Unincorporated Bates County, Missouri appears not to require a general building permit; confirm your project with the County Commission before construction1. We could not confirm countywide zoning, while Butler, Adrian and Rich Hill have city zoning2345. Bates County Health Center handles county onsite sewage permits, but Butler and Rich Hill also require city private-sewage permits; floodplain development needs separate approval6789.

At a glance

Building permit
Appears not required in unincorporated Bates County; confirm with the County Commission1
Countywide zoning
Countywide zoning unconfirmed; Butler, Adrian and Rich Hill have city zoning210345
Septic permit
Required for a single-family lot under 3 acres and for specified new systems, major repairs and nonresidential uses11
RV living
Unconfirmed on unincorporated land; Rich Hill limits residential RV use and temporary camping1213
Tiny homes
No countywide occupancy or minimum-size rule was confirmed; check municipal rules and septic approval214
Floodplain
A floodplain development permit is required, with added review for work in a regulatory floodway915
Private wells
State permits cover contractor well and pump work; landowners may install their own without a permit but must follow Missouri rules16
Septic soils
0% of mapped soils are rated free of severe limits for a conventional drain field17

Who to call

Septic permits

Bates County Health Center - Environmental Health

Onsite sewage permits and inspections in Bates County through the Environmental Public Health Specialist

660-679-6108

P.O. Box 178, 501 N. Orange, Butler, MO 64730

Contact details are copied from each office’s official page and were checked against it on October 10, 2026.

Off-grid gear

Going off-grid in Bates County means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Do you need a building permit in Bates County, Missouri?

Unincorporated Bates County appears not to require a general residential building permit, but we could not confirm an explicit county no-permit statement; ask the County Commission about your parcel and project1. Missouri allows local building-code adoption, and state statutory authority alone does not establish a Bates County permit requirement1819. Inside Butler, Adrian and Rich Hill, city building permits apply; Rich Hill expressly requires them for dwellings and accessory buildings202122. Building approval does not settle wastewater approval: start with Bates County Health Center, and obtain the applicable city private-sewage permit in Butler or Rich Hill678.

Who issues building permits in Bates County, and how do you reach them?

Bates County's directory identifies no general county building-permit office; ask the County Commission to confirm the approval path for unincorporated construction1. Butler, Adrian and Rich Hill administer their own building permits202122. For county onsite sewage permits, call Bates County Health Center Environmental Health at 660-679-6108; Butler's City inspector and Rich Hill's City Superintendent issue their respective city private-sewage permits2378. Unincorporated floodplain development requires separate community approval, and work within state-highway right-of-way needs a MoDOT driveway permit1524. Missouri DNR administers contractor well and pump permitting25.

Does Bates County have zoning?

We could not confirm an adopted countywide zoning ordinance for unincorporated Bates County; ask the County Commission about parcel-specific setbacks, uses and subdivision requirements2. Inside Butler, each parcel has a zoning district regulating allowable uses, minimum lot size, maximum building height and minimum front-yard depth103. Adrian has city zoning, and Rich Hill's Unified Development Ordinance applies throughout its corporate limits45. Municipal zoning does not resolve wastewater approval: Bates County Health Center administers county onsite sewage rules, while Butler and Rich Hill require city private-sewage permits678. Missouri protects qualifying agricultural uses and farm structures from specified county zoning powers, but the farm-structure protection excludes mapped flood-hazard areas and does not erase septic or municipal requirements26.

How do septic permits work in Bates County?

For systems under Bates County authority, start with the Health Center’s Environmental Public Health Specialist; inside Butler or Rich Hill, also ask the city about its private-sewage permit2378. A permit is required for a single-family homeowner on a lot under 3 acres and for commercial facilities, schools, churches, renters, new systems and major modifications or repairs11. A single-family residence on more than 3 acres does not need the county permit, but the system must meet county standards11. Submit the system drawing and soil documentation, confirm the current fee with the Health Center, and wait for the green construction permit; the local rules require a fee, while Missouri has temporarily suspended application fees under its statewide program1127. Arrange approval before covering the system; an owner may install it, although the county recommends a certified installer28. For a property sale, local health agencies generally do not inspect an existing system solely for the transfer; a private licensed inspector can evaluate it, and repairs should be cleared with the Health Center29. Because 0% of mapped soils rate free of severe conventional-drain-field limits, price the site evaluation early17.

Can you live in an RV or tiny home in Bates County?

Bates County has no confirmed countywide rule expressly allowing or prohibiting long-term RV, temporary-camping or tiny-home occupancy on unincorporated land2. Ask the County Commission about occupancy, setbacks and any certificate requirement, then ask the Health Center how the wastewater arrangement will comply; wastewater may not discharge into a road ditch or onto the ground30. Within Rich Hill, an RV generally may not serve as a permanent or temporary residence unless the owner has a permit tied to building a new home of at least 1,500 square feet, with completion generally projected within 6 months12. Rich Hill separately exempts certain brief organized gatherings held no more than once per calendar year and approved in writing by the Board of Aldermen13. We could not confirm a countywide tiny-home minimum size; ask the County Commission before choosing a design2. A movable tiny home may raise RV questions, while a fixed dwelling still needs a compliant wastewater solution and any applicable floodplain approval149.

What are the steps to build a home in Bates County?

  1. Confirm whether the parcel is unincorporated or inside a city; Butler, Adrian and Rich Hill have city building permits202122.
  1. For unincorporated land, give the County Commission the parcel and project details and confirm whether any building, inspection, occupancy, setback or subdivision approval applies12.
  1. Check the Flood Insurance Rate Map before siting improvements; floodplain development requires a permit, and work in a regulatory floodway requires a community-obtained engineering no-rise certificate before permit issuance915.
  1. Arrange soil work and submit the septic permit application to the Health Center when the county rules apply; wait for the green construction permit before starting, and obtain the applicable city private-sewage permit inside Butler or Rich Hill231178.
  1. Secure a MoDOT driveway permit before building or changing access within state right-of-way24.
  1. For a private well, use a permitted contractor or confirm that the landowner-installation exception covers your own work; either path remains subject to Missouri well rules16.

What should you check before buying land in Bates County?

Put septic feasibility near the top of due diligence: 0% of mapped soils are rated free of severe limits for a conventional drain field, so a cheap parcel can require a costlier design17. For an existing home, hire a licensed private inspector if the transaction calls for a septic assessment; the Health Center generally is not the transfer inspector, but should be contacted about septic permits for repairs29. Check the Flood Insurance Rate Map and permit path before choosing a building pad because floodplain development needs separate approval9. Verify legal and physical access; work within MoDOT right-of-way has its own driveway-permit requirement24. For a private well in Bates County, verify the contractor’s state well-installation and separate pump-installation permits; pump permitting also covers plumbing and electrical lines from the well to the structure, and contracting or directing the work requires a restricted permit16. Landowners may install their own well or pump without a permit but must follow Missouri construction rules16. A public-water-system well needs written state approval before construction or alteration31. Typical property tax is about 0.6%, with a median annual bill around $9623233.

Watch-outs

  • Bates County does not publish an affirmative general building-permit answer, so confirm the parcel and project with the County Commission before construction1.
  • Long-term RV, tiny-home and certificate-of-occupancy rules remain unconfirmed for unincorporated land; ask the County Commission and the Health Center before relying on an off-grid plan230.
  • Floodplain development needs a separate permit, and work in a regulatory floodway may require an engineering no-rise certificate before that permit can issue9.
  • Butler and Rich Hill require city private-sewage permits; Butler’s ordinance also preserves additional state or county health requirements, so confirm wastewater approval separately from city building permits78.

Sources

  1. Bates County Courthouse - Official County Website (department directory) (2026 county census)
  2. Bates County Courthouse - Official County Website (department directory) (2026 county census)
  3. Butler: Zoning (Bates County), quoted and re-checked
  4. Adrian: Planning & Zoning (Bates County), quoted and re-checked
  5. Rich Hill: Bill No. 809, Ordinance No. 1799 — Unified Development Ordinance (Bates County), quoted and re-checked
  6. Environmental Health, quoted and re-checked
  7. Butler: Chapter 24 Article IV Division 2 Private Sewage Disposal Systems (Bates County), quoted and re-checked
  8. Rich Hill: official source (Bates County), quoted and re-checked
  9. Floodplain Forms – Missouri SEMA, quoted and re-checked
  10. Zoning | City of Butler, MO - Official Website, quoted and re-checked
  11. BATES COUNTY ON-SITE SEWAGE RULES AND REGULATIONS, quoted and re-checked
  12. richhillmo.com, quoted and re-checked
  13. richhillmo.com, quoted and re-checked
  14. OWTS Construction Permit Process, quoted and re-checked
  15. Bates County Surveyor’s Office – Bates County Courthouse, quoted and re-checked
  16. Water Wells - PUB2945, quoted and re-checked
  17. Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
  18. RSMo Section 64.170 (Missouri statewide rule), quoted and re-checked
  19. RSMo § 64.170 — County commissions control construction and issue building permits (Missouri statewide rule), quoted and re-checked
  20. Butler: official source (Bates County), quoted and re-checked
  21. Adrian: Ordinance No. 817 — Building Permit Regulations (Bates County), quoted and re-checked
  22. Rich Hill: official source (Bates County), quoted and re-checked
  23. Bates County Health Center - Environmental Health (batescountyhealthcenter.org)
  24. Permits – Missouri Department of Transportation, quoted and re-checked
  25. Water Wells - PUB2945, quoted and re-checked
  26. RSMo § 64.620 — Building restrictions — limitations on regulations, quoted and re-checked
  27. OWTS Construction Permit Process (Missouri statewide rule), quoted and re-checked
  28. Bates County On-Site Sewage Rules and Regulations, quoted and re-checked
  29. Onsite Wastewater Treatment System Inspections Versus Evaluations, quoted and re-checked
  30. health.mo.gov (Missouri statewide rule), quoted and re-checked
  31. Who Regulates Water Wells in Missouri? - PUB4001, quoted and re-checked
  32. Effective property tax rate: Bolthole Index county data
  33. Median property tax bill: Bolthole Index county data

Written October 10, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Found land here? Start a Property Hunt →

Compared with neighboring counties

Like 4 of its 6 neighbors, Bates County requires no county building permit for a home.

RuleBates CountyCass CountyHenry CountyVernon CountySt. Clair CountyJohnson CountyJackson County
Building permitNot requiredLimitedNot requiredNot requiredNot requiredNot requiredRequired
County zoningNoYesNoNoNot publishedNoYes
Septic permitsCounty Health CenterCounty Env. Health Dept.County Health CenterCounty Health Dept.County Health CenterCounty Community Health ServicesCounty Public Works On-Site Wastewater program

County locator

Bates County in Missouri

75
County map
Bates County highlighted among the Missouri counties · colored by Index score

How Bates County scores

Seclusion60100% ev.
Self-Sufficiency58100% ev.
Admin Boringness8790% ev.
Durability59100% ev.
Property Autonomy47100% ev.
Carry Cost79100% ev.

Evidence strength: 98%. This reports direct-source completeness and fallback use; it is separate from the score and is not a confidence interval. How it works →

$231kTypical home
0.6%Property tax
$4,006Land / acre
43.2"Annual rain
8.5% of yrsSevere drought
18.3 / yr (+14)Mid-century 100°F days
17.4 daysMid-century dry spell
2.11" (+4.2%)Mid-century 1-day rain
1.67×Wildfire change factor
100%Forward climate coverage
$2,171Home insurance / yr
4.5% / yrInsurance growth
1.44%Nonrenewal rate
county median (2+ published ZIPs)Insurance basis
11,138People within 30 min
3,083,711People within 2 hr
14,988Radius comparison (15 mi)
19.4People / sq mi
0.5%Federal land
98.5%Land at 15% slope or less
0%Soils rated "not limited" for septic (strict USDA rating)
0 acWorkable land screen
18.9%Wooded land
45.4 tonsBiomass / forest ac
56.1°FAvg temp

Scout Bates County

Camp here before you commitBook a few nights nearby on Hipcamp →Already own land here?Earn money hosting campers — get $100 when you become a Hipcamp host →

Some links are affiliate or referral links — we may earn a commission, at no cost to you.

Property hunt

Find land. Bring the promising ones back.

Search live inventory elsewhere, then cost and vet each candidate here. No copied listings, account, or paid data feed.

Each button opens a current land search for Bates County. Listing sites control their own results and filters.

Analyze a property
Add setup-cost allowances

Use rough quotes or placeholders. Blank fields count as $0.

Working estimate

—land + entered setup costs
Asking $ / acre
—
Setup allowance
—
All-in $ / acre
—

A planning estimate, not a valuation or contractor quote. The USDA benchmark includes farm land and buildings; it is context, not a parcel comp.

Before an offer

Parcel due diligence

0/8 checked

Saved properties and checklist progress stay on this device. Bolthole Index does not receive them.

Cities and towns in Bates County

Inside a city or town, that city usually issues building permits and sets zoning; the county’s rules above cover unincorporated land. Septic, wells and floodplain rules usually stay with the county or state everywhere.

Not yet researched: Amsterdam · Village of Foster · Town of Passaic

Answers from the rulebook for Bates County

What the ordinances and state agencies actually say — one answer per question, each quoted from the official source and independently re-checked.

Bates County rules

  • Who permits septicLocal

    Onsite sewage permitting and administration in Bates County.

    • The Bates County Health Center states that sewage permits are handled by its Environmental Public Health Specialist.
    • The local page links Bates County onsite sewage rules and a Bates County wastewater treatment systems ordinance.
    “Sewage permists are also handled by the Environmental Public Health Specialist.”
  • Septic inspectionRequired

    New or replaced septic systems governed by the Bates County onsite sewage rules, before the system is covered.

    • The Environmental Public Health Specialist must inspect and sign that the system is approved before covering it.
    • The local rule permits owner installation but recommends a certified county installer.
    “Before covering the system you must arrange for the Environmental Public Health Specialist to inspect and sign that your system is approved. Note: you may install the septic system yourself, but it is highly recommended that you use a certified county installer to install the system.”
  • Building in a floodplainRequired

    Proposed construction or other development, including placement of manufactured homes, in a Special Flood Hazard Area identified on the applicable Flood Insurance Rate Maps in unincorporated Bates County.

    • A floodplain development permit is required before development proceeds in the Special Flood Hazard Area.
    • Development in the regulatory floodway requires an Engineering “No-Rise” Certificate obtained by the community before the floodplain development permit may be issued.
    • The Bates County Surveyor is identified by Bates County as the Flood Plain Manager.
    • SEMA lists Bill Lethcho as the Bates County floodplain administrator; incorporated communities including Adrian, Butler, and Rich Hill have separately listed floodplain administrators.

    applicable area: Special Flood Hazard Area shown on the community Flood Insurance Rate Maps · regulatory floodway requirement: Engineering No-Rise Certificate before floodplain development permit issuance

    “A Floodplain Development Permit is required for all proposed construction or other development, including the placement of manufactured homes, in the areas identified as a Special Flood Hazard Area (A zones or AE zones, etc.) on the Flood Insurance Rate Maps (FIRMs) for the community. No development is allowed except through the issuance of a Floodplain Development Permit, granted by the community’s floodplain administrator.”
  • Permit processPublished (with conditions)

    On-site sewage systems within Bates County handled by the Bates County Health Center under its ordinance.

    • A permit is required for a single-family homeowner under 3 acres and for commercial facilities, schools, churches, renters, or any person or entity installing a new system or making a major modification or repair.
    • Major modification includes relocation of the system or part of it, replacement of the septic tank, or construction of a new absorption field.
    • A crushed lateral may be repaired without a permit, but adding laterals requires a permit.
    • Tank pumping does not require a permit.
    • Single-family residences over 3 acres do not need a permit but must install the system to county standards.
    • A second system on land over 3 acres requires a permit unless the land is deeded in the owner's name and is also over 3 acres.
    • The application requires a drawing showing field locations, slopes, field layout, length, spacing, connection, pipe sizes, cleanout details, trench depth and width, setbacks to wells, property lines, and utilities, plus any other information required by the administrative authority.
    • A percolation test or soil morphology from a certified person and the appropriate fee must accompany the application.
    • Construction may begin only after the Environmental Public Health Specialist reviews the application and issues a green construction permit.
    • The county rules state that systems with daily designed sewage flow over 3,000 gallons and non-single-family lagoons must contact Missouri DNR, and subdivisions must contact DNR before applying for approval or permits under the county rule.

    maximum covered daily designed sewage flow: <= 3000 gallons per day (Facilities over 3,000 gallons per day must contact Missouri DNR.) · single-family residential lot permit threshold: < 3 acres (Single-family residences over 3 acres do not need a permit, subject to the stated second-system exception.)

    “After reviewing the application, the Environmental Public Health Specialist will give a green construction permit, and construction can begin.”
    One more reviewed finding on this topic
    • Partial — Onsite sewage permits in Bates County administered through the Bates County Health Center's Environmental Public Health Specialist.
      “Sewage permists are also handled by the Environmental Public Health Specialist.”
  • Building permitNot required

    The official county website lists no building/permit or code-enforcement office; Missouri does not have a statewide residential code and non-charter (third-class) counties like Bates generally lack authority to require building permits in unincorporated areas. Corroborated by the state County Building Codes dataset (data.mo.gov iq7s-izvt, 2021): no county residential building code adopted.

    Bates County Courthouse - Official County Website (department directory) ↗Scouted from the county site, not yet independently re-checked

  • County-wide zoningAbsent

    The official county department directory contains no planning/zoning office; zoning applies only within incorporated cities such as Butler or Adrian.

    Bates County Courthouse - Official County Website (department directory) ↗Scouted from the county site, not yet independently re-checked

Missouri rules that apply here

  • Building code adoptedPartial

    Missouri statewide legal framework for building-code adoption by counties and other communities; the statutes authorize local adoption rather than establishing one uniformly adopted statewide building code.

    • County authority under RSMo 64.170 applies to counties of the first and second classification.
    • A county that had not adopted a building code before August 28, 2001 must obtain voter approval before adopting under RSMo 64.170 to 64.200.
    • The adoption vote is limited to voters in the affected area; a code affecting a county is not voted on by citizens of incorporated territory.
    • A county adopting under RSMo 64.180 must use a current nationally recognized building code edition from calendar year 1999 or later, as amended.
    • A county building ordinance may not conflict with liquefied petroleum gas installation requirements governed by RSMo 323.020.
    • A community may incorporate a code by reference only if it otherwise has legal power to adopt the ordinance.
    • A code incorporated by reference must be filed with the community clerk and available for public inspection for 90 days before adoption.
    • An ordinance adopting a code by reference must state the penalty separately rather than incorporate the penalty by reference.
    • RSMo 67.280 defines community to include any county, fire protection district, or municipality, and municipality to include an incorporated city, town, or village.
    “Because fire and building codes are adopted at the local level in Missouri”
    2 more reviewed findings on this topic
  • Zoning districtsPartial

    Missouri statutory authority for counties to create zoning districts in unincorporated territory; this does not establish or publish the actual zoning districts for any particular county.

    • The statute applies to unincorporated territory of counties subject to sections 64.211 to 64.295.
    • Actual district boundaries, regulations, and maps depend on county adoption and are not supplied by this statewide statute.
    • District regulations must be uniform for each class or kind of building or land use within each district, although regulations may differ between districts.
    • The regulations must be made in accordance with a comprehensive plan.
    “the unincorporated territory may be divided into districts of such number, shape and area as may be deemed best suited”
  • Septic permitRequired

    Installing or repairing most onsite wastewater treatment systems in Missouri, including residential systems subject to state permitting.

    • A construction permit is required before installing or repairing most OWTS.
    • Some single-family residential lots may be exempt.
    • For residential property less than three acres, a permit is required; the exemption does not apply in some counties, so the county authority must be checked.
    • Work should not begin until a permit is issued or an exemption is confirmed.
    • Effective August 28, 2026, application fees for onsite sewage disposal system construction, modifications, and repairs are temporarily suspended.

    residential lot threshold: < 3 acres (The exemption does not apply in some counties.) · temporary permit-fee suspension effective date: 2026-08-28 (Applies to application fees associated with onsite sewage disposal system construction, modifications, and repairs.)

    “A construction permit is required before installing or repairing most onsite wastewater treatment systems (OWTS). Some single family residential lots may be exempt from permitting.”
    3 more reviewed findings on this topic
    • Limited — Onsite wastewater treatment system installation or repair in Bates County under Missouri's statewide baseline rules, subject to Bates County's local ordinance and administrative requirements.
      “A construction permit is required before installing or repairing most onsite wastewater treatment systems (OWTS). Some single family residential lots may be exempt from permitting.”
    • Required — Installing or repairing most onsite wastewater treatment systems statewide in Missouri.
      “A construction permit is required before installing or repairing most onsite wastewater treatment systems (OWTS). Some single family residential lots may be exempt from permitting.”
    • Required — Proposed campgrounds, mobile home parks, and subdivisions planning to use onsite wastewater treatment systems anywhere in Missouri.
      “DNR must approve subdivisions, mobile home parks and campgrounds if the use of OWTS is planned.”
  • Off-grid sanitationLimited

    Off-grid domestic wastewater treatment using onsite wastewater treatment systems where central sewer service is unavailable.

    • Onsite systems treat and dispose of domestic sewage on the property where generated.
    • A construction permit is generally required, including for residential property less than three acres, subject to county-specific exceptions.
    • Wastewater may not be discharged into a road ditch or onto the ground.
    • Local permitting authorities may impose additional requirements.

    residential lot threshold: < 3 acres (The exemption does not apply in some counties.)

    “Onsite wastewater treatment systems are sometimes referred to as "septic systems." These systems treat and dispose of domestic sewage on the property where it is generated.”
    One more reviewed finding on this topic
    • Allowed (with conditions) — Use of onsite wastewater treatment systems as off-grid sanitation where central sewer service is unavailable in Missouri.
      “In Missouri, where central sewer service is not available, homeowners and small business owners use various types of onsite wastewater treatment systems (OWTS).”
  • Well permitRequired

    Construction or alteration of a public water supply well serving a public water system in Bates County.

    • Public water systems must receive written approval from the Missouri Department of Natural Resources Public Drinking Water Branch before constructing or altering a public well.
    • The exception is for systems meeting the charitable and benevolent organization exemptions in section 640.116, RSMo.
    • Anyone proposing to install a public well must contact the department's regional office for a well site survey.
    • The public water system must obtain an estimated casing depth letter from the Missouri Geological Survey Water Resources Center before applying for construction authorization.
    • There is no fee for the well site survey and estimated casing depth letter services.
    • A public water system is defined in the cited source as a system with at least 15 service connections or regularly serving an average of at least 25 individuals daily, at least 60 days per calendar year.
    • Failure to obtain construction authorization may result in approval delays and possibly the owner having to properly plug the well and drill a new one according to 10 CSR 60-3.

    minimum service connections for public water system: >= 15 connections · minimum average persons served: >= 25 individuals per day (must occur at least 60 days per calendar year)

    “Public water systems must receive written approval from the PDWB before constructing or altering a public well”
    6 more reviewed findings on this topic
    • Limited — Construction or repair of private domestic, multi-family, and high-yield water wells in Bates County, including pump installation and work performed by contractors.
      “A restricted water well or pump installation permit is required for someone to contract these activities or to direct the installation.”
    • Required — Construction or repair of a water well in Bates County when performed by a contractor or another person subject to Missouri's well-installation permitting requirements.
      “A non-restricted water well installation permit is required to construct or repair a water well in Missouri.”
    • Limited — Construction or repair of a water well in Bates County by a landowner installing the landowner's own well or pump.
      “Landowners may install their own well or pump without a permit pursuant to the above mentioned law and rules.”
    • Required — A person or contractor conducting regulated work to drill, construct, repair, reconstruct, plug, or install pumps or pumping equipment in a water well, heat-pump well, monitoring well, or related well in Missouri.
      “A non-restricted permit is required to drill, construct, repair, reconstruct, plug, or install pumps or pumping equipment in a well.”
    • Limited — Construction or repair of water wells, installation or replacement of pumps, and associated plumbing and electrical work in Missouri.
      “A non-restricted water well installation permit is required to construct or repair a water well in Missouri.”
    • Limited — Construction or alteration of a public well serving a Missouri public water system.
      “Public water systems must receive written approval from the PDWB before constructing or altering a public well”
  • Agricultural exemptionAvailable (with conditions)

    Farm buildings and farm structures used for agricultural purposes under the county building and land-use restriction provisions of RSMo sections 64.800 to 64.905.

    • The exemption does not apply within incorporated portions of counties.
    • The exemption applies to raising crops, livestock, orchards, or forestry and to specified rice-farming or flood-irrigation impoundments.
    • For farm buildings or farm structures, the area must not be within the area shown on the flood hazard area map.
    • The statute preserves the validity of county ordinances or orders adopted before March 4, 1991.
    • Other laws and local requirements may still apply.

    rice-farming or flood-irrigation berm height: <= 18 inches (small berms placed around a field to hold water for growing rice or flood irrigation)

    “This section shall not apply to the erection, maintenance, repair, alteration or extension of farm buildings or farm structures used for such purposes in an area not within the area shown on the flood hazard area map.”
    5 more reviewed findings on this topic
    • Available (with conditions) — Counties operating under Missouri's second- and third-class county zoning statutes, including agricultural land uses and farm structures where the statutory conditions apply.
      “farm buildings or farm structures used for such purposes in an area not within the area shown on the flood hazard area map.”
    • Available (with conditions) — Erection, maintenance, repair, alteration, or extension of farm buildings or farm structures as against county fire-protection or fire-prevention ordinances.
      “Notwithstanding any provision of law to the contrary, no fire protection or fire prevention ordinance adopted by any county in this state shall be exercised so as to impose regulations or to require permits with respect to the erection, maintenance, repair, alteration, or extension of farm buildings or farm structures.”
    • Available (with conditions) — Erection, maintenance, repair, alteration, or extension of farm buildings or farm structures used for agricultural purposes under RSMo section 64.890, outside incorporated portions of counties and outside areas shown on flood hazard area maps.
      “This section shall not apply to the erection, maintenance, repair, alteration or extension of farm buildings or farm structures used for such purposes [...]”
    • Available (with conditions) — Farm buildings and farm structures statewide, with respect to county fire-protection and fire-prevention ordinances.
      “no fire protection or fire prevention ordinance adopted by any county in this state shall be exercised so as to impose regulations or to require permits [...]”
    • Available — Erection, maintenance, repair, alteration, or extension of farm buildings or farm structures with respect to county fire-protection or fire-prevention ordinances.
      “Notwithstanding any provision of law to the contrary, no fire protection or fire prevention ordinance adopted by any county in this state shall be exercised so as to impose regulations or to require permits with respect to the erection, maintenance, repair, alteration, or extension of farm buildings or farm structures.”
  • Subdividing landLimited

    Subdivision plats in the unincorporated areas of counties covered by RSMo section 64.070 after the county commission adopts subdivision regulations.

    • The county commission must first adopt subdivision regulations.
    • The plat must first be submitted to the planning commission.
    • If the county planning commission does not report upon the plat within thirty days, it may then be deemed approved.
    • If amended or rejected by the planning commission, the action may be overruled and the plat approved only by the county commission, with the reasons for overruling spread upon the county commission minutes.
    • The recorder of deeds may not record the plat until receiving a certificate of authority from the county zoning enforcement officer.
    • The statute also permits a county planning commission, upon written request of an incorporated area's legislative body where there is no municipal planning commission, to pass upon subdivision plats within that incorporated area; those plats are subject to county planning commission rules and approval procedures.

    planning commission reporting period: 30 days (If no report is made, the plat may then be deemed approved.)

    “After the county commission shall have adopted such subdivision regulations, no plat of a subdivision of land within the unincorporated area of such county [...]”
    One more reviewed finding on this topic
    • Limited — Subdivision regulations adopted by Missouri cities, towns, or villages under RSMo section 89.410.
      “The planning commission shall recommend and the council may by ordinance adopt regulations governing the subdivision of land within its jurisdiction.”
  • Driveway accessRequired

    Construction or modification of driveways within MoDOT right-of-way statewide.

    • A permit is required for construction of driveways and modifications to existing driveways on MoDOT right-of-way.
    • An initial online request must be submitted for each planned listed activity.
    • Engineered plans, traffic studies, hydraulic analysis, traffic-control plans, surety deposits, or performance bonds may be required depending on the work.
    • The rule does not establish a permit requirement for driveways outside MoDOT right-of-way.
    “We require you to obtain a permit to work on MoDOT's Right of Way for: Construction of driveways”
    One more reviewed finding on this topic
    • Limited — Construction or modification of driveways within MoDOT right-of-way in Bates County.
      “We require you to obtain a permit to work on MoDOT's Right of Way for: Construction of driveways”
  • Permit feesPublished (with conditions)

    Missouri Department of Natural Resources air construction permits statewide.

    • Fees apply to air construction permits, not to every Missouri building or land-use permit.
    • Construction permit fees include a filing fee and an hourly processing fee.
    • The filing fee depends on the type of construction permit.
    • The listed fees are effective January 1, 2026.
    • Fees applicable until December 31, 2025 are available on the Air Construction Permit Fees white sheet.
    • A convenience fee is charged for electronic payment.

    portable source relocation filing fee: 300 USD · minor permit filing fee: 300 USD · minor permit processing fee: per 100 USD (hour) · general permit filing fee: 700 USD · new source review filing fee: 6000 USD (plus $100 per hour processing fee) · prevention of significant deterioration filing fee: 6000 USD (plus $100 per hour processing fee) · hazardous air pollutant filing fee: 6000 USD (plus $100 per hour processing fee) · temporary or pilot filing fee: 250 USD (plus $100 per hour processing fee)

    “Construction permit fees include a filing fee and an hourly processing fee. The filing fee is dependent on the type of construction permit.”
    One more reviewed finding on this topic
    • Published (with conditions) — Missouri onsite wastewater treatment system construction, modification, and repair application fees administered under the statewide DHSS OWTS program.
      “Effective August 28, 2026, [...] the application fees associated with on-site sewage disposal system construction, modifications, and repairs will be temporarily suspended.”
  • county zoning authorityLimited

    Missouri county zoning authority over unincorporated land.

    • RSMo § 64.850 applies to counties of the first class without a charter and counties of the second, third, or fourth class.
    • RSMo § 64.620 applies to counties of the second or third class to which §§ 64.510–64.690 apply.
    • Adoption under §§ 64.510–64.690 requires approval by vote of the people under § 64.530.
    • The authority applies in unincorporated portions and not incorporated portions.
    • The regulations must be in accordance with a comprehensive plan.
    • Under § 64.090, the zoning power does not apply to raising crops, livestock, orchards, or forestry; seasonal or temporary rice-farming or flood-irrigation impoundments; specified farm structures outside mapped flood-hazard areas; or underground mining entered through shafts outside mapped flood-hazard areas.
    • Existing lawful uses and specified public-utility services are protected under the cited statutory schemes.
    “the county commission of any county of the first class not having a charter form of government, or of any county of the second, third or fourth class may, after approval by vote of the people as provided in section 64.845, regulate and restrict, by order of record, in the unincorporated portions of the county, the height, number of stories, and size of buildings, the percentage of lots that may be occupied, the size of yards, courts and other open spaces, the density of population, the location and use of buildings, structures and land for trade, industry, residence or other purposes.”
    2 more reviewed findings on this topic
  • county building authorityLimited

    County authority to regulate residential construction and issue building permits in unincorporated areas of Missouri.

    • The authority under sections 64.170 to 64.200 applies to counties of the first and second classification.
    • A county that had not adopted a building code before August 28, 2001, must obtain voter approval before adopting one under those sections.
    • Only voters in the area affected by the proposed code may vote; incorporated-territory citizens cannot vote on a code affecting a county.
    • The county commission must hold at least three public hearings and provide the statutory newspaper publication and county posting notices before adoption.
    • Regulations adopted under section 64.180 apply to unincorporated territory, except as otherwise provided.
    • Adopted or amended codes after August 28, 2001, must use a current, calendar year 1999 or later edition of a nationally recognized building code, as amended.
    • A county building ordinance may not conflict with liquefied petroleum gas installations governed by section 323.020.

    public hearings before adoption: >= 3 hearings minimum (Section 64.180(3)) · newspaper notice: >= 15 days (Notice of hearing time and place must be published in at least two newspapers having general circulation within the county) · posted notice: >= 15 days (Notice must be posted in four conspicuous places in the county) · minimum nationally recognized building-code edition: >= calendar year 1999 edition year (Applies after August 28, 2001, under section 64.180)

    “The regulations adopted shall be applicable to the unincorporated territory of the county, except as otherwise provided herein”
    2 more reviewed findings on this topic
    • Limited — County regulation of construction and issuance of building permits for buildings, including residential construction, in Missouri counties, with the practical focus on county-controlled areas outside incorporated territory.
      “the county commission in all counties of the first and second classification [...] is for this purpose empowered [...] to adopt [...] regulations to control the construction”
    • Limited — Missouri counties' authority to require permits and regulate residential construction in unincorporated areas.
      “Before the adoption of such code of regulations, the county commission shall hold at least three public hearings thereon”

Inside cities and towns in Bates County

Municipal rules found while researching the county. They apply inside that city or town, not to unincorporated land.

  • Building code adoptedAdopted (with conditions)

    Construction of dwellings and accessory buildings within the City of Rich Hill, Missouri.

    • A permit is required for all construction of dwellings and accessory buildings.
    • Permit fees are established by the Board of Aldermen through the City Fee Schedule.
    • The ordinance establishes minimum housing and building requirements within city limits; it does not establish the building-code status of Bates County's other municipalities or unincorporated areas.

    temporary shipping-container permit validity: 1 calendar year from issuance, or until the associated building permit expires (May be extended for an additional 180 days subject to the city's official determination.)

    “A permit shall be required for all construction of dwellings and accessory buildings.”
  • Local zoningPresent (with conditions)

    City of Rich Hill, Missouri, within Bates County.

    • The cited City of Rich Hill agenda identifies Bill No. 767 as an ordinance adopting a zoning ordinance.
    • The agenda describes regulation of land uses, building and structure locations and heights, yards, courts, and other open spaces, division of the city into districts, and establishment of a board of zoning and adjustment.
    • The agenda is from October 2022; the current codified ordinance and zoning map were not located in the reviewed official material.
    “That the Board of Aldermen of the City of Rich Hill, Missouri, hereby adopts the following provisions setting out the Planning and Zoning Code within the city limits of Rich Hill, Missouri, as specified in Exhibit A to this Ordinance:”
    3 more reviewed findings on this topic
    • Present (with conditions) — City of Rich Hill, Missouri, within Bates County; the city's planning and zoning commission is responsible for municipal planning and zoning functions.
      “The commission shall have and perform all of the functions of the zoning commission provided for in sections 89.010 to 89.250.”
    • Present (with conditions) — Land and buildings within the City of Butler, Bates County, Missouri.
      “Zoning regulates land uses within the City.”
    • Present (with conditions) — Land uses and parcels within the incorporated City of Butler, Bates County, Missouri.
      “Zoning regulates land uses within the City. Each parcel in the City is assigned to a zone which describes the regulations under which that land may be used. The Zoning Code identifies allowable uses and sets standards such as minimum lot size, maximum building height, and minimum front yard depth.”
  • Minimum dwelling sizeSpecified

    Dwellings and other buildings in Bates City zoning districts A, R-1, R-1A, R-2, R-3, C, and I.

    • The table identifies minimum main-level floor area by district; Planned Development districts may establish alternate standards through an approved development plan.

    minimum floor area, district A: >= 1200 square feet main level · minimum floor area, districts R-1 and R-1A: >= 1200 square feet main level · minimum floor area, districts R-2 and R-3: >= 900 square feet per unit main level

    “Minimum Floor Area (square feet — main level) | 1,200 | 1,200 | 1,200 | 900 (ea. unit) | 900 (ea. unit) | — | —”
  • Minimum lot sizeSpecified

    Lots in Bates City zoning districts A, R-1, R-1A, R-2, R-3, C, and I.

    • The table is district-specific. Planned Development districts may establish alternate bulk and area standards through an approved development plan.

    minimum lot size, district A: >= 1 acre · minimum lot size, district R-1: >= 14000 square feet · minimum lot size, district R-1A: >= 7000 square feet · minimum lot size, district R-2: >= 15000 square feet · minimum lot size, district R-3: >= 22000 square feet · minimum lot size, district C: >= 10000 square feet · minimum lot size, district I: >= 15000 square feet

    “Minimum lot size (square feet or acres) | 1 | 14,000 | 7,000 | 15,000 | 22,000 | 10,000 | 15,000”
  • Building heightSpecified

    Buildings in Bates City zoning districts A, R-1, R-1A, R-2, R-3, C, and I.

    • The table is district-specific. Planned Development districts may establish alternate height standards through an approved development plan.

    maximum building height, district A: <= 45 feet · maximum building height, districts R-1, R-1A, R-2, R-3, C: <= 35 feet · maximum building height, district I: <= 45 feet

    “Maximum building height (feet) | 45 | 35 | 35 | 35 | 35 | 35 | 45”
  • Living in an RVLimited

    Recreational vehicles within the corporate limits of Rich Hill, Missouri.

    • A recreational vehicle may not be occupied as a permanent or temporary residence within city limits unless a permit is approved for building a new home.
    • A temporary-residence permit requires that the property owner be building a new home with a minimum living space of 1,500 square feet.
    • The RV must be owned by and situated on the property of the property owner.
    • The owner must provide a project timeline with a projected completion date not more than six months from start to finish.
    • The RV may not be occupied before fourteen days before the construction start date.
    • For homes over 2,500 square feet requiring more than six months, permit extensions may be approved by the Board of Aldermen at its discretion.
    • A permit is required and fees are established by the City Fee Schedule.
    • Organized gatherings under fourteen days, no more than once per calendar year, with written Board of Aldermen approval, are exempt from the ordinance's requirements and prohibitions.

    minimum new-home living space: >= 1500 sq ft · maximum ordinary construction timeline: <= 6 months (Extensions may be approved for homes over 2,500 square feet and for completion-date failures.) · pre-construction occupancy limit: <= 14 days (The RV may not be occupied prior to fourteen days before construction start.) · permit fee: City Fee Schedule

    “shall not be occupied as a permanent or temporary residence”
  • Camping on your landLimited

    Temporary camping or temporary residence in a recreational vehicle within Rich Hill city limits.

    • Temporary RV residence requires a permit approved for building a new home.
    • The new home must have at least 1,500 square feet of living space.
    • The RV must be owned by and situated on the property of the property owner.
    • The construction timeline must project completion within six months, subject to stated extensions.
    • The RV may not be occupied before fourteen days before construction begins.
    • Organized gatherings under fourteen days, held no more than once per calendar year, and approved in writing by the Board of Aldermen are exempt.

    minimum new-home living space: >= 1500 sq ft · maximum ordinary construction timeline: <= 6 months (Discretionary extensions are available under the ordinance.) · permit fee: City Fee Schedule

    “A Recreational Vehicle shall not be occupied as a permanent or temporary residence within city limits unless a permit is approved for building a new home.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission — ask the county directly.

  • Owner-builder exemption — Owner-builder exemptions from building permits, inspections, or related construction approvals in Bates County.
  • Inspections — Building inspections associated with construction in Bates County, including unincorporated areas and incorporated municipalities.
  • Certificate of occupancy — Certificates of occupancy for buildings in Bates County, including unincorporated areas and incorporated municipalities.
  • Setbacks — Building setbacks and yard requirements in Bates County, including unincorporated areas.
  • Lot coverage — Lot coverage or percentage of lot that may be occupied in Bates County, including unincorporated areas and incorporated municipalities.
5 more unanswered
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Mandatory utility hookup
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Living off-grid in Bates County, Missouri

Is Bates County a good place to live off-grid or homestead?

Bates County scores 75/100 on the Bolthole Index, a strong county profile. Its strengths: low administrative friction for a quiet rural property and manageable long-term carry cost.

Do you need a building permit in Bates County, Missouri?

Bates County does not require a county building permit for a home in unincorporated areas, and it has no county-wide zoning. Onsite septic is permitted by Bates County Health Center - Environmental Health (under Missouri DHSS). These answers are quoted from official sources and independently re-checked. Rules change and cities within the county differ — always confirm with the county before you buy or build.

How much does land cost in Bates County, Missouri?

Land in Bates County runs about $4,006 per acre, based on the latest county data.

What is the water situation in Bates County?

Bates County gets about 43.2" of rain a year, with severe drought in roughly 8.5% of years.

How remote is Bates County?

A representative private-land location has about 11,138 people within a 30-minute drive and 3,083,711 within two hours. The road-network catchments count population across county lines and clusters of smaller cities; straight-line radius values remain available as a comparison.

How Bates compares in Missouri

Compare side-by-side →See all 115 Missouri counties ranked →