Davidson County, Tennessee requires a Metro Codes building permit for new homes and many residential alterations1. Metro zoning applies countywide, with allowed uses and development standards determined parcel by parcel23. Metro Public Health handles local septic administration4.
At a glance
- Building permit
- Required for new homes and many residential alterations1
- Zoning
- Countywide Metro zoning; uses and dimensional rules vary by parcel23
- Building codes
- Metro adopted the 2024 international building and trade codes with local amendments5
- Septic
- Metro Public Health administers local septic review; final inspection occurs before covering the system46
- Owner-builder
- A qualifying owner-occupant may self-permit, but remains responsible for codes and inspections78
- Floodplain
- All development in a Special Flood Hazard Area requires local permits9
Who to call
Building permits
Metro Nashville Department of Codes and Building Safety
Building permits, plan review and inspections for Davidson County / Metro Nashville, including residential construction and use-and-occupancy
800 President Ronald Reagan Way, 1st Floor, Nashville, TN 37210
Planning & zoning
Metro Nashville Planning Department
Zoning administration under the Metropolitan Zoning Code, subdivision review, and development questions for Davidson County / Metro Nashville
800 President Ronald Reagan Way, 2nd Floor, Nashville, TN 37210
Septic permits
Metro Public Health Department, Septic and Sewage Disposal Systems
Septic (subsurface sewage disposal) system permitting, soils interpretation, design review and inspection for Davidson County
2500 Charlotte Avenue, Nashville, TN 37209
Contact details are copied from each office’s official page and were checked against it on October 4, 2026.
Off-grid gear
Going off-grid in Davidson County means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Davidson County, Tennessee?
Yes. Davidson County requires a Metro building permit for new residential buildings, additions, mobile or modular homes, accessory structures, pools, habitable-space conversions, specified alterations and demolitions; normal maintenance repairs described by Metro are excluded1. A site plan accompanies a residential construction permit application1. Metro adopted the 2024 international building, trade, accessibility and energy standards in 20255. Tennessee's state residential permit program serves jurisdictions without local code enforcement, so it does not replace Metro Codes review in Davidson County105.
Who is the Davidson County building department, and how do you reach it?
The Metro Nashville Department of Codes and Building Safety handles building permits, plan review and inspections for Davidson County11. Its office is at 800 President Ronald Reagan Way, 1st Floor, Nashville, TN 37210; call 615-862-650011. Residential applications can be made through ePermits11. Metro assigns the application to a Zoning Examiner, routes it for required agency approvals and signoffs, then issues the permit after approval and payment12. New-home fees are valuation-based, remodeling fees use actual improvement value, and separate fees apply to plumbing, electrical and gas/mechanical permits13. A qualifying owner-occupant may use a self-permit, but must accept code responsibility, submit notarized affidavits and cannot self-permit a detached accessory dwelling unit7. The workers' compensation exemption does not waive code compliance, trade permits or inspections8.
Does Davidson County have zoning?
Yes. Metro zoning covers Davidson County, and each parcel's allowed uses and development standards follow its zone district23. Metro publishes its zoning classifications, while overlays and Specific Plans can add to or change the base district rules1415. Minimum lot area, setbacks, lot coverage and height are district-specific, not universal county rules16171819. Metro's RS5 example has a minimum 5,000-square-foot lot, but that example does not govern differently zoned parcels16. Metro's occupancy table limits occupants according to floor area; it does not establish a general countywide minimum dwelling size20. Call Metro Planning at 615-862-7190 for zoning, subdivision or development questions21.
How do septic permits work in Davidson County?
Davidson County is a contract county for septic permit and Certificate of Completion packages, while Metro Public Health administers local septic review and enforcement224. Metro Public Health is at 2500 Charlotte Avenue, Nashville, TN 37209; call 615-340-561623. A conventional septic system serving a residence or accessory building requires a permit before installation24. Once installation is complete, the installer must arrange a final inspection before covering the system; approval leads to a Certificate of Completion6. Site evaluation matters because only about 16.1% of mapped Davidson County soils avoid severe limits for a conventional drain field25. If a qualifying bonded sanitary sewer serves the street, the utility may require connection instead of continued use of another sewage-disposal method26.
Can you live in an RV or tiny home on your land in Davidson County?
We could not confirm a general Davidson County rule allowing long-term RV living, private-land camping or tiny-home occupancy. Metro zoning still controls every parcel, and the district, overlays and Specific Plans determine the permitted use and dimensional standards215. Ask Metro Planning whether the proposed dwelling and occupancy are allowed on the specific parcel before buying or placing a unit21. A qualifying owner-occupant may self-permit a single-family residence but cannot use that route for a detached accessory dwelling unit7. Metro's floor-area table regulates occupancy loads, not whether a tiny home is an allowed dwelling type on a particular parcel20.
How do you build a home in Davidson County, step by step?
- Confirm the parcel's use, lot size, setbacks, coverage, height, overlays and any Specific Plan with Metro Planning271421.
- Check flood mapping early: all development in a Special Flood Hazard Area needs local permits, and residential floors in the floodplain must sit four feet above the base flood elevation28.
- If sewer is unavailable, coordinate the septic construction permit with Metro Public Health42423.
- Submit the site plan and residential application to Metro Codes, then complete each required agency signoff and pay the valuation-based and trade-permit fees11213.
- Follow the issued inspection checklist and obtain separate trade inspections where applicable29.
- After final building and trade inspections, obtain the Use and Occupancy letter30.
What should you check before buying land in Davidson County?
Start with parcel zoning, sewer availability, septic suitability, flood exposure and legal access. Every development in a Special Flood Hazard Area requires local permits; floodplain fill must be balanced by an equal volume of cut, and floodway development is prohibited with few exceptions3132. Altering floodplain land or drainage channels also requires written approval from the Metro water-services director28. For an unsewered lot, ask Metro Public Health about soils and system design before treating acreage as buildable425. A driveway connecting to state highway right-of-way requires a separate TDOT entrance permit33. Subdivision review has separate sewage-disposal and site requirements, and accessible public water can trigger infrastructure conditions3435.
Watch-outs
- A Metro building permit comes with a project-specific inspection checklist, and the final Use and Occupancy letter follows completion of required building and trade inspections3637.
- Floodplain rules reach more than buildings: all development in a Special Flood Hazard Area requires local permits, and larger land-disturbance work can also require a grading permit9.
- A floodway is substantially more restrictive than the broader floodplain: development is prohibited with few exceptions32.
- Metro zoning has no single universal lot size, setback, coverage or height rule; the parcel's district, overlays and Specific Plans control2716171819.
- We could not confirm a general private-well rule or a complete countywide local driveway rule; ask Metro Public Health about a proposed well and Metro Planning about access before relying on either2321.
Sources
- Residential Building Permit Procedures, quoted and re-checked
- Building Permit Process, quoted and re-checked
- Building Permit Process, quoted and re-checked
- Septic and Sewage Disposal Systems, quoted and re-checked
- Adopted Codes for Metro Nashville, quoted and re-checked
- Subsurface Sewage Disposal System Frequently Asked Questions, quoted and re-checked
- Residential Building Permit Procedures, quoted and re-checked
- Metro Nashville Codes Administration, Affidavit of Exemption, quoted and re-checked
- Build Responsibly to Prevent Flood Damage, quoted and re-checked
- Residential Permit FAQs (Tennessee statewide rule), quoted and re-checked
- Metro Nashville Department of Codes and Building Safety (nashville.gov)
- Building Permit Process, quoted and re-checked
- Building Permit Process, quoted and re-checked
- Zoning Classifications, quoted and re-checked
- Understanding the Zoning Code, quoted and re-checked
- Understanding the Zoning Code, quoted and re-checked
- Understanding the Zoning Code, quoted and re-checked
- Understanding the Zoning Code, quoted and re-checked
- Understanding the Zoning Code, quoted and re-checked
- Property Standards Code Violation Categories, quoted and re-checked
- Metro Nashville Planning Department (nashville.gov)
- Third-Party Permits & Final Inspections, quoted and re-checked
- Metro Public Health Department, Septic and Sewage Disposal Systems (nashville.gov)
- Online Application for Septic Related Services, quoted and re-checked
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- Utility Customers Frequently Asked Questions (Tennessee statewide rule), quoted and re-checked
- Understanding the Zoning Code, quoted and re-checked
- Metropolitan Nashville–Davidson County Stormwater Management Manual, Volume 1 - Regulations, 2026, Volume 1 Appendix A, quoted and re-checked
- Building Permit Process, quoted and re-checked
- Building Permit Process, quoted and re-checked
- Build Responsibly to Prevent Flood Damage, quoted and re-checked
- Build Responsibly to Prevent Flood Damage, quoted and re-checked
- Highway Entrance Permits (Tennessee statewide rule), quoted and re-checked
- Regulations to Govern Subsurface Sewage Disposal Systems, quoted and re-checked
- Metro Nashville Subdivision Regulations Amended January 21, 2021, quoted and re-checked
- Building Permit Process, quoted and re-checked
- Building Permit Process, quoted and re-checked
Written October 4, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.