Unincorporated Valley County, Nebraska requires a zoning permit or certificate of zoning compliance before most construction, alteration or changes in land use1. Non-residential farm buildings skip the zoning permit but still need a compliance certificate and must meet applicable yard and flood-hazard standards2. A separate county building-code permit remains unconfirmed; ask Valley County Planning and Zoning before starting work3. Septic registration and any required site-specific permit are handled by Nebraska's state program4.

At a glance

Building permit
A county zoning permit or certificate of zoning compliance is required for most construction in unincorporated areas1
Zoning
Yes in unincorporated Valley County, outside municipal limits and municipal zoning jurisdictions5
Farm buildings
Non-residential farm buildings skip the zoning permit but need a certificate of zoning compliance2
Septic
State registration applies; some systems also require state construction and operating permits678
RV living
Long-term occupancy on private land is not confirmed; ask Valley County Planning and Zoning3
Manufactured home
At least 900 square feet and 18 feet wide, with a permanent foundation and utility connections9
Owner-builder
Own-property work is exempt from contractor registration, but county zoning approval still applies1011

Who to call

Zoning

Valley County Planning and Zoning

Zoning permits, certificates of zoning compliance, land-use questions and floodplain administration in unincorporated Valley County

(308)730-7470

47vcpz@gmail.com

125 S. 15th Street, Ord, NE 68862

Septic permits

Nebraska Department of Water, Energy and Environment Onsite Section

State certification and contacts for onsite wastewater work, including septic installation, inspection, pumping and soil evaluation

(402) 471-4285

245 Fallbrook Blvd., Ste. 100, Lincoln, NE 68521

Contact details are copied from each office’s official page and were checked against it on October 6, 2026.

Off-grid gear

Going off-grid in Valley County means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Do you need a building permit in Valley County, Nebraska?

For most projects in unincorporated Valley County, the practical county approval is a zoning permit or certificate of zoning compliance: one is required before a building or structure is erected, reconstructed, enlarged, moved or structurally altered, or before regulated land use begins1. Non-residential farm buildings are exempt from the zoning permit but still need a certificate of zoning compliance and remain subject to yard, flood-hazard and other applicable district rules2. Valley County's application requires a site plan and fees, and construction cannot begin without an approved permit or written confirmation from the Zoning Administrator1213. Whether Valley County separately adopted a building code or conducts general building inspections remains unconfirmed, so ask Planning and Zoning what review applies3.

Who handles Valley County building and zoning permits?

Valley County Planning and Zoning is the first stop for a rural build, land-use approval and floodplain questions3. The office is at 125 S. 15th Street in Ord; call (308)730-7470 or email 47vcpz@gmail.com3. Submit the application and site plan at least 48 hours before the Zoning Administrator acts; the plan must locate the structures, roads, setbacks, well, sewage system and driveway12. The fee varies with the zoning activity, but the form does not state the amount, so request the current charge from the office13. No separate county building department or general inspection program was confirmed; ask whether anything beyond zoning approval applies3.

Does Valley County have zoning?

Yes. Valley County zoning applies in unincorporated territory but excludes incorporated municipalities and areas where a municipality legally exercises zoning jurisdiction14. The official zoning map maintained by the Zoning Administrator or County Clerk controls a parcel's current district15. Lot size, setbacks and allowable lot coverage vary by district and overlay1617. In the cited districts, a building designed for human habitation may be no taller than 45 feet18. Where onsite sewage disposal is proposed, the cited standard requires at least 1 acre and allows state wastewater rules to require more because of site conditions19. Ask Planning and Zoning to confirm the district, use, setbacks, coverage, height and overlays before treating a parcel as buildable3.

How do septic permits work in Valley County?

Private onsite wastewater systems in Valley County are administered under Nebraska's statewide program rather than by a county health department4. Most Nebraska systems are constructed under Authorization by Rule without a construction permit, while large systems, systems handling non-domestic waste and systems with siting issues can require a site-specific permit8. When a permit application is required, construction approval must precede construction and an operating permit must precede discharge or use7. New or changed systems must be registered with the state, and inspection work must be performed or supervised by an appropriately certified professional, licensed engineer or registered environmental health specialist820. Contact the Nebraska DWEE Onsite Section at (402) 471-428521. About 40% of mapped Valley County soils avoid severe limitations for a conventional drain field, so evaluate the specific site early22.

Can you live in an RV or tiny home in Valley County?

Valley County's rules do not confirm whether an RV may be occupied long-term on private land, so ask Planning and Zoning before buying or installing utilities around that plan3. A distinct tiny-home occupancy rule also could not be confirmed, but placing or constructing a dwelling still requires county zoning approval1. A manufactured home used for habitation must have a HUD label, at least 900 square feet of floor area, an exterior width of at least 18 feet, a permanent foundation and permanent utility connections, along with the county's other design standards9. The 900-square-foot rule is specific to manufactured homes, not a confirmed minimum for every dwelling type23. Ask Planning and Zoning to classify the proposed unit and confirm its district, setbacks, wastewater and floodplain requirements3.

Building a home in Valley County: the steps, in order

  1. Call Valley County Planning and Zoning at (308)730-7470 to confirm county jurisdiction, the zoning district, overlays, allowed use, setbacks, coverage and height limits351718.
  1. Lay out the home, driveway, well and wastewater area; onsite sewage disposal requires at least 1 acre under the cited standard and site conditions may require more19.
  1. Have a Nebraska-certified onsite professional evaluate and register the septic system and determine whether state construction and operating permits are required218.
  1. Submit the zoning application, fee and detailed site plan at least 48 hours before action; do not begin without approval or written confirmation12.
  1. Owner-builders must follow county zoning approval, state codes and local covenants even though own-property work is exempt from state contractor registration1110. An owner may perform electrical work on a qualifying principal residence or farm property, but the licensing exception does not waive other approvals24.
  1. Obtain floodplain approval where applicable and a Nebraska approach permit for new or changed state-highway access2526.

What should you check before buying land in Valley County?

Start with jurisdiction and zoning: county rules do not govern land inside incorporated municipalities or active municipal zoning jurisdictions, and district standards can change the use, setbacks, lot coverage and buildable area51617. Check flood mapping before committing to a site because development requires floodplain approval; proposed subdivisions in a flood-hazard area also receive County Board review2527. Evaluate wastewater early because only about 40% of mapped soils avoid severe limitations for a conventional drain field, and onsite disposal can require more than the cited 1-acre minimum2219. A new or changed driveway onto a state highway needs a Nebraska permit, while a general county-road driveway rule could not be confirmed26. Farmland averages about $3,037 per acre, the effective property-tax rate is about 1.6%, and the median annual property-tax bill is about $1,897282930.

Watch-outs

  • A farm-building exception covers only non-residential farm buildings and removes only the zoning-permit requirement; a certificate of zoning compliance and applicable yard and flood-hazard standards still apply2.
  • Valley County's reviewed materials do not confirm a separate county building code or general inspection program, so ask Planning and Zoning what review applies before construction3.
  • Long-term RV occupancy and a distinct tiny-home rule remain unconfirmed, while manufactured homes must meet the county's specific size, foundation, design and utility standards39.

Sources

  1. Zoning Regulations — Valley County, Nebraska, quoted and re-checked
  2. Zoning Regulations — Valley County, Nebraska, quoted and re-checked
  3. Valley County Planning and Zoning (valleycountyne.gov)
  4. Nebraska Administrative Code Title 124 — Onsite Wastewater Treatment Systems, quoted and re-checked
  5. Zoning Regulations — Valley County, Nebraska, quoted and re-checked
  6. Nebraska DEE - Onsite Wastewater Program (2026 county census)
  7. Owner Construction/Operating Permit Checklist, quoted and re-checked
  8. Onsite Wastewater Program (Nebraska statewide rule), quoted and re-checked
  9. Zoning Regulations — Valley County, Nebraska, quoted and re-checked
  10. Nebraska Revised Statute 48-2104 — Registration required, quoted and re-checked
  11. Valley County Zoning Permit Application, quoted and re-checked
  12. Valley County Zoning Permit Application, quoted and re-checked
  13. Valley County Zoning Permit Application, quoted and re-checked
  14. Planning and Zoning – Valley County, quoted and re-checked
  15. Zoning Regulations — Valley County, Nebraska, quoted and re-checked
  16. Zoning Regulations — Valley County, Nebraska, quoted and re-checked
  17. Zoning Regulations — Valley County, Nebraska, quoted and re-checked
  18. Zoning Regulations — Valley County, Nebraska, quoted and re-checked
  19. Zoning Regulations — Valley County, Nebraska, quoted and re-checked
  20. Nebraska Revised Statute 81-15,248 (Nebraska statewide rule), quoted and re-checked
  21. Nebraska Department of Water, Energy and Environment Onsite Section (dwee.nebraska.gov)
  22. Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
  23. Zoning Regulations — Valley County, Nebraska, quoted and re-checked
  24. Nebraska Revised Statute 81-2121 — State Electrical Act exceptions, quoted and re-checked
  25. Zoning Regulations — Valley County, Nebraska, quoted and re-checked
  26. Title 410, Chapter 2 - Driveway and Approach Road Permits (Nebraska statewide rule), quoted and re-checked
  27. Zoning Regulations — Valley County, Nebraska, quoted and re-checked
  28. Farmland value per acre (USDA census): Bolthole Index county data
  29. Effective property tax rate: Bolthole Index county data
  30. Median property tax bill: Bolthole Index county data

Written October 6, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Found land here? Start a Property Hunt →

Compared with neighboring counties

Unlike 4 of its 6 neighbors, Valley County requires a building permit only in limited cases.

RuleValley CountyGarfield CountyGreeley CountySherman CountyWheeler CountyLoup CountyHoward County
Building permitLimitedRequiredRequiredLimitedLimitedRequiredRequired
County zoningYesYesYesYesYesYesYes
Septic permitsNE Dept. of Env. & EnergyNDEENE Dept. of Env. & EnergyNE Dept. of WaterNE Dept. of Env. & EnergyNE Dept. of WaterNE Dept. of Env. & Energy

County locator

Valley County in Nebraska

47
County map
Valley County highlighted among the Nebraska counties · colored by Index score

How Valley County scores

Seclusion80100% ev.
Self-Sufficiency23100% ev.
Admin Boringness47100% ev.
Durability36100% ev.
Property Autonomy53100% ev.
Carry Cost7296% ev.

Evidence strength: 100%. This reports direct-source completeness and fallback use; it is separate from the score and is not a confidence interval. How it works →

$193kTypical home
1.6%Property tax
$3,037Land / acre
26.1"Annual rain
20.8% of yrsSevere drought
9.6 / yr (+8.3)Mid-century 100°F days
21.6 daysMid-century dry spell
1.39" (+5.6%)Mid-century 1-day rain
1.56×Wildfire change factor
100%Forward climate coverage
$2,088Home insurance / yr
1.7% / yrInsurance growth
0.72%Nonrenewal rate
single ZIP shrunk to state medianInsurance basis
6,497People within 30 min
386,154People within 2 hr
5,117Radius comparison (15 mi)
7.1People / sq mi
0.2%Federal land
77.2%Land at 15% slope or less
40%Soils rated "not limited" for septic (strict USDA rating)
144,260 acWorkable land screen
5.9%Wooded land
32.5 tonsBiomass / forest ac
49°FAvg temp

Scout Valley County

Camp here before you commitBook a few nights nearby on Hipcamp →Already own land here?Earn money hosting campers — get $100 when you become a Hipcamp host →

Some links are affiliate or referral links — we may earn a commission, at no cost to you.

Property hunt

Find land. Bring the promising ones back.

Search live inventory elsewhere, then cost and vet each candidate here. No copied listings, account, or paid data feed.

Each button opens a current land search for Valley County. Listing sites control their own results and filters.

Analyze a property
Add setup-cost allowances

Use rough quotes or placeholders. Blank fields count as $0.

Working estimate

—land + entered setup costs
Asking $ / acre
—
Setup allowance
—
All-in $ / acre
—

A planning estimate, not a valuation or contractor quote. The USDA benchmark includes farm land and buildings; it is context, not a parcel comp.

Before an offer

Parcel due diligence

0/8 checked

Saved properties and checklist progress stay on this device. Bolthole Index does not receive them.

Cities and towns in Valley County

Inside a city, town or township here, that government usually sets zoning and may issue its own building permits; the county’s rules above cover land outside them.

Arcadia Township · Village of Arcadia · Village of Elyria · North Loup Township · Village of North Loup · Ord · Ord Township

Answers from the rulebook for Valley County

What the ordinances and state agencies actually say — one answer per question, each quoted from the official source and independently re-checked.

Valley County rules

  • Building permitLimited

    Zoning/building-related permits for construction and regulated uses in unincorporated Valley County.

    • Non-residential farm buildings are exempt from zoning permit requirements but require a certificate of zoning compliance.
    • Farm buildings must still comply with yard, flood hazard, and other applicable district requirements.
    • Buildings or structures that do not qualify as farms, and non-farm structures or uses, are subject to zoning permit requirements.
    • This claim concerns county zoning permits; a separate building-code permit requirement was not established.
    “No building, structure, or land shall hereafter be used or occupied, and no building or structure or part thereof shall hereafter be erected, constructed, reconstructed, enlarged, moved or structurally altered without a zoning permit / certificate of zoning compliance first being issued by the Zoning Administrator”
  • Owner-builder exemptionAvailable (with conditions)

    Owner-builders undertaking construction or other regulated activity in rural, unincorporated Valley County.

    • No construction may begin without an approved permit or written confirmation from the Zoning Administrator.
    • The owner/builder is solely responsible for compliance with all State codes and local covenants.
    • Construction or other action must begin within 1 year of zoning permit approval and be completed within 2 years.
    • The application must be filed at least 48 hours before action by the Zoning Administrator.
    • The application requires a site plan and receipt of fees.
    • The form also serves the Villages of Arcadia, Elyria, and North Loup; municipal requirements may apply there.

    application lead time: >= 48 hours (before action by the Zoning Administrator) · start deadline after zoning permit approval: <= 1 year · completion deadline after zoning permit approval: <= 2 years

    “**No construction shall begin without an approved permit or written confirmation from the Zoning Administrator. **Owner / Builder shall be solely responsible for compliance”
  • Certificate of occupancyLimited

    Certificates of zoning compliance, described in the county regulation as occupancy permits, for farm uses and buildings in unincorporated Valley County.

    • The source specifically addresses farm buildings and premises, not a general certificate of occupancy for every building.
    • A certificate must be applied for and issued before use or occupancy of covered farm buildings or premises.
    • Variances, administrative appeals, or conditional-use authorization may be required for approval.
    “to issue zoning permits and certificates of zoning compliance (occupancy permits) as required by the Resolution”
  • County-wide zoningPresent

    Valley County zoning regulation in unincorporated areas.

    • The county regulation excludes land within incorporated municipalities and legally established municipal planning and zoning jurisdictional areas.
    “The provisions of this Resolution shall apply to a land within the boundaries of Valley County, Nebraska, excluding the land included, now or in the future, in the corporate limits of any incorporated municipality within or adjoining the County and excluding any legally established planning and zoning jurisdictional areas of any incorporated municipality within or adjoining the County”
  • Local zoningPresent (with conditions)

    County zoning regulation in unincorporated Valley County.

    • The county planning and zoning page describes a county zoning regulation.
    • Incorporated municipalities may have separate municipal rules.
    “The provisions of this Resolution shall apply to a land within the boundaries of Valley County, Nebraska, excluding the land included, now or in the future, in the corporate limits of any incorporated municipality within or adjoining the County and excluding any legally established planning and zoning jurisdictional areas of any incorporated municipality within or adjoining the County, as defined on the Official Zoning Map of any such municipality.”
  • Zoning districtsPublished (with conditions)

    Published Valley County zoning districts and overlay districts.

    • The regulation identifies AG, RCI, WPO, AHO, and FHO districts.
    • The official zoning map is maintained by the Zoning Administrator and/or County Clerk and is the final authority for current zoning status.
    “AG …………… General Agricultural District RCI …………... Rural Commercial / Industrial District WPO …………. Wellhead Protection Overlay District AHO ………….. Airport Hazard Overlay District FHO ………….. Flood Hazard Overlay District”
  • Minimum dwelling sizeSpecified

    Manufactured homes used for human habitation in unincorporated Valley County.

    • The 900-square-foot minimum appears in the county's manufactured-home definition and applies together with the other listed manufactured-home standards.

    minimum floor area: >= 900 square feet

    “or any successor regulations thereto and which complies with the following minimum standards: 1. a minimum floor area of nine hundred (900) square feet,”
  • Minimum lot sizeSpecified

    Lots in Valley County zoning districts, including lots using onsite sewage disposal.

    • A one-acre minimum applies where onsite sewage disposal is proposed.
    • A larger lot may be required by Nebraska Title 124 based on soil, slope, depth to water table, lagoon, or other disposal requirements.
    • Lots where sewage-disposal facilities are not needed may have a one-half-acre minimum in the cited district.
    • District and conditional-use standards can differ.

    minimum lot area with onsite sewage disposal: >= 1 acre (Larger area may be required by Title 124.) · minimum lot area without sewage-disposal facilities: >= 0.5 acre (Cited district standard.)

    “The minimum lot area for a single-family dwelling unit, manufactured home, mobile home or other allowable or permitted use where on-site sewage disposal is proposed shall be one (1) acre, provided that a larger lot area may be required by the standards and regulations of Title 124”
  • SetbacksSpecified

    Buildings and regulated structures in Valley County zoning districts and overlays.

    • Setbacks vary by primary zoning district.
    • The wellhead-protection overlay requires the primary district setback plus protected-well setbacks.
    “2. Side Yard Setback - Ten (10) feet 3. Rear Yard Setback - Ten (10) feet”
  • Lot coverageSpecified

    Lot coverage standards for structures in Valley County zoning districts.

    • The ordinance references lot-coverage requirements for new structures and nonconforming structures; numeric standards vary by district.
    “no building or structure shall hereafter be erected, constructed, reconstructed, enlarged, moved or altered to exceed the height or bulk, to occupy a greater percentage of land area, to have a narrower or smaller front, side or rear setback than is herein required”
  • Building heightSpecified

    Buildings designed for human habitation in the cited Valley County zoning districts.

    • The cited district provides no limitation generally, but imposes a 45-foot maximum for buildings designed for human habitation.

    maximum height for buildings designed for human habitation: <= 45 ft

    “No limitation, except for buildings designed for human habitation which shall have a maximum height of forty five (45) feet.”
  • Manufactured homesLimited

    Placement and residential use of manufactured homes in unincorporated Valley County.

    • The structure must be factory-built for human habitation.
    • It must bear a HUD compliance label.
    • It must meet all listed minimum standards, including 900 square feet, 18-foot exterior width, roof pitch, comparable exterior materials, non-reflective roof material, removal of wheels and towing apparatus, permanent foundation attachment, and permanent utility connections.
    • A zoning permit or certificate of zoning compliance is required before use, occupancy, erection, construction, movement, or structural alteration, subject to stated farm-building and public-right-of-way exceptions.

    minimum floor area: >= 900 square feet · minimum exterior width: >= 18 feet · minimum roof pitch: 2 1/2 inches rise per 12 inches horizontal run

    “or any successor regulations thereto and which complies with the following minimum standards: 1. a minimum floor area of nine hundred (900) square feet, 2. a minimum exterior width of eighteen (18) feet, 3. a minimum roof pitch of two and one-half (2 ½) inches of rise per each twelve (12) inches of horizontal run,”
  • Agricultural exemptionAvailable (with conditions)

    Non-residential farm buildings under the Valley County zoning regulation.

    • The exemption is from the zoning permit requirement only.
    • The building remains subject to yard, flood-hazard, and other applicable district requirements.
    • A certificate of zoning compliance is required.
    “Non-residential farm buildings, as defined in Section 303.44 of this Resolution, shall be subject to the requirements of this Resolution, but shall be exempt from the zoning permit requirements of this Resolution, but shall require issuance of a certificate of zoning compliance;”
  • Subdividing landRegulated (with conditions)

    Proposed subdivisions of land where all or part of the land is in a Valley County flood hazard area.

    • The County Board of Supervisors reviews the plans.
    • Proposals greater than five acres or fifty lots, whichever is lesser, must include regulatory flood-elevation data when in special flood-hazard areas.
    • Adequate drainage and properly located utilities are required.
    • The Board may require design modifications to minimize flood hazards.

    review threshold: greater than 5 acres or 50 lots, whichever is lesser (Applies to the flood-elevation-data requirement in special flood-hazard areas.)

    “The Valley County Board of Supervisors shall review the plans of any proposed subdivision of land where all or a portion of such land is located in a flood hazard area and shall make findings of fact that:”
  • Building in a floodplainRequired

    Floodplain development and substantial improvements in Valley County flood-hazard areas.

    • A zoning permit or certificate of zoning compliance is required before floodplain development or substantial improvement.
    • The requirement applies to new construction, substantial improvements, other development, farm buildings, and manufactured homes in flood-hazard areas.
    “No person, firm or corporation shall initiate any floodplain development or substantial improvement or cause the same to be done without first obtaining a zoning permit / certificate of zoning compliance for development as defined in this Resolution.”
  • Permit feesVariable (with conditions)

    Valley County zoning-permit applications.

    • The application will not be processed without a site plan and receipt of fees.
    • The form states that the fee is determined based on zoning activity but does not publish an amount or current fee schedule.

    fee basis: zoning activity

    “Fee Determined Based on Zoning Activity:”
  • Permit processPublished (with conditions)

    Valley County zoning-permit applications for development and construction in the county zoning jurisdiction.

    • A site plan is required with all applications.
    • The plan must show lot dimensions, structure location and size, adjoining roads, setbacks, water well, sewage disposal system, driveway and sidewalks, and applicable non-residential parking, loading, fencing, and signage.
    • No construction may begin without an approved permit or written confirmation from the Zoning Administrator.
    • The application must be filed at least 48 hours before action by the Zoning Administrator.
    • Construction or other action must begin within one year of approval and be completed within two years.
    • Applications require fees.

    advance filing: >= 48 hours · start deadline: <= 1 year after approval · completion deadline: <= 2 years after approval

    “A site plan is required with all applications. Aerial photos, google maps, etc can be used as a base. The plan must indicate the following:”

Nebraska rules that apply here

  • Building code adoptedAdopted (with conditions)

    Nebraska's state building code, including state-owned or state-agency buildings and local jurisdictions as specified by Nebraska law.

    • The adopted code consists of the 2018 International Building Code with stated exceptions, the 2018 International Residential Code with stated exceptions, the 2018 International Existing Building Code with a stated exception, the 2018 Uniform Plumbing Code, and minimum radon-resistant construction standards.
    • The state building code applies to all buildings and structures owned by the state or a state agency.
    • It applies in a county, city, or village that elects to adopt it as its local code.
    • It also applies in a county, city, or village that has not adopted an authorized local code within two years after an update to the state building code.
    • The default state-code rule does not apply to construction on a farm or for farm purposes.
    • A local jurisdiction may instead adopt a code that conforms generally with the state building code, subject to the requirements and exceptions in section 71-6406.

    International Building Code edition: 2018 (Except section 101.4.3 and chapter 29; section 305.2.3 applies to a facility having twelve or fewer children; section 310.4.1 applies to a care facility for twelve or fewer persons.) · International Residential Code edition: 2018 (Except section R313 and chapters 25 through 33.) · International Existing Building Code edition: 2018 (Except section 809.) · Uniform Plumbing Code edition: 2018 · local-code adoption deadline after state-code update: 2 years (If no authorized local code is adopted, the state building code applies, except to construction on a farm or for farm purposes.)

    “(1) There is hereby created the state building code. The Legislature hereby adopts by reference:”
  • Camping on your landLimited

    Temporary camping on state or county public highways, roadside areas, parks, and other property acquired for highway or roadside park purposes in Nebraska.

    • Camping is unlawful except at places designated as campsites by the Department of Transportation, the county, or another governmental entity owning or controlling the property.
    • The statute excludes certain lands transferred or leased to the Game and Parks Commission and other lands controlled by the Game and Parks Commission or a natural resources district, which are governed under separate statutes.
    • Camping includes temporary lodging out of doors in a sleeping bag, tent, trailer, station wagon, pickup camper, camper-bus, or other vehicle.
    • Violation is a Class V misdemeanor and may require reimbursement for campsite damage.

    penalty: Class V misdemeanor

    “It shall be unlawful to camp on any state or county public highway, roadside area, park, [...] except at such places as are designated campsites”
  • Tiny homesLimited

    Tiny houses produced or sold in Nebraska and classified as manufactured homes, modular housing units, or recreational vehicles, including park model recreational vehicles.

    • The Nebraska Public Service Commission states that tiny houses can be built as either a manufactured home, modular housing unit, or recreational vehicle.
    • For a park model recreational vehicle under current Nebraska law, the unit must be designed and marketed as temporary living quarters for recreational, camping, travel, or seasonal use; must not be permanently affixed to real property for use as a permanent dwelling; must be built on a single chassis mounted on wheels; must have a gross trailer area not exceeding 400 square feet in the setup mode; and must be certified by the manufacturer as complying with ANSI A119.5, 2025 edition.
    • LB1147 enacted the 400-square-foot park-model limit and specified the 2020 ANSI A119.5 edition; its emergency clause states that the act takes effect when passed and approved according to law.
    • State classification or construction compliance does not establish unrestricted land-use occupancy. County zoning resolutions may regulate the location, size, and uses of structures including house trailers and automobile trailers, and may regulate uses of buildings and land in unincorporated areas.
    • County zoning powers do not apply within incorporated cities or villages, or areas where a city or village has been granted and is exercising zoning jurisdiction. Local zoning, building, utility, health, and other requirements may therefore impose additional conditions.

    park model gross trailer area: <= 400 square feet (Measured in the setup mode.) · park model chassis: single chassis mounted on wheels · park model permanent-affixation: false (The unit must not be permanently affixed to real property for use as a permanent dwelling.)

    “(16) Park model recreational vehicle means a vehicular unit which meets the following criteria: (a) Is designed and marketed as temporary living quarters for recreational, camping, travel, or seasonal use; (b) Is not permanently affixed to real property for use as a permanent dwelling; (c) Is built on a single chassis mounted on wheels with a gross trailer area not exceeding four hundred square feet in the set up mode; and (d) Is certified by the manufacturer as complying with the ANSI A119.5 Park Model Recreational Vehicle Standard of the American National Standards Institute, 2025 edition;”
  • Who permits septicState (with conditions)

    Private onsite wastewater treatment systems serving dwellings and non-dwellings in Valley County.

    • Nebraska Title 124 applies statewide.
    • The Department establishes setbacks through regulations, construction permits, general permits, or memoranda of agreement with local government agencies.
    • More stringent local requirements may apply.
    “Setback distances for all onsite wastewater treatment systems will be established by the Department in either this regulation, a construction permit, general permit, or memorandum of agreement with a local government agency as determined by the Department to be necessary to protect public health, the environment, surface water, and groundwater.”
    One more reviewed finding on this topic
    • Mixed (with conditions) — Onsite wastewater treatment systems statewide in Nebraska, including septic systems, holding tanks, lagoons, mound systems, and other decentralized systems.
      “Any local requirements (city, county) are separate from and in addition to the requirements found in Title 124 that apply statewide.”
  • Septic permitLimited

    Onsite wastewater systems statewide where system size, non-domestic waste handling, or siting issues require a site-specific evaluation and permitting; ordinary systems also remain subject to applicable Title 124 compliance and registration rules.

    • The official program page identifies permitting for systems requiring site-specific evaluation because of large size, handling of non-domestic wastes, or siting issues.
    • A system constructed, reconstructed, altered, modified, or otherwise changed must be registered with the Department.
    • Local city or county requirements may apply separately.
    “Most onsite wastewater systems in Nebraska are constructed under “Authorization by Rule” which does not require a construction permit [...] However, some systems will require a permit”
    One more reviewed finding on this topic
    • Required — Onsite wastewater systems in Valley County when Title 124 requires a permit.
      “When a permit application is required, Title 124 requires a construction permit prior to any onsite system construction and an operating permit prior to wastewater discharge to or any use of the onsite system.”
  • Septic inspectionLimited

    Inspection of private onsite wastewater treatment systems statewide in Nebraska.

    • Inspection must be carried out or supervised by a certified professional, a Nebraska-licensed professional engineer, or a Nebraska-registered environmental health specialist.
    • The statute allows the Director by contract to delegate onsite wastewater inspection and registration to a governmental subdivision with a sufficiently stringent program and enforcement authority.
    “A private onsite wastewater treatment system shall not be [...] inspected [...] unless the [...] inspection [...] is carried out or supervised by either a certified professional”
  • Off-grid sanitationAllowed (with conditions)

    Off-grid wastewater sanitation using an onsite wastewater treatment system, including septic systems, holding tanks, lagoons, or mound systems, statewide in Nebraska.

    • The onsite system must comply with Title 124.
    • Only a properly certified professional may inspect, repair, pump, or install an onsite septic system.
    • The wastewater directed to the onsite system is limited to domestic wastewater.
    • Any local city or county requirements apply separately.
    “households depend on septic systems [...] for wastewater treatment. [...] the Nebraska Department [...] regulates these systems through Title 124”
  • Well permitLimited

    Construction or modification of water wells in Nebraska groundwater management areas, on land owned or controlled by the person constructing the well.

    • Before commencing construction, the applicant must apply to the district in which the well will be located, using district forms.
    • No permit is required for test holes or dewatering wells intended for use for ninety days or less.
    • No permit is required for a single water well designed and constructed to pump fifty gallons per minute or less.
    • A district may exempt replacement water wells by rule and regulation.
    • A district may require a permit for a well designed and constructed to pump fifty gallons per minute or less when it is commingled, combined, clustered, or joined with another well or water source, excluding a water source used to water range livestock; combined wells are treated as one well and their combined capacity is used as the rated capacity.
    • In groundwater management areas where regulations have been imposed to control declining groundwater levels, a district may require permits for each well or categories of wells designed and constructed to pump fifty gallons per minute or less, except water sources required for human needs relating to health, fire control, or sanitation and water sources used to water range livestock.
    • The district must review the application and issue or deny the permit within thirty days after filing.
    • The application requires a fifty-dollar filing fee payable to the district.
    • The application must include the applicant's name and post-office address, proposed use, intended location, size, type and description, estimated depth if known, estimated capacity in gallons per minute, irrigation acreage and legal description if applicable, non-irrigation use description if applicable, replacement-well registration number if applicable, and other information required by the district.
    • A person who failed to obtain a required permit must apply for a late permit, accompanied by a two-hundred-fifty-dollar fee and the same information required for an ordinary application.
    • A person must apply before modifying a well that was previously exempt into one for which a permit would otherwise be required.

    pump capacity threshold: <= 50 gallons per minute (Single wells at or below this threshold are exempt unless a district rule requires a permit under the statutory exceptions.) · ordinary application filing fee: 50 USD (Payable to the district.) · late permit application fee: 250 USD (Applies when a required permit was not obtained.) · district decision deadline: 30 days (Measured after the application is filed.) · dewatering intended-use period: <= 90 days (Test holes and dewatering wells intended for use for ninety days or less do not require a permit.)

    “shall, before commencing construction, apply with the district in which the water well will be located for a permit on forms provided by the district”
  • Mandatory utility hookupConditional

    Wastewater service for dwellings and non-dwellings generating wastewater statewide in Nebraska.

    • The property must have an onsite wastewater treatment system complying with Title 124, or be connected to a public sewer system or other wastewater works.
    • Local city and county requirements are separate from and in addition to statewide Title 124 requirements.
    “A dwelling or non-dwelling that generates wastewater must have an onsite wastewater treatment (OWT) system [...] or be connected to a public sewer system”
  • Driveway accessRequired

    New, relocated, or altered private driveways and commercial approach roads connecting to State Highway rights of way.

    • No permits will be issued for driveways or approach roads to private property where the Department has acquired all or portions of the rights of access.
    • Applications must use the Department-furnished form.
    • Hard-surfaced driveway and approach-road applications go to the Department of Roads; unsurfaced driveway applications go to the proper District Engineer's office.
    • The driveway or approach road must comply with permit conditions and must not alter highway drainage or side ditches.
    • A certified check is required as a guarantee; its amount is determined after application and based on the extent of proposed work.
    “Any person desiring to construct a new driveway or approach road or any person desiring to relocate or alter an existing driveway or approach road shall apply for a permit to do so.”
  • Short-term rentalsLimited

    Short-term lodging operations in Nebraska, including hotels, tourist homes, private homes rented in whole or in part, campgrounds, and RV pads or hookups.

    • A separate lodging tax permit is required for each hotel.
    • The permit is issued only after examination and approval.
    • The permit is not assignable and is valid only for the named operator, location, and transaction of business.
    • The permit must be conspicuously displayed.
    • Operating without a permit or after suspension is a misdemeanor; conviction may result in a fine up to $500 per day.
    • The cited state rule addresses lodging-tax permitting and does not establish statewide zoning approval for short-term rentals.

    maximum fine for operation without permit after conviction: <= 500 USD per day

    “Every person engaged in the business of operating a hotel in this state where the public may, for a consideration, obtain sleeping accommodations, must file an application with the Nebraska Department of Revenue for a Nebraska lodging tax permit.”
  • county zoning authorityGeneral

    Nebraska county boards adopting zoning resolutions for county territory outside incorporated cities and villages and outside areas where a city or village has been granted or ceded zoning jurisdiction and is exercising that jurisdiction.

    • The county board may adopt a zoning resolution having the force and effect of law.
    • The zoning resolution may regulate buildings, structures, lot coverage, setbacks, yards, population density, building uses, and land uses for agriculture, forestry, recreation, residence, industry, and trade in the unincorporated area of the county.
    • The powers may not be exercised within incorporated cities or villages or within an unincorporated area over which a city or village has been granted or ceded zoning jurisdiction and is exercising it.
    • A city or village zoning ordinance or amendment controlling an unincorporated area supersedes the county resolution or regulation.
    • If a zoning resolution or regulation affects the Niobrara scenic river corridor, the Niobrara Council must act as provided in section 72-2010.
    • A county board may not prohibit a qualifying manufactured home solely because it is manufactured, but may impose the listed installation and design standards and may not impose additional standards unless uniformly applied to all single-family dwellings in the zoning district.
    • Special districts or zones may be established in areas subject to seasonal or periodic flooding.
    “to adopt a zoning resolution, which shall have the force and effect of law;”
  • county building authorityGeneral

    Nebraska counties adopting, administering, enforcing, and requiring permits under local building or construction codes for buildings, including residential construction, in unincorporated areas.

    • A county may enact, administer, or enforce a local building or construction code only if it adopts the state building code or adopts a building or construction code that conforms generally with the state building code.
    • A local code may include special or differing standards only within the statutory conformity rules, including standards addressing construction costs, safety, durability, efficiency, best practices, or special local conditions.
    • A local code must be regularly updated; generally, the most recently enacted state building code or a conforming code must be adopted within two years after an update to the state building code.
    • If a county does not adopt a code as authorized within two years after an update to the state building code, the state building code applies in the county, except that it does not apply to construction on a farm or for farm purposes.
    • A county may adopt administrative amendments concerning enforcement organization, staff qualifications, plan examination, inspections, appeals, permits, and fees, and may publish those amendments separately from the code.
    • Under section 23-172, county-adopted codes and the building-permit or occupancy-permit requirements imposed by those codes or sections 23-114.04 and 23-114.05 apply throughout the county except within incorporated cities or villages and except within an unincorporated area where a city or village has been granted zoning jurisdiction and is exercising that jurisdiction.
    • Under section 23-114.04, permits are required before erection, construction, reconstruction, alteration, repair, or conversion of a nonfarm building or structure within a zoned area; a permit may be withheld when the proposed purpose conflicts with applicable district zoning regulations.
    • Section 23-114.04 permits reasonable county permit-fee schedules and requires written plans, including sanitation, plumbing, and sewage-disposal information, that fully conform to zoning regulations before permits issue.
    • Section 23-172 states that nothing in that section creates an obligation for the county to inspect plumbing work to determine compliance with the plumbing code.
    “Any county, city, or village may enact, administer, or enforce a local building or construction code if or as long as such county, city, or village: (i) Adopts the state building code; or (ii) Adopts a building or construction code that conforms generally with the state building code.”

Set by your township or city, not the county

In Nebraska, zoning is adopted by each township or city, so Valley County has no county-wide answer on these. Find your township or city in the list of places on this page, or call its clerk or zoning administrator.

  • Living in an RV
  • Accessory dwellings

Still unanswered

We looked and could not find an official answer yet. Silence is not permission — ask the county directly.

  • Inspections — Building inspections in unincorporated Valley County.

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Living off-grid in Valley County, Nebraska

Is Valley County a good place to live off-grid or homestead?

Valley County scores 47/100 on the Bolthole Index, a solid county profile. Its strengths: sparse surroundings — about 6,497 people within a 30-minute drive and manageable long-term carry cost. Watch-outs: workable self-sufficiency basics (26.1″/yr rainfall) and elevated current hazard exposure.

Do you need a building permit in Valley County, Nebraska?

Valley County requires a building permit only in limited cases (such as floodplains or specific zones), and it enforces county zoning. Onsite septic is permitted by Nebraska Department of Environment and Energy (NDEE / Department of Water, Energy and Environment). Owner-builders may act as their own contractor to build their home. These answers are quoted from official sources and independently re-checked. Rules change and cities within the county differ — always confirm with the county before you buy or build.

How much does land cost in Valley County, Nebraska?

Land in Valley County runs about $3,037 per acre, based on the latest county data.

What is the water situation in Valley County?

Valley County gets about 26.1" of rain a year, with severe drought in roughly 20.8% of years.

How remote is Valley County?

A representative private-land location has about 6,497 people within a 30-minute drive and 386,154 within two hours. The road-network catchments count population across county lines and clusters of smaller cities; straight-line radius values remain available as a comparison.

How Valley compares in Nebraska

Compare side-by-side →See all 93 Nebraska counties ranked →