Kaufman County, Texas

Building permits, zoning and land rules in Kaufman County, Texas

49Index Score / 100
#146 of 254 in Texas

Unincorporated Kaufman County, Texas requires a Fire Marshal building-permit application for public buildings, commercial establishments and multifamily dwellings with more than 3 units; a typical single-family house is not listed1. Unincorporated land has no county zoning, but septic, floodplain and driveway approvals can still apply2345. Development Services handles septic outside Oak Ridge and Terrell, which have their own septic authorities6.

At a glance

Building permit
Required for public, commercial and multifamily buildings with more than 3 units1
Building code
2024 International Fire Code applies to covered commercial and public buildings7
Zoning
No general county zoning authority over unincorporated land2
Septic
Development Services handles septic except inside Oak Ridge and Terrell36
RV / tiny home living
No county zoning restriction, but septic and other development rules can still apply23
Driveway / culvert
A county application and $75 fee apply within the county right-of-way58
Floodplain
A permit is required for development in mapped floodplain in unincorporated areas4

Who to call

Building permits

Kaufman County Fire Marshal's Office

Building permits for public buildings, commercial establishments and multi-family dwellings with more than 3 units in unincorporated Kaufman County; fire code compliance and construction/operational permits

469-376-4122

firemarshal@kaufmancounty.net

1902 E. US Highway 175, Kaufman, TX 75142

Septic permits

Kaufman County Development Services

On-site sewage facility (OSSF/septic) permits, plats, 911 addressing, culvert and floodplain permits for unincorporated Kaufman County

(469) 376-4127

101 N. Houston Street, Kaufman, TX 75142

Contact details are copied from each office’s official page and were checked against it on October 11, 2026.

Off-grid gear

Going off-grid in Kaufman County means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Do you need a building permit in Kaufman County, Texas?

Kaufman County requires a Fire Marshal building-permit application for new public buildings, commercial establishments and multifamily dwellings with more than 3 units in unincorporated areas; a typical single-family house is not included in that published list1. Ask the Fire Marshal to confirm the project's classification and Development Services which septic, culvert, floodplain and addressing applications apply19. Inside Terrell, the city handles building permits, including new construction and specified remodeling or accessory work, and also administers septic within city limits1011.

Who issues Kaufman County building permits and inspections?

The Kaufman County Fire Marshal's Office handles covered building applications and inspections in unincorporated areas; call 469-376-4122 or email firemarshal@kaufmancounty.net1129. Kaufman County adopted the 2024 International Fire Code with amendments for commercial and public buildings under the Fire Marshal's jurisdiction7. Subcontractors schedule required inspections, including tests and visual checks before work is buried or covered12. Covered public, commercial and multifamily buildings with more than 3 units need a Certificate of Occupancy before use and annual renewal following a fire-hazard inspection; a new business or ownership change also triggers the requirement, with stated exceptions for certain home businesses and projects already undergoing building-permit review131.

Does Kaufman County have zoning?

Unincorporated Kaufman County has no county zoning ordinance, so county zoning does not set minimum dwelling size, lot size, setbacks, lot coverage, height or land-use districts, or prohibit accessory dwellings, RVs, tiny homes, manufactured homes or temporary camping2. Terrell, Mabank and Kemp have municipal zoning; Mesquite, mainly in Dallas County but extending into Kaufman County, also sets its own zoning14151617. Development Services retains septic permitting outside Oak Ridge and Terrell6. Dividing unincorporated land can require county platting review, subject to state exceptions and municipal jurisdictional limits18.

How do septic permits work in Kaufman County?

Kaufman County Development Services handles septic permits for unincorporated land and city addresses except Oak Ridge and Terrell, which are separate authorized agents; a septic system must be permitted before operation36. Call (469) 376-4127 about county OSSF rules19. Installation or repair of any system portion, including sprinklers, requires a TCEQ-licensed installer or repairer20. Texas's narrow exemption for a single-family dwelling on at least 10 acres requires every condition, including a licensed site evaluation and system components at least 100 feet from property lines; ask Development Services whether county requirements allow it21. Only about 3% of Kaufman County soils rate 'not limited' for a conventional drain field, so arrange a site evaluation early; poor ratings do not mean septic is impossible22.

Can you live in an RV or tiny home in Kaufman County?

For an RV or tiny home on unincorporated Kaufman County land, septic, floodplain, access and platting requirements still need attention even without county zoning34518. We could not confirm county requirements for long-term RV occupancy, utility connections or off-grid sanitation, so ask Development Services how the proposed water and wastewater setup will be treated before moving onto the parcel19. Inside Terrell, permitted uses depend on the city's zoning district, and the city administers septic1411.

Building a home in Kaufman County: the steps, in order

  1. Confirm whether the parcel is unincorporated or inside a city or its permitting jurisdiction18.
  2. Ask the Fire Marshal whether the proposed building is one of the public, commercial or larger multifamily projects requiring its building application19.
  3. If the county construction process applies, submit the Pre-Development Questionnaire, attend the pre-development meeting and file the applicable applications23.
  4. Allow up to 30 days for each submittal review, then attend the pre-construction meeting before building-permit issuance23.
  5. Arrange septic, floodplain and county-right-of-way approvals that fit the site345.
  6. For a covered project, have subcontractors schedule required inspections and complete final acceptance before the Certificate of Compliance1223.

What should you check before buying land in Kaufman County?

Development in an unincorporated FEMA-designated floodplain requires a Kaufman County floodplain permit, with fees based on project scope4. A driveway or culvert within the county right-of-way requires a Culvert Application and $75 fee; Development Services requests payment after reviewing the required documents58. The precinct commissioner determines culvert size, and the permit expires after 12 months5. State-highway access instead requires a fully executed state driveway permit before right-of-way construction24. Confirm plat status before buying or dividing acreage18. For covered county building projects, the building-permit fee uses gross square footage, the county's cost-per-square-foot chart and a 0.3% factor25.

Watch-outs

  • The Fire Marshal's published building-permit list names public buildings, commercial establishments and multifamily dwellings with more than 3 units, not typical single-family houses1.
  • A county right-of-way driveway needs a county Culvert Application, while a connection to a state highway follows the state driveway-permit process524.
  • Texas has limited trade-license exemptions for an owner working on the owner's residence or homestead, but we could not confirm a county owner-builder exemption from permits or inspections; ask the Fire Marshal before starting work269.

Sources

  1. Permits and Inspections, quoted and re-checked
  2. Texas law on county zoning and building authority
  3. On-Site Sewage Facilities, quoted and re-checked
  4. Floodplain Management, quoted and re-checked
  5. Culvert Permits, quoted and re-checked
  6. Kemp: FAQs - Development Services (Kaufman County), quoted and re-checked
  7. Permits and Inspections, quoted and re-checked
  8. Payments, quoted and re-checked
  9. Kaufman County Fire Marshal's Office (kaufmancounty.net)
  10. Terrell: Building Permits and Inspections (Kaufman County), quoted and re-checked
  11. Terrell: Septic Installation / Inspection (OSSF) (Kaufman County), quoted and re-checked
  12. Permits and Inspections, quoted and re-checked
  13. Certificate of Occupancy, quoted and re-checked
  14. Terrell: Zoning Changes (Kaufman County), quoted and re-checked
  15. Town of Mabank: Permits & Inspections (Kaufman County), quoted and re-checked
  16. Kemp: Sec. 42-220. Permitted uses, A, Agricultural District (Kaufman County), quoted and re-checked
  17. Mesquite: Appendix C, Zoning Ordinance, § 4.933 (Kaufman County), quoted and re-checked
  18. Subdivisions & Use of County Land, quoted and re-checked
  19. Kaufman County Development Services (kaufmancounty.net)
  20. On-Site Sewage Facilities, quoted and re-checked
  21. Getting a Permit for an OSSF - Such as a Septic System (Texas statewide rule), quoted and re-checked
  22. Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
  23. Permits and Inspections, quoted and re-checked
  24. Section 4: Driveway Permits, Design, and Materials (Texas statewide rule), quoted and re-checked
  25. Building Permits | Kaufman County, TX, quoted and re-checked
  26. Exemptions to Electrician Licensing (Texas statewide rule), quoted and re-checked

Written October 11, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Found land here? Start a Property Hunt →

Compared with neighboring counties

Like all 6 of its neighbors, Kaufman County has no countywide zoning.

RuleKaufman CountyRockwall CountyVan Zandt CountyDallas CountyRains CountyHunt CountyCollin County
Building permitLimitedLimitedLimitedLimitedLimitedNot requiredLimited
County zoningNoNoNoNoNoNoNo
Septic permitsCounty Development ServicesCounty Env. Health CoordinatorCounty Abatement/Env. OfficeCounty Health & Human ServicesCounty Env. OfficeCounty Health Dept.County Development Services

County locator

Kaufman County in Texas

49
County map
Kaufman County highlighted among the Texas counties · colored by Index score

How Kaufman County scores

Seclusion17100% ev.
Self-Sufficiency49100% ev.
Admin Boringness7290% ev.
Durability63100% ev.
Property Autonomy71100% ev.
Carry Cost69100% ev.

Evidence strength: 98%. This reports direct-source completeness and fallback use; it is separate from the score and is not a confidence interval. How it works →

$300kTypical home
1.7%Property tax
$5,522Land / acre
41.4"Annual rain
13.5% of yrsSevere drought
43.4 / yr (+27.9)Mid-century 100°F days
23.1 daysMid-century dry spell
2.35" (+3.7%)Mid-century 1-day rain
1.39×Wildfire change factor
100%Forward climate coverage
$2,241Home insurance / yr
0.4% / yrInsurance growth
0%Nonrenewal rate
county median (2+ published ZIPs)Insurance basis
69,686People within 30 min
9,245,325People within 2 hr
92,717Radius comparison (15 mi)
237.8People / sq mi
0.2%Federal land
100%Land at 15% slope or less
3.4%Soils rated "not limited" for septic (strict USDA rating)
14,756 acWorkable land screen
21.5%Wooded land
16.9 tonsBiomass / forest ac
65.5°FAvg temp

Scout Kaufman County

Camp here before you commitBook a few nights nearby on Hipcamp →Already own land here?Earn money hosting campers — get $100 when you become a Hipcamp host →

Some links are affiliate or referral links — we may earn a commission, at no cost to you.

Property hunt

Find land. Bring the promising ones back.

Search live inventory elsewhere, then cost and vet each candidate here. No copied listings, account, or paid data feed.

Each button opens a current land search for Kaufman County. Listing sites control their own results and filters.

Analyze a property
Add setup-cost allowances

Use rough quotes or placeholders. Blank fields count as $0.

Working estimate

—land + entered setup costs
Asking $ / acre
—
Setup allowance
—
All-in $ / acre
—

A planning estimate, not a valuation or contractor quote. The USDA benchmark includes farm land and buildings; it is context, not a parcel comp.

Before an offer

Parcel due diligence

0/8 checked

Saved properties and checklist progress stay on this device. Bolthole Index does not receive them.

Cities and towns in Kaufman County

Inside a city or town, that city usually issues building permits and sets zoning; the county’s rules above cover unincorporated land. Septic, wells and floodplain rules usually stay with the county or state everywhere.

Not yet researched: Combine · Cottonwood · Crandall · Village of Grays Prairie · Town of Oak Grove · Town of Oak Ridge · Village of Rosser · Town of Scurry · Town of Talty

Answers from the rulebook for Kaufman County

What the ordinances and state agencies actually say — one answer per question, each quoted from the official source and independently re-checked.

Kaufman County rules

  • Building permitLimited

    New construction in unincorporated Kaufman County.

    • A building permit application is required when the building is a public building, commercial establishment, or multi-family dwelling with more than 3 units.
    • The page also lists possible separate applications for 911 addressing, OSSF, culvert, and floodplain matters.

    multi-family dwelling threshold: > 3 units (more than 3 units)

    “If your building will be a public building, commercial establishment, or a multi-family dwelling with more than 3 units, you will need to submit a building permit application to the Fire Marshal's Office.”
  • Building code adoptedPartial

    New commercial establishments and public buildings in unincorporated Kaufman County under the County Fire Marshal's jurisdiction.

    • The adopted code is the 2024 International Fire Code with amendments.
    • The page describes responsibility for new commercial establishments and public buildings in unincorporated Kaufman County.

    adopted code: 2024 International Fire Code (with amendments)

    “Kaufman County has adopted the 2024 International Fire Code with amendments.”
    One more reviewed finding on this topic
    • Partial — New commercial establishments and public buildings in unincorporated Kaufman County subject to the county Fire Marshal.
      “Kaufman County has adopted the 2024 International Fire Code with amendments.”
  • InspectionsRequired

    Projects requiring County construction permits in unincorporated Kaufman County.

    • Required inspections are identified during the Pre-Construction Meeting.
    • Subcontractors are responsible for contacting the respective department to schedule required inspections.
    • A final inspection occurs after associated construction permits pass acceptance tests.
    “Sub-contractors are responsible for contacting the respective department to schedule required inspections throughout the construction process.”
    One more reviewed finding on this topic
    • Required — New commercial establishments and public buildings in unincorporated Kaufman County, including required construction and final inspections.
      “Sub-contractors are responsible for contacting the respective department to schedule required inspections throughout the construction process. These may include hydrostatic pressure tests, pneumatic air pressure tests, visual inspections prior to being buried or covered, and operational tests.”
  • Certificate of occupancyRequired

    Public buildings, commercial establishments, and residential buildings with four or more units under the Kaufman County Fire Marshal process.

    • A new CO is required for a new business or a change in ownership of an existing building or business.
    • A CO is not required when a building permit has already been applied for and the CO will be issued during final inspection, for an individual working from a home office, for a residence-based business with no employees or customers visiting, or when no CO is required for a TDLR license.
    • Covered buildings must renew annually; renewal follows a fire-hazard inspection and lasts one year.
    • Additional inspection fees apply when violations remain after the second inspection.
    “All public buildings, commercial establishments, and residential buildings with four or more units are required to obtain a Certificate of Occupancy from the Fire Marshal's Office before occupying the building.”
    One more reviewed finding on this topic
    • Limited — Existing commercial or public buildings under the Kaufman County Fire Marshal process.
      “If there will be a change in ownership, but the use / occupancy type of the building will remain the same, you will need to apply for a new Certificate of Occupancy.”
  • Zoning districts · by state lawNo county rule

    Unincorporated Kaufman County: no county rule sets this, because Kaufman County has adopted no county zoning ordinance (Texas law lets some counties zone, but this one has not). The county legal census found no county zoning ordinance, citing kaufmancounty.net.

    • Septic, floodplain, subdivision and health rules still apply; cities and towns set their own rules inside their limits.
    • Chapter 231 does not grant a general statewide county zoning power; authority is provided through geographically or subject-matter limited subchapters.
    • For Padre Island, the authority applies in Cameron or Willacy County outside a municipality and within two miles of a publicly owned park or recreational development, or within two miles of a beach, wharf, or bathhouse used by at least 500 persons annually.
    “This subchapter applies to the areas of Padre Island located in Cameron or Willacy County and located: (1) outside a municipality but within two miles of a publicly owned park or recreational development; or (2) within two miles of a beach, wharf, or bathhouse used by at least 500 persons annually.”
  • Minimum dwelling size · by state lawNo county rule

    Unincorporated Kaufman County: no county rule sets this, because Kaufman County has adopted no county zoning ordinance (Texas law lets some counties zone, but this one has not). The county legal census found no county zoning ordinance, citing kaufmancounty.net.

    • Septic, floodplain, subdivision and health rules still apply; cities and towns set their own rules inside their limits.
    • Chapter 231 does not grant a general statewide county zoning power; authority is provided through geographically or subject-matter limited subchapters.
    • For Padre Island, the authority applies in Cameron or Willacy County outside a municipality and within two miles of a publicly owned park or recreational development, or within two miles of a beach, wharf, or bathhouse used by at least 500 persons annually.
    “This subchapter applies to the areas of Padre Island located in Cameron or Willacy County and located: (1) outside a municipality but within two miles of a publicly owned park or recreational development; or (2) within two miles of a beach, wharf, or bathhouse used by at least 500 persons annually.”
  • Minimum lot size · by state lawNo county rule

    Unincorporated Kaufman County: no county rule sets this, because Kaufman County has adopted no county zoning ordinance (Texas law lets some counties zone, but this one has not). The county legal census found no county zoning ordinance, citing kaufmancounty.net.

    • Septic, floodplain, subdivision and health rules still apply; cities and towns set their own rules inside their limits.
    • Chapter 231 does not grant a general statewide county zoning power; authority is provided through geographically or subject-matter limited subchapters.
    • For Padre Island, the authority applies in Cameron or Willacy County outside a municipality and within two miles of a publicly owned park or recreational development, or within two miles of a beach, wharf, or bathhouse used by at least 500 persons annually.
    “This subchapter applies to the areas of Padre Island located in Cameron or Willacy County and located: (1) outside a municipality but within two miles of a publicly owned park or recreational development; or (2) within two miles of a beach, wharf, or bathhouse used by at least 500 persons annually.”
  • Setbacks · by state lawNo county rule

    Unincorporated Kaufman County: no county rule sets this, because Kaufman County has adopted no county zoning ordinance (Texas law lets some counties zone, but this one has not). The county legal census found no county zoning ordinance, citing kaufmancounty.net.

    • Septic, floodplain, subdivision and health rules still apply; cities and towns set their own rules inside their limits.
    • Chapter 231 does not grant a general statewide county zoning power; authority is provided through geographically or subject-matter limited subchapters.
    • For Padre Island, the authority applies in Cameron or Willacy County outside a municipality and within two miles of a publicly owned park or recreational development, or within two miles of a beach, wharf, or bathhouse used by at least 500 persons annually.
    “This subchapter applies to the areas of Padre Island located in Cameron or Willacy County and located: (1) outside a municipality but within two miles of a publicly owned park or recreational development; or (2) within two miles of a beach, wharf, or bathhouse used by at least 500 persons annually.”
  • Lot coverage · by state lawNo county rule

    Unincorporated Kaufman County: no county rule sets this, because Kaufman County has adopted no county zoning ordinance (Texas law lets some counties zone, but this one has not). The county legal census found no county zoning ordinance, citing kaufmancounty.net.

    • Septic, floodplain, subdivision and health rules still apply; cities and towns set their own rules inside their limits.
    • Chapter 231 does not grant a general statewide county zoning power; authority is provided through geographically or subject-matter limited subchapters.
    • For Padre Island, the authority applies in Cameron or Willacy County outside a municipality and within two miles of a publicly owned park or recreational development, or within two miles of a beach, wharf, or bathhouse used by at least 500 persons annually.
    “This subchapter applies to the areas of Padre Island located in Cameron or Willacy County and located: (1) outside a municipality but within two miles of a publicly owned park or recreational development; or (2) within two miles of a beach, wharf, or bathhouse used by at least 500 persons annually.”
  • Building height · by state lawNo county rule

    Unincorporated Kaufman County: no county rule sets this, because Kaufman County has adopted no county zoning ordinance (Texas law lets some counties zone, but this one has not). The county legal census found no county zoning ordinance, citing kaufmancounty.net.

    • Septic, floodplain, subdivision and health rules still apply; cities and towns set their own rules inside their limits.
    • Chapter 231 does not grant a general statewide county zoning power; authority is provided through geographically or subject-matter limited subchapters.
    • For Padre Island, the authority applies in Cameron or Willacy County outside a municipality and within two miles of a publicly owned park or recreational development, or within two miles of a beach, wharf, or bathhouse used by at least 500 persons annually.
    “This subchapter applies to the areas of Padre Island located in Cameron or Willacy County and located: (1) outside a municipality but within two miles of a publicly owned park or recreational development; or (2) within two miles of a beach, wharf, or bathhouse used by at least 500 persons annually.”
  • Living in an RV · by state lawNo county rule

    Unincorporated Kaufman County: no county rule sets this, because Kaufman County has adopted no county zoning ordinance (Texas law lets some counties zone, but this one has not). The county legal census found no county zoning ordinance, citing kaufmancounty.net.

    • Septic, floodplain, subdivision and health rules still apply; cities and towns set their own rules inside their limits.
    • Chapter 231 does not grant a general statewide county zoning power; authority is provided through geographically or subject-matter limited subchapters.
    • For Padre Island, the authority applies in Cameron or Willacy County outside a municipality and within two miles of a publicly owned park or recreational development, or within two miles of a beach, wharf, or bathhouse used by at least 500 persons annually.
    “This subchapter applies to the areas of Padre Island located in Cameron or Willacy County and located: (1) outside a municipality but within two miles of a publicly owned park or recreational development; or (2) within two miles of a beach, wharf, or bathhouse used by at least 500 persons annually.”
  • Camping on your land · by state lawNo county rule

    Unincorporated Kaufman County: no county rule sets this, because Kaufman County has adopted no county zoning ordinance (Texas law lets some counties zone, but this one has not). The county legal census found no county zoning ordinance, citing kaufmancounty.net.

    • Septic, floodplain, subdivision and health rules still apply; cities and towns set their own rules inside their limits.
    • Chapter 231 does not grant a general statewide county zoning power; authority is provided through geographically or subject-matter limited subchapters.
    • For Padre Island, the authority applies in Cameron or Willacy County outside a municipality and within two miles of a publicly owned park or recreational development, or within two miles of a beach, wharf, or bathhouse used by at least 500 persons annually.
    “This subchapter applies to the areas of Padre Island located in Cameron or Willacy County and located: (1) outside a municipality but within two miles of a publicly owned park or recreational development; or (2) within two miles of a beach, wharf, or bathhouse used by at least 500 persons annually.”
  • Tiny homes · by state lawNo county rule

    Unincorporated Kaufman County: no county rule sets this, because Kaufman County has adopted no county zoning ordinance (Texas law lets some counties zone, but this one has not). The county legal census found no county zoning ordinance, citing kaufmancounty.net.

    • Septic, floodplain, subdivision and health rules still apply; cities and towns set their own rules inside their limits.
    • Chapter 231 does not grant a general statewide county zoning power; authority is provided through geographically or subject-matter limited subchapters.
    • For Padre Island, the authority applies in Cameron or Willacy County outside a municipality and within two miles of a publicly owned park or recreational development, or within two miles of a beach, wharf, or bathhouse used by at least 500 persons annually.
    “This subchapter applies to the areas of Padre Island located in Cameron or Willacy County and located: (1) outside a municipality but within two miles of a publicly owned park or recreational development; or (2) within two miles of a beach, wharf, or bathhouse used by at least 500 persons annually.”
  • Manufactured homes · by state lawNo county rule

    Unincorporated Kaufman County: no county rule sets this, because Kaufman County has adopted no county zoning ordinance (Texas law lets some counties zone, but this one has not). The county legal census found no county zoning ordinance, citing kaufmancounty.net.

    • Septic, floodplain, subdivision and health rules still apply; cities and towns set their own rules inside their limits.
    • Chapter 231 does not grant a general statewide county zoning power; authority is provided through geographically or subject-matter limited subchapters.
    • For Padre Island, the authority applies in Cameron or Willacy County outside a municipality and within two miles of a publicly owned park or recreational development, or within two miles of a beach, wharf, or bathhouse used by at least 500 persons annually.
    “This subchapter applies to the areas of Padre Island located in Cameron or Willacy County and located: (1) outside a municipality but within two miles of a publicly owned park or recreational development; or (2) within two miles of a beach, wharf, or bathhouse used by at least 500 persons annually.”
  • Accessory dwellings · by state lawNo county rule

    Unincorporated Kaufman County: no county rule sets this, because Kaufman County has adopted no county zoning ordinance (Texas law lets some counties zone, but this one has not). The county legal census found no county zoning ordinance, citing kaufmancounty.net.

    • Septic, floodplain, subdivision and health rules still apply; cities and towns set their own rules inside their limits.
    • Chapter 231 does not grant a general statewide county zoning power; authority is provided through geographically or subject-matter limited subchapters.
    • For Padre Island, the authority applies in Cameron or Willacy County outside a municipality and within two miles of a publicly owned park or recreational development, or within two miles of a beach, wharf, or bathhouse used by at least 500 persons annually.
    “This subchapter applies to the areas of Padre Island located in Cameron or Willacy County and located: (1) outside a municipality but within two miles of a publicly owned park or recreational development; or (2) within two miles of a beach, wharf, or bathhouse used by at least 500 persons annually.”
  • Who permits septicCounty

    On-site sewage facility permitting administered through Kaufman County Development Services.

    • Installers or repairers must be licensed by TCEQ to install or repair any portion of a septic system.
    “Kaufman County requires Septic Systems to be permitted prior to be being put into operation.”
    One more reviewed finding on this topic
    • County — OSSF permitting administration by Kaufman County Development Services.
      “Kaufman County requires Septic Systems to be permitted prior to be being put into operation. Please see our OSSF ordinances for rules governing Septic Systems below.”
  • Septic permitRequired

    Septic systems and other on-site sewage facilities in Kaufman County.

    • The permit must be obtained before the septic system is put into operation.
    • Installation or repair requires TCEQ licensing.
    “Kaufman County requires Septic Systems to be permitted prior to be being put into operation.”
    One more reviewed finding on this topic
    • Required — Septic systems in Kaufman County before being placed into operation.
      “Kaufman County requires Septic Systems to be permitted prior to be being put into operation.”
  • Subdividing landRegulated (with conditions)

    Subdivision and land development in the unincorporated area of Kaufman County, including divisions of land subject to county platting requirements.

    • Kaufman County publishes and maintains Subdivision and Land Development Regulations 12-2025 and related platting checklists.
    • Under Texas Local Government Code §232.001, a plat is required for a tract outside municipal limits when the owner divides it into two or more parts to lay out a subdivision, lots, or public-use streets, alleys, squares, parks, or other parts of the tract.
    • The commissioners court must approve a plat required by §232.001 by an order entered in the court minutes.
    • State-law exceptions and limitations apply, including the agricultural, farm, ranch, wildlife-management, or timber-production exception; the related-person transfer exception for four or fewer parts; the exception for subdivisions in which all lots exceed 10 acres when no public-use part is laid out; and the Veterans' Land Board exception.
    • Municipal limits and applicable municipal extraterritorial-jurisdiction agreements may affect whether Kaufman County or a municipality administers platting.
    “Kaufman County requires that public improvements be constructed prior to the final plat being approved by the Commissioners Court.”
  • Driveway accessRequired

    Driveway and culvert installation within the Kaufman County right-of-way.

    • The permit expires 12 months after issuance.
    • Return the application plus fee to Development Services.
    • Development Services forwards the application to the applicable Commissioner's office.
    • The Commissioner determines the proper culvert size and may request additional information.
    • The stated processing contact time is 3–5 business days.

    permit validity: 12 months (from date of issuance)

    “A culvert permit is required for the installation of driveways and culverts within the County Right-of-Way, as stated in the Kaufman County Subdivision and Land Regulations; Section 11.03.”
    One more reviewed finding on this topic
    • Required — Installation of driveways and culverts within the Kaufman County Right-of-Way.
      “A culvert permit is required for the installation of driveways and culverts within the County Right-of-Way, as stated in the Kaufman County Subdivision and Land Regulations; Section 11.03.”
  • Building in a floodplainRequired

    Development in unincorporated areas designated by FEMA as floodplain.

    • A floodplain permit is required whenever development occurs in an unincorporated FEMA-designated floodplain.
    • The County regulations state that only limited uses and development permitted by the Flood Damage Prevention Ordinance are allowed in the 100-year floodplain.
    • FEMA review and permitting requirements also apply in FEMA-designated Areas of Special Flood Hazard.
    • The developer is responsible for floodplain permitting review fees.
    “A flood plain permit is required any time development occurs in any unincorporated area designated by the FEMA map to be in a flood plain.”
    One more reviewed finding on this topic
    • Required — Development in an unincorporated Kaufman County area designated as floodplain by the FEMA map.
      “A flood plain permit is required any time development occurs in any unincorporated area designated by the FEMA map to be in a flood plain.”
  • Permit feesPublished (with conditions)

    County building permits and selected development-related permits in unincorporated Kaufman County.

    • The building permit fee is calculated after application submission using gross square footage, cost per square foot, and a 0.3% factor.
    • The cost-per-square-foot chart is referenced on the County page but was not reproduced in the opened text.
    • Culvert permits within the County right-of-way have a $75 fee.
    • Floodplain permit fees are based on project scope and communicated to the applicant.

    building permit fee factor: 0.3 percent (Applied to gross square footage multiplied by cost per square foot.) · culvert fee: 75 USD (Culvert application for driveways and culverts within the County right-of-way.)

    “Square Footage (Gross) `x` Cost per Square Foot (see chart below) `x` .003 (0.3%) `=` Permit Fee”
    One more reviewed finding on this topic
    • Published (with conditions) — Driveway and culvert permits within the County Right-of-Way.
      “A Culvert Application is required for the installation of driveways and culverts within the County Right-of-Way, as stated in the Kaufman County Subdivision and Land Regulations; Section 11.03. Bureau Code: 1812517 Total Amount due: $75.00”
  • Permit processPublished (with conditions)

    New construction projects administered through Kaufman County Development Services and the Fire Marshal.

    • Submit a Pre-Development Questionnaire.
    • A pre-development meeting follows review of the questionnaire.
    • Applicable permit applications are submitted to the county.
    • Each submittal may take up to 30 days to review.
    • After approvals, a pre-construction meeting occurs and the building permit is issued at its conclusion.
    • Subcontractors must schedule required inspections.
    • A final acceptance test precedes the Certificate of Compliance.

    application review time: <= 30 days (each submittal may take up to 30 days)

    “Your applications and plans will be forwarded to the respective department for review. Each submittal may take up to 30 days to review to ensure compliance with applicable codes.”
    One more reviewed finding on this topic
    • Published (with conditions) — New construction permit process in unincorporated Kaufman County.
      “Your applications and plans will be forwarded to the respective department for review. Each submittal may take up to 30 days to review to ensure compliance with applicable codes.”
  • County-wide zoningAbsent

    As a Texas county, Kaufman County has no general zoning authority over unincorporated land; Development Services administers plats and permits but not zoning districts.

    Kaufman County Development Services ↗Scouted from the county site, not yet independently re-checked

Texas rules that apply here

  • Owner-builder exemptionConditional

    An owner performing electrical, plumbing, or air-conditioning and refrigeration work on the owner's own residence or homestead in Texas.

    • Electrical work is exempt from state electrician licensing when performed on a dwelling the person owns and resides in.
    • Plumbing is exempt from state plumbing licensing when performed by the property owner in the property owner's homestead.
    • Air-conditioning and refrigeration contracting is exempt from the applicable state registration requirements when performed in a building owned solely by the person as the person's home.
    • These exemptions do not establish a blanket exemption for every construction trade or contractor-regulated activity.
    “A person who perform electrical work on a dwelling that they own and reside in is not required by the state to be licensed as electricians.”
    One more reviewed finding on this topic
    • Conditional — Electrical work on a dwelling owned and occupied by the property owner in Texas.
      “A person who perform electrical work on a dwelling that they own and reside in is not required by the state to be licensed”
  • Septic inspectionLimited

    OSSF installation and, where applicable, maintenance inspections in Texas

    • Authorized agents or their designated representatives inspect system installation.
    • Some permitting authorities impose more stringent requirements.
    • Maintenance-provider inspection and reporting requirements apply to systems and circumstances governed by 30 TAC §285.91(4).
    • Electronic monitoring may reduce reporting to every six months where the stated monitoring conditions apply.

    reduced maintenance reporting interval with qualifying electronic monitoring: 6 months (only where the system uses the specified electronic monitoring, automatic notification, and disinfection monitoring)

    “Many times, the AA has a "designated representative" (DR) to assist them with their responsibilities, which include reviewing plans for constructing, altering, extending or repairing each OSSF; issuing permits; and inspecting system installation. [...] If the system uses an electronic monitor, automatic radio or telephone to notify the maintenance provider of system or component failure and to monitor the amount of disinfection in the system, reporting may be reduced to every six months.”
    One more reviewed finding on this topic
    • Limited — OSSFs using secondary treatment or drip irrigation in Texas.
      “A system using secondary treatment or drip irrigation must be inspected by a valid maintenance company once every four months, or be maintained by the single family homeowner, where allowed.”
  • Off-grid sanitationLimited

    Off-grid wastewater sanitation through an OSSF in Texas.

    • An OSSF generally requires a permit and approved plan before construction, installation, alteration, extension, repair, or operation.
    • A qualifying single-family dwelling on a tract of at least 10 acres may use the 10-acre permitting exemption only if every stated site-evaluation, setback, nuisance, groundwater, on-site disposal, and single-dwelling condition is met.
    • Local permitting authorities may impose requirements more stringent than state minimums.
    • Emergency repairs are exempt from permitting only for the listed repair types and must be reported in writing within 72 hours after repairs begin.

    10-acre exemption tract size: >= 10 acres (all TCEQ conditions must be satisfied) · 10-acre exemption OSSF setback: >= 100 feet from property line (all parts of the OSSF)

    “An OSSF may be exempt from permitting if it complies with all other requirements, including planning, construction, and installation standards of 30 TAC 285 AND meets the “10 acre rule”:”
    One more reviewed finding on this topic
    • Limited — Composting toilets used as on-site sewage facility treatment systems in Texas.
      “Composting toilets will be approved by the executive director provided the system has been tested and certified under NSF International Standard 41 (1999) or under any other standards approved by the executive director.”
  • Well permitLimited

    Drilling, equipping, operating, or completing a water well, or substantially altering a well or well pump, where the well is within a groundwater conservation district in Texas.

    • A groundwater conservation district must require a permit except as provided by Texas Water Code §36.117.
    • A district may not require a permit or permit amendment for maintenance or repair that does not increase production capability above the authorized or permitted production rate.
    • Permit applications must be in writing and sworn.
    • Whether a particular private well is exempt or subject to additional district requirements depends on the applicable groundwater conservation district's rules.

    permit application form: in writing and sworn

    “Except as provided by Section 36.117, a district shall require a permit for the drilling, equipping, operating, or completing of wells or for substantially altering the size of wells or well pumps.”
  • county zoning authorityLimited

    Texas counties adopting zoning regulations for specified unincorporated or otherwise specially defined areas.

    • Chapter 231 does not grant a general statewide county zoning power; authority is provided through geographically or subject-matter limited subchapters.
    • For Padre Island, the authority applies in Cameron or Willacy County outside a municipality and within two miles of a publicly owned park or recreational development, or within two miles of a beach, wharf, or bathhouse used by at least 500 persons annually.
    • Other Chapter 231 subchapters address special areas including the Amistad Recreation Area in Val Verde County, military zones, certain lakes, the El Paso Mission Trail Historical Area, Lake Somerville, and Falcon Lake in Zapata County.
    • The cited statute was enacted effective September 1, 1987; the Falcon Lake subchapter was added effective June 15, 2007, and amended effective September 1, 2009.

    Padre Island distance from publicly owned park or recreational development: <= 2 miles (Area must be outside a municipality and in Cameron or Willacy County.) · Padre Island distance from beach, wharf, or bathhouse: <= 2 miles (The beach, wharf, or bathhouse must be used by at least 500 persons annually.)

    “This subchapter applies to the areas of Padre Island located in Cameron or Willacy County and located: (1) outside a municipality but within two miles of a publicly owned park or recreational development; or (2) within two miles of a beach, wharf, or bathhouse used by at least 500 persons annually.”
    One more reviewed finding on this topic
    • Limited — County zoning authority over unincorporated land in Texas, where a specific statutory grant applies.
      “As you suggest, a county has very limited and specific zoning authority, and none that may be used to regulate construction or operation of the proposed facility.”
  • county building authorityLimited

    Texas counties adopting and enforcing fire-code building permits for specified buildings in unincorporated areas and applying residential building-code standards in certain counties.

    • Under Section 233.061, the county must have a population over 250,000 or be adjacent to a county with a population over 250,000.
    • Under Section 233.062, the fire code applies only to commercial establishments, public buildings, and multifamily residential dwellings consisting of four or more units constructed in an unincorporated area.
    • The fire code does not apply to an industrial facility having a fire brigade that conforms to Occupational Health and Safety Administration requirements.
    • A covered applicant must submit a plan and a commissioners-court-set application fee; the county must issue or deny the permit within 30 days, and failure to act within 30 days approves the construction for purposes of the subchapter.
    • The fire code must conform to the International Fire Code or Uniform Fire Code as those codes existed on May 1, 2005, or establish protective measures exceeding those standards; later editions may be adopted.
    • Residential standards under Section 233.152 apply only if the county adopts a resolution or order and the county is within 50 miles of an international border or has a population over 100.
    • Those residential standards apply only to new single-family-house or duplex construction beginning after September 1, 2009; manufactured or modular structures governed by Occupations Code Chapters 1201 or 1202 are excluded from the definition of new residential construction.
    • A municipality's building code controls in its extraterritorial jurisdiction, and Section 233.152 does not authorize county prior approval of new residential construction or county zoning regulations.
    • Fire-code inspection and permit fees may be charged under a fee schedule based on building type, limited to amounts necessary to administer and enforce the subchapter; inspection fees must be reasonable and reflect approximate inspection costs.

    county population threshold for fire-code authority: > 250000 persons (A county adjacent to a county over 250,000 also qualifies.) · multifamily residential dwelling threshold: >= 4 units (The fire code applies only to covered buildings constructed in an unincorporated area.) · residential-code border distance: <= 50 miles (Alternative qualification is county population over 100.) · application decision period: 30 days (If the commissioners court does not issue or deny the permit within 30 days after receiving the application and fee, construction is approved for purposes of the subchapter.) · residential standards effective construction date: > 2009-09-01 (Applies only to new residential construction that begins after September 1, 2009.)

    “The commissioners court of a county with a population of over 250,000 or a county adjacent to a county with a population of over 250,000 may adopt a fire code and rules necessary to administer and enforce the fire code. [...] The fire code applies only to the following buildings constructed in an unincorporated area of the county: (1) a commercial establishment; (2) a public building; and (3) a multifamily residential dwelling consisting of four or more units.”
    One more reviewed finding on this topic
    • Limited — County fire-code adoption and building-permit authority for specified buildings in unincorporated areas of qualifying Texas counties, including multifamily residential dwellings of four or more units.
      “The commissioners court of a county with a population of over 250,000 or a county adjacent to a county with a population of over 250,000 may adopt a fire code and rules necessary to administer and enforce the fire code.”

Inside cities and towns in Kaufman County

Municipal rules found while researching the county. They apply inside that city or town, not to unincorporated land.

  • Local zoningPresent

    Zoning within the City of Terrell, Kaufman County, Texas.

    • The page states that the current ordinance was adopted in September 2025.
    “The City's current Zoning Ordinance was adopted September of 2025.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission — ask the county directly.

  • Mandatory utility hookup — Water and sewer utility-connection requirements in Kaufman County.
  • Agricultural exemption — Agricultural exemptions from Kaufman County development, building, or land-use requirements.
  • Short-term rentals — Short-term rentals in Kaufman County.

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Living off-grid in Kaufman County, Texas

Is Kaufman County a good place to live off-grid or homestead?

Kaufman County scores 49/100 on the Bolthole Index, a solid county profile. Its strengths: low administrative friction for a quiet rural property and a stronger property-autonomy legal backdrop. Watch-outs: about 69,686 people within a 30-minute drive.

Do you need a building permit in Kaufman County, Texas?

Kaufman County requires a building permit only in limited cases (such as floodplains or specific zones), and it has no county-wide zoning. Onsite septic is permitted by Kaufman County Development Services / Public Works (OSSF program). Owner-builders may act as their own contractor to build their home. These answers are quoted from official sources and independently re-checked. Rules change and cities within the county differ — always confirm with the county before you buy or build.

Can you live in an RV or tiny home on your land in Kaufman County?

Living in an RV on your own land in Kaufman County is allowed: Unincorporated Kaufman County: no county rule sets this, because Kaufman County has adopted no county zoning ordinance (Texas law lets some counties zone, but this one has not). The county legal census found no county zoning ordinance, citing kaufmancounty.net. Septic, floodplain, subdivision and health rules still apply; cities and towns set their own rules inside their limits. Chapter 231 does not grant a general statewide county zoning power; authority is provided through geographically or subject-matter limited subchapters. A tiny home is allowed. Confirm with the county before relying on it.

How much does land cost in Kaufman County, Texas?

Land in Kaufman County runs about $5,522 per acre, based on the latest county data.

What is the water situation in Kaufman County?

Kaufman County gets about 41.4" of rain a year, with severe drought in roughly 13.5% of years.

How remote is Kaufman County?

A representative private-land location has about 69,686 people within a 30-minute drive and 9,245,325 within two hours. The road-network catchments count population across county lines and clusters of smaller cities; straight-line radius values remain available as a comparison.

How Kaufman compares in Texas

Compare side-by-side →See all 254 Texas counties ranked →