Unincorporated Murray County, Georgia requires building permits and inspections, and the county Building Inspection Department handles both12. Murray County Land Use / Zoning assigns each parcel to a zoning district, while septic permits come from Murray County Environmental Health, not the building department345. Before buying rural land, confirm the parcel's zoning district and order the required septic soil study early67.
At a glance
- Building permit
- Required; county permitting covers unincorporated Murray County82
- Building inspections
- Required; the contractor must call for each required inspection9
- Zoning
- Yes; each parcel is assigned a zone district3
- Septic permit
- Required for a new onsite sewage system; begin with a soil study7
- Tiny home
- Possible only if district minimum size and residential codes are met10
- RV living
- Not confirmed; ask Land Use / Zoning before relying on RV occupancy35
- Owner-builder
- Exempt from state contractor licensing, not local permits or codes11
- Private well
- Contact the county health department for site review; a local permit was not confirmed1213
Who to call
Building permits
Murray County Building Inspection Department
Building permits and inspections for unincorporated Murray County and the City of Eton
121 N. Fourth Ave., Chatsworth, GA 30705
Zoning
Murray County Land Use / Zoning
Building-permit applications, rezoning, conditional uses, variances, soil erosion and stormwater issues
121 N. Fourth Ave., Chatsworth, GA 30705-1129
Septic permits
Murray County Environmental Health
Onsite sewage management and environmental-health services in Murray County
121 N. Fourth Ave., Chatsworth, GA 30705-1129
Roads & driveways
Murray County Public Works Department
Driveway and tile permits and county-road maintenance
Contact details are copied from each office’s official page and were checked against it on October 10, 2026.
Off-grid gear
Going off-grid in Murray County means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Murray County, Georgia?
Yes. Murray County's code makes it unlawful to erect, construct, alter, repair, move, demolish or occupy a regulated building in unincorporated Murray County in violation of the technical codes, and the Building Inspection Department performs permitting and inspections there12. The county enforces the state-adopted construction codes, and its codes page lists the 2018 International Building Code with current Georgia amendments14. A permit is valid for one year from issuance, and the application fee is non-refundable once processed15. The county says the contractor is responsible for calling the office for every required inspection on the construction job9. Georgia's mandatory construction codes apply statewide even when a local government does not enforce every code itself, and Murray County locally administers permits and inspections162. An owner may build the owner's own home without holding a Georgia residential or general contractor license, but that licensing exemption does not remove Murray County permits, inspections, zoning, or building-code requirements11. For an owner-building permit to alter an existing structure, the owner must intend to occupy it, act as general contractor, hire licensed plumbing, electrical and HVAC people for work the owner is not licensed to do, and cannot permit another owner-built building if the property sells within 24 months after the certificate of occupancy17.
Who is the Murray County building department, and how do you reach it?
The Murray County Building Inspection Department handles permitting and inspections for unincorporated Murray County and the City of Eton2. Call the department at (706) 517-1400, ext. 1231, or visit 121 N. Fourth Ave., Chatsworth, GA 307052. Land Use / Zoning reviews building-permit applications as well as rezoning, conditional-use, variance, soil-erosion, and stormwater matters5. Call Land Use / Zoning at (706) 517-1400, ext. 5, at 121 N. Fourth Ave., Chatsworth, GA 30705-11295. Inside Chatsworth, the application goes to the city zoning administrator and then to the county for permit issuance and inspections, while Eton applications are processed by the county15. Use the Building Inspection Department for permit and inspection scheduling, and involve Land Use / Zoning early when the proposed use or site plan depends on the parcel's district256.
Does Murray County, Georgia have zoning?
Yes. Murray County adopted zoning practices in 2003 and assigns each parcel its own zone district3. The district matters because permitted residential uses and minimum dwelling size vary by zoning classification10. The confirmed minimum dwelling sizes are 584 square feet in AG, 864 square feet in RR, and 1,200 square feet in SR, and the home must also satisfy residential building codes18. Setbacks are set by district: the front yard is 40 feet from an arterial or collector and 25 feet from a local street in AG, RR and SR; side and rear yards are 50 and 50 feet in AG, 15 and 20 feet in RR, and 10 and 20 feet in SR19. A minimum lot size, lot-coverage limit, and building-height limit were not confirmed, so ask Land Use / Zoning for the parcel's classification and applicable standards before designing the site65.
How do septic permits work in Murray County?
Murray County Environmental Health administers onsite sewage management as part of the North Georgia Health District and Georgia Department of Public Health413. For a new residential system, first obtain a soil study from a Georgia-registered soil classifier, then submit the study, house floor plan, and applicable fee with the permit application7. Residential permit fees run from $150 through $550 based on the home's square-footage band, including basements and garages in the calculation720. Existing systems can be inspected for bank loans and similar purposes for $100, or $150 with a letter21. Only 10% of Murray County soils are rated without severe limitations for a conventional septic drain field, so make the soil study a purchase contingency rather than a late construction task22. Georgia also requires a final inspection and written approval before an onsite system is backfilled or used23.
Can you live in an RV or tiny home on your land in Murray County?
A tiny home used as a residence in Murray County must meet the minimum dwelling size for its zoning district and pass the applicable residential building codes10. The confirmed district floors are 584 square feet in AG, 864 square feet in RR, and 1,200 square feet in SR, which means many homes commonly marketed as tiny houses will be too small for the parcel's district10. Georgia also treats site-built and modular tiny homes as dwelling units subject to building codes and local siting approval24. Murray County's rule for living in an RV on private land was not confirmed; ask Land Use / Zoning about the specific parcel, length of stay, utility connections, and construction-period occupancy before relying on an RV plan35.
Building a home in Murray County: the steps, in order
- Ask Land Use / Zoning to confirm the parcel's district and the proposed home's use and minimum size65.
- Obtain the required soil study from a Georgia-registered soil classifier and take it, the floor plan, and the applicable fee to Murray County Environmental Health713.
- Apply through the county for the building permit; unincorporated Murray County permitting and inspection are handled by the Building Inspection Department82.
- If the driveway meets a county road, contact Public Works about its driveway or tile permit; if it meets a state highway, obtain the required state right-of-way permit through GDOT2526.
- During construction, have the contractor call for every required building inspection9.
- Do not backfill or use the septic system until the County Board of Health has completed the final inspection and issued written approval23.
What should you check before buying land in Murray County?
Start with zoning and wastewater: confirm the parcel's district with Land Use / Zoning, then secure a septic soil study because only 10% of county soils are rated without severe limitations for a conventional drain field622. Terrain also matters: 64% of Murray County land is at a slope of 15% or less, while 77.6% is wooded, so clearing, grading, and driveway design can materially shape the buildable area2728. Check mapped flood risk because Georgia communities administer their own floodplain ordinances and the parcel-specific status was not established here29. If access is from a county road, ask Public Works about driveway and tile permits; access within a state-highway right-of-way requires a GDOT permit2526. The effective property-tax rate is about 0.6%, with a median annual bill around $1,1113031.
Watch-outs
- A Georgia owner-builder licensing exemption does not waive Murray County building permits, inspections, zoning, or building codes11.
- Only 10% of Murray County soils are rated without severe limits for a conventional septic drain field, so obtain the required soil study before committing to a homesite227.
- Murray County RV occupancy, minimum lot size, setbacks, lot coverage, and building height were not confirmed; ask Land Use / Zoning for parcel-specific standards65.
Sources
- Commonly Enforced Codes, quoted and re-checked
- Murray County Building Inspection Department (murraycountyga.org)
- murraycountyga.org, quoted and re-checked
- Environmental Health, quoted and re-checked
- Murray County Land Use / Zoning (murraycountyga.org)
- murraycountyga.org, quoted and re-checked
- Onsite Sewage Management (Wastewater), quoted and re-checked
- Commonly Enforced Codes (2026 county census)
- Building Inspections, quoted and re-checked
- murraycountyga.org, quoted and re-checked
- Residential and Commercial General Contractors Frequently Asked Questions (Georgia statewide rule), quoted and re-checked
- Water Well Standards (Georgia statewide rule), quoted and re-checked
- Murray County Environmental Health (murraycountyga.org)
- Murray County Code of Ordinances, quoted and re-checked
- Procedures for Acquiring a Residential or Commercial Building Permit, quoted and re-checked
- Mandatory and Permissive State Codes (Georgia statewide rule), quoted and re-checked
- Owner Building Permit Affidavit (Alteration of Existing Structure), quoted and re-checked
- murraycountyga.org, quoted and re-checked
- Murray County Code of Ordinances — Land Use District Ordinance, quoted and re-checked
- Onsite Sewage Management (Wastewater), quoted and re-checked
- Onsite Sewage Management (Wastewater), quoted and re-checked
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- Manual for On-Site Sewage Management Systems (Georgia statewide rule), quoted and re-checked
- Georgia Tiny House Fact Sheet (Georgia statewide rule), quoted and re-checked
- Murray County Public Works Department (murraycountyga.org)
- Regulations for Driveway & Encroachment Control Manual (Georgia statewide rule), quoted and re-checked
- Share of land at 15% slope or less: Bolthole Index county data
- Wooded share of land: Bolthole Index county data
- Floodplain Management (Georgia statewide rule), quoted and re-checked
- Effective property tax rate: Bolthole Index county data
- Median property tax bill: Bolthole Index county data
Written October 10, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.