.5% of mapped soils avoid a “very limited” rating for conventional septic drain fields, making early OWTS feasibility work especially valuable.307
Watch-outs
- An RV or uncertified tiny home is not a permanent-habitation workaround in unincorporated Chaffee County.11
- Colorado's repair-and-maintenance exemption for owners is not a blanket exemption for constructing a new home; ask Building Safety what the county requires.2120
- Floodplain construction requires both an elevation certificate and professionally stamped foundation plans.38
- A county-road driveway and direct access to a state highway follow different permit routes.3334
- Salida and Poncha Springs issue their own building permits, and Salida, Buena Vista and Poncha Springs run their own zoning, so a parcel inside town limits is not governed by the county Land Use Code.345618
Sources
- Chaffee County Building Department Applications and Fees (2026 county census)
- Chaffee County Land Use Code, quoted and re-checked
- Salida: Salida Code Sec. 16-3-30 Use-specific standards (Chaffee County), quoted and re-checked
- Town of Poncha Springs: Poncha Springs Municipal Code Sec. 13-01-060 General restrictions (Chaffee County), quoted and re-checked
- Salida: Salida Code Sec. 16-3-20 Table of allowed uses (Chaffee County), quoted and re-checked
- Town of Buena Vista: Buena Vista Municipal Code, UDC Sec. 2.3 Residential districts (Chaffee County), quoted and re-checked
- Building Permit Application Guide, quoted and re-checked
- Chaffee County Planning & Zoning (cms2.revize.com)
- Chaffee County Land Use Code, quoted and re-checked
- Title 25 - Public Health and Environment - Colorado Revised Statutes 2024 (Colorado statewide rule), quoted and re-checked
- Chaffee County Land Use Code — Amended September 16, 2025, quoted and re-checked
- Chaffee County Land Use Code — Amended September 16, 2025, quoted and re-checked
- Consumers of Manufactured Homes and Tiny Homes - HUD (Colorado statewide rule), quoted and re-checked
- Colorado Revised Statutes 2026, Title 30, § 30-11-125 (2026 county census)
- Water Administration (Colorado statewide rule), quoted and re-checked
- Chaffee County Land Use Code — Amended September 16, 2025, quoted and re-checked
- Adopted Codes & Design Criteria, quoted and re-checked
- Chaffee County Land Use Code, quoted and re-checked
- Building Department Applications and Fees, quoted and re-checked
- Chaffee County Building Safety Department (cms2.revize.com)
- Colorado Revised Statutes 2026, Title 30, § 30-11-125 (Colorado statewide rule), quoted and re-checked
- Chaffee County Land Use Code, quoted and re-checked
- Building Permit Application Guide, quoted and re-checked
- Chaffee County Land Use Code — Amended September 16, 2025, quoted and re-checked
- Chaffee County Land Use Code — Amended September 16, 2025, quoted and re-checked
- Adopted Codes & Design Criteria, quoted and re-checked
- Title 25 - Public Health and Environment - Colorado Revised Statutes 2024 (Colorado statewide rule), quoted and re-checked
- Town of Poncha Springs: Poncha Springs Municipal Code Sec. 13-01-060 General restrictions (Chaffee County), quoted and re-checked
- Chaffee County Building Department, Development Services / Environmental Health (cms2.revize.com)
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- Chaffee County Land Use Code, quoted and re-checked
- Building Permit Application Guide, quoted and re-checked
- Chaffee County Land Use Code — Amended September 16, 2025, quoted and re-checked
- Access Permits | Frequently Asked Questions (Colorado statewide rule), quoted and re-checked
- Building Permit Application Guide, quoted and re-checked
- Chaffee County Land Use Code, quoted and re-checked
- Chaffee County Land Use Code — Amended September 16, 2025, quoted and re-checked
- Building Permit Application Guide, quoted and re-checked
- Share of land at 15% slope or less: Bolthole Index county data
- Federal land share: Bolthole Index county data
Written October 16, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.