Marshall County, Tennessee requires building permits for construction, most exterior renovation and remodeling, and all additions, while routine maintenance and repairs are exempt1. Zoning applies countywide, but the authority and rules vary by jurisdiction; Lewisburg has its own municipal zoning ordinance234. TDEC handles septic permits and final inspections in Marshall County56.
At a glance
- Building permit
- Required for construction, most exterior renovation and remodeling, and all additions71
- Zoning
- Zoning applies countywide; county and municipal rules vary by jurisdiction83
- Septic permit
- TDEC permit required before septic installation or repair9510
- Owner-builder
- Conditional licensing exemption for one personal residence every two years; permits still apply1112
- A-1 single-wide
- Limited by model age, owner occupancy, porches and installation requirements13
- RV or tiny-home living
- Rules not confirmed; ask county zoning about the parcel and proposed occupancy1415
- Minimum lot size
- At least 7,500 square feet and 75 feet wide for a residence outside municipalities; district rules may require more1617
- Septic soil suitability
- Only about 6% of soils lack severe limits for a conventional drain field18
Who to call
Building permits
Marshall County Building Codes and Zoning
Building permits, inspections, zoning and planning submissions, and flood-development submissions for Marshall County
206 Legion Avenue, Suite A, Lewisburg, TN 37091
Septic permits
TDEC Division of Water Resources — Columbia Environmental Field Office
Division of Water Resources assistance, including septic-related services, for Marshall County
1421 Hampshire Pike, Suite 100, Columbia, TN 38401
Contact details are copied from each office’s official page and were checked against it on October 7, 2026.
Off-grid gear
Going off-grid in Marshall County means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Marshall County, Tennessee?
Yes. Marshall County requires a residential or commercial building permit for construction, most exterior renovation and remodeling, and every addition1. Routine maintenance and repairs do not require a permit1. Permitted construction is inspected for compliance with minimum construction standards, zoning and setback requirements19. Marshall County has adopted the 2018 residential, building, mechanical, plumbing and fuel-gas codes, the 2009 energy-conservation code and 2018 NFPA 10120. Do not begin regulated work early: starting before the permit is received may result in double the normal permit fee1.
Who issues Marshall County building permits, and how do you reach the office?
Marshall County Building Codes and Zoning handles the county's building-permit, inspection, zoning, planning and flood-development submissions15. The office is at 206 Legion Avenue, Suite A, Lewisburg, TN 37091, and the phone number is (931) 359-056715. Applications and inspection requests are submitted through the respective county portals2115. The published process does not supply a complete review timeline or every required application item, so use the portal or call with the parcel number and project description before filing2115. Marshall County's local fee schedule could not be confirmed; Tennessee publishes fees for state-administered residential permits, but that schedule does not establish the charge for a county-issued permit22.
Does Marshall County have zoning?
Yes. Marshall County Government administers zoning outside municipal corporations, while land inside Lewisburg is governed by the city's own zoning ordinance23244. Use the county's interactive parcel map, then verify the district before relying on a permitted use25. For a residence outside municipalities, no approval may reduce the lot below 7,500 square feet or 75 feet wide at the building line, and district rules may require more16. For example, A-1 requires 2 acres without public water or three-quarters of an acre with it, while A-2 requires at least 30,000 square feet and public water17. Front, side and rear setbacks also vary by district26. We could not confirm minimum dwelling size, lot coverage or building-height limits; ask Marshall County Building Codes and Zoning to read the current district rules15. Tennessee's county agricultural zoning exemption is conditional: the land must be devoted to agriculture and the structure incidental to that enterprise, with exceptions including certain nearby public facilities and floodplain land27.
How do septic permits work in Marshall County?
TDEC's Division of Water Resources administers septic permits and inspections in Marshall County28. Obtain the septic permit before beginning dirt work or construction of the building pad; separate triggers apply to repairs and modifications29. When installation is complete, notify TDEC so the system can be inspected and approved30. The Columbia Environmental Field Office serves Marshall County; call (931) 380-3371 or email columbia.efo_adm@tn.gov for help31. Only about 6% of Marshall County soils rate without severe limitations for a conventional drain field, so confirm a usable septic area before choosing a house site18. A qualifying utility may require sewer connection for an existing building on a parcel abutting a public way with sanitary sewer, but that does not mean sewer reaches every parcel32.
Can you live in an RV or tiny home on land in Marshall County?
We could not confirm a rule that answers long-term RV occupancy, temporary camping or tiny-home occupancy on private land in Marshall County. Take the parcel number and proposed use to the governing zoning authority before buying or moving a unit onsite because county and municipal rules vary by jurisdiction3. A tiny home does not automatically avoid permitting because Marshall County requires permits for construction, most exterior renovation and remodeling, and all additions1. Single-wide mobile homes in the A-1 district have a separate, confirmed rule: the unit must be a model within five years of the current date, be owner occupied, have front and back porches of at least 80 square feet each, have its tongue removed and receive specified perimeter treatment; additional septic, water, power and lot-size requirements apply13.
Building a home in Marshall County: the steps, in order
- Identify whether Marshall County Government or a municipality controls the parcel's zoning, then confirm the use, minimum lot size and setbacks31726.
- Confirm septic feasibility and obtain the TDEC permit before dirt work or construction of the building pad2931.
- Submit the county building and zoning materials through the appropriate portal2115.
- Receive the building permit before starting because early work may trigger double the normal permit fee1.
- Request county inspections through the portal as construction proceeds1915.
- Notify TDEC after septic installation so the system can be inspected and approved30.
- If the driveway enters a Tennessee state highway right-of-way, obtain the TDOT entrance permit before construction or a change in use33. An owner may build one personal residence every two years without a contractor license if it is not for resale, lease or rent; hired work of $25,000 or more still requires a licensed contractor, and all permits and zoning approvals remain required34.
What should you check before buying land in Marshall County?
Start with the parcel's governing zoning authority, district, setbacks, legal access, flood status, water source and septic feasibility. Marshall County's interactive map provides parcel zoning information, but jurisdiction determines the governing rules253. District and utility service can materially change the minimum lot size; C-1 residential lots, for example, require 30,000 square feet with public water only, 15,000 square feet with public water and sewerage, or 1 acre without public water35. If the tract will be divided, confirm the subdivision process before relying on a proposed lot layout36. Only about 6% of county soils rate without severe limits for a conventional drain field, even though about 74.5% of the land has a slope of 15% or less, so evaluate the actual homesite rather than county averages alone1837. We could not confirm a private-well permit rule or countywide water-connection requirement; ask Building Codes and Zoning and TDEC which authority applies1531.
Watch-outs
- Starting regulated work before Marshall County issues the building permit triggers a charge of double the normal permit fee1.
- Zoning applies across Marshall County, but the authority and rules vary by jurisdiction; Lewisburg has its own municipal ordinance34.
- We could not confirm RV living, temporary camping, tiny-home occupancy or private-well permitting; ask Building Codes and Zoning and TDEC about the parcel before committing to land1531.
Sources
- Frequently Asked Questions About Building Permits, quoted and re-checked
- Marshall County Building Codes and Zoning, quoted and re-checked
- Planning & Zoning Official, quoted and re-checked
- Title 14 — Zoning and Land Use Control, quoted and re-checked
- Septic System Construction Permit, quoted and re-checked
- Third-Party Permits & Final Inspections for Subsurface Sewage Disposal Systems, quoted and re-checked
- Frequently Asked Questions About Building Permits (2026 county census)
- Marshall County Building Codes and Zoning (2026 county census)
- TDEC - Subsurface Sewage Disposal Systems (SSDS) (2026 county census)
- Septic System Construction Permit, quoted and re-checked
- Residential Permit FAQs (2026 county census)
- Residential Permit FAQs, quoted and re-checked
- Single Wide Mobile Homes, quoted and re-checked
- Marshall County Building Codes and Zoning, quoted and re-checked
- Marshall County Building Codes and Zoning (marshallcountytn.gov)
- Zoning Resolution of Marshall County, Tennessee, quoted and re-checked
- Zoning Resolution of Marshall County, Tennessee, quoted and re-checked
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- Frequently Asked Questions About Building Permits, quoted and re-checked
- Adopted Codes, quoted and re-checked
- Marshall County Building Codes and Zoning, quoted and re-checked
- Residential Building Permit Fees, quoted and re-checked
- Marshall County Building Codes and Zoning, quoted and re-checked
- Planning & Zoning Official, quoted and re-checked
- Marshall County Building Codes and Zoning, quoted and re-checked
- Frequently Asked Questions About Building Permits, quoted and re-checked
- Exemption from County Zoning Regulation for Buildings on Land Used for Agriculture, Opinion No. 22-07 (Tennessee statewide rule), quoted and re-checked
- Online Application for Septic Related Services, quoted and re-checked
- Online Application for Septic Related Services, quoted and re-checked
- Subsurface Sewage Disposal System Related Permits, quoted and re-checked
- TDEC Division of Water Resources — Columbia Environmental Field Office (tn.gov)
- Utility Customers Frequently Asked Questions (Tennessee statewide rule), quoted and re-checked
- Highway Entrance Permits (Tennessee statewide rule), quoted and re-checked
- Residential Permit FAQs, quoted and re-checked
- Zoning Resolution of Marshall County, Tennessee, quoted and re-checked
- Planning and Zoning Official, quoted and re-checked
- Share of land at 15% slope or less: Bolthole Index county data
Written October 7, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.