Fillmore County, Nebraska

Building permits, zoning and land rules in Fillmore County, Nebraska

47Index Score / 100
#38 of 93 in Nebraska

Unincorporated Fillmore County, Nebraska requires a county building permit and zoning approval for new construction and structures larger than 100 square feet12. Cities and villages may administer their own building permits and zoning, but Nebraska remains the septic-permit authority throughout Fillmore County34. The county performs a zoning-compliance inspection before issuing a required certificate of occupancy; a separate residential building-code inspection schedule could not be confirmed56.

At a glance

Building permit
Required for new construction and structures over 100 square feet1
Zoning
Yes in the county's defined rural and unincorporated jurisdiction2
Septic
State Title 124 rules; qualifying systems need construction and operating permits47
RV living
Not confirmed; ask the county Zoning Office8
Tiny homes
Local approval controls; manufactured homes are allowed conditionally in residential districts9
Owner-builder
Exempt from contractor registration on own property, not from permits1011
County-road driveway
Permission required before installation12

Who to call

Zoning

Fillmore County Planning and Zoning

Zoning permits, zoning information and property-change questions in Fillmore County's jurisdiction

402-759-4982

zoning@fillmorecountyne.gov

1320 G Street, Geneva, Nebraska 68361

Septic permits

Nebraska Department of Water, Energy, and Environment — Onsite Wastewater Program

Statewide onsite wastewater standards, professional certification, system registration and permits for systems needing site-specific review

(402) 471-4285

DWEE.onsite@nebraska.gov

245 Fallbrook Blvd. Suite 100 Lincoln, NE 68521

Roads & driveways

Fillmore County Department of Roads

County-road access driveways and work on or adjacent to county roadways

Contact details are copied from each office’s official page and were checked against it on October 9, 2026.

Off-grid gear

Going off-grid in Fillmore County means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Do you need a building permit in Fillmore County, Nebraska?

Fillmore County requires a building permit and zoning approval for all new construction and structures larger than 100 square feet in the county zoning jurisdiction1314. Structures under 100 square feet do not need a zoning permit but still must meet setbacks13. A building-permit application requires two identical plan sets, including a plot plan, footing detail, wall detail, roof detail and floor plan; construction cannot begin before approval15. The zoning permit fee is $25 per parcel or location, and the published full-subdivision fee is $5016. Covered buildings, structures and land uses also need a certificate of occupancy, with an exception for primarily agricultural use17. The Zoning Administrator examines the site for zoning compliance before issuing that certificate, but a separate residential building-code inspection schedule could not be confirmed5.

Who issues building permits in Fillmore County, and how do you reach them?

Fillmore County Planning and Zoning issues county building and zoning permits in the county's rural jurisdiction118. Reach the office at 402-759-4982 or zoning@fillmorecountyne.gov, or visit 1320 G Street, Geneva, Nebraska 6836118. The Zoning Administrator must decide a complete application within 30 days, and a written appeal is due within 10 days after the determination is filed19. Fillmore County does not administer zoning inside Geneva, and other incorporated communities may administer their own building permits and zoning; confirm the parcel's jurisdiction before applying3. Septic permits do not shift to a city building office: the Nebraska Onsite Wastewater Program administers the state rules throughout Fillmore County420. The County Highway Superintendent's office separately approves county-road driveway access before installation12.

Does Fillmore County have zoning?

Fillmore County zoning applies in its rural and unincorporated planning jurisdiction, excluding the one-mile planning jurisdictions of Exeter, Fairmont, Geneva, Grafton, Milligan, Ohiowa and Shickley; county jurisdiction reaches Strang's corporate limits21. The official zoning map is maintained by the County Clerk, and district-specific rules control each parcel22. An AG-1 single-family home generally needs a 3-acre lot and has separation requirements from other single-family homes23. An R-2 single-family lot may be 5,000 square feet with public or community water and sewer, but the minimum rises to 3 acres when both systems are private24. Setbacks are district-specific; the AG-1 front yard is 25 feet from the established road right-of-way25. R-1 single-family dwellings have a 35-foot height limit, while AG-1 lists no height limit for its table categories, subject to supplemental rules2627.

How do septic permits work in Fillmore County?

Nebraska's Onsite Wastewater Program administers statewide Title 124 requirements for systems throughout Fillmore County, including addresses inside cities and villages; additional local requirements may apply28. Many ordinary systems proceed under state compliance and registration rules, while systems with large size, non-domestic waste or siting issues can require site-specific review2920. When a Title 124 permit application is required, obtain the septic construction permit before building; registration, applicable fees and engineer certification must precede the operating permit, which is required before discharge or use30. State representatives may inspect, sample and monitor affected areas, but we could not confirm a routine pre-occupancy septic inspection for every system31. Only about 3.1% of Fillmore County soils are rated without severe limitations for a conventional drain field, so arrange a parcel-specific evaluation before fixing the house and drain-field locations32.

Can you live in an RV or tiny home on your land in Fillmore County?

We could not confirm a Fillmore County rule that plainly allows or prohibits long-term RV occupancy, temporary camping on private land or tiny-home occupancy. Ask Planning and Zoning whether the proposed use is allowed in the parcel's district and whether it needs zoning approval or a certificate of occupancy18. Nebraska classifies tiny houses as manufactured homes, modular housing units or recreational vehicles, but classification does not override local land-use approval33. A park-model recreational vehicle is designed for temporary living and cannot be permanently affixed as a permanent dwelling33. County regulations impose standards on manufactured homes outside mobile-home parks, but the available material does not resolve all of those standards9. The confirmed 900-square-foot minimum applies specifically to manufactured homes outside mobile-home parks, not every dwelling type34. Ask Planning and Zoning for a written district-specific answer before buying a small-home site18.

Building a home in Fillmore County: the steps, in order

  1. Confirm whether the parcel is in Fillmore County's rural zoning jurisdiction or a community's planning area1435.
  2. Ask Fillmore County Planning and Zoning at 402-759-4982 to confirm the district, allowed use, lot size, setbacks and height rules183626.
  3. Have an onsite professional evaluate the wastewater site, then ask the Nebraska Onsite Wastewater Program whether the design needs septic construction and operating permits720.
  4. Obtain a floodplain development permit before work in a covered floodplain area37.
  5. Obtain county driveway approval before installing access from the county highway road system12.
  6. Submit the building-permit plans and zoning-approval materials, pay the zoning permit fee and wait for approval before construction1516.
  7. Obtain the required certificate of occupancy before initial or continued occupancy or use38.

What should you check before buying land in Fillmore County?

Start with jurisdiction, zoning district, lot size, legal access, floodplain status and wastewater feasibility before committing to a Fillmore County parcel339124032. A division into multiple building lots may trigger subdivision review, so discuss the proposed split with Planning and Zoning before closing4118. Fillmore County is sparsely settled at about 9.6 people per square mile, and the nearest city of 100,000 or more is about 52 miles from the county center4243. Farmland averages about $7,359 per acre in the cited agricultural data, while the typical home value is about $188,6454445. A licensed water-well contractor generally must register wells with the Nebraska Department of Natural Resources, but a separate construction permit for every domestic well could not be confirmed46.

Watch-outs

  • Fillmore County requires a building permit and zoning approval for new construction and structures larger than 100 square feet; smaller structures remain subject to setbacks13.
  • Fillmore County does not administer zoning inside Geneva, and incorporated communities may run their own building permits and zoning; Nebraska still administers septic requirements throughout the county34.
  • Only about 3.1% of county soils are rated without severe limitations for a conventional septic drain field, making an early site evaluation especially valuable32.
  • Long-term RV living, private-land camping and tiny-home occupancy could not be confirmed; ask Fillmore County Planning and Zoning at 402-759-4982 before buying for one of those uses18.

Sources

  1. Planning and Zoning FAQs – Fillmore County, quoted and re-checked
  2. Forms, Permits and Regulations – Fillmore County, quoted and re-checked
  3. Forms, Permits and Regulations – Fillmore County, quoted and re-checked
  4. Owner Construction/Operating Permit Checklist, quoted and re-checked
  5. Fillmore County Zoning Regulations, quoted and re-checked
  6. Fillmore County Zoning Regulations, quoted and re-checked
  7. Owner Construction/Operating Permit Checklist, quoted and re-checked
  8. Fillmore County Zoning Regulations (2026 county census)
  9. Fillmore County Zoning Regulations, quoted and re-checked
  10. Nebraska Revised Statute 48-2104 — Registration required (2026 county census)
  11. Nebraska Revised Statute 48-2104 — Registration required (Nebraska statewide rule), quoted and re-checked
  12. Policies and Permits – Fillmore County, quoted and re-checked
  13. Planning and Zoning FAQs – Fillmore County, quoted and re-checked
  14. Fillmore County Zoning Regulations, quoted and re-checked
  15. Planning and Zoning FAQs – Fillmore County, quoted and re-checked
  16. Zoning Fees – Fillmore County, quoted and re-checked
  17. Fillmore County Zoning Regulations, quoted and re-checked
  18. Fillmore County Planning and Zoning (fillmorecountyne.gov)
  19. Fillmore County Zoning Regulations, quoted and re-checked
  20. Nebraska Department of Water, Energy, and Environment — Onsite Wastewater Program (dwee.nebraska.gov)
  21. Fillmore County Zoning Regulations – 2013, updated wind and solar provisions, quoted and re-checked
  22. Fillmore County Zoning Regulations, quoted and re-checked
  23. Fillmore County Zoning Regulations - 2013, quoted and re-checked
  24. Fillmore County Zoning Regulations - 2013, quoted and re-checked
  25. Planning and Zoning FAQs – Fillmore County, quoted and re-checked
  26. Fillmore County Zoning Regulations, quoted and re-checked
  27. Fillmore County Zoning Regulations - 2013, quoted and re-checked
  28. Owner Construction/Operating Permit Checklist, quoted and re-checked
  29. Onsite Wastewater Program (Nebraska statewide rule), quoted and re-checked
  30. Owner Construction/Operating Permit Checklist, quoted and re-checked
  31. Title 124 Onsite Wastewater Treatment Systems, quoted and re-checked
  32. Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
  33. Housing and Recreational Vehicle (Nebraska statewide rule), quoted and re-checked
  34. Fillmore County Zoning Regulations – 2013, updated wind and solar provisions, quoted and re-checked
  35. Forms, Permits and Regulations – Fillmore County, quoted and re-checked
  36. Fillmore County Zoning Regulations - 2013, quoted and re-checked
  37. Fillmore County Floodplain Ordinance, quoted and re-checked
  38. Fillmore County Zoning Regulations – 2013, updated wind and solar provisions, quoted and re-checked
  39. Fillmore County Zoning Regulations, quoted and re-checked
  40. Fillmore County Zoning Regulations, quoted and re-checked
  41. Fillmore County Planning & Zoning Subdivision Requirements, quoted and re-checked
  42. Population density: Bolthole Index county data
  43. Straight-line distance from the county center to the nearest city of 100,000+ people: Bolthole Index county data
  44. Farmland value per acre (USDA census): Bolthole Index county data
  45. Typical home value (Zillow): Bolthole Index county data
  46. dhhs.ne.gov, quoted and re-checked

Written October 9, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Found land here? Start a Property Hunt →

Compared with neighboring counties

Like all 6 of its neighbors, Fillmore County has countywide zoning.

RuleFillmore CountyClay CountyYork CountyThayer CountySaline CountyNuckolls CountyJefferson County
Building permitLimitedLimitedRequiredRequiredLimitedRequiredLimited
County zoningYesYesYesYesYesYesYes
Septic permitsNDEENE Dept. of WaterNDEENE Dept. of WaterNE Dept. of Env. & EnergyNDEENE Dept. of Env. & Energy

County locator

Fillmore County in Nebraska

47
County map
Fillmore County highlighted among the Nebraska counties · colored by Index score

How Fillmore County scores

Seclusion63100% ev.
Self-Sufficiency2398% ev.
Admin Boringness59100% ev.
Durability39100% ev.
Property Autonomy53100% ev.
Carry Cost62100% ev.

Evidence strength: 99%. This reports direct-source completeness and fallback use; it is separate from the score and is not a confidence interval. How it works →

$189kTypical home
1.1%Property tax
$7,359Land / acre
28.4"Annual rain
17.4% of yrsSevere drought
15.8 / yr (+13)Mid-century 100°F days
20.7 daysMid-century dry spell
1.79" (+4.8%)Mid-century 1-day rain
1.59×Wildfire change factor
100%Forward climate coverage
$2,389Home insurance / yr
1.6% / yrInsurance growth
3.26%Nonrenewal rate
county median (2+ published ZIPs)Insurance basis
13,150People within 30 min
1,518,984People within 2 hr
7,217Radius comparison (15 mi)
9.6People / sq mi
1.2%Federal land
99.2%Land at 15% slope or less
3.1%Soils rated "not limited" for septic (strict USDA rating)
11,488 acWorkable land screen
1.6%Wooded land
19.4 tonsBiomass / forest ac
51.6°FAvg temp

Scout Fillmore County

Camp here before you commitBook a few nights nearby on Hipcamp →Already own land here?Earn money hosting campers — get $100 when you become a Hipcamp host →

Some links are affiliate or referral links — we may earn a commission, at no cost to you.

Property hunt

Find land. Bring the promising ones back.

Search live inventory elsewhere, then cost and vet each candidate here. No copied listings, account, or paid data feed.

Each button opens a current land search for Fillmore County. Listing sites control their own results and filters.

Analyze a property
Add setup-cost allowances

Use rough quotes or placeholders. Blank fields count as $0.

Working estimate

—land + entered setup costs
Asking $ / acre
—
Setup allowance
—
All-in $ / acre
—

A planning estimate, not a valuation or contractor quote. The USDA benchmark includes farm land and buildings; it is context, not a parcel comp.

Before an offer

Parcel due diligence

0/8 checked

Saved properties and checklist progress stay on this device. Bolthole Index does not receive them.

Cities and towns in Fillmore County

Inside a city, town or township here, that government usually sets zoning and may issue its own building permits; the county’s rules above cover land outside them.

Belle Prairie Township · Bennett Township · Chelsea Township · Village of Exeter · Exeter-Fairmont Consolidated Township · Village of Fairmont · Franklin Township · Geneva · Glengary Township · Grafton Township · Village of Grafton · Hamilton Township · Liberty Township · Madison Township · Village of Milligan · Momence Township · Village of Ohiowa · Village of Shickley · Stanton Township · Village of Strang · West Blue Township

Answers from the rulebook for Fillmore County

What the ordinances and state agencies actually say — one answer per question, each quoted from the official source and independently re-checked.

Fillmore County rules

  • Building permitRequired

    New construction and structures greater than 100 square feet in the county zoning jurisdiction.

    • The county FAQ states that building permits are required for all new construction and structures greater than 100 square feet.
    • County zoning regulations separately require a zoning permit for buildings over 100 square feet and structures, including agricultural structures, in unincorporated areas.
    • Buildings under 100 square feet do not require a zoning permit but must meet setback regulations.

    minimum structure size for stated building-permit requirement: > 100 square feet (The FAQ says structures greater than 100 square feet; the zoning regulations separately state buildings over 100 square feet.)

    “A zoning permit is required for all buildings over 100 square feet and structures, including those utilized for agricultural purposes in the unincorporated areas of Fillmore County to verify compliance with yard, flood hazard and other applicable requirements of the zoning regulations.”
    2 more reviewed findings on this topic
    • Limited — New construction and structures greater than 100 square feet in the county jurisdiction.
      “Building permits are required for all new constructions and structures greater than 100 square feet.”
    • Required — New construction and structures greater than 100 square feet in unincorporated Fillmore County.
      “Building permits are required for all new constructions and structures greater than 100 square feet.”
  • InspectionsLimited

    Zoning-compliance inspections of buildings, structures, and land uses in unincorporated Fillmore County.

    • No separate residential building-code inspection schedule was located.
    • The zoning administrator examination occurs before issuance of a certificate of occupancy.
    “Conduct inspections of buildings, structures and uses of land to determine compliance with the provisions of this resolution.”
    One more reviewed finding on this topic
    • Limited — Buildings, structures, and sites for which a zoning permit application seeks construction, enlargement, alteration, repair, replacement, removal, demolition, or a change of use or occupancy.
      “Before issuing a certificate of occupancy, the Zoning Administrator shall examine all buildings, structures or sites for which an application has been filed for a zoning permit to construct, enlarge, alter, repair, replace, remove, demolish, or change the use or occupancy. The Zoning Administrator shall maintain a record of all examinations and inspections, together with a record of findings of violations of the law.”
  • Certificate of occupancyRequired

    Initial and continued occupancy and use of buildings, structures, or land requiring a zoning permit, except primarily agricultural use as stated in the regulation.

    • A certificate is required for initial and continued occupancy and use of the building or land to which it applies.
    • The regulation states an exception for use which is primarily agricultural.
    • The Zoning Administrator examines buildings, structures, or sites before issuance.
    • A partial certificate may be issued for up to 90 days if the completed portion may be occupied safely.

    maximum temporary certificate period: <= 90 days (Partial certificate issued upon request and subject to safe occupancy.)

    “A certificate of occupancy shall be deemed to authorize, and is required for, both initial and continued occupancy and use of the building or land to which it applies, and shall continue in effect so long as such building or land is used as authorized in the certificate of occupancy.”
    3 more reviewed findings on this topic
    • Required — Initial and continued occupancy and use of covered buildings or land in the county zoning jurisdiction.
      “No building, structure or land shall be used or occupied, in whole or in part, nor shall any change made in the use or type of occupancy of an existing building or structure requiring a zoning permit, nor shall any change be made in the use of land, except to any use which is primarily agricultural, unless a certificate of occupancy shall may be issued by the Zoning Administrator in accordance with this resolution. [...] A certificate of occupancy shall be deemed to authorize, and is required for, both initial and continued occupancy and use of the building or land to which it applies, and shall continue in effect so long as such building or land is used as authorized in the certificate of occupancy.”
    • Required — Buildings, structures, land uses, and occupancy changes requiring a zoning permit, except primarily agricultural land use.
      “A certificate of occupancy shall be deemed to authorize, and is required for, both initial and continued occupancy and use of the building or land to which it applies, and shall continue in effect so long as such building or land is used as authorized in the certificate of occupancy.”
    • Required — Initial and continued occupancy and use of buildings or land requiring a zoning permit in unincorporated Fillmore County.
      “No building, structure or land shall be used or occupied, in whole or in part, nor shall any change made in the use or type of occupancy of an existing building or structure requiring a zoning permit, nor shall any change be made in the use of land, except to any use which is primarily agricultural, unless a certificate of occupancy shall may be issued by the Zoning Administrator in accordance with this resolution.”
  • County-wide zoningPresent (with conditions)

    County zoning in rural and unincorporated areas within Fillmore County's planning jurisdiction.

    • The county jurisdiction excludes unincorporated areas within the one-mile planning jurisdiction of Exeter, Fairmont, Geneva, Grafton, Milligan, Ohiowa and Shickley.
    • Strang is included up to the village corporate limits.
    • Zoning permits are required before covered construction or placement.
    “The provisions of this Resolution shall apply within the planning jurisdiction of Fillmore County, Nebraska as established on the map entitled “Official Zoning Map”.”
    3 more reviewed findings on this topic
    • Present (with conditions) — Fillmore County's rural and unincorporated planning jurisdiction.
      “The provisions of this Resolution shall apply within the planning jurisdiction of Fillmore County, Nebraska as established on the map entitled “Official Zoning Map”. The planning jurisdiction of Fillmore County includes the rural and unincorporated areas of the County, less the unincorporated areas within the one-mile planning jurisdiction of the communities of Exeter, Fairmont, Geneva, Grafton, Milligan, Ohiowa and Shickley, and excluding Strang of which the county jurisdiction includes the area up to the corporate limits of the village.”
    • Present — County zoning within Fillmore County's rural and unincorporated planning jurisdiction.
      “The planning jurisdiction of Fillmore County includes the rural and unincorporated areas of the County, less the unincorporated areas within the one-mile planning jurisdiction of the communities of Exeter, Fairmont, Geneva, Grafton, Milligan, Ohiowa and Shickley, and excluding Strang of which the county jurisdiction includes the area up to the corporate limits of the village.”
    • Present — Zoning administration and zoning permits in unincorporated Fillmore County.
      “No building or other structure shall be erected, moved, replaced, added to, or structurally altered without a zoning permit first having been issued by the Zoning Administrator.”
  • Local zoningVaries (with conditions)

    Aggregate local zoning across Fillmore County, including county zoning in unincorporated areas and separate municipal zoning within incorporated places.

    • The aggregate conclusion reflects different administering authorities and does not mean Fillmore County administers every local ordinance.
    • Geneva zoning is administered by the City of Geneva.
    “Fillmore County does not handle zoning within Geneva city limits.”
    One more reviewed finding on this topic
    • Varies (with conditions) — Aggregate of county zoning and incorporated-community zoning across Fillmore County; the county does not administer zoning within Geneva city limits and separate regulations are published for several communities.
      “Fillmore County does not handle zoning within Geneva city limits.”
  • Zoning districtsPublished (with conditions)

    County zoning districts and overlay districts shown in the Fillmore County Zoning Regulations.

    • The regulations state that district boundaries are shown on the official zoning map incorporated by reference.
    • District-specific rules apply within the county planning jurisdiction.
    • The regulations list AG-1, AG-2, R, R-1, R-2, C-1, C-2, I-1, I-2, FF/FW, WHP, AHO, and CO districts or overlays.
    “For the purpose of this resolution, there are hereby created zoning districts for Fillmore County, as named and described in Article 5 of this Resolution.”
    2 more reviewed findings on this topic
    • Published — County zoning districts and the Official Zoning Map.
      “The signed copy of the Zoning Map containing the zoning districts designated at the time of adoption of this resolution shall be maintained in the office of the County Clerk for the use and benefit of the public. [...] No amendment to this resolution which involves matter portrayed on the Official Zoning Map shall become effective until after such change and entry have been made on said map.”
    • Published — Published Fillmore County zoning districts and official zoning-map administration.
      “For the purpose of this resolution, there are hereby created zoning districts for Fillmore County, as named and described in Article 5 of this Resolution. AG-1 - Agriculture District AG-2 - Agriculture District R - Residential District R-1 – Residential District R-2 – Residential District C-1 - General Commercial District C-2 - Highway Commercial District”
  • Minimum dwelling sizeDistrict specific (with conditions)

    Manufactured homes outside mobile-home parks in county zoning districts.

    • The 900-square-foot minimum applies to manufactured homes outside mobile-home parks, not necessarily to every dwelling type.

    minimum manufactured-home floor area: >= 900 square feet (Outside mobile-home parks)

    “All manufactured homes located outside mobile home parks shall meet the following standards: 1. The home shall have no less than nine hundred (900) square feet of floor area.”
  • Minimum lot sizeDistrict specific (with conditions)

    Minimum lot sizes in Fillmore County's AG-1 Agriculture District.

    • Lot area excludes road right-of-way.
    • For single-family dwellings, the regulation also requires separation from other single-family dwellings: 1,000 feet without an improved all-weather road, or 500 feet when separated by an improved all-weather road, including the road right-of-way.
    • Additional district separation distances may apply.

    dwelling or use having water and sewer lot area: 3 acres · other use lot area: 1 acre · accessory use lot area: 1 acre · single-family dwelling lot size: 3 acres · minimum separation without improved all-weather road: >= 1000 feet (between single-family dwellings) · minimum separation with improved all-weather road: >= 500 feet (between single-family dwellings, including road right-of-way)

    “Dwellings & uses having water & sewer 3 acres *** 100' 25' 3' 3' no limit”
    One more reviewed finding on this topic
    • District specific (with conditions) — Minimum lot sizes in Fillmore County's R-2 Residential District.
      “If with public/community water and sewer, otherwise 1.5 acres with any combination of public and private water/sewer systems and 3 acres with both systems being private.”
  • SetbacksDistrict specific (with conditions)

    County zoning setbacks generally within Fillmore County's planning jurisdiction.

    • Minimum setbacks are determined by the applicable zoning district.
    • Where no specific setback definition applies, the Zoning Administrator determines a suitable dimension consistent with the applicable district's intent.
    • No structure may project into a required front, side, or rear setback.
    • Specified at-grade surfaces and architectural projections may encroach subject to the listed conditions.
    “Minimum building setbacks shall be required along all public roadways or right-of-ways as set forth in the district regulations, except as exempted herein.”
    One more reviewed finding on this topic
    • Specified — District-specific building setbacks in unincorporated Fillmore County.
      “Setbacks are different for each zoning district. We need to know the legal description and address.”
  • Lot coverageDistrict specific (with conditions)

    Lot-coverage limits in Fillmore County zoning districts.

    • The regulations prohibit construction or alteration that occupies a greater percentage of lot area than allowed for the applicable district.
    • A variance may be required to exceed the applicable percentage.
    “No building or structure shall hereafter be erected or altered to exceed the height or bulk, to accommodate or house a greater number of families, to occupy a greater percentage of lot area, to have narrower or smaller rear yards, front yards, side yards or other open spaces than herein required, or in any manner contrary to the provisions of this Resolution.”
    One more reviewed finding on this topic
    • Specified — District-specific lot-coverage controls in unincorporated Fillmore County.
      “At grade patios, parking areas, loading areas and similar at grade surfacing shall be permitted to encroach into any yard, provided such surfaced area shall be included in the calculation of maximum lot coverage as set forth in each zoning district regulation.”
  • Building heightDistrict specific (with conditions)

    Building heights in Fillmore County's AG-1 Agriculture District.

    • The AG-1 table states no limit for the listed categories, but other district-specific or supplemental regulations may apply.
    • A variance is required to exceed applicable height or bulk standards where a limit applies.

    dwelling or use having water and sewer maximum height: no limit · other use maximum height: no limit · accessory use maximum height: no limit

    “Other Uses 1 acre *** 100' 25' 3' 3' no limit”
    2 more reviewed findings on this topic
    • Specified — District-specific building-height controls in unincorporated Fillmore County.
      “Building and structures shall not exceed three (3) stories in height.”
    • District specific (with conditions) — Building-height limits in Fillmore County zoning districts.
      “Single Family Dwelling 7000** 50' 25' 7' 20' 35'”
  • Manufactured homesAllowed (with conditions)

    Manufactured homes in the county R, R-1, and R-2 residential districts.

    • Manufactured homes must comply with Article 9.
    • The applicable district's dimensional, setback, permit, and other requirements apply.
    • Mobile-home parks in R-2 are subject to sections 5.5.08 and 5.5.09.
    “Manufactured homes which comply with the provisions of Article 9”
    One more reviewed finding on this topic
    • Limited — Manufactured homes located outside mobile-home parks in the county zoning jurisdiction.
      “All manufactured homes located outside mobile home parks shall meet the following standards:”
  • Subdividing landRegulated (with conditions)

    Division of land into two or more lots, sites, or other divisions for transfer or building development in unincorporated Fillmore County.

    • The county process document states that property being divided at least 3 acres but not over 10 acres requires a subdivision.
    • A preliminary plat must be reviewed before final printing.
    • A signed and notarized final plat, Mylar copy, paper copy, application fee, and county-clerk filing fee are required.

    county subdivision application fee: 50 USD (Separate filing fee payable to County Clerk)

    “property being divided that is at least 3 acres, but not over 10 aces will require a subdivision”
  • Driveway accessRequired

    Access driveways on the Fillmore County highway road system.

    • Permission from the County Highway Superintendent's office is required before installation.
    • A location inspection determines whether a culvert is needed.
    • Culverts must be at least 18 inches in diameter.
    • County Highway Superintendent approval covers drives up to 60 feet; longer drives require County Board approval.
    • The landowner bears cost, installation, and maintenance.
    • The County Roads Department provides one 24-foot driveway tube for rural new residences as the main drive, subject to the Superintendent's determination of need and diameter.

    minimum culvert diameter: >= 18 inches · maximum length under superintendent approval: <= 60 feet (Longer drives require County Board approval.) · rural new residence driveway tube: 24 feet (One main driveway tube, with need and diameter determined by the County Highway Superintendent's Office.)

    “installed only after receiving permission from the Fillmore County Highway Superintendent’s office.”
    One more reviewed finding on this topic
    • Required — Access driveways on the Fillmore County highway road system.
      “All access driveways on the county highway road system, earth filled or otherwise, to be installed only after receiving permission from the Fillmore County Highway Superintendent’s office.”
  • Building in a floodplainRequired

    Development, construction, or substantial improvement in the floodplain areas covered by the Fillmore County floodplain ordinance.

    • The ordinance applies to lands identified on FIRM Index #31059CIND0A dated September 16, 2004 as Zone A and within the ordinance zoning district.
    • No development may begin without a floodplain development permit.
    • The floodplain administrator or governing body may impose safeguards and restrictions.
    • Greater restrictions, easements, covenants, and deed restrictions remain applicable.
    “no development shall be allowed except upon the issuance of a floodplain development permit”
    2 more reviewed findings on this topic
    • Limited — Structures over 100 square feet and other structures requiring zoning permits in unincorporated Fillmore County where flood-hazard requirements apply.
      “A zoning permit is required for all buildings over 100 square feet and structures, including those utilized for agricultural purposes in the unincorporated areas of Fillmore County to verify compliance with yard, flood hazard and other applicable requirements of the zoning regulations.”
    • Limited — Development within the county flood-plain overlay district.
      “FLOOD PLAIN: Those lands within the zoning jurisdiction of Fillmore County which are subject to a one percent (1%) or greater chance of flooding in any given year.”
  • Permit feesPublished

    Published Fillmore County planning and zoning fees.

    • The county zoning-fee page states a late penalty doubles the fee.
    • The zoning regulations state the fee schedule may be altered or amended only by the County Board.

    zoning permit: 25 USD per parcel/location · lot split, 3 lots or less: 25 USD · full subdivision: 50 USD · special use permit: 50 USD · variance application: 50 USD · change of zoning: 50 USD

    “Zoning Permit – $25.00 per parcel / location Lot Split – $25.00, 3 lots or less Full Subdivision – $50.00 Special Use Permit – $50.00 Variance Application – $50.00 Change of Zoning – $50.00 Late Penalty – Fee Doubled”
    2 more reviewed findings on this topic
  • Permit processPublished (with conditions)

    County zoning-permit process for covered structures and uses.

    • Applications require a plot plan and other information specified by the Zoning Administrator.
    • The Zoning Administrator must approve or disapprove an application within 30 days of receipt.
    • Upon approval and receipt of required fees, the permit is issued.
    • An appeal must be made in writing within 10 days after the determination is filed.
    • No construction or placement may begin until approval.

    application decision period: <= 30 days · appeal period: <= 10 days (After the Zoning Administrator's determination is filed.)

    “The Zoning Administrator shall examine all applications for zoning permits, including plans, specifications and documents filed therewith and shall either approve or disapprove such application within thirty (30) days of receipt of same.”
    2 more reviewed findings on this topic
    • Published (with conditions) — County zoning-permit application and review process.
      “All applications for a zoning permit shall be accompanied by a plot plan showing the location, ground area, height and bulk of all present and proposed structures, additions, parking areas and site improvements; the actual dimensions and shape of the lot lines; the uses to be built upon; the building lines in proposed structures or additions; and any other reasonable and pertinent information as may be required by the Zoning Administrator or the proper enforcement of these regulations. [...] The Zoning Administrator shall examine all applications for zoning permits, including plans, specifications and documents filed therewith and shall either approve or disapprove such application within thirty (30) days of receipt of same. [...] An appeal from approval or disapproval of any application shall be made to the Board of Zoning Adjustment in writing within ten (10) days after the determination of the Zoning Administrator has been filed.”
    • Published (with conditions) — Fillmore County zoning and building-permit application process.
      “Need two (2) identical sets of plans at the time of application, including a plot plan, footing detail, wall detail, roof detail and floor plan.”

Nebraska rules that apply here

  • Owner-builder exemptionAvailable

    A person performing work or having work performed on the person's own property under Nebraska's Contractor Registration Act.

    • The exemption means the person is not a contractor for purposes of the Contractor Registration Act.
    • The exemption applies to work on the person's own property.
    • The statute separately states that a person earning less than five thousand dollars annually for construction services is also not a contractor for purposes of the Act.
    • The exemption does not exempt a contractor from withholding requirements under the Nebraska Revenue Act of 1967.
    • This is a contractor-registration exemption and does not establish exemption from applicable building permits, inspections, building codes, electrical requirements, or other local or state approvals.

    annual construction-services earnings threshold: < 5000 USD (Separate statutory basis for not being a contractor under the Act; the own-property exemption has no stated dollar threshold.)

    “Any person who performs work or has work performed on his or her own property or any person who earns less than five thousand dollars annually for construction services is not a contractor for purposes of the Contractor Registration Act.”
  • Building code adoptedAdopted (with conditions)

    Nebraska's state building code, including state-owned or state-agency buildings and local jurisdictions as specified by Nebraska law.

    • The adopted code consists of the 2018 International Building Code with stated exceptions, the 2018 International Residential Code with stated exceptions, the 2018 International Existing Building Code with a stated exception, the 2018 Uniform Plumbing Code, and minimum radon-resistant construction standards.
    • The state building code applies to all buildings and structures owned by the state or a state agency.
    • It applies in a county, city, or village that elects to adopt it as its local code.
    • It also applies in a county, city, or village that has not adopted an authorized local code within two years after an update to the state building code.
    • The default state-code rule does not apply to construction on a farm or for farm purposes.
    • A local jurisdiction may instead adopt a code that conforms generally with the state building code, subject to the requirements and exceptions in section 71-6406.

    International Building Code edition: 2018 (Except section 101.4.3 and chapter 29; section 305.2.3 applies to a facility having twelve or fewer children; section 310.4.1 applies to a care facility for twelve or fewer persons.) · International Residential Code edition: 2018 (Except section R313 and chapters 25 through 33.) · International Existing Building Code edition: 2018 (Except section 809.) · Uniform Plumbing Code edition: 2018 · local-code adoption deadline after state-code update: 2 years (If no authorized local code is adopted, the state building code applies, except to construction on a farm or for farm purposes.)

    “(1) There is hereby created the state building code. The Legislature hereby adopts by reference:”
    One more reviewed finding on this topic
    • Adopted (with conditions) — Nebraska energy-code requirements applicable to residential construction where a local jurisdiction has not adopted an energy code.
      “The 2018 IECC went into effect on July 1, 2020. If a local jurisdiction has not adopted an energy code, the Nebraska Department of Water, Energy, and Environment Planning and Aid Division will enforce the code.”
  • Camping on your landLimited

    Temporary camping on state or county public highways, roadside areas, parks, and other property acquired for highway or roadside park purposes in Nebraska.

    • Camping is unlawful except at places designated as campsites by the Department of Transportation, the county, or another governmental entity owning or controlling the property.
    • The statute excludes certain lands transferred or leased to the Game and Parks Commission and other lands controlled by the Game and Parks Commission or a natural resources district, which are governed under separate statutes.
    • Camping includes temporary lodging out of doors in a sleeping bag, tent, trailer, station wagon, pickup camper, camper-bus, or other vehicle.
    • Violation is a Class V misdemeanor and may require reimbursement for campsite damage.

    penalty: Class V misdemeanor

    “It shall be unlawful to camp on any state or county public highway, roadside area, park, [...] except at such places as are designated campsites”
  • Tiny homesLimited

    Tiny houses produced or sold in Nebraska and classified as manufactured homes, modular housing units, or recreational vehicles, including park model recreational vehicles.

    • The Nebraska Public Service Commission states that tiny houses can be built as either a manufactured home, modular housing unit, or recreational vehicle.
    • For a park model recreational vehicle under current Nebraska law, the unit must be designed and marketed as temporary living quarters for recreational, camping, travel, or seasonal use; must not be permanently affixed to real property for use as a permanent dwelling; must be built on a single chassis mounted on wheels; must have a gross trailer area not exceeding 400 square feet in the setup mode; and must be certified by the manufacturer as complying with ANSI A119.5, 2025 edition.
    • LB1147 enacted the 400-square-foot park-model limit and specified the 2020 ANSI A119.5 edition; its emergency clause states that the act takes effect when passed and approved according to law.
    • State classification or construction compliance does not establish unrestricted land-use occupancy. County zoning resolutions may regulate the location, size, and uses of structures including house trailers and automobile trailers, and may regulate uses of buildings and land in unincorporated areas.
    • County zoning powers do not apply within incorporated cities or villages, or areas where a city or village has been granted and is exercising zoning jurisdiction. Local zoning, building, utility, health, and other requirements may therefore impose additional conditions.

    park model gross trailer area: <= 400 square feet (Measured in the setup mode.) · park model chassis: single chassis mounted on wheels · park model permanent-affixation: false (The unit must not be permanently affixed to real property for use as a permanent dwelling.)

    “(16) Park model recreational vehicle means a vehicular unit which meets the following criteria: (a) Is designed and marketed as temporary living quarters for recreational, camping, travel, or seasonal use; (b) Is not permanently affixed to real property for use as a permanent dwelling; (c) Is built on a single chassis mounted on wheels with a gross trailer area not exceeding four hundred square feet in the set up mode; and (d) Is certified by the manufacturer as complying with the ANSI A119.5 Park Model Recreational Vehicle Standard of the American National Standards Institute, 2025 edition;”
  • Who permits septicState (with conditions)

    Onsite wastewater treatment systems in Fillmore County under Nebraska Title 124.

    • The state checklist notes that additional local requirements may apply and may differ from Title 124.
    • Title 124 certification and permitting requirements apply to covered onsite wastewater work.
    “Permit applications are reviewed in the order received by the Department.”
    3 more reviewed findings on this topic
    • State (with conditions) — Onsite wastewater treatment systems serving Fillmore County.
      “submitted to the Nebraska Department of Environment and Energy (NDEE)”
    • State — Onsite wastewater permitting and operating requirements applicable in Fillmore County.
      “Title 124 - Rules and Regulations for the Design, Operation, and Maintenance of On-site Wastewater Treatment Systems permit application, citizenship attestation (if applicable), soils information, and 1 set of P.E. sealed plans/specifications completed and submitted to the Nebraska Department of Environment and Energy (NDEE), date:”
    • Mixed (with conditions) — Onsite wastewater treatment systems statewide in Nebraska, including septic systems, holding tanks, lagoons, mound systems, and other decentralized systems.
      “Any local requirements (city, county) are separate from and in addition to the requirements found in Title 124 that apply statewide.”
  • Septic permitRequired

    Onsite wastewater systems in Fillmore County when a Title 124 permit application is required.

    • A construction permit is required before onsite system construction when a permit application is required.
    • An operating permit is required before wastewater discharge to or any use of the onsite system.
    • System registration, applicable fees, and engineer certification of completion are required before an operating permit can be issued.
    • Additional local requirements may apply.
    “When a permit application is required, Title 124 requires a construction permit prior to any onsite system construction and an operating permit prior to wastewater discharge to or any use of the onsite system.”
    3 more reviewed findings on this topic
    • Required — Onsite wastewater systems in Fillmore County when a Title 124 permit application is required.
      “requires a construction permit prior to any onsite system construction”
    • Required — Onsite wastewater systems in Fillmore County when a Title 124 permit application is required.
      “When a permit application is required, Title 124 requires a construction permit prior to any onsite system construction and an operating permit prior to wastewater discharge to or any use of the onsite system. When a construction permit is issued, Title 124 requires that any modifications, revisions, or changes to the system or design be approved by NDEE prior to changes being made to the system. Title 124 requires system registration (Installer) and certification of completion (Engineer) before an operating permit can be issued.”
    • Limited — Onsite wastewater systems statewide where system size, non-domestic waste handling, or siting issues require a site-specific evaluation and permitting; ordinary systems also remain subject to applicable Title 124 compliance and registration rules.
      “Most onsite wastewater systems in Nebraska are constructed under “Authorization by Rule” which does not require a construction permit [...] However, some systems will require a permit”
  • Septic inspectionLimited

    Onsite wastewater systems subject to state oversight.

    • A Department representative may enter at reasonable times to inspect, sample, and monitor affected areas.
    • The source does not establish a universal pre-occupancy inspection requirement for every system.
    “must allow a Department representative to enter”
    One more reviewed finding on this topic
    • Limited — Inspection of private onsite wastewater treatment systems statewide in Nebraska.
      “A private onsite wastewater treatment system shall not be [...] inspected [...] unless the [...] inspection [...] is carried out or supervised by either a certified professional”
  • Off-grid sanitationAllowed (with conditions)

    Off-grid wastewater sanitation using an onsite wastewater treatment system, including septic systems, holding tanks, lagoons, or mound systems, statewide in Nebraska.

    • The onsite system must comply with Title 124.
    • Only a properly certified professional may inspect, repair, pump, or install an onsite septic system.
    • The wastewater directed to the onsite system is limited to domestic wastewater.
    • Any local city or county requirements apply separately.
    “households depend on septic systems [...] for wastewater treatment. [...] the Nebraska Department [...] regulates these systems through Title 124”
  • Well permitLimited

    Construction or modification of water wells in Nebraska groundwater management areas, on land owned or controlled by the person constructing the well.

    • Before commencing construction, the applicant must apply to the district in which the well will be located, using district forms.
    • No permit is required for test holes or dewatering wells intended for use for ninety days or less.
    • No permit is required for a single water well designed and constructed to pump fifty gallons per minute or less.
    • A district may exempt replacement water wells by rule and regulation.
    • A district may require a permit for a well designed and constructed to pump fifty gallons per minute or less when it is commingled, combined, clustered, or joined with another well or water source, excluding a water source used to water range livestock; combined wells are treated as one well and their combined capacity is used as the rated capacity.
    • In groundwater management areas where regulations have been imposed to control declining groundwater levels, a district may require permits for each well or categories of wells designed and constructed to pump fifty gallons per minute or less, except water sources required for human needs relating to health, fire control, or sanitation and water sources used to water range livestock.
    • The district must review the application and issue or deny the permit within thirty days after filing.
    • The application requires a fifty-dollar filing fee payable to the district.
    • The application must include the applicant's name and post-office address, proposed use, intended location, size, type and description, estimated depth if known, estimated capacity in gallons per minute, irrigation acreage and legal description if applicable, non-irrigation use description if applicable, replacement-well registration number if applicable, and other information required by the district.
    • A person who failed to obtain a required permit must apply for a late permit, accompanied by a two-hundred-fifty-dollar fee and the same information required for an ordinary application.
    • A person must apply before modifying a well that was previously exempt into one for which a permit would otherwise be required.

    pump capacity threshold: <= 50 gallons per minute (Single wells at or below this threshold are exempt unless a district rule requires a permit under the statutory exceptions.) · ordinary application filing fee: 50 USD (Payable to the district.) · late permit application fee: 250 USD (Applies when a required permit was not obtained.) · district decision deadline: 30 days (Measured after the application is filed.) · dewatering intended-use period: <= 90 days (Test holes and dewatering wells intended for use for ninety days or less do not require a permit.)

    “shall, before commencing construction, apply with the district in which the water well will be located for a permit on forms provided by the district”
    One more reviewed finding on this topic
    • Limited — Water wells serving property in Fillmore County.
      “must register all wells with the Nebraska Department of Natural Resources”
  • Mandatory utility hookupConditional

    Wastewater service for dwellings and non-dwellings generating wastewater statewide in Nebraska.

    • The property must have an onsite wastewater treatment system complying with Title 124, or be connected to a public sewer system or other wastewater works.
    • Local city and county requirements are separate from and in addition to statewide Title 124 requirements.
    “A dwelling or non-dwelling that generates wastewater must have an onsite wastewater treatment (OWT) system [...] or be connected to a public sewer system”
  • Agricultural exemptionAvailable (with conditions)

    County zoning regulations and permit requirements for agricultural-purpose buildings on qualifying Nebraska farmsteads, and county zoning treatment of residences on farmsteads.

    • For purposes of the statute, nonfarm buildings are all buildings except buildings utilized for agricultural purposes on a farmstead of twenty acres or more that produces one thousand dollars or more of farm products each year.
    • The county board may decide whether buildings located on farmsteads used as residences are subject to county zoning regulations and permit requirements.
    • The exemption concerns county zoning and permit requirements; other applicable state, local, health, septic, floodplain, or safety requirements are not resolved by this statute.
    • The statute requires county zoning regulations to be adopted or amended only after adoption of a county comprehensive development plan and receipt of specific planning-commission recommendations.

    qualifying farmstead size: >= 20 acres (farmstead used for agricultural purposes) · annual farm products: >= 1000 USD (farmstead must produce at least this amount of farm products each year)

    “buildings utilized for agricultural purposes on a farmstead of twenty acres or more which produces one thousand dollars or more of farm products each year.”
    One more reviewed finding on this topic
    • Available (with conditions) — Agricultural buildings on farmsteads of at least 20 acres producing at least $1,000 of farm products annually, in the context of county zoning regulations and permit requirements.
      “For purposes of this section and section 23-114.04, nonfarm buildings are all buildings except those buildings utilized for agricultural purposes on a farmstead of twenty acres or more which produces one thousand dollars or more of farm products each year.”
  • Short-term rentalsLimited

    Short-term lodging operations in Nebraska, including hotels, tourist homes, private homes rented in whole or in part, campgrounds, and RV pads or hookups.

    • A separate lodging tax permit is required for each hotel.
    • The permit is issued only after examination and approval.
    • The permit is not assignable and is valid only for the named operator, location, and transaction of business.
    • The permit must be conspicuously displayed.
    • Operating without a permit or after suspension is a misdemeanor; conviction may result in a fine up to $500 per day.
    • The cited state rule addresses lodging-tax permitting and does not establish statewide zoning approval for short-term rentals.

    maximum fine for operation without permit after conviction: <= 500 USD per day

    “Every person engaged in the business of operating a hotel in this state where the public may, for a consideration, obtain sleeping accommodations, must file an application with the Nebraska Department of Revenue for a Nebraska lodging tax permit.”
  • county zoning authorityGeneral

    Nebraska county boards adopting zoning resolutions for county territory outside incorporated cities and villages and outside areas where a city or village has been granted or ceded zoning jurisdiction and is exercising that jurisdiction.

    • The county board may adopt a zoning resolution having the force and effect of law.
    • The zoning resolution may regulate buildings, structures, lot coverage, setbacks, yards, population density, building uses, and land uses for agriculture, forestry, recreation, residence, industry, and trade in the unincorporated area of the county.
    • The powers may not be exercised within incorporated cities or villages or within an unincorporated area over which a city or village has been granted or ceded zoning jurisdiction and is exercising it.
    • A city or village zoning ordinance or amendment controlling an unincorporated area supersedes the county resolution or regulation.
    • If a zoning resolution or regulation affects the Niobrara scenic river corridor, the Niobrara Council must act as provided in section 72-2010.
    • A county board may not prohibit a qualifying manufactured home solely because it is manufactured, but may impose the listed installation and design standards and may not impose additional standards unless uniformly applied to all single-family dwellings in the zoning district.
    • Special districts or zones may be established in areas subject to seasonal or periodic flooding.
    “to adopt a zoning resolution, which shall have the force and effect of law;”
  • county building authorityGeneral

    Nebraska counties adopting, administering, enforcing, and requiring permits under local building or construction codes for buildings, including residential construction, in unincorporated areas.

    • A county may enact, administer, or enforce a local building or construction code only if it adopts the state building code or adopts a building or construction code that conforms generally with the state building code.
    • A local code may include special or differing standards only within the statutory conformity rules, including standards addressing construction costs, safety, durability, efficiency, best practices, or special local conditions.
    • A local code must be regularly updated; generally, the most recently enacted state building code or a conforming code must be adopted within two years after an update to the state building code.
    • If a county does not adopt a code as authorized within two years after an update to the state building code, the state building code applies in the county, except that it does not apply to construction on a farm or for farm purposes.
    • A county may adopt administrative amendments concerning enforcement organization, staff qualifications, plan examination, inspections, appeals, permits, and fees, and may publish those amendments separately from the code.
    • Under section 23-172, county-adopted codes and the building-permit or occupancy-permit requirements imposed by those codes or sections 23-114.04 and 23-114.05 apply throughout the county except within incorporated cities or villages and except within an unincorporated area where a city or village has been granted zoning jurisdiction and is exercising that jurisdiction.
    • Under section 23-114.04, permits are required before erection, construction, reconstruction, alteration, repair, or conversion of a nonfarm building or structure within a zoned area; a permit may be withheld when the proposed purpose conflicts with applicable district zoning regulations.
    • Section 23-114.04 permits reasonable county permit-fee schedules and requires written plans, including sanitation, plumbing, and sewage-disposal information, that fully conform to zoning regulations before permits issue.
    • Section 23-172 states that nothing in that section creates an obligation for the county to inspect plumbing work to determine compliance with the plumbing code.
    “Any county, city, or village may enact, administer, or enforce a local building or construction code if or as long as such county, city, or village: (i) Adopts the state building code; or (ii) Adopts a building or construction code that conforms generally with the state building code.”

Set by your township or city, not the county

In Nebraska, zoning is adopted by each township or city, so Fillmore County has no county-wide answer on these. Find your township or city in the list of places on this page, or call its clerk or zoning administrator.

  • Living in an RV
  • Accessory dwellings

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Living off-grid in Fillmore County, Nebraska

Is Fillmore County a good place to live off-grid or homestead?

Fillmore County scores 47/100 on the Bolthole Index, a solid county profile. Its strengths: sparse surroundings — about 13,150 people within a 30-minute drive and manageable long-term carry cost. Watch-outs: workable self-sufficiency basics (28.4″/yr rainfall) and elevated current hazard exposure.

Do you need a building permit in Fillmore County, Nebraska?

Fillmore County requires a building permit only in limited cases (such as floodplains or specific zones), and it enforces county zoning. Onsite septic is permitted by Nebraska Department of Environment and Energy (NDEE), Onsite Wastewater Program. Owner-builders may act as their own contractor to build their home. These answers are quoted from official sources and independently re-checked. Rules change and cities within the county differ — always confirm with the county before you buy or build.

How much does land cost in Fillmore County, Nebraska?

Land in Fillmore County runs about $7,359 per acre, based on the latest county data.

What is the water situation in Fillmore County?

Fillmore County gets about 28.4" of rain a year, with severe drought in roughly 17.4% of years.

How remote is Fillmore County?

A representative private-land location has about 13,150 people within a 30-minute drive and 1,518,984 within two hours. The road-network catchments count population across county lines and clusters of smaller cities; straight-line radius values remain available as a comparison.

How Fillmore compares in Nebraska