Bolthole Index

Brule County, South Dakota

Building permits, zoning and land rules in Brule County, South Dakota

46Index Score / 100
#43 of 66 in South Dakota

Brule County, South Dakota requires a building permit for any new or replacement structure subject to county jurisdiction1. Unincorporated Brule County has county zoning with district-specific lot sizes and setbacks; rules inside incorporated communities may differ234. South Dakota administers onsite wastewater requirements, although local governments may impose stricter standards5.

At a glance

Building permit
Required for any new or replacement structure1
Zoning
Yes in unincorporated Brule County; requirements vary by district6
Septic oversight
South Dakota DANR administers statewide minimum onsite-wastewater requirements5
RV living
Limited outside campgrounds in unincorporated areas; longer occupancy needs county authorization7
Tiny home
A wheeled unit treated as a camping unit faces the county RV occupancy limits8
Owner-builder trades
Conditional state pathways allow owners to wire or plumb a qualifying personal residence910
Private well
A state water-right permit may be required and, when required, must precede drilling11

Who to call

Building permits

Brule County Planning & Zoning Department

Building permits, zoning permits, zoning enforcement, and land-use questions in unincorporated Brule County

605-234-4432

Septic permits

South Dakota DANR On-Site Wastewater Program

State onsite-wastewater installation requirements and questions about septic plan submissions

(605) 773-4647

Contact details are copied from each office’s official page and were checked against it on October 9, 2026.

Off-grid gear

Going off-grid in Brule County means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Do you need a building permit in Brule County, South Dakota?

Yes. Brule County requires a building permit for any new or replacement structure subject to county jurisdiction, and the county Planning & Zoning Department issues building and zoning permits112. The published building-permit fee is calculated at $0.50 per $1,000, with a $5 minimum and $50 maximum; starting construction first raises the fee to $250, with daily penalties also possible1314. The county materials do not identify an adopted construction-code edition for homes. For covered nonresidential work begun after July 1, 2026, the state default is the 2024 International Building Code where the local government has not adopted its own qualifying ordinance; residences, manufactured homes, farmsteads, and accessory structures are among the exclusions15. State electrical and plumbing requirements remain separate from the county land-use permit1617.

Who issues Brule County building permits, and how do you reach the office?

Brule County Planning & Zoning is the building-permit and zoning contact for unincorporated Brule County12. The department manages physical growth in the unincorporated area, enforces zoning regulations, and issues zoning and building permits12. Call 605-234-4432 before filing to identify the parcel's district, application, and supporting material12. The county schedule confirms permits for new or replacement structures and lists related application fees, but it does not provide a complete submission, review, inspection, or issuance workflow14. We could not confirm whether a general county building inspection or certificate of occupancy follows the permit, so ask Planning & Zoning about inspections and closeout. Electrical work has a separate state inspection sequence, including rough-in before wiring is covered and final inspection before occupancy9.

Does Brule County have zoning?

Yes. Brule County administers zoning in unincorporated areas, but the county material does not establish the rules inside incorporated municipalities18. The listed districts are agricultural, agricultural residential, two residential categories, manufactured-home park, highway commercial, and planned unit development19. Minimum lot size varies sharply: agricultural is 10 acres, agricultural residential is 1.5 acres, the residential districts are 1 acre and one-half acre, manufactured-home park is 3 acres, highway commercial is 2 acres, and planned unit development is 5 acres3. Setbacks vary by district and are measured from the right of way20. Agricultural front, rear, and side yards are 50 feet, 20 feet, and 10 feet; highway commercial yards are 100 feet, 25 feet, and 25 feet4. Confirm the parcel's district and detailed ordinance requirements with Planning & Zoning12.

How do septic permits work in Brule County?

South Dakota DANR administers minimum onsite wastewater requirements in Brule County, and local governments may impose stricter standards5. A conventional individual onsite system may be installed under the state chapter without project-plan review, but plans for other installations receiving human waste require DANR approval before construction21. Where water or electricity is unavailable, state rules call for a vault privy, chemical toilet, incinerator toilet, or composting unit; except for vault privies, those unconventional systems need DANR approval before installation22. An onsite system cannot be used where public wastewater service is available under the state definition, which includes certain sites with public sewer within 400 feet23. Only 21.4% of Brule County soils are rated without severe limitations for a conventional drain field, so make septic feasibility an early purchase contingency24. Call DANR at (605) 773-4647 about the proposed design and required records25.

Can you live in an RV or tiny home on land in Brule County?

Unincorporated Brule County limits occupancy of an RV, trailer, or other camping unit outside a designated campground to 14 days per calendar year unless an ordinance exception or county approval applies26. Longer intended occupancy requires a conditional use before the fifteenth day unless the separate special-permit or construction pathway applies7. A permit may allow occupancy on the occupants' land while a house is being built for up to 1 year, renewable once for up to 1 additional year, but continued construction progress is required7. Brule County does not expressly name tiny homes on wheels; if a unit's characteristics or use make it a camping unit or travel trailer, the same occupancy limits apply8. Ask Planning & Zoning to classify the proposed unit before purchase12.

Building a home in Brule County, South Dakota: the steps, in order

  1. Call Brule County Planning & Zoning at 605-234-4432 to confirm jurisdiction and identify the parcel's zoning district, minimum lot size, and setbacks12320.
  2. Confirm the home is allowed and obtain the county building and zoning permits before construction112.
  3. Resolve wastewater with South Dakota DANR; nonconventional systems require approved plans, and public-sewer availability can prevent use of an onsite system2123.
  4. Determine whether the planned well use needs a state water-right permit before drilling, and use a South Dakota-licensed well driller unless drilling your own well11.
  5. Obtain an approved state homeowner permit before personally wiring a qualifying owner-occupied residence; the electrical exemption does not cover commercial or rental property or waive county permits9.
  6. A homeowner may personally plumb a qualifying single-family residence or farmstead with the state homeowner permit, required inspections, and code compliance; commercial and rental properties require a licensed plumbing contractor10.

What should you check before buying land in Brule County?

Start with the zoning map and district requirements because Brule County regulates lot size and setbacks by district6320. If a sale or division needs a new plat, the published fee is $100 for the first lot and $25 for each additional lot, but the fee sheet does not provide the complete subdivision standards27. Make septic feasibility a contract contingency because only 21.4% of county soils are rated without severe limitations for a conventional drain field24. Confirm legal road access, and obtain state permission before constructing or modifying access onto a state highway28. Check flood maps and ask Planning & Zoning who handles local floodplain permits because a Brule County-specific process could not be confirmed2912. The median property-tax bill is about $1,744 per year at an effective rate near 0.8%, not a parcel quote3031.

Watch-outs

  • Do not assume an agricultural parcel is permit-exempt: Brule County requires permits for new or replacement structures, and no county agricultural exemption was confirmed1.
  • The agricultural district setback row is not a countywide default; Brule County setbacks vary by zoning district and are measured from the right of way20.
  • South Dakota's owner electrical and plumbing pathways do not waive Brule County building or zoning permits, and commercial or rental properties do not qualify910.

Sources

  1. BRULE COUNTY ZONING, quoted and re-checked
  2. BRULE COUNTY ZONING ORDINANCE LOT REQUIREMENTS OVERVIEW, quoted and re-checked
  3. BRULE COUNTY ZONING ORDINANCE LOT REQUIREMENTS OVERVIEW, quoted and re-checked
  4. BRULE COUNTY ZONING ORDINANCE LOT REQUIREMENTS OVERVIEW, quoted and re-checked
  5. South Dakota Feedlot Permit Program - Septic Tank Systems, quoted and re-checked
  6. BRULE COUNTY ZONING ORDINANCE LOT REQUIREMENTS OVERVIEW, quoted and re-checked
  7. Brule County Zoning Manual, quoted and re-checked
  8. Brule County Zoning Manual, quoted and re-checked
  9. Homeowner Wiring, quoted and re-checked
  10. Homeowner Plumbing, quoted and re-checked
  11. South Dakota Water Rights - Drilling a Well, quoted and re-checked
  12. Brule County Planning & Zoning Department (brulecounty.gov)
  13. BRULE COUNTY ZONING, quoted and re-checked
  14. BRULE COUNTY ZONING, quoted and re-checked
  15. SDLRC - Codified Law 11-10 - BUILDING CODES AND STANDARDS, quoted and re-checked
  16. South Dakota Electrical Commission - Homeowner Wiring (South Dakota statewide rule), quoted and re-checked
  17. South Dakota Plumbing Commission - Inspections (South Dakota statewide rule), quoted and re-checked
  18. BRULE COUNTY ZONING ORDINANCE LOT REQUIREMENTS OVERVIEW, quoted and re-checked
  19. BRULE COUNTY ZONING ORDINANCE LOT REQUIREMENTS OVERVIEW, quoted and re-checked
  20. BRULE COUNTY ZONING ORDINANCE LOT REQUIREMENTS OVERVIEW, quoted and re-checked
  21. One-Stop Permitting and Regulation Guide (2025 Edition), quoted and re-checked
  22. Rule 74:53:01 Individual and Small On-Site Wastewater Systems, quoted and re-checked
  23. Rule 74:53:01 Individual and Small On-Site Wastewater Systems, quoted and re-checked
  24. Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
  25. South Dakota DANR On-Site Wastewater Program (danr.sd.gov)
  26. Brule County Zoning Ordinance, quoted and re-checked
  27. Brule County Zoning, quoted and re-checked
  28. Instructions: Applying for permission for driveway or intersection on a South Dakota state highway (South Dakota statewide rule), quoted and re-checked
  29. National Flood Insurance Program (South Dakota statewide rule), quoted and re-checked
  30. Median property tax bill: Bolthole Index county data
  31. Effective property tax rate: Bolthole Index county data

Written October 9, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Found land here? Start a Property Hunt →

Compared with neighboring counties

Like 4 of the 5 neighbors with published rules, Brule County has countywide zoning.

RuleBrule CountyBuffalo CountyAurora CountyJerauld CountyGregory CountyLyman CountyHand County
Building permitRequiredNot requiredLimitedRequiredRequiredRequiredRequired
County zoningYesNoYesYesYesNot publishedYes
Septic permitsDANRDANRDANRDANRDANRDANRDANR

County locator

Brule County in South Dakota

46
County map
Brule County highlighted among the South Dakota counties · colored by Index score

How Brule County scores

Seclusion88100% ev.
Self-Sufficiency1996% ev.
Admin Boringness51100% ev.
Durability34100% ev.
Property Autonomy67100% ev.
Carry Cost81100% ev.

Evidence strength: 99%. This reports direct-source completeness and fallback use; it is separate from the score and is not a confidence interval. How it works →

$257kTypical home
0.8%Property tax
$3,337Land / acre
23.3"Annual rain
14.2% of yrsSevere drought
17.9 / yr (+13)Mid-century 100°F days
22.4 daysMid-century dry spell
1.33" (+3.6%)Mid-century 1-day rain
1.5×Wildfire change factor
100%Forward climate coverage
$1,808Home insurance / yr
5% / yrInsurance growth
0.67%Nonrenewal rate
county median (2+ published ZIPs)Insurance basis
312People within 30 min
100,315People within 2 hr
3,299Radius comparison (15 mi)
6.5People / sq mi
22.7%Federal land
96%Land at 15% slope or less
21.4%Soils rated "not limited" for septic (strict USDA rating)
108,318 acWorkable land screen
2.9%Wooded land
8.8 tonsBiomass / forest ac
47.4°FAvg temp

Scout Brule County

Camp here before you commitBook a few nights nearby on Hipcamp →Already own land here?Earn money hosting campers — get $100 when you become a Hipcamp host →

Some links are affiliate or referral links — we may earn a commission, at no cost to you.

Property hunt

Find land. Bring the promising ones back.

Search live inventory elsewhere, then cost and vet each candidate here. No copied listings, account, or paid data feed.

Each button opens a current land search for Brule County. Listing sites control their own results and filters.

Analyze a property
Add setup-cost allowances

Use rough quotes or placeholders. Blank fields count as $0.

Working estimate

—land + entered setup costs
Asking $ / acre
—
Setup allowance
—
All-in $ / acre
—

A planning estimate, not a valuation or contractor quote. The USDA benchmark includes farm land and buildings; it is context, not a parcel comp.

Before an offer

Parcel due diligence

0/8 checked

Saved properties and checklist progress stay on this device. Bolthole Index does not receive them.

Cities and towns in Brule County

Inside a city, town or township here, that government usually sets zoning and may issue its own building permits; the county’s rules above cover land outside them.

America Township · Brule Township · Chamberlain · Chamberlain Township · Cleveland Township · Eagle Township · Highland Township · Kimball · Kimball Township · Lyon Township · Ola Township · Plainfield Township · Pleasant Grove Township · Plummer Township · Town of Pukwana · Pukwana Township · Red Lake Township · Richland Township · Smith Township · Torrey Lake Township · Union Township · Waldro Township · West Point Township · Wilbur Township · Willow Lake Township

Answers from the rulebook for Brule County

What the ordinances and state agencies actually say — one answer per question, each quoted from the official source and independently re-checked.

Brule County rules

  • Building permitRequired

    Any new or replacement structure subject to Brule County jurisdiction.

    • Government entities owe no construction fee, but permits are still required.
    • After-construction permits incur a flat per-building fee in addition to daily penalty guidelines.
    • The source states the fee schedule is effective January 6, 2015 and all fees are non-refundable.
    “***Building permits are required for any new or replacement structure.”
  • County-wide zoningPresent (with conditions)

    County zoning ordinance and mapped land-use districts in Brule County.

    • The cited overview identifies districts and dimensional standards; use-specific permissions and exceptions require the ordinance text.
    “BRULE COUNTY ZONING ORDINANCE LOT REQUIREMENTS OVERVIEW”
    One more reviewed finding on this topic
  • Local zoningPresent

    County-administered zoning in Brule County, including the listed county districts; incorporated-municipality rules were not separately established in this research.

    • The source is a county zoning-district overview and does not establish the zoning status of incorporated municipalities.
    “BRULE COUNTY ZONING ORDINANCE LOT REQUIREMENTS OVERVIEW”
    2 more reviewed findings on this topic
  • Zoning districtsPublished (with conditions)

    Published Brule County zoning districts and their summarized lot requirements.

    • The overview states: AG, AR, R1, R2, MHP, HC, and PUD; it also lists visibility triangles, shelter belts, and trees as setback-related categories.
    • The overview directs readers to ordinance text for more detailed information.
    “AGRICULTURAL (AG) 10 ACRES 250’ 50’ 20’ 10’ AGRICULTURIAL RESIDENTIAL (AR) 1.5 ACRES 100’ 50’ 20’ 10’ MODERATEE DENSITY RRESIDENTIAL (R1) 1 ACRE 100’ 30-50’ * 20’ 10’ HIGH DENSITY RESIDENIAL (R2) ½ ACRE 75’ 30-50’ * 20’ 10’ MANUFACTURED HOME PARK (MHP) 3 ACRES 300’ 30’ 10’ 10’ HIGHWAY COMMERCIAL (HC) 2 ACRES 150’ 100’ 25’ 25’ PLANNED UNIT DEVELOPMENT (PUD) 5 ACRES N/A N/A N/A N/A”
    One more reviewed finding on this topic
    • Published (with conditions) — Published Brule County zoning-district categories and dimensional overview.
      “AGRICULTURAL (AG) [...] AGRICULTURIAL RESIDENTIAL (AR) [...] MODERATEE DENSITY RRESIDENTIAL (R1) [...] HIGH DENSITY RESIDENIAL (R2) [...] MANUFACTURED HOME PARK (MHP) [...] HIGHWAY COMMERCIAL (HC) [...] PLANNED UNIT DEVELOPMENT (PUD)”
  • Minimum lot sizeDistrict specific (with conditions)

    Lots in Brule County zoning districts AG, AR, R1, R2, MHP, HC, and PUD.

    • The overview states that setback details may require consulting the ordinance text.
    • All setbacks are measured from the right of way.

    AG lot area: 10 acres · AR lot area: 1.5 acres · R1 lot area: 1 acre · R2 lot area: ½ acre · MHP lot area: 3 acres · HC lot area: 2 acres · PUD lot area: 5 acres

    “AGRICULTURAL (AG) 10 ACRES [...] AGRICULTURIAL RESIDENTIAL (AR) 1.5 ACRES [...] MODERATEE DENSITY RRESIDENTIAL (R1) 1 ACRE [...] HIGH DENSITY RESIDENIAL (R2) ½ ACRE”
    One more reviewed finding on this topic
    • District specific (with conditions) — Lots in Brule County zoning districts.
      “AGRICULTURAL (AG) 10 ACRES 250’ 50’ 20’ 10’ AGRICULTURIAL RESIDENTIAL (AR) 1.5 ACRES 100’ 50’ 20’ 10’ MODERATEE DENSITY RRESIDENTIAL (R1) 1 ACRE 100’ 30-50’ * 20’ 10’ HIGH DENSITY RESIDENIAL (R2) ½ ACRE 75’ 30-50’ * 20’ 10’ MANUFACTURED HOME PARK (MHP) 3 ACRES 300’ 30’ 10’ 10’ HIGHWAY COMMERCIAL (HC) 2 ACRES 150’ 100’ 25’ 25’ PLANNED UNIT DEVELOPMENT (PUD) 5 ACRES N/A N/A N/A N/A”
  • SetbacksSpecified

    County zoning districts listed in the Brule County lot-requirements overview.

    • AG front/rear/side yards: 50/20/10 feet; AR: 50/20/10 feet; R1 front yard 30-50 feet, rear 20 feet, side 10 feet; R2 front yard 30-50 feet, rear 20 feet, side 10 feet; MHP: 30/10/10 feet; HC: 100/25/25 feet.
    • All setbacks are measured from the right of way.
    • The overview states that the ordinance text contains more detailed information.
    “**ALL SETBACKS AREE MEASURED FROM THE RIGHT OF WAY.”
    2 more reviewed findings on this topic
    • District specific (with conditions) — Front, rear, and side yards in Brule County zoning districts.
      “AGRICULTURAL (AG) 10 ACRES 250’ 50’ 20’ 10’ [...] HIGHWAY COMMERCIAL (HC) 2 ACRES 150’ 100’ 25’ 25’ [...] **ALL SETBACKS AREE MEASURED FROM THE RIGHT OF WAY.”
    • District specific (with conditions) — Front, rear, and side yards in Brule County zoning districts.
      “VISIBILITY TRIANGLE (TWO ROADS) 50’ 50’ SHELTER BELTS 50’ TREE (FRONT SETBACK ONLY) 25’ *REFER TO THE ORDINANCE TEXT FOR MORE DETAILED INFORMATION **ALL SETBACKS AREE MEASURED FROM THE RIGHT OF WAY.”
  • Living in an RVLimited

    Camping-unit occupancy, including travel trailers, campers, recreation vehicles, and trailer coaches, on land governed by the Brule County Zoning Ordinance.

    • A camping unit may not be parked and occupied on a lot outside a designated campground for more than 14 days within a calendar year unless an applicable exception or approval applies.
    • A camping unit intended to be occupied for more than 14 days within a calendar year outside a campground must obtain a conditional use before occupancy on the fifteenth or later day, subject to the ordinance's cross-reference.
    • Under Section 1305, no camping unit, mobile home, or manufactured home may be parked and occupied in any district for more than 48 hours without a special permit from the Zoning Administrator.
    • A Section 1305 special permit may last no more than 14 days and may not be renewed within the same calendar year.
    • A permit may be issued for a camping unit, mobile home, or manufactured home on land owned by the occupants during construction of a house, or for up to one year renewable for one additional period of up to one year.
    • A construction-related permit becomes void if material progress is not made within 45 days after issuance or site or construction work ceases for 45 consecutive days.
    • Section 1305 does not apply when a manufactured home is used for agricultural-related nonhuman-habitation purposes.
    • The ordinance states that the 14-day rule applies whether occupancy is continuous or intermittent during the calendar year.
    • Municipal rules may differ within incorporated municipalities.

    outside-designated-campground occupancy limit: <= 14 days per calendar year (unless an applicable exception or approval applies) · special permit initial limit: <= 48 hours (without a special permit) · special permit duration: <= 14 days (not renewable within the same calendar year) · construction-related permit period: <= 1 year (renewable for one additional period not exceeding one year) · construction progress deadline: >= 45 days (permit becomes void if material progress is not made within this period) · construction cessation deadline: >= 45 consecutive days (permit becomes void if site or construction work ceases for this period)

    “No camping unit as defined herein shall be parked and occupied upon a lot and not within a designated campground for a period greater than fourteen (14) days within a calendar year unless in accordance with Section 1505. Any camping unit placed with the intent to occupy said unit for a period greater than fourteen (14) days within a calendar year and not pursuant to Section 1305 shall obtain a conditional use prior to occupying said camping unit on the fifteenth or greater day. This Section shall apply whether the camping unit is placed for a continuous period or intermittently throughout a calendar year.”
    2 more reviewed findings on this topic
    • Temporary only (with conditions) — Camping-unit occupancy, including an RV or trailer used for camping, in unincorporated Brule County.
      “shall obtain a conditional use prior to occupying said camping unit on the fifteenth or greater day.”
    • Temporary only (with conditions) — Occupancy of a recreational vehicle, travel trailer, or other qualifying camping unit on a lot outside a designated campground in Brule County's unincorporated areas.
      “No camping unit as defined herein shall be parked and occupied upon a lot and not within a designated campground for a period greater than fourteen (14) days within a calendar year unless in accordance with Section 1505. Any camping unit placed with the intent to occupy said unit for a period greater than fourteen (14) days within a calendar year and not pursuant to Section 1305 shall obtain a conditional use prior to occupying said camping unit on the fifteenth or greater day.”
  • Tiny homesLimited

    A tiny home on wheels in Brule County's unincorporated areas when its characteristics or use bring it within the ordinance's definitions of a camping unit or travel trailer.

    • The ordinance defines a camping unit as any vehicle, tent, trailer, or portable shelter used for camping purposes, and defines a travel trailer as a moveable wheeled vehicle designed or used as living and sleeping quarters or for recreation or business purposes.
    • The ordinance does not expressly use the term 'tiny home on wheels'; classification as a camping unit or travel trailer is therefore dependent on the unit's characteristics and use.
    • If classified as a camping unit, the Section 1325 fourteen-day annual limit and conditional-use requirement apply outside a designated campground. Section 1305's forty-eight-hour rule and special-permit/construction exceptions also apply to camping units, mobile homes, and manufactured homes.
    • The ordinance separately defines a modular home as a structure manufactured off-site, transportable on a temporary chassis or conveyance, and used as a permanent dwelling when placed on a permanent foundation; a wheeled unit that remains on wheels does not satisfy that permanent-foundation description on the text reviewed.
    • The ordinance applies only within unincorporated areas and excludes the incorporated communities of Chamberlain, Kimball, and Pukwana, including the stated extraterritorial jurisdictional area.
    • Section 1325 cross-references Section 1505, but Section 1505 is titled Planning Commission Appointment and Terms, not conditional-use criteria. Conditional-use procedures and decision authority are stated in other sections, including Sections 1511, 1513, 1515, 1605, and 1705.

    ordinary occupancy limit if treated as camping unit outside designated campground: <= 14 days per calendar year (Longer intended occupancy requires a conditional use unless the Section 1305 pathway applies.) · special-permit initial limit if treated as camping unit: <= 14 days (Not renewable within the same calendar year.) · construction/extended permit period: <= 1 year (Renewable for one additional period not exceeding one year, subject to the ordinance's progress and cessation conditions.)

    “Camping Unit - Any vehicle, tent, trailer or portable shelter used for camping purposes.”
  • Subdividing landLimited

    New plats in Brule County.

    • The official fee sheet lists a new-plat fee of $100 for one lot and $25 for each additional lot.
    • The opened source does not provide the complete subdivision ordinance or approval standards.

    new plat fee, first lot: 100 USD · new plat fee, each additional lot: 25 USD

    “New Plat $100 (1 lot) each additional lot $25”
  • Permit feesPublished (with conditions)

    Brule County zoning, building-permit, plat, variance, conditional-use, rezoning, and special-meeting fees.

    • Building permits: $5 minimum, $50 maximum, or $0.50 per $1,000 as stated in the schedule; $250 after construction has begun.
    • New plat: $100 for one lot and $25 for each additional lot.
    • Variance, conditional-use, and rezoning application: $250.
    • Special meeting: $250 each meeting; a special meeting is any meeting other than the second Tuesday.
    • Government entities owe no construction fee, although permits remain required.
    • Fees are non-refundable and the schedule states an effective date of January 6, 2015.

    building permit minimum: 5 USD · building permit maximum: 50 USD · after-construction permit fee: 250 USD (after built or after construction started) · new plat one-lot fee: 100 USD · additional-lot fee: 25 USD · variance/conditional-use/rezoning fee: 250 USD · special meeting fee: 250 USD (meeting other than second Tuesday)

    “Building Permits $5/min $50/max, ($.50/1000) or $250/ (after built or after construction started)”
  • Permit processPartial

    Brule County building permits, new plats, variances, conditional uses, and rezoning applications.

    • The fee schedule identifies permit and application categories but does not provide the complete application, review, inspection, or appeal process.
    • Government entities still require permits.
    • After-construction permits incur the stated flat fee in addition to daily penalty guidelines.
    “After construction permit fee is a flat per building fee in addition to the daily penalty guidelines defined in the Zoning Ordinance.”
    One more reviewed finding on this topic
    • Partial — County building permits and related zoning applications.
      “***Building permits are required for any new or replacement structure.”

South Dakota rules that apply here

  • Owner-builder exemptionConditional

    A homeowner performing plumbing installation in the homeowner's single-family residence or farmstead in South Dakota, including a residence where the homeowner will reside when construction is complete

    • The homeowner must be the owner and the person performing the installation.
    • The homeowner plumbing permit is for residences only and must be for a single-family dwelling; it does not include other structures on the property.
    • Mobile-home or modular-home installation is allowed only when the unit is on an owner-occupied lot at the time of installation.
    • Commercial and rental properties must be plumbed by a licensed South Dakota plumbing contractor.
    • The installation must comply with the state plumbing code, Administrative Rule 20:54.
    • Proof of ownership showing the physical address must be submitted.
    • If approved, a $130 check or money order is required.
    • The certificate expires two years from the date the permittee signs and dates the permit.
    • The installation requires state inspection and approval, including underground, rough-in, and final inspections; advance notice is required.
    • Five days' notice is recommended for inspections.
    • Additional inspections beyond the allotted inspections cost $75 per inspection.

    permit fee: 130 USD (If the application is approved.) · certificate validity: 2 years (Measured from the date the permittee signs and dates the permit.) · additional inspection fee: 75 USD per inspection (For inspections beyond the allotted inspections.)

    “as a homeowner, you may install plumbing in your residence [...] You must be the owner and person performing the installation in order to qualify”
    3 more reviewed findings on this topic
    • Conditional — South Dakota owner's exemption for a permit to wire the applicant's personal residence; this does not establish an exemption from county zoning or building permits.
      “A permit for wiring a person's residence may only be issued if:”
    • Available (with conditions) — An individual owner personally installing electrical wiring and fixtures in a residence or farmstead in Brule County that the owner owns and resides in or on.
      “South Dakota Codified Law (SDCL) 20:44:14:01(12) defines an "owner's exemption" as an exemption from licensure requirements for an individual owner who is personally installing electrical wiring and fixtures in a residence or farmstead which is owned and resided in or on by the person installing the electrical wiring or fixtures. You MUST have an approved homeowner permit BEFORE starting any electrical work.”
    • Available (with conditions) — An individual owner personally installing electrical wiring and fixtures in a residence or farmstead owned and resided in by that individual.
      “an "owner's exemption" as an exemption from licensure requirements”
  • Building code adoptedPartial

    South Dakota building-code adoption framework for local governments, including residential structures and county or municipal construction standards.

    • For residential structures, the statute authorizes the governing body of a municipality to adopt the 2024 International Residential Code; the quoted residential authorization does not name counties.
    • A residential-structure rule may not require installation of a sprinkler system and may not impose requirements more stringent than the 2024 International Residential Code.
    • A residential structure means a detached one-family or two-family dwelling, a townhouse not more than three stories with a separate means of egress, and related accessory structures.
    • For buildings other than residential structures, a local-unit ordinance must comply with the 2024 International Building Code, subject to statutory exclusions and permitted amendments.
    • The nonresidential rule does not apply to HUD-compliant mobile or manufactured homes, may not require fire sprinklers in a single-family dwelling, and does not apply to qualifying specialty resorts or vacation-home establishments constructed to Group R-3 requirements.
    • Where a local unit has not adopted a qualifying ordinance, the default 2024 International Building Code design standard applies to covered construction commenced after July 1, 2026, but the default does not apply to residential structures, mobile or manufactured homes, farmsteads, or accessory structures.

    residential model code: 2024 International Residential Code (Municipal governing body authorization; no sprinkler requirement; no requirements more stringent than the code) · nonresidential model code: 2024 International Building Code (Statutory exclusions apply) · default nonresidential design-standard commencement: > 2026-07-01 (The default does not apply to residential structures, mobile or manufactured homes, farmsteads, or accessory structures)

    “The governing body of a municipality may enact requirements for construction, alteration, movement, enlargement, replacement, repair, equipment, use and occupancy, location, removal, and demolition of a residential structure by adopting the 2024 edition of the International Residential Code, as published by the International Code Council, Incorporated.”
    3 more reviewed findings on this topic
    • Partial — Nonresidential construction in a local unit of government that has not adopted a building-code ordinance, including applicable Brule County areas.
      “must be based on the 2024 edition of the International Building Code as published by the International Code Council, Incorporated.”
    • Partial — Statewide South Dakota building standards for construction and related work within a local unit of government that has not adopted an ordinance prescribing standards under SDCL § 11-10-5.
      “The design standard [...] of any building commenced after July 1, 2026 [...] must be based on the 2024 edition of the International Building Code”
    • Partial — South Dakota building-code standards for construction within local units of government, including unincorporated county areas.
      “The design standard for construction, alteration, movement, enlargement, replacement, repair, equipment, use and occupancy, location, removal, and demolition of any building commenced after July 1, 2026, within the boundaries of any local unit of government that has not adopted an ordinance prescribing the standards pursuant to § 11-10-5, must be based on the 2024 edition of the International Building Code as published by the International Code Council, Incorporated. [...] The provisions of this section do not apply to any residential structure as defined in § 11-10-12, mobile or manufactured home, or farmstead and any accessory structure or building thereto.”
  • InspectionsRequired

    Plumbing installations in South Dakota outside cities that administer their own plumbing inspection requirements.

    • The exception is for cities with their own inspection requirements.
    • Inspection requests generally require at least 72 hours advance notice, excluding weekends and holidays.
    • Inspections occur after a plumbing installation certificate is secured.

    installation certificate fee: 20 USD · single-family inspection fee: 110 USD · small-structure inspection fee: 100 USD (Five or fewer fixtures.) · large-structure inspection fee: 275 USD (Six or more fixtures.)

    “You must have a plumbing inspection certificate for all plumbing installations.”
    One more reviewed finding on this topic
  • Who permits septicState

    Individual and small on-site wastewater systems statewide in South Dakota.

    • The South Dakota Department of Agriculture and Natural Resources secretary or authorized representative administers the state on-site wastewater requirements.
    • The state rules are minimum requirements; local governments may impose more stringent requirements, according to the DANR permitting guide.
    “The authority for regulating on-site wastewater systems is found in SDCL Chapter 34A-2.”
    2 more reviewed findings on this topic
    • State — On-site wastewater systems in South Dakota, including Brule County.
      “South Dakota has developed installation requirements for on-site wastewater systems.”
    • State (with conditions) — On-site wastewater systems in Brule County under South Dakota requirements.
      “The authority for regulating on-site wastewater systems is found in SDCL Chapter 34A-2. The regulations are in the ARSD Articles 74:53:01. These regulations are the state’s minimum requirements and standards, but local governments may have more stringent regulations.”
  • Septic permitLimited

    On-site wastewater installations receiving human excreta in Brule County.

    • Plans and specifications must be submitted to DANR for installations other than a conventional individual onsite system.
    • For works of sanitary significance, plans and specifications must be submitted at least 30 days before planned construction.

    advance submission: >= 30 days (Applies to works of sanitary significance.)

    “Plans and specifications must be submitted to DANR for any installation that will receive human excreta other than a conventional individual onsite system, per ARSD 74:53:01:03. For works of sanitary significance, plans and specifications must be submitted at least 30 days prior to the planned commencement of construction, per ARSD 74:53:04:05.”
    One more reviewed finding on this topic
    • Required — Nonconventional on-site wastewater installations receiving human excreta in South Dakota, including Brule County.
      “Plans and specifications for all installations which receive human excreta, other than a conventional individual on-site wastewater system, must be submitted to the secretary for review and approval prior to construction.”
  • Septic inspectionLimited

    On-site wastewater system installation, equipment, and operation in South Dakota, including Brule County.

    • Inspection is discretionary rather than stated as a mandatory pre-approval inspection.
    “Inspection of the installation, equipment, and operation of an on-site wastewater system may be made at any time by the secretary or the secretary's authorized representative.”
  • Off-grid sanitationLimited

    Sanitation systems used when water or electrical systems are unavailable.

    • Vault privies, chemical toilets, incinerator toilets, or composting units must be used when a water or electrical system is unavailable.
    • Except for vault privies, unconventional systems are experimental and require plans and specifications submitted to the secretary for approval before installation.
    “Vault privies, chemical toilets, incinerator toilets, or composting units shall be used when a water or electrical system is not available.”
    One more reviewed finding on this topic
  • Well permitLimited

    Water wells and associated water uses in Brule County.

    • A water right permit is required only when the proposed water use requires one.
    • If required, the permit must be approved before well drilling.
    • The chief engineer may authorize a test well before permit approval.
    • A permit holder has five years to construct the water-use system and an additional four years to place all water to beneficial use.
    • A person who is not drilling their own well must hire a South Dakota-licensed well driller.

    construction period after approved water-right permit: 5 years · beneficial-use period after construction period: 4 years

    “If a water right permit is needed, state law requires the permit to be approved prior to doing any well drilling.”
    One more reviewed finding on this topic
    • Limited — Water-well drilling and proposed water uses statewide in South Dakota.
      “If a water right permit is needed, state law requires the permit to be approved prior to doing any well drilling.”
  • Mandatory utility hookupConditional

    On-site wastewater systems where public wastewater service may be available.

    • An on-site wastewater system may not be constructed, installed, or operated where a public wastewater system is available.
    • Availability includes location within a municipality or sanitary district, a public sewer within 400 feet, and a municipality or sanitary district request to provide service.

    public sewer distance: <= 400 feet (One of the listed availability circumstances.)

    “No person may construct, install, or operate an on-site wastewater system where a public wastewater system is available.”
  • Agricultural exemptionAvailable (with conditions)

    Farmsteads and accessory structures or buildings thereto under South Dakota's default construction-design standard when the local unit of government has not adopted an ordinance prescribing standards under SDCL 11-10-5.

    • The default standard applies to building work commenced after July 1, 2026.
    • The local unit of government may adopt an ordinance allowing local administration and enforcement of the design standard.
    • The exclusion is from SDCL 11-10-6's default 2024 International Building Code design standard; it does not establish that all local zoning, building, occupancy, or other requirements are waived.
    • The statute defines farmstead as a farm or ranch, including any structure or building located on the land.
    • Residential structures and mobile or manufactured homes are also excluded from this specific default-standard provision.

    construction commencement date: > 2026-07-01 (The provision applies to buildings commenced after July 1, 2026.) · building standard: 2024 International Building Code (The default standard does not apply to a farmstead or accessory structure or building thereto.)

    “farmstead and any accessory structure or building thereto.”
  • Driveway accessLimited

    New or modified driveways and intersections connecting to South Dakota state highways.

    • Permission from the South Dakota Department of Transportation is required for access to a state highway.
    • The application may require an access approach design, vicinity map, estimated traffic volumes, three copies of a site plan, traffic-control plan, liability insurance, development plan, drainage plan, traffic-impact study, and revegetation plan.
    • Construction cannot begin until the access permit is issued.
    • The permittee pays construction, maintenance, and removal costs.
    • The permit expires if access is not under construction within one year, subject to one written one-year extension.
    • Access construction must be completed within 45 days after initiation within the highway right-of-way.

    application review update threshold: 30 days (If the application is not completed within 30 days, a Department employee will contact the applicant with an update.) · construction completion period: 45 days (Measured from initiation of construction within the highway right-of-way.)

    “Construction of the access shall not proceed until the access permit is issued. The access shall be completed in an expeditious and safe manner and shall be finished within 45 days from the initiation of construction within the highway right-of-way.”
  • Building in a floodplainRequired

    Development in floodplains within South Dakota communities participating in the National Flood Insurance Program, including incorporated and unincorporated areas administered separately by local governments.

    • Participating communities must adopt and enforce a flood-damage-prevention ordinance.
    • Permits are required for all types of development in the floodplain.
    • New or substantially improved homes and manufactured homes must be elevated above the Base Flood Elevation.
    • Non-residential buildings must be elevated or flood-proofed.
    • Elevation Certificates are required to document compliance.
    • NFIP participation and eligibility are established separately for incorporated and unincorporated areas; the source does not establish a single uniform permit process for every South Dakota location.
    “Require permits for all types of development in the floodplain.”
  • county zoning authorityGeneral

    South Dakota county boards' authority to adopt zoning ordinances, including for unincorporated county land.

    • The authority is granted for promoting the health, safety, or general welfare of the county.
    • The statute authorizes regulation of building and land-use characteristics including height, number of stories, building and structure size, lot coverage, yards, courts, open spaces, population density, and locations and uses of buildings, structures, and land.
    • The authorized purposes expressly include trade, industry, residence, flood plain, and other purposes.
    • This claim identifies statewide enabling authority; whether a particular county has adopted an ordinance is a separate local question.
    “For the purpose of promoting health, safety, or the general welfare of the county the board may adopt a zoning ordinance to regulate and restrict the height, number of stories, and size of buildings and other structures, the percentage of lot that may be occupied, the size of the yards, courts, and other open spaces, the density of population, and the location and use of buildings, structures, and land for trade, industry, residence, flood plain, or other purposes.”
  • county building authorityLimited

    County authority to prescribe building standards and issue building permits for construction in South Dakota, including unincorporated areas.

    • Section 11-10-5 expressly addresses ordinances adopted by any local unit of government, and expressly provides for amendments to a county ordinance filed with the county auditor.
    • That provision concerns buildings other than residential structures as defined in § 11-10-12.
    • Section 11-10-12 expressly authorizes a municipality to enact residential-structure requirements using the 2024 International Residential Code, rather than expressly extending that authorization to counties.
    • A county, municipality, or township may not require permits for specified repairs or substantially similar replacements to existing exterior parts of a detached single-family owner-occupied residential structure, except designated historical property repairs authorized under chapter 1-19B.
    • Construction under the default § 11-10-6 standard is subject to the residential, manufactured-home, farmstead, accessory-structure, and specialty-resort exclusions stated there.

    nonresidential code: 2024 International Building Code (County ordinances may amend, modify, or delete portions before enactment; HUD-compliant mobile or manufactured homes and specified Group R-3 specialty resorts or vacation home establishments are excluded; no single-family dwelling fire sprinkler may be required.) · permit exemption effective date: 2026 (Applies to listed repairs and substantially similar replacements of existing exterior parts.)

    “Additional deletions, modifications, and amendments to the county ordinance may be made by the governing body and are effective upon their adoption and filing with the county auditor. [...] Notwithstanding any authority granted to a county, municipality, or township to prescribe building codes or standards or to issue building permits, a county, municipality, or township may not require a building permit for the repair or substantially similar replacement of any of the following existing exterior parts of a detached single-family owner-occupied residential structure:”

Set by your township or city, not the county

In South Dakota, zoning is adopted by each township or city, so Brule County has no county-wide answer on these. Find your township or city in the list of places on this page, or call its clerk or zoning administrator.

  • Minimum dwelling size
  • Lot coverage
  • Building height
  • Camping on your land
  • Manufactured homes
  • Accessory dwellings
  • Short-term rentals

Still unanswered

We looked and could not find an official answer yet. Silence is not permission — ask the county directly.

  • Certificate of occupancy — Certificates of occupancy in Brule County.

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Living off-grid in Brule County, South Dakota

Is Brule County a good place to live off-grid or homestead?

Brule County scores 46/100 on the Bolthole Index, a marginal county profile. Its strengths: deep seclusion — about 312 people within a 30-minute drive and manageable long-term carry cost. Watch-outs: thin water margin (23.3″/yr rainfall) and elevated current hazard exposure.

Do you need a building permit in Brule County, South Dakota?

Brule County generally requires a residential building permit, and it enforces county zoning. Onsite septic is permitted by South Dakota Department of Agriculture and Natural Resources (DANR) - On-Site Wastewater Program. Owner-builders may act as their own contractor to build their home. These answers are quoted from official sources and independently re-checked. Rules change and cities within the county differ — always confirm with the county before you buy or build.

Can you live in an RV or tiny home on your land in Brule County?

Living in an RV on your own land in Brule County is limited to specific cases: Camping-unit occupancy, including travel trailers, campers, recreation vehicles, and trailer coaches, on land governed by the Brule County Zoning Ordinance. A camping unit may not be parked and occupied on a lot outside a designated campground for more than 14 days within a calendar year unless an applicable exception or approval applies. A camping unit intended to be occupied for more than 14 days within a calendar year outside a campground must obtain a conditional use before occupancy on the fifteenth or later day, subject to the ordinance's cross-reference. A tiny home is limited to specific cases. Confirm with the county before relying on it.

How much does land cost in Brule County, South Dakota?

Land in Brule County runs about $3,337 per acre, based on the latest county data.

What is the water situation in Brule County?

Brule County gets about 23.3" of rain a year, with severe drought in roughly 14.2% of years.

How remote is Brule County?

A representative private-land location has about 312 people within a 30-minute drive and 100,315 within two hours. The road-network catchments count population across county lines and clusters of smaller cities; straight-line radius values remain available as a comparison.

How Brule compares in South Dakota

Compare side-by-side →See all 66 South Dakota counties ranked →