Building permits, zoning and land rules in Calumet County, Wisconsin

58Index Score / 100
#56 of 72 in Wisconsin

A new home in Calumet County, Wisconsin needs a Uniform Dwelling Code building permit, issued by the delegated municipality, county authority where applicable, or the state1. County general zoning covers only the Towns of Brillion, Charlestown, New Holstein, and Woodville, but county shoreland and floodplain zoning covers all unincorporated areas2. Septic permits in every town, village and city come from the county's Sanitation program3.

At a glance

Building (UDC) permit
Required for new 1- and 2-family homes under Wisconsin's UDC1
County zoning permit
Only in Brillion, Charlestown, New Holstein and Woodville towns4
Septic permit
Countywide; $500 including the $100 state fee5
Owner-builder
Allowed when the owner occupies or will occupy the home6
Tiny home
Under 400 sq. ft. requires conditional-use approval and a permanent foundation in county zoning districts7
Minimum home size
Generally 750 sq. ft. in Chapter 82 districts, with listed exceptions8
Temporary camping
Limited by district, lot size, setbacks and duration where Chapter 82 applies9

Who to call

Zoning

Calumet County Planning, Zoning and Land Information Department (Code Administrators)

Zoning administration, floodplain and shoreland zoning, land-use permit assistance including building-permit guidance, wetland regulation, and identifying which town or agency issues a given permit

(920) 849-1442

206 Court Street, Chilton, WI 53014

Floodplain permits

Calumet County Shoreland & Floodplain Zoning (Planning, Zoning and Land Information Department)

Administers the general Zoning Code (Chapter 82, in effect only in four towns), the Shoreland Zoning Ordinance (Chapter 52), and the Floodplain Ordinance (Chapter 51), the latter two in effect in every unincorporated part of Calumet County

206 Court Street, Chilton, WI 53014

Online permits →

Septic permits

Calumet County Sanitation Program (Planning, Zoning and Land Information Department)

Septic (POWTS) permitting, soil testing, and pumping/maintenance records for the whole county under Chapter 74

(920) 849-1442

206 Court Street, Chilton, WI 53014

Online permits →

Roads & driveways

Calumet County Highway Department

Access permits for new driveways, streets, and other connections to county highways

(920) 849-1434

Highway_Dept@calumetcounty.org

241 East Chestnut, Chilton, WI 53014

Contact details are copied from each office’s official page and were checked against it on October 9, 2026.

Off-grid gear

Going off-grid in Calumet County means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Do you need a building permit in Calumet County, Wisconsin?

Yes. A Uniform Dwelling Code permit is required for every new one- or two-family home in Calumet County, including stick-built, modular and manufactured-home installations1. Construction starts only after plan approval and after the permit is issued and posted10. The responsible inspector must inspect each construction phase before work is covered; after a request is made and the work is ready, the inspector has two business days before it may be covered11. Occupancy follows a final inspection that finds no major health or safety violations, although only some municipalities issue a separate occupancy permit; the exterior must be completed within two years after permit issuance12. An owner who occupies or will occupy the home may take out the construction and erosion-control permits, but the owner-builder option does not remove required permits or inspections6.

Who issues building permits and zoning approval in Calumet County, and how do you reach the Code Administrators?

Permit and inspection authority depends on the parcel: Wisconsin may delegate Uniform Dwelling Code jurisdiction to a municipality or county, and the state handles new homes where the local authority lacks jurisdiction1. Start with Calumet County's Planning, Zoning and Land Information Department, whose Code Administrators assist with zoning, building permits, floodplain zoning, sanitation, some road-access matters and wetland regulation13. The office is at 206 Court Street, Chilton, WI 53014, and the phone number is (920) 849-144213. The department has moved within the courthouse, so visitors should use entrance D1 or D213. The county does not issue every approval: building permits depend on the municipality or delegated inspector, zoning outside the four towns depends on the town, village or city, and septic permits stay with the county Sanitation program at (920) 849-14421415316. Ask the Code Administrators to identify the delegated building inspector for the parcel and whether a separate local permit is needed for an addition or alteration, because those requirements vary by municipality14.

Does Calumet County have zoning, and who zones where?

Calumet County's general zoning ordinance applies only in the Towns of Brillion, Charlestown, New Holstein and Woodville; cities and villages may impose their own rules, and septic permits still come from the county153. The county's online map shows current district boundaries in those county-zoned towns17. In Chapter 82 districts, a dwelling generally needs at least 750 square feet of floor area, subject to exceptions for tiny homes, multiple-occupancy units and manufactured-home parks8. Road setbacks are 125 feet from a state or federal road centerline, 100 feet from a county road centerline and 75 feet from a town road centerline; different measurements govern private roads and platted subdivisions18. Maximum building height varies by district, and agricultural structures used solely for agriculture are among the listed exemptions19. County shoreland and floodplain zoning still applies throughout unincorporated Calumet County, including outside those four towns2.

How do septic permits work in Calumet County, Wisconsin?

Calumet County administers Private Onsite Wastewater Treatment Systems throughout the county under Chapter 743. A sanitary permit for a POWTS or holding tank costs $500, including the $100 state fee5. Licensed Certified Soil Testers and licensed plumbers may submit soil tests, sanitary permits and payments online; a submission is complete only when the department has all required paperwork and payment20. Reach the Sanitation program at 206 Court Street, Chilton, WI 53014, or at (920) 849-144216. Only about 2.6% of Calumet County soils are rated without severe limitations for a conventional drain field, so obtain a soil and site evaluation before committing to a homesite21. Camping sanitation in Chapter 82 districts must use an approved onsite system, a self-contained holding tank emptied at an approved dump station, or a portable toilet handled through an approved dump station22.

Can you live in an RV or tiny home on your land in Calumet County, Wisconsin?

In areas governed by Chapter 82, one camping party may camp without a regular zoning permit only in specified districts on a lot of at least 1 acre9. The camping unit must stay at least 25 feet from lot lines and 50 feet from another dwelling other than the landowner's home, and camping is capped at 15 consecutive days and 30 days per calendar year9. The unit must be removed or stored inside a building after each stay9. Calumet County's reviewed rules do not confirm long-term residential RV occupancy, so ask the Code Administrators about the parcel's applicable town or municipal rules13. In Chapter 82 districts, a home under 400 square feet designed for no more than 3 people needs conditional-use approval and a permanent foundation; applicable building codes remain part of that review7.

How do you build a home in Calumet County, Wisconsin? The steps, in order

  1. Identify the parcel's municipality and zoning authority; county general zoning covers only Brillion, Charlestown, New Holstein and Woodville towns, while cities and villages may have separate rules15.
  2. Check the county mapping site for the zoning district and any shoreland or floodplain overlay172.
  3. If dividing land, submit the county application, fee and draft certified survey map or plat; all minor and major divisions require county approval2324.
  4. Have a licensed professional complete the soil work and sanitary submission; the county's online process requires all paperwork and payment20.
  5. Obtain a county-highway access permit where applicable; a private-driveway permit costs $15025.
  6. Ask the Code Administrators which delegated authority issues the UDC permit, then wait for plan approval and the posted building permit before starting110.
  7. Request each phase inspection before covering work, then obtain a clean final inspection before occupancy1112.

What to check before you buy land in Calumet County

Confirm the zoning authority and district before judging buildability, because general county zoning covers only four towns and incorporated municipalities may have different rules15. Check minimum lot area, height and setbacks for the actual district rather than applying one countywide number261918. For any land split, Calumet County approval is required: a minor subdivision creates four or fewer lots, while a major subdivision creates five or more24. In a regulated floodplain, a Land Use Permit is required before new development, a repair, modification, addition or change in building use, including sewer and water facilities27. A county-highway driveway also needs an access permit25. Septic suitability is a major cost question because only about 2.6% of county soils are rated without severe limitations for a conventional drain field21. Calumet County's effective property-tax rate is about 1.5%, and the median annual bill is about $3,8302829.

Watch-outs

  • Calumet County's general Zoning Code applies only in the Towns of Brillion, Charlestown, New Holstein and Woodville; cities, villages and other towns may apply different local rules15.
  • The county's Planning, Zoning and Land Information Department recently moved within the Chilton Courthouse; use entrance D1 or D2 to find it in person13.
  • Calumet County has posted a notice about a fraudulent invoice scam circulating in the county; verify any invoice or fee request that claims to be from the county before paying it13.
  • Calumet County's temporary-camping allowance in Chapter 82 does not establish permission for full-time RV living; ask the Code Administrators and the parcel's municipality before relying on an RV as a residence913.
  • A town, village or city may issue the building permit or set zoning, but the sanitary (septic) permit, shoreland and floodplain permits and county-highway driveway permits come from Calumet County5225.

Sources

  1. UDC (Uniform Dwelling Code / One- and Two-Family Dwellings), quoted and re-checked
  2. Zoning | Calumet County, WI, quoted and re-checked
  3. Sanitation | Calumet County, WI, quoted and re-checked
  4. Zoning | Calumet County, WI, quoted and re-checked
  5. Sanitary Application Submittal, quoted and re-checked
  6. Wisconsin’s Uniform Dwelling Code, quoted and re-checked
  7. Chapter 82 Zoning Ordinance, quoted and re-checked
  8. Chapter 82 Zoning Ordinance, quoted and re-checked
  9. Zoning | Calumet County, WI, quoted and re-checked
  10. Wisconsin’s Uniform Dwelling Code, quoted and re-checked
  11. Wisconsin’s Uniform Dwelling Code, quoted and re-checked
  12. Wisconsin’s Uniform Dwelling Code, quoted and re-checked
  13. Calumet County Planning, Zoning and Land Information Department (Code Administrators) (co.calumet.wi.us)
  14. DSPS One- & Two-Family Uniform Dwelling Code, quoted and re-checked
  15. Zoning | Calumet County, WI, quoted and re-checked
  16. Calumet County Sanitation Program (Planning, Zoning and Land Information Department) (co.calumet.wi.us)
  17. Zoning | Calumet County, WI, quoted and re-checked
  18. Chapter 82 Zoning Ordinance, quoted and re-checked
  19. Chapter 82 Zoning Ordinance, quoted and re-checked
  20. Sanitation | Calumet County, WI, quoted and re-checked
  21. Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
  22. Chapter 82 Outdoor Recreational and Residential Use Requirements, quoted and re-checked
  23. Land Division | Calumet County, WI, quoted and re-checked
  24. Land Division | Calumet County, WI, quoted and re-checked
  25. Highway Department Permits | Calumet County, quoted and re-checked
  26. Chapter 82 Outdoor Recreational and Residential Use Requirements, quoted and re-checked
  27. Zoning | Calumet County, WI, quoted and re-checked
  28. Effective property tax rate: Bolthole Index county data
  29. Median property tax bill: Bolthole Index county data

Written October 9, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Found land here? Start a Property Hunt →

Compared with neighboring counties

Like all 6 of its neighbors, Calumet County requires a building permit for a home.

RuleCalumet CountyManitowoc CountyWinnebago CountyOutagamie CountyBrown CountyFond du Lac CountySheboygan County
Building permitRequiredRequiredRequiredRequiredRequiredRequiredRequired
County zoningYesYesYesYesNoNoYes
Septic permitsCounty PlanningCounty Planning & Zoning Dept.County Planning & Zoning Dept.County Development & Land ServicesCounty Planning & Land ServicesCounty Land Information Dept.County Planning & Conservation Dept.

County locator

Calumet County in Wisconsin

58
County map
Calumet County highlighted among the Wisconsin counties · colored by Index score

How Calumet County scores

Seclusion32100% ev.
Self-Sufficiency52100% ev.
Admin Boringness44100% ev.
Durability80100% ev.
Property Autonomy70100% ev.
Carry Cost56100% ev.

Evidence strength: 100%. This reports direct-source completeness and fallback use; it is separate from the score and is not a confidence interval. How it works →

$381kTypical home
1.5%Property tax
$8,232Land / acre
33.2"Annual rain
0.5% of yrsSevere drought
1.2 / yr (+1.2)Mid-century 100°F days
12.2 daysMid-century dry spell
1.4" (+5.3%)Mid-century 1-day rain
1.63×Wildfire change factor
100%Forward climate coverage
$1,026Home insurance / yr
1.6% / yrInsurance growth
0.68%Nonrenewal rate
county median (2+ published ZIPs)Insurance basis
42,736People within 30 min
3,205,122People within 2 hr
194,051Radius comparison (15 mi)
167.2People / sq mi
0.1%Federal land
98.6%Land at 15% slope or less
2.6%Soils rated "not limited" for septic (strict USDA rating)
4,264 acWorkable land screen
12.6%Wooded land
47.4 tonsBiomass / forest ac
45.3°FAvg temp

Scout Calumet County

Camp here before you commitBook a few nights nearby on Hipcamp →Already own land here?Earn money hosting campers — get $100 when you become a Hipcamp host →

Some links are affiliate or referral links — we may earn a commission, at no cost to you.

Property hunt

Find land. Bring the promising ones back.

Search live inventory elsewhere, then cost and vet each candidate here. No copied listings, account, or paid data feed.

Each button opens a current land search for Calumet County. Listing sites control their own results and filters.

Analyze a property
Add setup-cost allowances

Use rough quotes or placeholders. Blank fields count as $0.

Working estimate

—land + entered setup costs
Asking $ / acre
—
Setup allowance
—
All-in $ / acre
—

A planning estimate, not a valuation or contractor quote. The USDA benchmark includes farm land and buildings; it is context, not a parcel comp.

Before an offer

Parcel due diligence

0/8 checked

Saved properties and checklist progress stay on this device. Bolthole Index does not receive them.

Cities and towns in Calumet County

Inside a city, town or township here, that government usually sets zoning and may issue its own building permits; the county’s rules above cover land outside them.

Not yet researched: Brillion · Town of Brillion · Town of Brothertown · Town of Charlestown · Chilton · Town of Chilton · Town of Harrison · Village of Harrison · Village of Hilbert · New Holstein · Town of New Holstein · Village of Potter · Town of Rantoul · Town of Stockbridge · Village of Stockbridge · Town of Woodville

Answers from the rulebook for Calumet County

What the ordinances and state agencies actually say — one answer per question, each quoted from the official source and independently re-checked.

Calumet County rules

  • County-wide zoningPresent (with conditions)

    Calumet County zoning authority, including general zoning in specified towns and shoreland and floodplain zoning in unincorporated areas.

    • General zoning is in effect in the towns of Brillion, Charlestown, New Holstein, and Woodville.
    • Shoreland zoning is in effect in all unincorporated areas of Calumet County.
    • Floodplain zoning is in effect in all unincorporated areas of Calumet County.
    “This ordinance is in effect in the towns of Brillion, Charlestown, New Holstein, and Woodville.”
    One more reviewed finding on this topic
    • Present (with conditions) — County shoreland and floodplain zoning throughout unincorporated Calumet County, plus general county zoning in the towns of Brillion, Charlestown, New Holstein, and Woodville.
      “This ordinance is in effect in the towns of Brillion, Charlestown, New Holstein, and Woodville. [...] Chapter 52 is in effect in all the unincorporated areas of Calumet County. [...] Chapter 51 is in effect in all unincorporated areas of Calumet County.”
  • Local zoningVaries (with conditions)

    Aggregate local zoning across Calumet County townships, cities, villages, and county zoning jurisdiction.

    • County general zoning applies only in Brillion, Charlestown, New Holstein, and Woodville towns.
    • County shoreland and floodplain zoning applies in unincorporated areas.
    • Incorporated cities and villages may have their own local regulations.
    “If you are located within an incorporated area (city or village), please contact your local municipality to determine what regulations may be applicable for your property.”
  • Zoning districtsPublished (with conditions)

    County zoning districts in areas under Calumet County zoning jurisdiction.

    • The county states that current zoning district boundaries are shown on its online mapping site.
    • Chapter 82 contains district requirements, including lot area, lot width, impervious surface, setbacks, density, and height schedules.
    • Chapter 82 is in effect in the towns of Brillion, Charlestown, New Holstein, and Woodville.
    “Current zoning district boundaries used by the county are shown on the On-line Mapping Site. This ordinance is in effect in the towns of Brillion, Charlestown, New Holstein, and Woodville.”
    One more reviewed finding on this topic
    • Published (with conditions) — County zoning districts under Chapter 82.
      “The ordinance establishes the land use regulations for the areas under county zoning jurisdiction. Current zoning district boundaries used by the county are shown on the On-line Mapping Site. This ordinance is in effect in the towns of Brillion, Charlestown, New Holstein, and Woodville.”
  • Minimum dwelling sizeSpecified

    Dwelling units in Chapter 82 zoning districts.

    • The general minimum floor area is 750 square feet.
    • Multiple-occupancy units and tiny homes are exceptions.
    • Tiny homes under 400 square feet may receive conditional-use approval if the stated conditions are met.
    • Manufactured homes in manufactured-home parks must have at least 550 square feet.

    minimum floor area: >= 750 square feet (Except multiple-occupancy units, tiny homes, and manufactured-home parks)

    “Except for occupancy units within a multiple occupancy development and except as specified in par.(b), for dwelling units in all districts, the minimum floor area shall be 750 square feet.”
  • Minimum lot sizeDistrict specific (with conditions)

    Lots in Chapter 82 zoning districts.

    • Minimum lot-area requirements vary by zoning district and use.
    • Camping on a lot requires at least 1 acre in specified districts.
    • Specific district schedules were not exhaustively extracted.
    “Such camping shall be allowed in the Natural Area, Exclusive Agricultural, General Agricultural, Heartland, and Small Estate Residential districts provided that the lot is at least 1 acre in area.”
  • SetbacksSpecified

    Structures in areas subject to Calumet County Chapter 82.

    • State and federal road setbacks are measured from the road centerline.
    • County and town road setbacks are also measured from the centerline.
    • Private-road setbacks are measured from the edge of the traveled roadway.
    • Platted-subdivision setbacks are measured from the road right-of-way.
    • Road-setback averaging may apply, but may not reduce the setback below 10 feet from the road right-of-way.

    state or federal road setback: 125 feet (Measured from centerline) · county road setback: 100 feet (Measured from centerline) · town road setback: 75 feet (Measured from centerline) · private road setback: >= 30 feet (From edge of traveled roadway; roads or easements serving 3 or more lots) · platted subdivision road setback: >= 30 feet (From road right-of-way) · road-setback averaging floor: >= 10 feet (From road right-of-way)

    “The required setback for all structures fronting on State and Federal roads shall be 125 feet from the centerline of the road. [...] The required setback for all structures fronting on County roads shall be 100 feet from the centerline of the road. [...] The required setback for all structures fronting on all town roads shall be 75 feet from the centerline of the road. [...] In all cases of road setback averaging, the road setback shall not be reduced to less than 10 feet from the road right-of-way.”
  • Building heightSpecified

    Structures governed by Chapter 82.

    • Maximum height requirements are listed in Article IV by zoning district.
    • Agricultural structures used solely for agricultural purposes and other listed structures are exempt.
    • Additional airport height restrictions may be administered by a municipality.
    “Unless restricted or permitted increases are identified elsewhere in this chapter, maximum height requirements for principal and accessory structures are listed in Article IV, Zoning District Requirements.”
  • Camping on your landLimited

    Camping by one camping party on a lot in an area subject to Calumet County Chapter 82, including the county-zoned towns of Brillion, Charlestown, New Holstein, and Woodville.

    • Camping in an approved campground is permitted without issuance of a regular zoning permit.
    • Camping on a lot by one camping party is allowed without a regular zoning permit only in the Natural Area, Exclusive Agricultural, General Agricultural, Heartland, and Small Estate Residential districts.
    • The lot must be at least 1 acre.
    • Sanitation must be provided by connection to an approved onsite waste disposal system, a self-contained holding tank with disposal at an approved sanitary dump station, or a portable toilet with disposal at an approved sanitary dump station.
    • The camping unit must be at least 25 feet from all lot lines, at least 50 feet from any dwelling unit other than the landowner’s dwelling on the property, and must meet the required road setback.
    • Camping may not exceed 15 consecutive days or more than 30 days in any calendar year.
    • The camping unit must be removed or stored inside a building after each camping stay.
    • County Chapter 82 does not govern incorporated cities and villages; local municipal regulations may apply there.

    minimum lot area: >= 1 acre · minimum setback from lot lines: >= 25 feet · minimum setback from other dwelling: >= 50 feet (does not include the landowner’s dwelling on the property) · maximum consecutive camping stay: <= 15 days · maximum camping days per calendar year: <= 30 days

    “Camping on a lot by 1 camping party shall be allowed without issuance of a regular zoning permit, subject to the following:”
  • Tiny homesLimited

    Tiny homes with less than 400 square feet of floor area in county zoning districts.

    • Designed for occupation by 3 or fewer people.
    • Requires conditional-use approval by the Planning, Zoning and Farmland Preservation Committee.
    • Must be placed on a permanent foundation.
    • State, county, and local building codes must be addressed as conditions of the conditional-use request.

    maximum floor area for tiny-home category: < 400 square feet · maximum designed occupants: <= 3 people

    “Homes with floor area less than 400 square feet and designed for occupation by 3 or less people may be approved as a conditional use by the Planning, Zoning and Farmland Preservation Committee. Tiny Homes shall be placed on a permanent foundation”
  • Accessory dwellingsLimited

    Accessory residences in the Commercial Center (CC) zoning district under Calumet County Chapter 82.

    • The accessory residence must be necessary to a non-residential use on the same lot.
    • It must be the only dwelling unit on the lot.
    • It may provide living quarters only for the owner, proprietor, commercial tenant, employee, or caretaker of the non-residential use.
    • Accessory residences are listed as an accessory use in the Commercial Center district, subject to other applicable Chapter 82 requirements.
    • Chapter 82 applies only in county-zoned areas; incorporated cities and villages may impose their own rules.
    “Residences accessory to a permitted use or approved conditional use.”
  • Who permits septicCounty (with conditions)

    Private Onsite Wastewater Treatment Systems throughout Calumet County.

    • County Chapter 74 governs design, installation, operation, inspection, and administration of POWTS.
    • State requirements also apply.
    “Chapter 74 - Sanitation contains standards that govern the design, installation, operation, inspection, and administration of Private Onsite Wastewater Treatment Systems (POWTS) within all areas of Calumet County.”
    One more reviewed finding on this topic
    • County (with conditions) — Private Onsite Wastewater Treatment Systems throughout Calumet County.
      “Chapter 74 - Sanitation contains standards that govern the design, installation, operation, inspection, and administration of Private Onsite Wastewater Treatment Systems (POWTS) within all areas of Calumet County.”
  • Septic permitRequired

    POWTS and holding tanks in Calumet County.

    • The sanitary application process requires the applicable application materials and payment.
    • The listed sanitary permit fee includes a $100 state fee.

    sanitary permit fee: 500 USD (Includes $100 State Fee)

    “Sanitary Permit, All POWTS and Holding Tanks (Includes $100 State Fee) | $500”
  • Off-grid sanitationLimited

    Camping on a lot under Chapter 82 section 82-75(b).

    • Sanitary waste disposal must use an approved onsite system, self-contained holding tank with disposal at an approved dump station, or portable toilet with disposal at an approved dump station.
    • Camping is limited to specified zoning districts and a lot of at least 1 acre.
    “Sanitary waste disposal shall be provided by either: 1. Connection to an approved on-site waste disposal system. 2. Self-contained holding tank with disposal at an approved sanitary dump station.”
  • Subdividing landRegulated (with conditions)

    Minor and major land divisions in incorporated and unincorporated Calumet County.

    • Minor subdivisions create four or fewer lots; major subdivisions create five or more lots.
    • County approval is required.
    • Cluster subdivisions may increase the number of lots in some cases.
    “All proposed land divisions, which include minor subdivisions (creation of four or less lots) and major subdivisions (creation of five or more lots) located within Calumet County, incorporated and unincorporated areas, requires the approval of Calumet County.”
  • Driveway accessRequired

    Access to county highways and county right-of-way.

    • Permit type and fee vary for public streets, private driveways, agricultural driveways, recreational crossings, and commercial driveways.

    private driveway access permit: 150 USD · commercial driveway access permit: 400 USD

    “ACCESS PERMITS Public Street: $875.00 Private Driveway: $150.00 Agricultural Driveway: $200.00 Recreational Crossing: $200.00 Commercial Driveway: $400.00”
  • Building in a floodplainRequired

    New development, repair, modification, or addition to an existing structure, and changes in use of a building or structure, including sewer and water facilities, within areas regulated by Calumet County Chapter 51 Floodplain.

    • The property must be within the floodplain areas regulated by Chapter 51, identified by the official floodplain maps and applicable map revisions.
    • A Land Use Permit must be obtained before the covered activity may begin.
    • The permit application must include applicant, owner, and contractor information; the legal description; proposed use; and whether the work is new construction or modification.
    • A scaled site plan must identify the lot location, dimensions, area, elevation, ordinary high-water mark of abutting navigable waterways, existing structures and setbacks, existing or proposed onsite sewage or private water systems, access roads, floodplain and floodway limits, lowest-floor and fill elevations, and data sufficient to determine the regional flood elevation.
    • All development must comply with other applicable local, state, and federal regulations.
    • Floodplain development may be denied if it obstructs flow or increases regional flood height.
    • The ordinance requires fees for work requiring a land-use permit or public hearing; fees are established by the County Planning, Zoning and Land Information Department Fee Schedule and are non-refundable.
    • County Chapter 51 applies in unincorporated areas; incorporated municipalities may have separate or more restrictive rules.
    “A Land Use Permit shall be obtained before any new development; repair, modification or addition to an existing structure;”
    One more reviewed finding on this topic
    • Limited — Development and land-disturbing activities in unincorporated Calumet County floodplains.
      “Chapter 51 - Floodplain (PDF) contain standards that govern development and land disturbing activities in floodplains with the purpose of protect life, health, and property. Chapter 51 is in effect in all unincorporated areas of Calumet County.”
  • Permit feesPublished (with conditions)

    Calumet County sanitary permits and related applications.

    • The sanitary permit fee includes a $100 state fee.
    • Fees vary by application type.

    sanitary permit for all POWTS and holding tanks: 500 USD (Includes $100 state fee) · plan approval for mound, at-grade, or pressure distribution systems: 250 USD · plan approval for holding tank and conventional systems, 1- and 2-family dwellings: 100 USD · reconnection to existing POWTS: 125 USD · privy pit or vault: 125 USD · soil test review: 30 USD

    “Plan Approval (Mound, At-Grade, or Pressure Distribution Systems) | $250 Plan Approval Holding Tank and Conventional Systems (1 & 2-Family Dwellings) | $100 [...] Sanitary Permit, All POWTS and Holding Tanks (Includes $100 State Fee) | $500 [...] Reconnection to Existing POWTS | $125 Privy (Pit or Vault) | $125 [...] Soil Test Review Fee | $30”
    One more reviewed finding on this topic
    • Published (with conditions) — County sanitary, access, driveway, and utility permits.
      “Public Street: $875.00 Private Driveway: $150.00 Agricultural Driveway: $200.00 Recreational Crossing: $200.00 Commercial Driveway: $400.00”
  • Permit processPublished (with conditions)

    Calumet County sanitary permit and soil-test submissions.

    • Applicants may submit sanitary permits, soil tests, and payments online.
    • The process is intended for licensed Certified Soil Testers and licensed plumbers.
    • All necessary paperwork and payments must be submitted for a complete submission.
    • The online form requires application type, municipality, primary contact, property address or parcel ID, date of submittal, and supporting materials.
    “Calumet County now offers the ability to submit sanitary permits, soil tests, and payments online. [...] This application process is intended for licensed Certified Soil Testers (CSTs) and licensed plumbers submitting soil tests and sanitary permits. A submission is not considered to be complete unless all necessary paperwork and payments have been submitted to the Department.”
    One more reviewed finding on this topic
    • Published (with conditions) — County zoning, land-division, sanitary, and access permit processes.
      “A submittal is considered complete with the following have been received: Land Division Application (linked below), Application Fee, and Draft Certified Survey Map or Plat.”

Wisconsin rules that apply here

  • Building permitRequired

    New one- and two-family dwellings covered by Wisconsin’s Uniform Dwelling Code, including covered additions and alterations.

    • The cited brochure states that permit requirements for alterations and additions vary by municipality.
    • Construction begins only after plans are approved and the building permit is issued and posted.
    • The enforcing jurisdiction may be the municipality, county, or state.
    • Local zoning, land-use, floodplain, sanitary, well, driveway, utility, and other approvals may also be required.
    • A building permit cannot be issued for a new dwelling using a private onsite wastewater treatment system until a sanitary permit has been issued.
    “Begin construction after plans are approved and building permit is issued and posted.”
    2 more reviewed findings on this topic
    • Required — New UDC dwelling construction in Calumet County.
      “Begin construction after plans are approved and building permit is issued and posted.”
    • Required — New one- and two-family dwelling units in Calumet County.
      “A permit under the UDC is required for new one- and two-family dwelling units. This includes stick-built, modular, and manufactured home installations.”
  • Owner-builder exemptionConditional

    An owner obtaining construction and erosion-control permits for a dwelling covered by the Wisconsin Uniform Dwelling Code.

    • The owner must occupy the home currently or will occupy it after completion.
    • The exemption permits the owner to take out the construction and erosion-control permits without the state-certified Dwelling Contractor and Dwelling Contractor Qualifier arrangement described for contractors.
    • The owner-occupancy statement must be checked on the permit application if the applicant does not possess Dwelling Contractor certification.
    • The source describes an owner-occupancy condition; it does not establish a general exemption for non-occupant owners.
    “The construction and erosion control permits must be taken out by a state-certified Dwelling Contractor, who also employs a state-certified Dwelling Contractor Qualifier, or by the owner who occupies the home currently or will after completion.”
    One more reviewed finding on this topic
    • Available (with conditions) — Construction and erosion-control permits for a UDC home.
      “The construction and erosion control permits must be taken out by a state-certified Dwelling Contractor, who also employs a state-certified Dwelling Contractor Qualifier, or by the owner who occupies the home currently or will after completion.”
  • Building code adoptedAdopted (with conditions)

    Public buildings, places of employment, and multifamily buildings subject to Wisconsin's commercial building code.

    • The Division of Industry Services reviews plans before construction for compliance with state statutes and building codes.
    • Local certified municipalities may provide plan review and inspection services for certain building types.
    • The Wisconsin Commercial Building Code adopted the 2021 ICC effective September 1, 2025; plans submitted November 1, 2025 or later must comply with the updated code.
    • Municipalities may have grandfathered fire detection, prevention, and suppression ordinances under 2013 Act 270.

    2021 ICC adoption date: September 1, 2025 (The deadline for building plan compliance was delayed.) · updated-code plan-submission deadline: November 1, 2025 (Plans submitted on or after this date must comply with the updated Commercial Building Code.)

    “2013 Act 270 establishes a uniform commercial building code in Wisconsin while allowing municipalities to grandfather fire detection, prevention, and suppression ordinances”
    5 more reviewed findings on this topic
    • Adopted (with conditions) — New one- and two-family dwellings in Wisconsin, including Calumet County.
      “The statewide code for new homes in Wisconsin is the Uniform Dwelling Code (UDC), SPS 320-325 of the Wisconsin Administrative Code and its adopted references. It is a uniform building code that applies across the state.”
    • Adopted (with conditions) — Wisconsin Uniform Dwelling Code requirements applicable to new one- and two-family dwellings in Calumet County.
      “Program Code Chapter: SPS 320-325 [...] The program governing one- and two-family dwelling units (including manufactured homes) is also called the UDC program, referring to the Uniform Dwelling Code.”
    • Adopted (with conditions) — New one- and two-family dwellings in Wisconsin built since June 1, 1980.
      “The Uniform Dwelling Code (UDC) is the statewide building code for one- and two-family dwellings built since June 1, 1980.”
    • Adopted (with conditions) — New Wisconsin one- and two-family dwelling construction, including stick-built, modular, and manufactured home installations
      “A permit under the UDC is required for new one- and two-family dwelling units. This includes stick-built, modular, and manufactured home installations.”
    • Adopted — Wisconsin's Uniform Dwelling Code, chapters SPS 320-325, for new one- and two-family dwelling units, including stick-built, modular, and manufactured home installations.
      “SPS 320-325 Uniform Dwelling Code (UDC), construction standard for 1-2 family dwelling units, applies uniformly statewide”
  • InspectionsRequired

    Each phase of construction of a one- or two-family dwelling governed by the Wisconsin Uniform Dwelling Code.

    • Inspections are called for before each phase is covered up.
    • The local inspector’s instructions apply.
    • The inspector has two business days after the inspection request and the work being ready to inspect before the work may be covered.
    • Inspections check compliance with the code and may also check compliance with approved plans.
    • The UDC is enforced by municipal or county building inspection departments or the Wisconsin Division of Industry Services.

    inspection response period: 2 business days (After the inspection request and the work is ready to inspect, before the work may be covered up.)

    “Call for inspections of each phase of construction prior to covering it up - check the local inspector’s instructions. The inspector has two business days after the date that you make the inspection request and the work is ready to inspect, before you may cover up the work. Inspectors will check for compliance with the code.”
    One more reviewed finding on this topic
    • Required — UDC dwelling construction in Calumet County.
      “Call for inspections of each phase of construction prior to covering it up - check the local inspector’s instructions. The inspector has two business days after the date that you make the inspection request and the work is ready to inspect, before you may cover up the work. Inspectors will check for compliance with the code.”
  • Certificate of occupancyLimited

    Occupancy of UDC dwellings in Calumet County.

    • Occupancy follows a final inspection finding no major health or safety violations.
    • Some municipalities issue occupancy permits; the state rule does not make issuance universal.
    • The dwelling exterior must be completed within two years after permit issuance.

    exterior completion deadline: 2 years after permit issuance

    “Take occupancy after receiving a final inspection in which no major health or safety violations are found. (Some municipalities will issue occupancy permits.) Also, the dwelling’s exterior must be completed within two years after permit issuance.”
    One more reviewed finding on this topic
    • Limited — Occupancy of a dwelling governed by Wisconsin’s Uniform Dwelling Code after construction.
      “Take occupancy after receiving a final inspection in which no major health or safety violations are found. (Some municipalities will issue occupancy permits.) Also, the dwelling’s exterior must be completed within two years after permit issuance.”
  • Lot coverageSpecified

    Impervious-surface coverage in the statewide shoreland framework and the DNR county model ordinance for qualifying shoreland lots or parcels.

    • The general standard applies to construction, reconstruction, expansion, replacement, or relocation of impervious surfaces within 300 feet of the ordinary high-water mark on riparian lots and parcels entirely within 300 feet of the ordinary high-water mark.
    • The general standard is 15 percent.
    • A lot or parcel may exceed 15 percent but not exceed 30 percent with a permit and mitigation plan.
    • For highly developed shorelines, counties are not required to adopt the special standards; if adopted, residential coverage may exceed 30 percent but not exceed 40 percent with a mitigation plan.
    • Treated impervious surfaces and defined roadways and sidewalks may be excluded from calculation when the ordinance conditions are met.

    general impervious-surface limit: <= 15 percent of lot or parcel · maximum under general standard with mitigation: 30 percent of lot or parcel (permit and mitigation plan required) · highly developed shoreline residential maximum: 40 percent of lot or parcel (special standard adopted and mitigation plan required)

    “The percentage of impervious surface allowed on a lot or parcel described under section 11.2 and as calculated under section 11.3 shall not exceed 15%.”
  • Manufactured homesAllowed (with conditions)

    Occupancy of a manufactured home installed as a new one- or two-family dwelling in Wisconsin.

    • The Uniform Dwelling Code applies to new one- and two-family dwellings built since June 1, 1980.
    • The UDC includes manufactured homes and the installation of manufactured homes produced on or after April 1, 2007.
    • Occupancy follows a final inspection in which no major health or safety violations are found.
    • Some municipalities issue occupancy permits.
    • The dwelling exterior must be completed within two years after permit issuance.
    • Local sanitary requirements may require certain plumbing systems.
    • Local zoning and land-use requirements may also apply.

    UDC coverage start date: >= 1980-06-01 date (The cited coverage is for new one- and two-family dwellings and their additions and alterations.) · manufactured-home installation coverage start date: >= 2007-04-01 date · exterior completion deadline: <= 2 years after permit issuance

    “The installation of manufactured homes produced on or after April 1, 2007.”
  • Septic inspectionRequired

    Privately owned wastewater treatment systems and septic systems statewide in Wisconsin.

    • Systems must be visually inspected at least once every three years.
    • Anaerobic treatment tanks must be serviced when combined sludge and scum volume reaches one-third of tank volume.
    • Counties, acting as state agents, operate maintenance-tracking programs and send reminders to landowners.

    visual inspection interval: <= 3 years · combined sludge and scum service threshold: >= 33.333333 percent of tank volume (One-third of tank volume.)

    “The code only requires that systems shall be visually inspected at least once every 3 years.”
  • Well permitLimited

    Construction of private wells statewide in Wisconsin.

    • A Well Construction Notification Number must be obtained before constructing a new private well that is not a high-capacity well.
    • Exceptions to the notification requirement include high-capacity wells, reconstruction of existing wells, and wells on Native American property; high-capacity wells or other wells requiring written DNR approval follow the approval requirements.
    • Some DNR-approved county ordinances additionally require a well permit before construction.
    • A Well Construction Report must be submitted to DNR within 30 days after construction.

    well construction notification fee: 50.5 USD (Fee and notification number are not refundable or transferable.) · well construction report deadline: 30 days after construction

    “Wisconsin law requires that a property owner provide advance notice to DNR before construction of any new private well that is not a high capacity well, and advance notice of any heat exchange drillhole construction (geothermal system) that does not require a written DNR approval.”
  • Mandatory utility hookupWater and sewer (with conditions)

    Pre-installation water and sewer systems in a manufactured/mobile home park in Wisconsin.

    • Pre-installation plumbing-system plan review is required.
    • Submitted plans must comply with the Wisconsin Plumbing Code.
    • A conditional approval letter gives permission to start construction.
    • Local permitting requirements remain pending.
    “Pre-installation plan review of the water and sewer systems in a manufactured/mobile home park is required as a plumbing system plan review via esla.wi.gov.”
  • Agricultural exemptionConditional

    Wisconsin farmland preservation zoning districts and farmland preservation agreements; these are conditional agricultural-use protections and tax-credit frameworks, not a blanket exemption from local land-use or land-division ordinances.

    • Certified farmland preservation zoning districts limit land uses to agriculture and other compatible uses.
    • Local ordinances are crafted locally and must meet or be more restrictive than Chapter 91 standards.
    • A farmland preservation agreement requires land to remain in agricultural use for 10 years and comply with state soil and water conservation standards.
    • Agreement eligibility requires ownership of the farmland, location in a designated Agricultural Enterprise Area, at least $6,000 gross farm revenue during the last year or $18,000 during the last three years, and compliance with applicable conservation standards.
    • A certificate of compliance from the county land conservation committee is required to show compliance.
    • Other local zoning and land-division ordinances continue to apply.
    • A covered agreement provides exemption from special assessments for sanitary sewer or water imposed by specified local governmental entities.
    • Releases before expiration require written consent, a DATCP finding that agricultural use of other protected farmland will not be impaired, and payment of the specified conversion fee.

    farmland preservation agreement term: 10 years (agreements effective before December 8, 2023, were minimum 15-year agreements) · minimum gross farm revenue during last year: >= 6000 USD (alternative test of $18,000 during the last three years) · minimum gross farm revenue during last three years: >= 18000 USD (alternative to the $6,000 last-year test) · tax credit: $10.00 per acre or $12.50 per acre if also in a certified farmland preservation zoning district (other eligibility requirements apply)

    “Remember that other local ordinances (such as zoning and land division ordinances) continue to apply to your land, regardless of whether you sign an agreement.”
  • Short-term rentalsLimited

    Lodging rented to tourists or transients for short periods in Wisconsin, including homes, condos, cabins, cottages, and similar lodging facilities.

    • A DATCP lodging permit is required for all lodging facilities in Wisconsin.
    • A tourist or transient must be away from the person's permanent address.
    • The reviewed source does not establish local zoning or municipal operating restrictions.
    “If lodging is rented to a tourist or transient, it will require a permit.”
  • Campground & park staysLimited

    Recreational trailers, pickup truck campers, and motor homes occupying campsites in Wisconsin State Park System family campgrounds.

    • Camping reservations are required before setting up on any site.
    • A campsite may contain no more than one recreation trailer, pickup truck camper, or motor home.
    • No person may camp or leave a camping unit in a family campground for more than 14 days in any 21 days.
    • Pickup campers or motor homes pulling a trailer are treated as a single unit.

    maximum camping-unit occupancy per campsite: 1 recreation trailer, pickup truck camper, or motor home (Pickup campers or motor homes pulling a trailer are treated as a single unit.) · maximum stay: 14 days in any 21 days

    “A campsite may be occupied by no more than one recreation trailer, pickup truck camper or motor home. Pickup campers or motor homes pulling a trailer are treated as a single unit. [...] No one may camp or leave a camping unit in a family campground for more than 14 days in any 21 days.”
    3 more reviewed findings on this topic
    • Limited — Occupancy of recreational vehicles, including recreation trailers, pickup truck campers, motor homes, camper vans, and truck campers, at Wisconsin State Park System campsites.
      “A campsite may be occupied by no more than one recreation trailer, pickup truck camper or motor home. Pickup campers or motor homes pulling a trailer are treated as a single unit.”
    • Limited — Temporary camping at Wisconsin State Park System properties.
      “Camping reservations are required and can be made up to 11 months in advance of your planned date of occupancy. Campers must make a reservation before setting up on any site.”
    • Limited — Temporary camping in Wisconsin State Park System family campgrounds.
      “Camping reservations are required and can be made up to 11 months in advance of your planned date of occupancy. Campers must make a reservation before setting up on any site. [...] No one may camp or leave a camping unit in a family campground for more than 14 days in any 21 days. [...] Not all properties offer camping during non-summer months. Camping seasons vary by property.”
  • county zoning authorityGeneral

    Wisconsin counties may enact and amend county zoning ordinances under Wis. Stat. § 59.69 for participating towns, which are generally unincorporated areas.

    • County zoning applies only in towns that have adopted county zoning.
    • After a comprehensive revision of the county zoning ordinance, the town has authority to decide whether county zoning applies in the town.
    • Towns have authority to approve or disapprove amendments to a county zoning ordinance.
    • A town that does not fall under county zoning may be unzoned or may have its own town zoning ordinance.
    “Counties exercise zoning ordinances under s. 59.69, Wis. Stats. County zoning only applies in towns that have adopted county zoning.”
  • county building authorityGeneral

    Wisconsin county authority to administer construction and inspection of new one- and two-family dwellings, including in unincorporated areas, through the UDC delegation and inspection framework.

    • Counties must have delegated authority to exercise UDC jurisdiction.
    • A county with delegated authority has jurisdiction over new one- and two-family dwellings in cities, villages, and towns that do not have their own delegated authority.
    • The DSPS page directs applicants to the municipality when it has delegated authority and otherwise to DSPS or the appointed county inspector.
    • The authority described is for construction and inspection under the statewide UDC; local zoning, land-use, sanitary, floodplain, and other requirements may still apply.

    covered construction: new one- and two-family dwellings (Jurisdiction depends on DSPS delegation and whether the municipality has its own delegated authority.)

    “Counties: Counties with delegated authority have been authorized jurisdiction over the construction and inspection of new one- and two-family dwellings in cities, villages, and towns which do not have their own delegated authority.”
    2 more reviewed findings on this topic
    • General — County authority to enforce the statewide Uniform Dwelling Code and administer building inspection and permitting for new one- and two-family dwellings in Wisconsin, including unincorporated areas where the county is the responsible inspection authority.
      “The UDC is primarily enforced by municipal or county building inspectors who must be state-certified. In lieu of local enforcement, municipalities have the option to have the state provide enforcement for just new homes.”
    • Limited — County enforcement of Wisconsin’s Uniform Dwelling Code for new one- and two-family dwellings in municipalities, including towns, that do not have their own delegated authority
      “Counties: Counties with delegated authority have been authorized jurisdiction over the construction and inspection of new one- and two-family dwellings in cities, villages, and towns which do not have their own delegated authority.”

Set by your township or city, not the county

In Wisconsin, zoning is adopted by each township or city, so Calumet County has no county-wide answer on these. Find your township or city in the list of places on this page, or call its clerk or zoning administrator.

  • Living in an RV

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Living off-grid in Calumet County, Wisconsin

Is Calumet County a good place to live off-grid or homestead?

Calumet County scores 58/100 on the Bolthole Index, a solid county profile. Its strengths: mixed durability signals and a stronger property-autonomy legal backdrop. Watch-outs: about 42,736 people within a 30-minute drive.

Do you need a building permit in Calumet County, Wisconsin?

Calumet County generally requires a residential building permit, and it enforces county zoning. Onsite septic is permitted by Calumet County Planning, Zoning & Land Information Department (Sanitation). Owner-builders may act as their own contractor to build their home. These answers are quoted from official sources and independently re-checked. Rules change and cities within the county differ — always confirm with the county before you buy or build.

How much does land cost in Calumet County, Wisconsin?

Land in Calumet County runs about $8,232 per acre, based on the latest county data.

What is the water situation in Calumet County?

Calumet County gets about 33.2" of rain a year, with severe drought in roughly 0.5% of years.

How remote is Calumet County?

A representative private-land location has about 42,736 people within a 30-minute drive and 3,205,122 within two hours. The road-network catchments count population across county lines and clusters of smaller cities; straight-line radius values remain available as a comparison.

How Calumet compares in Wisconsin

Compare side-by-side →See all 72 Wisconsin counties ranked →