A new one- or two-family home in Dane County, Wisconsin requires a Uniform Dwelling Code building permit, including a stick-built, modular or manufactured home, issued by a delegated municipality or the state1. County zoning permits are required in the unincorporated towns that have adopted Dane County's zoning ordinance, with municipal zoning applying inside cities and villages23. Septic permits and well-location permits for every address in the county, city or not, go through Public Health Madison & Dane County4.
At a glance
- Building permit
- Required for a new one- or two-family home; a delegated municipality or DSPS issues the UDC permit5
- Zoning
- County zoning applies where the town board adopted the county ordinance (six towns have opted out); cities and villages zone themselves2
- Septic permit
- Required before installing or altering a private sewage system; Public Health Madison & Dane County handles applications64
- Owner-builder exemption
- Available to an owner who occupies or will occupy the home, without waiving plans, permits, inspections or code compliance7
- RV or tiny-home living
- Not confirmed countywide; ask Dane County Zoning about the parcel's district and town89
- Well permit
- A county well-location permit is required before installing a private well or water system10
- Septic soils
- Only about 6.9% of county land is free of severe limits for a conventional drain field11
- Lot standards
- District-specific; examples range from no minimum lot size in NR-C to 15,000 square feet in RE-112
Who to call
Zoning
Reviews and issues the county zoning permit required for new structures, decks, additions, alterations and keeping domestic fowl or bees outside the cities and villages of unincorporated Dane County
210 Martin Luther King Jr. Blvd., Rm 116, Madison, WI 53703-3342
Septic permits
Public Health Madison & Dane County - Environmental Health (Well & Septic Program)
Issues well location permits and sanitary (septic) permits for private wells and septic systems in Dane County, and enforces mandatory triennial septic inspection and maintenance
Roads & driveways
Dane County Highway Department
Issues permits to access or work within Dane County Trunk Highway right-of-way, and for oversize or overweight loads on county trunk highways
2302 Fish Hatchery Road, Madison, WI 53713-2495
Contact details are copied from each office’s official page and were checked against it on October 15, 2026.
Off-grid gear
Going off-grid in Dane County means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Dane County, Wisconsin?
A new one- or two-family home in Dane County needs a Uniform Dwelling Code permit, including a stick-built, modular or manufactured-home installation1. Wisconsin's UDC supplies the construction standards and inspection procedures, while commercial buildings and multifamily buildings with three or more units follow separate rules13. Construction may begin only after the plans are approved and the building permit is issued and posted14. For a home using private septic, the municipality cannot issue the building permit until the county sanitary permit is obtained6. Required inspections for a new home cover footings, foundation and foundation reinforcement, rough construction, insulation and the final stage; call the inspector named on the UDC permit1516. An owner who occupies or will occupy the home may take out the construction and erosion-control permits without a Dwelling Contractor Certification, but must still meet plan, inspection and code requirements717. New-home plumbing and electrical work generally still has to be done by licensed professionals18. Occupancy follows a final inspection with no major health or safety violations; some municipalities also issue occupancy permits19.
Who issues zoning permits and building permits in Dane County, and how do you reach them?
Dane County Planning & Development handles county zoning permits; a delegated municipality or Wisconsin DSPS issues the UDC building permit20. County zoning approval generally precedes the town building permit; ask the town clerk who serves the parcel, because most towns also require their own building permit after county zoning approval and some want site-plan approval first219. Madison, Stoughton, McFarland and Cambridge handle their own building permits22232425. Septic and well-location permits remain with Public Health Madison & Dane County, including inside cities and villages; call 608-242-6515 or email privatewellseptic@publichealthmdc.com4. Reach Dane County Zoning at (608) 266-4266 or zoning@danecounty.gov9. Residential county zoning permits cost $50 plus $0.10 per square foot, including porches, decks and basement areas; additional fees may apply26. Starting work before the permit is issued doubles the fee, and floor area for a new house is counted with basements and attached garages27. The zoning division also inspects the work against the permit28.
Does Dane County have zoning, and where does it apply?
Dane County zoning applies only in the unincorporated towns where the town board has adopted Chapter 10 of the county code; the current ordinance lists Berry, Blue Mounds, Bristol, Springfield, Sun Prairie and Westport as opted out, and areas under city or village extraterritorial zoning are excluded229. Where a town has adopted the ordinance, more restrictive county or town rules still apply30. Elsewhere in the county, cities and villages zone for themselves31. Madison, Waunakee, Stoughton, Windsor and Cambridge administer their own zoning3233343536. Public Health Madison & Dane County remains the septic-permit contact4. Start with the parcel's zoning-district fact sheet because permitted and conditional uses, lot standards and overlays vary by district37. For example, NR-C has no minimum lot size, while a newly created RE-1 lot must contain at least 15,000 square feet12. NR-C generally requires at least four feet at side and rear lot lines, although other districts and shoreland or floodplain rules may be stricter38. Building coverage is capped at 10% in NR-C and 15% in RE, while AT-B has no lot-coverage limit; height limits also vary by district and use394041. Development in the regulatory floodplain, including construction, grading and work on sewage or water facilities, requires a floodplain development permit42. No covered building or addition may be occupied until Dane County issues its zoning certificate of compliance, subject to the ordinance's agricultural exceptions43.
How do septic permits work in Dane County?
Dane County requires a sanitary permit to install, repair, modify, extend, enlarge, convert, reconnect or structurally alter a private sewage system6. Public Health Madison & Dane County directs applicants to obtain a soil evaluation from a licensed certified soil tester and a system design from a licensed professional, who submits the application4. A licensed master plumber or master restricted plumber must sign the application before installation44. The county, not the state, runs the program day to day, though work that needs a state sanitary permit stays subject to state rules45. Only about 6.9% of county land is rated without severe limitations for a conventional drain field, so make soil suitability a purchase contingency11. A building with required plumbing must connect when the local sanitary district finds public sewer available; private sewage systems are prohibited in designated Dane County floodplain areas4647. The county inspects private sewage and non-plumbing sanitary systems after construction but before backfilling48. Most septic systems also require inspection every three years4. A privy requires a county sanitary permit, and a structure served only by a privy cannot contain plumbing or connect to a water supply49.
Can you live in an RV or tiny home on your land in Dane County?
We could not confirm a countywide rule allowing long-term RV occupancy, private-land camping or a separate tiny-home occupancy path in unincorporated Dane County. Dane County zoning applies in the towns that have adopted it, so ask Dane County Zoning, or the town if it has opted out, how the parcel's district treats the proposed vehicle or structure before buying or moving it onto the land29. A manufactured home used as a new dwelling falls under the Uniform Dwelling Code permit requirement, but its land use must still fit the parcel's zoning district5037. We also could not confirm one countywide minimum dwelling size; ask Dane County Zoning about the chosen district and the UDC permit issuer about the proposed home's code compliance913. If a tiny home is treated as a manufactured home, it counts as a single-family dwelling under county zoning, and each space in a manufactured home community must have at least 3,000 square feet51.
Building a home in Dane County: the steps, in order
- Ask Dane County Zoning to confirm permitted use, lot size, setbacks, coverage and any shoreland or floodplain overlay3752.
- Ask the local sanitary district whether sewer is available; otherwise arrange the soil evaluation and sanitary permit with Public Health Madison & Dane County534.
- Obtain the county well-location permit before installing a private well or water system10.
- Obtain driveway approval from the town, county or state responsible for the road; a driveway longer than 125 feet also needs a Dane County Land and Water Resources erosion-control permit54. Driveway permit information goes in with the zoning application, and the town clerk handles town roads5556.
- Submit the plans, elevations and required agency information for county zoning review before work starts5728.
- After zoning approval, obtain and post the UDC permit from the delegated municipality or DSPS58.
- Schedule each construction-stage inspection before covering the work, then obtain the final inspection and required county zoning certificate of compliance before occupancy591943.
What to check before you buy land in Dane County, Wisconsin
Put septic suitability first: only about 6.9% of Dane County land is rated without severe limitations for a conventional drain field11. Confirm sewer availability and obtain a soil evaluation before fixing the house site534. Check the zoning map for the district and floodplain overlay because lot size, setbacks and coverage vary, and regulated floodplain development needs its own permit12383952. Ask Dane County Highway Department whether county-highway frontage is controlled access: new access points need approval, and a single-family access permit costs $1356061. Controlled-access spacing rules can constrain driveway placement; a change in use affecting safe access also needs review62. On general-access county highways, the county may issue access permits and lists a $100 single-family access fee63. If the purchase depends on splitting the tract, confirm the map or plat process before closing because county rules regulate divisions creating lots of 35 acres or less64. Budget separately for the UDC permit and the county zoning permit, whose residential fee starts at $50 plus $0.10 per square foot65.
Watch-outs
- The UDC permit issuer depends on delegated authority, so ask the town clerk whether a municipality or DSPS serves the parcel589.
- Private sewage systems are prohibited in designated Dane County floodplain areas, so a floodplain development permit alone does not establish septic eligibility4742.
- We could not confirm a countywide rule allowing permanent RV or tiny-home occupancy; ask Dane County Zoning about the parcel's district and town before buying29.
- Six towns (Berry, Blue Mounds, Bristol, Springfield, Sun Prairie and Westport) are listed as opted out of Dane County zoning, so a parcel there answers to the town's own rules2.
Sources
- UDC (Uniform Dwelling Code / One- and Two-Family Dwellings), quoted and re-checked
- Dane County Zoning Ordinance (Ch. 10, Dane County Code), quoted and re-checked
- Chapter 10 Zoning Ordinance, quoted and re-checked
- Public Health Madison & Dane County - Environmental Health (Well & Septic Program) (publichealthmdc.com)
- UDC (Uniform Dwelling Code / One- and Two-Family Dwellings), quoted and re-checked
- Chapter 46 Private Sewage System Ordinance and Health Ordinance, quoted and re-checked
- Wisconsin’s Uniform Dwelling Code, quoted and re-checked
- Dane County Zoning Ordinance (Ch. 10, Dane County Code) (2026 county census)
- Dane County Zoning (danecountyplanning.com)
- Chapter 45 — Relating to Private Water Systems, quoted and re-checked
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- Dane County Code Chapter 10: District dimensional standards, quoted and re-checked
- UDC (Uniform Dwelling Code / One- and Two-Family Dwellings), quoted and re-checked
- Wisconsin’s Uniform Dwelling Code, quoted and re-checked
- UDC (Uniform Dwelling Code / One- and Two-Family Dwellings), quoted and re-checked
- UDC (Uniform Dwelling Code / One- and Two-Family Dwellings), quoted and re-checked
- Instructions for Submitting a UDC Permit Application, quoted and re-checked
- Wisconsin DSPS - Building a Home in Wisconsin (UDC Guide) (2026 county census)
- Wisconsin’s Uniform Dwelling Code, quoted and re-checked
- Permits & Licenses, quoted and re-checked
- Dane County Zoning Permits, quoted and re-checked
- Madison: Permits (Dane County), quoted and re-checked
- Stoughton: Planning & Development (Dane County), quoted and re-checked
- Village of McFarland: When is a Building Permit Required? (Dane County), quoted and re-checked
- Village of Cambridge: official source (Dane County), quoted and re-checked
- Dane County Zoning Permits, quoted and re-checked
- Dane County Code Chapter 12: Zoning Fees, quoted and re-checked
- Dane County Zoning Permits, quoted and re-checked
- Dane County Zoning Ordinance (Chapter 10), amended April 10, 2025, quoted and re-checked
- Chapter 10 Zoning Ordinance, quoted and re-checked
- Dane County Zoning Ordinance (Chapter 10), amended April 10, 2025, quoted and re-checked
- Madison: Development | Planning (Dane County), quoted and re-checked
- Village of Waunakee: Sec. 133-229. Height and area requirements, R-1 Single-Family Residential District (Dane County), quoted and re-checked
- Stoughton: Planning & Development (Dane County), quoted and re-checked
- Village of Windsor: Community Development (Dane County), quoted and re-checked
- Village of Cambridge: Plan Commission and Zoning (Dane County), quoted and re-checked
- Chapter 10 — Zoning, quoted and re-checked
- Dane County Code Chapter 10: District dimensional standards, quoted and re-checked
- Dane County Code Chapter 10: District dimensional standards, quoted and re-checked
- Chapter 10 — Zoning, quoted and re-checked
- Dane County Chapter 10 Zoning Ordinance, quoted and re-checked
- Chapter 17 Floodplain Zoning, quoted and re-checked
- Dane County Code Chapter 10: Zoning, quoted and re-checked
- Chapter 46 — Private Sewage System Ordinance and Health Ordinance, quoted and re-checked
- Chapter 46 — Private Sewage System Ordinance and Health Ordinance, quoted and re-checked
- Chapter 46 Private Sewage System Ordinance and Health Ordinance, quoted and re-checked
- Chapter 46 — Private Sewage System Ordinance and Health Ordinance, quoted and re-checked
- Chapter 46 Private Sewage System Ordinance and Health Ordinance, quoted and re-checked
- Dane County Code Chapter 46: Private Sewage System Ordinance and Health Ordinance, quoted and re-checked
- UDC (Uniform Dwelling Code / One- and Two-Family Dwellings), quoted and re-checked
- Chapter 10 Zoning Ordinance, quoted and re-checked
- Floodplain Zoning, quoted and re-checked
- Dane County Code Chapter 46: Private Sewage System Ordinance and Health Ordinance, quoted and re-checked
- Dane County Zoning Permits, quoted and re-checked
- Dane County Zoning Permits, quoted and re-checked
- Dane County Zoning Permits, quoted and re-checked
- Dane County Zoning Permits, quoted and re-checked
- UDC (Uniform Dwelling Code / One- and Two-Family Dwellings), quoted and re-checked
- Wisconsin’s Uniform Dwelling Code, quoted and re-checked
- Dane County Highway Department (highway.danecounty.gov)
- Chapter 79: County Trunk Highway Access Control, quoted and re-checked
- Highway Permit Applications, quoted and re-checked
- Chapter 79: County Trunk Highway Access Control, quoted and re-checked
- Chapter 75 Land Division and Subdivision Regulations, quoted and re-checked
- Dane County Zoning Permits, quoted and re-checked
Written October 15, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.