Bolthole Index

Manitowoc County, Wisconsin

Building permits, zoning and septic rules in Manitowoc County, Wisconsin

61Index Score / 100
#51 of 72 in Wisconsin

Unincorporated Manitowoc County, Wisconsin requires a county zoning/setback permit for every structure, regardless of cost or size, plus a Uniform Dwelling Code building permit for a new one- or two-family home12. The county guide also directs builders to obtain a town building permit3. County zoning applies in the towns that participate in county general zoning, and incorporated municipalities may run their own zoning approval4. Septic permits come from the Manitowoc County Planning and Zoning Department5.

At a glance

Building permit
Every structure needs a county zoning/setback permit; a new home also needs UDC and town building approval1
Zoning
County general zoning applies in participating towns; incorporated municipalities may run their own zoning4
Septic
A separate county permit is required for each private sewage system, with limited repair exceptions6
Owner-builder
An owner who occupies or will occupy the home may take out the construction and erosion-control permits7
Minimum lot
Varies by zoning district, from residential lots measured in square feet to 20-acre districts8
Road setback
60 feet from a town road and 100 feet from a county or state highway in county-regulated districts9
RV or tiny home
Residential occupancy rules were not confirmed; ask the county and the parcel's town10
Private well
Obtain a Wisconsin Well Construction Notification Number before constructing most new private wells11

Who to call

Planning & zoning

Manitowoc County Planning and Zoning Department

Zoning, sanitary (POWTS), and shoreland administration for unincorporated Manitowoc County

920-683-4185

4319 Expo Drive, Manitowoc, WI 54220

Zoning

Manitowoc County Planning and Zoning Department - Zoning

General county zoning administration and zoning/setback permits for towns under Manitowoc County General Zoning

Septic permits

Manitowoc County Planning and Zoning Department - Sanitary (POWTS)

Private Onsite Wastewater Treatment System (POWTS/septic) permitting for unincorporated Manitowoc County

Planning & zoning

Manitowoc County Planning & Zoning Department - Guide to Building (Rural Areas)

Step-by-step guidance for building in the unincorporated areas of Manitowoc County: zoning, driveway access, surveys, septic siting, and permits

Contact details are copied from each office’s official page and were checked against it on October 9, 2026.

Off-grid gear

Going off-grid in Manitowoc County means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Do you need a building permit in Manitowoc County, Wisconsin?

Yes. Every structure in unincorporated Manitowoc County needs a county zoning/setback permit regardless of cost or size, and every new one- or two-family dwelling needs a permit under Wisconsin's Uniform Dwelling Code1. That statewide code covers stick-built, modular and manufactured-home installations12. The county guide separately directs applicants to obtain the town building permit3. An owner who occupies or will occupy the finished home may take out the construction and erosion-control permits, but that option does not waive permits or code compliance7. Required dwelling inspections cover footings, foundation and reinforcement, rough work, insulation and final completion13. A satisfactory final inspection is required before occupancy, though a separate occupancy permit is not confirmed countywide14.

Who issues building permits and zoning approval in Manitowoc County?

Start with the Manitowoc County Planning and Zoning Department at 4319 Expo Drive, Manitowoc, WI 54220, or call 920-683-418515. The county handles rural zoning/setback permits and its sanitary program, while the applicable town is the next stop for the building permit identified in the county guide35. Before choosing a house site, ask Planning and Zoning whether the use fits the parcel's district and whether floodplain or wetland constraints affect it3. Then identify the responsible building inspector, because Uniform Dwelling Code permitting and inspection may be handled by a delegated municipality, a delegated county or the state, depending on the location12. The responsible inspector controls scheduling for the required construction inspections13.

Does Manitowoc County have zoning?

Manitowoc County has general zoning in participating towns, but county zoning is not uniformly effective in every town and incorporated municipalities may administer their own zoning4. Chapter 8 identifies agricultural, residential, lake residential, commercial, industrial and natural-area districts16. Minimum lot size depends on the district: examples range from 10,000 square feet for a sewered Lake Residential lot to 20 acres in Exclusive Agriculture and Natural Areas17. In county-regulated districts, common road setbacks are 60 feet from a town road and 100 feet from a county or state highway, while Lake Michigan setbacks are usually greater than 75 feet9. Height limits are generally 35 feet in residential and natural-area districts and 60 feet in agricultural, industrial and commercial districts; farm structures are exempt from height restrictions, not from every land-use rule1819. Septic permits are not delegated to the towns: the county Planning and Zoning Department administers them5.

How do septic permits work in Manitowoc County?

The Manitowoc County Planning and Zoning Department administers the county sanitary code, alongside Wisconsin's POWTS rules5. A separate permit is required for every private sewage system, although specified minor and promptly reported emergency repairs are exceptions6. For a new home on private sewage, start with a soils evaluation; a licensed plumber designs the system and submits it for county review before installation20. Start early because only 2.6% of county soils are rated without severe limitations for a conventional drain field21. The system cannot be covered or placed in service until the department has had an opportunity to inspect it, and POWTS outside sanitary districts in unincorporated areas must be inspected every three years22. A non-plumbing sanitation system also requires a sanitary permit, so off-grid sanitation is not an unregulated workaround23.

Can you live in an RV or tiny home in Manitowoc County?

We could not confirm a county rule that directly answers long-term RV occupancy, temporary private-land camping or tiny-home occupancy in Manitowoc County. Ask the Manitowoc County Planning and Zoning Department and the parcel's town before buying or placing a unit, because zoning authority varies by location415. A tiny home used as a dwelling must still clear the applicable building, zoning and sanitation requirements; district-specific lot sizes, setbacks and heights apply in county-zoned areas172418. A vacation-home rental is clearer: it requires a conditional-use application, a POWTS compliance inspection report and compliance with occupancy and parking conditions, and guests cannot sleep in campers, motor homes, recreational vehicles or trailers outside the principal rental structure25. Separately, the county's zoning chapter says a mobile home may not be used as a residence within the county unless it is located in a manufactured home park26.

Building a home in Manitowoc County: the steps, in order

  1. Confirm the parcel's zoning district and check the proposed site for floodplain or wetland constraints3.
  2. If creating a parcel smaller than 15 acres, complete the required Certified Survey Map process before recording the division27.
  3. Confirm residential driveway access with the County Highway Department or town; an existing field entrance may not be enough28.
  4. Arrange the soils evaluation, septic design and sanitary permit for private sewage, and obtain the state notification number before constructing most new private wells2011.
  5. Submit the county zoning/setback application and any required floodplain land-use permit with accurate site plans329.
  6. Obtain and post the applicable dwelling and town building permits, then schedule every required inspection through final approval113.

What should you check before buying land in Manitowoc County?

Confirm the governing municipality and zoning district first, because county general zoning depends on town participation and incorporated municipalities may administer their own rules304. Verify legal residential driveway access before treating an existing field entrance as usable28. If the parcel was newly divided and is smaller than 15 acres, confirm that the required Certified Survey Map was approved and recorded31. Order a soils evaluation early because only 2.6% of county soils are rated without severe limits for a conventional drain field21. Check the flood map and permit path before planning repairs, additions, utility work or a change of use in a regulated floodplain29. Near Lake Michigan, confirm the site-specific setback because it is usually greater than 75 feet24.

Watch-outs

  • County general zoning is not effective in every town, so confirm the parcel's governing zoning authority before applying county district standards4.
  • A proposed driveway location can prevent access, and an existing field entrance may not establish residential access28.
  • Floodplain repairs, additions, utility work and changes of use may require a county land-use permit before work begins29.

Sources

  1. UDC (Uniform Dwelling Code / One- and Two-Family Dwellings), quoted and re-checked
  2. Building a Structure in the Rural Areas of Manitowoc County, quoted and re-checked
  3. Building a Structure in the Rural Areas of Manitowoc County, quoted and re-checked
  4. Chapter 8 General Zoning and Land Use Regulation, quoted and re-checked
  5. Sanitary - Manitowoc County, quoted and re-checked
  6. Chapter 13 Private Sewage Systems, quoted and re-checked
  7. Instructions for Submitting a UDC Permit Application, quoted and re-checked
  8. Building a Structure in the Rural Areas of Manitowoc County, quoted and re-checked
  9. Building a Structure in the Rural Areas of Manitowoc County, quoted and re-checked
  10. Chapter 8 General Zoning and Land Use Regulation (2026 county census)
  11. Well and heat exchange notification, quoted and re-checked
  12. UDC (Uniform Dwelling Code / One- and Two-Family Dwellings), quoted and re-checked
  13. UDC (Uniform Dwelling Code / One- and Two-Family Dwellings), quoted and re-checked
  14. Wisconsin’s Uniform Dwelling Code, quoted and re-checked
  15. Manitowoc County Planning and Zoning Department (manitowoccountywi.gov)
  16. Chapter 8 General Zoning and Land Use Regulation, quoted and re-checked
  17. Chapter 8 General Zoning and Land Use Regulation, quoted and re-checked
  18. Building a Structure in the Rural Areas of Manitowoc County, quoted and re-checked
  19. Building a Structure in the Rural Areas of Manitowoc County, quoted and re-checked
  20. Chapter 13 Private Sewage Systems, quoted and re-checked
  21. Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
  22. Chapter 13 Private Sewage Systems, quoted and re-checked
  23. Chapter 13 Private Sewage Systems, quoted and re-checked
  24. Chapter 8 General Zoning and Land Use Regulation, quoted and re-checked
  25. Chapter 8 General Zoning and Land Use Regulation, quoted and re-checked
  26. Chapter 8 General Zoning and Land Use, quoted and re-checked
  27. Building a Structure in the Rural Areas of Manitowoc County, quoted and re-checked
  28. Building a Structure in the Rural Areas of Manitowoc County, quoted and re-checked
  29. Chapter 31 Floodplain Zoning, quoted and re-checked
  30. Chapter 8 General Zoning and Land Use Regulation, quoted and re-checked
  31. Planning & Park Commission Applications - Manitowoc County, quoted and re-checked

Written October 9, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Found land here? Start a Property Hunt →

Compared with neighboring counties

Like all 6 of its neighbors, Manitowoc County requires a building permit for a home.

RuleManitowoc CountyCalumet CountyBrown CountySheboygan CountyKewaunee CountyOutagamie CountyWinnebago County
Building permitRequiredRequiredRequiredRequiredRequiredRequiredRequired
County zoningYesYesNoYesYesYesYes
Septic permitsCounty Planning & Zoning Dept.County PlanningCounty Planning & Land ServicesCounty Planning & Conservation Dept.County Land & Water Conservation Dept.County Development & Land ServicesCounty Planning & Zoning Dept.

County locator

Manitowoc County in Wisconsin

61
County map
Manitowoc County highlighted among the Wisconsin counties · colored by Index score

How Manitowoc County scores

Seclusion31100% ev.
Self-Sufficiency63100% ev.
Admin Boringness44100% ev.
Durability77100% ev.
Property Autonomy70100% ev.
Carry Cost61100% ev.

Evidence strength: 100%. This reports direct-source completeness and fallback use; it is separate from the score and is not a confidence interval. How it works →

$266kTypical home
1.5%Property tax
$7,751Land / acre
32.6"Annual rain
0.3% of yrsSevere drought
0.4 / yr (+0.4)Mid-century 100°F days
12.4 daysMid-century dry spell
1.46" (+8.5%)Mid-century 1-day rain
1.6×Wildfire change factor
100%Forward climate coverage
$1,047Home insurance / yr
1.6% / yrInsurance growth
0.59%Nonrenewal rate
county median (2+ published ZIPs)Insurance basis
76,156People within 30 min
2,998,002People within 2 hr
72,748Radius comparison (15 mi)
138People / sq mi
0.4%Federal land
94%Land at 15% slope or less
2.6%Soils rated "not limited" for septic (strict USDA rating)
9,647 acWorkable land screen
23%Wooded land
47.5 tonsBiomass / forest ac
45°FAvg temp

Scout Manitowoc County

Camp here before you commitBook a few nights nearby on Hipcamp →Already own land here?Earn money hosting campers — get $100 when you become a Hipcamp host →

Some links are affiliate or referral links — we may earn a commission, at no cost to you.

Property hunt

Find land. Bring the promising ones back.

Search live inventory elsewhere, then cost and vet each candidate here. No copied listings, account, or paid data feed.

Each button opens a current land search for Manitowoc County. Listing sites control their own results and filters.

Analyze a property
Add setup-cost allowances

Use rough quotes or placeholders. Blank fields count as $0.

Working estimate

—land + entered setup costs
Asking $ / acre
—
Setup allowance
—
All-in $ / acre
—

A planning estimate, not a valuation or contractor quote. The USDA benchmark includes farm land and buildings; it is context, not a parcel comp.

Before an offer

Parcel due diligence

0/8 checked

Saved properties and checklist progress stay on this device. Bolthole Index does not receive them.

Cities and towns in Manitowoc County

Inside a city, town or township here, that government usually sets zoning and may issue its own building permits; the county’s rules above cover land outside them.

Not yet researched: Town of Cato · Town of Centerville · Village of Cleveland · Town of Cooperstown · Town of Eaton · Village of Francis Creek · Town of Franklin · Town of Gibson · Village of Kellnersville · Town of Kossuth · Town of Liberty · Manitowoc · Town of Manitowoc · Town of Manitowoc Rapids · Town of Maple Grove · Village of Maribel · Town of Meeme · Town of Mishicot · Village of Mishicot · Town of Newton · Town of Rockland · Town of Schleswig · Village of St. Nazianz · Town of Two Creeks · Two Rivers · Town of Two Rivers · Village of Valders · Village of Whitelaw

Answers from the rulebook for Manitowoc County

What the ordinances and state agencies actually say — one answer per question, each quoted from the official source and independently re-checked.

Manitowoc County rules

  • Building permitRequired

    Construction of all structures in unincorporated Manitowoc County.

    • A town building permit may also be required.
    • The county zoning-setback permit is distinct from the UDC construction permit.
    “A County Zoning-Setback Permit is required for the construction of all structures within the unincorporated areas of Manitowoc County regardless of cost and size.”
  • County-wide zoningPresent (with conditions)

    Unincorporated Manitowoc County and towns that have approved county general zoning by town-board resolution; county shoreland and floodplain rules also apply in their statutory areas.

    • Chapter 8 applies to all development, structures, and land uses within unincorporated areas.
    • Chapter 8 becomes effective in a town when approved by town-board resolution and filed with the County Clerk.
    • The county zoning page lists 16 towns under Manitowoc County General Zoning.
    “This ordinance applies to all development, structures, and land uses within the unincorporated areas of the county. [...] Following enactment by the county, this ordinance will become effective in a town when it is approved by a resolution adopted by the town board and a certified copy of the resolution is filed with the County Clerk.”
    One more reviewed finding on this topic
    • Present (with conditions) — County shoreland and floodplain zoning, including county-administered regulation of development in mapped floodplain areas.
      “Chapter 09 Shoreland Zoning [...] Chapter 31 Floodplain Zoning”
  • Local zoningVaries (with conditions)

    Aggregate of county, town, city, and village zoning across Manitowoc County.

    • The county zoning page lists Cato, Centerville, Cooperstown, Eaton, Gibson, Kossuth, Liberty, Manitowoc, Manitowoc Rapids, Maple Grove, Meeme, Mishicot, Rockland, Schleswig, Two Creeks, and Two Rivers as towns under Manitowoc County General Zoning.
    • Other incorporated municipalities and towns may administer their own zoning.
    “Towns under Manitowoc County General Zoning: Cato Centerville Cooperstown Eaton Gibson Kossuth Liberty Manitowoc Manitowoc Rapids Maple Grove Meeme Mishicot Rockland Schleswig Two Creeks Two Rivers”
    One more reviewed finding on this topic
    • Varies (with conditions) — Aggregate of unincorporated county zoning and participating town zoning; incorporated municipalities may administer their own zoning.
      “Towns under Manitowoc County General Zoning: Cato Centerville Cooperstown Eaton Gibson Kossuth Liberty Manitowoc Manitowoc Rapids Maple Grove Meeme Mishicot Rockland Schleswig Two Creeks Two Rivers”
  • Zoning districtsPartial

    County general-zoning districts shown in the official county building guide for unincorporated areas.

    • The guide displays selected district abbreviations and dimensional standards, including Exclusive Agriculture, General Agriculture, Large Estate Residential, Small Estate Residential, Rural Residential, High Density Residential, Lake Residential, Commercial/Business, Industrial, and Natural Areas.
    • The guide states that Lake Michigan setbacks are in most cases much greater than 75 feet.
    • Farm structures and parts thereof are exempt from height restrictions.
    • Lot-size requirements for Lake Residential differ for sewered and unsewered lots.
    “EXCLUSIVE AGRICULTURE 20 ACRE 150 60’ 60' OR 100' 25'/10’ 75' GA GENERAL AGRICULTURE 10 ACRE”
    2 more reviewed findings on this topic
    • Published (with conditions) — County general zoning districts in unincorporated Manitowoc County and participating towns.
      “8.08 Establishment of Districts. 8.09 Exclusive Agriculture (EA). 8.10 General Agriculture (GA). 8.11 Large Estate Residential (LE). 8.12 Small Estate Residential (SE). 8.13 Rural Residential (RR). 8.14 High Density Residential (HD). 8.15 Lake Residential (LR). 8.16 Commercial/Business (CB). 8.17 Industrial (ID). 8.18 Natural Area (NA).”
    • Published (with conditions) — Manitowoc County General Zoning districts.
      “Chapter 8 County Code – General Zoning Ordinance (Manitowoc County adopted a comprehensive revision of its current general zoning code on November 7, 2011)”
  • Minimum lot sizeSpecified

    County zoning districts shown in the county guide for unincorporated Manitowoc County.

    • The guide states that the lot-size requirement for Lake Residential varies between sewered and unsewered lots.
    • The listed districts include Exclusive Agriculture, General Agriculture, Large Estate Residential, Small Estate Residential, Rural Residential, High Density Residential, Lake Residential, Commercial/Business, Industrial, and Natural Areas.

    Exclusive Agriculture minimum lot area: 20 acres · General Agriculture minimum lot area: 10 acres · Large Estate Residential minimum lot area: 5 acres · Small Estate Residential minimum lot area: 2 acres · Rural Residential minimum lot area: 1 acre · High Density Residential minimum lot area: 0.5 acre · Lake Residential minimum lot area: 10,000 or 20,000 square feet (sewered versus unsewered lot) · Commercial/Business minimum lot area: 10000 square feet · Industrial minimum lot area: 1 acre · Natural Areas minimum lot area: 20 acres

    “EA EXCLUSIVE AGRICULTURE 20 ACRE 150 60’ 60' OR 100' 25'/10’ 75'”
    One more reviewed finding on this topic
    • District specific (with conditions) — Lots in county zoning districts.
      “EA EXCLUSIVE AGRICULTURE 20 ACRE [...] GA GENERAL AGRICULTURE 10 ACRE [...] LE LARGE ESTATE RESIDENTIAL 217,800 5 ACRE”
  • SetbacksSpecified

    County-regulated residential, agricultural, commercial, industrial, and natural-area districts in unincorporated Manitowoc County.

    • The guide lists road setbacks of 60 feet from a town road and 100 feet from county or state highways.
    • Principal/accessory setbacks from property lines vary by district, including 25/10 feet and 7.5/5 feet.
    • The ordinary-high-water-mark setback shown is 75 feet, but Lake Michigan setbacks are in most cases much greater.

    town road setback: 60 feet · county or state highway setback: 100 feet · ordinary high water mark setback: 75 feet (Lake Michigan setbacks are in most cases much greater)

    “**LAKE MICHIGAN SETBACKS ARE IN MOST CASES MUCH GREATER THAN 75 FEET.”
    One more reviewed finding on this topic
  • Building heightDistrict specific (with conditions)

    Structures in county zoning districts.

    • EA, GA, ID, and CB generally allow 60-foot maximum height; LE, SE, RR, HD, LR, and NA generally allow 35 feet.
    • Farm structures and parts thereof are exempt from height restrictions.
    • Other exceptions may be permitted by § 8.25 or Chapters 20, 24, or 25.

    agricultural, industrial, and commercial district maximum: 60 feet (subject to ordinance exceptions) · residential and natural-area district maximum: 35 feet (subject to ordinance exceptions)

    “FARM STRUCTURES AND PARTS THEREOF ARE EXEMPT FROM HEIGHT RESTRICTIONS.”
    One more reviewed finding on this topic
  • Manufactured homesLimited

    Mobile and manufactured homes used for human habitation in county-regulated areas.

    • A mobile home may not be used as a residence within the county unless it is located in a manufactured home park.
    • Manufactured homes used for human habitation must meet Wisconsin construction standards.
    “A mobile home may not be used as a residence within the county unless it is located in a manufactured home park.”
  • Who permits septicMixed (with conditions)

    Private onsite wastewater treatment systems in Manitowoc County.

    • The county administers Chapter 13.
    • Wisconsin Administrative Code ch. SPS 383 also applies.
    “The Planning & Zoning Department administers Chapter 13 of the Manitowoc County Code and Chapter SPS 383 of the Wisconsin Administrative Code, which regulate the installation and maintenance of Private Onsite Wastewater Treatment Systems (POWTS), better known as “septic systems.””
    2 more reviewed findings on this topic
    • Mixed (with conditions) — Private onsite wastewater treatment systems in Manitowoc County.
      “The Planning & Zoning Department administers Chapter 13 of the Manitowoc County Code and Chapter SPS 383 of the Wisconsin Administrative Code, which regulate the installation and maintenance of Private Onsite Wastewater Treatment Systems (POWTS), better known as “septic systems.””
    • County (with conditions) — Private sewage systems and sanitary permits in Manitowoc County.
      “All applications for septic systems must be submitted to the County on a State approved form signed by a master plumber or master restricted plumber (sewer).”
  • Septic permitRequired

    POWTS, non-plumbing sanitation systems, and buildings requiring private sewage systems in Manitowoc County.

    • Minor repairs such as manhole risers or covers, septic tank baffles, pumps, related controls and wiring, vents, and other Department-determined items are exempt.
    • Emergency repairs or removal of stoppages may occur without a permit if promptly reported.
    • A separate application and permit is required for every private sewage system.
    “A sanitary permit shall be obtained by the property owner, his or her agent, or his or her contractor before any POWTS or any part thereof may be installed, replaced, repaired, reconnected, or modified. A sanitary permit is not required for minor repairs to POWTS such as manhole risers or covers, septic tank baffles, pumps and related controls and wiring, vents, and other items as determined by the Department.”
    2 more reviewed findings on this topic
    • Required — Installation, replacement, repair, reconnection, modification, or construction of a building requiring a private sewage system.
      “No person may install, locate, move, reconstruct, extend, enlarge, alter, convert, or modify a private sewage system or change the land use connected to the system, unless the owner of the property on which such private sewage system is located, or is to be located, holds a valid sanitary permit.”
    • Required — Installation, relocation, reconstruction, extension, enlargement, alteration, conversion, modification, or connected-land-use change involving a private sewage system.
      “No person may install, locate, move, reconstruct, extend, enlarge, alter, convert, or modify a private sewage system or change the land use connected to the system, unless the owner of the property on which such private sewage system is located, or is to be located, holds a valid sanitary permit.”
  • Septic inspectionRequired

    Private sewage systems in Manitowoc County.

    • Systems may not be covered or placed into service until the Department has had an opportunity to inspect.
    • Every POWTS must be inspected once every three years.
    • A signed certificate must be filed within 30 days after inspection.
    • The maintenance program applies to unincorporated areas outside sanitary districts.

    inspection interval: 3 years

    “Every POWTS in Manitowoc County must be inspected once every three (3) years. The inspector must provide the owner of the POWTS with a signed certificate of inspection on a form approved by the Director.”
  • Off-grid sanitationLimited

    Non-plumbing sanitation systems such as composting or incinerating toilets and privies.

    • A non-plumbing sanitation system may be permitted only where the building has no indoor plumbing.
    • If plumbing or running water is supplied, another acceptable sewage-disposal method must be provided.
    • A sanitary permit is required before constructing or installing the system.
    “A non-plumbing sanitation system may be permitted only when the building served by the non-plumbing sanitation system does not have an indoor plumbing system.”
    One more reviewed finding on this topic
    • Limited — Non-plumbing sanitation systems and private sewage systems in Manitowoc County.
      “A sanitary permit shall be obtained before constructing or installing a non-plumbing sanitation system.”
  • Mandatory utility hookupConditional

    Buildings served by a private sewage system when DNR-approved public sewer becomes available.

    • The building must be disconnected from the POWTS within one year and connected to public sewer.
    • The utility having jurisdiction determines whether sewer is available.
    • The disconnected POWTS must be abandoned under SPS 383.

    connection deadline after sewer availability: 1 year

    “When public sewer approved by the DNR becomes available to a building served by a POWTS, the building shall be disconnected from the POWTS within one (1) year and a connection shall be made to the public sewer.”
  • Agricultural exemptionConditional

    Agricultural structures in county-regulated zoning districts in unincorporated Manitowoc County.

    • The county guide states that farm structures and parts thereof are exempt from height restrictions.
    • The source does not establish a blanket exemption from all zoning, building, septic, floodplain, or permit requirements.
    “***FARM STRUCTURES AND PARTS THEREOF ARE EXEMPT FROM HEIGHT RESTRICTIONS.”
  • Subdividing landRegulated (with conditions)

    Subdivision review in Manitowoc County.

    • Subdivision plat review fees and requirements may vary by number of lots and applicable local or state rules.
    “Chapter 12 Subdivision Regulations Chapter 13 Private Sewage System”
    3 more reviewed findings on this topic
    • Regulated (with conditions) — Land divisions in the unincorporated areas addressed by the county building guide and Planning & Park Commission land-division review.
      “All divisions of land of fifteen (15) acres or less in size must be surveyed and a certified survey map or subdivision plat must be approved”
    • Regulated (with conditions) — Land division and subdivision review in Manitowoc County.
      “If the parcel is not an existing tract of land and is less than 15 acres, a Certified Survey Map is required.”
    • Regulated (with conditions) — Subdivision and other land division in the unincorporated area of Manitowoc County.
      “Any division of land within the unincorporated area of Manitowoc County which results in a subdivision as defined herein shall be, and any other division may be surveyed, and a plat thereof approved and recorded as required by this Ordinance and Wis. Stat. ch. 236.”
  • Driveway accessLimited

    Driveway access for new construction in rural and unincorporated Manitowoc County.

    • The applicant must check with the County Highway Department or town.
    • The proposed driveway location could prevent access.
    • Existing field access versus residential access may limit property use.
    • Chapter 8 section 8.35(3) contains additional driveway requirements.
    “Check with the County Highway Department or the Town to make sure a driveway access will be permitted. (The location of the proposed driveway could prevent access.)”
    One more reviewed finding on this topic
    • Limited — Driveway access for development in rural and unincorporated Manitowoc County.
      “Check with the County Highway Department or the Town to make sure a driveway access will be permitted. (The location of the proposed driveway could prevent access.)”
  • Building in a floodplainRequired

    Development in areas regulated by Manitowoc County Chapter 31 Floodplain Zoning, including new development, repairs, modifications, additions, and changes of use.

    • A land-use permit must be obtained before initiating new development, repairs, modifications, additions, or changes in use, including sewer and water facilities.
    • The application must include applicant, owner, contractor, legal-description, proposed-use, and new-construction/modification information, plus a scaled site-development plan.
    • Development must comply with the applicable floodplain district standards and all other applicable regulations.
    • The ordinance identifies floodway, floodfringe, general floodplain, and coastal floodplain districts.
    • The ordinance is effective February 23, 2023.
    “A land use permit shall be obtained before any new development, repair, modification, or addition to any existing structure”
    One more reviewed finding on this topic
    • Required — New development, repairs, modifications, additions, and use changes within areas regulated by Manitowoc County Floodplain Ordinance Chapter 31.
      “A land use permit shall be obtained before any new development, repair, modification, or addition to any existing structure, or change in the use of a building or structure, including sewer and water facilities, may be initiated.”
  • Short-term rentalsLimited

    Vacation-home or short-term rentals regulated by Chapter 8.

    • A conditional-use permit application is required.
    • The application must specify bedrooms, maximum overnight occupants, and parking spaces.
    • A POWTS compliance inspection report is required.
    • Occupancy is limited to two persons per bedroom plus two additional persons, not exceeding 12 total.
    • Only one structure may provide sleeping accommodations; accessory buildings may not be used.
    • Campers, motor homes, recreation vehicles, trailers, and other means may not provide overnight accommodations outside the principal structure for a vacation-home rental.

    maximum occupancy: <= 12 persons (also limited to two persons per bedroom plus two additional persons)

    “Occupancy is limited to no more than 2 persons per bedroom, plus 2 additional persons, per structure, and may not exceed a total of 12 persons.”
  • Permit feesPublished (with conditions)

    Current county planning, zoning, sanitary, POWTS, and subdivision-related fees shown in the 2025 fee schedule.

    • The schedule states an effective date of January 1, 2025.
    • Plan approval fees are additionally required where marked with an asterisk.
    • Examples include zoning amendment $553, conditional-use request $553, subdivision plat review $454 plus $50 per additional lot, conventional sanitary permit $530, alternate/mound systems $645, large-scale systems $781, and maintenance program fee $15 per year.

    zoning amendment: 553 USD · conditional use permit request: 553 USD · subdivision plat review first lot: 454 USD (plus $50 per additional lot) · gravity conventional sanitary permit: 530 USD (plan approval fee needed) · alternate, in-ground pressure, and mound systems: 645 USD (plan approval fee needed) · large scale systems: 781 USD (plan approval fee needed) · maintenance program fee: 15 USD per year

    “Petition for Zoning Amendment -------------------------------------------------- $553.00 [...] Subdivision Plat Review (includes 1 lot) -------------------------------------- $454.00 +50.00/additional lot [...] Maintenance Program Fee -------------------------------------------------------- $15.00 per year Effective 1/1/25”
  • Permit processPublished (with conditions)

    County zoning/setback and sanitary permit processes, with state UDC permit procedures for qualifying dwellings.

    • Zoning/setback permits precede covered construction or structural work.
    • Sanitary applications use a state-approved form and require signature by a master plumber or master restricted plumber.
    • UDC applications require jurisdiction, project, occupancy, permit type, contractor information where applicable, and project details.
    “All applications for septic systems must be submitted to the County on a State approved form signed by a master plumber or master restricted plumber (sewer).”
    2 more reviewed findings on this topic
    • Published (with conditions) — County zoning, sanitary, floodplain, and UDC permit processes.
      “Regardless of which agency has authority, your application must include:”
    • Published (with conditions) — New construction and county-regulated development in unincorporated Manitowoc County.
      “Obtain a zoning/setback permit from Manitowoc County Planning & Zoning Department. An accurate site plan of the proposed development must be submitted. The plan shall show the location and dimensions of the structure, the estimated cost of the structure, the distances to all property lines, the centerline of the road and to the ordinary high water mark if applicable.”

Wisconsin rules that apply here

  • Owner-builder exemptionConditional

    An owner obtaining construction and erosion-control permits for a dwelling covered by the Wisconsin Uniform Dwelling Code.

    • The owner must occupy the home currently or will occupy it after completion.
    • The exemption permits the owner to take out the construction and erosion-control permits without the state-certified Dwelling Contractor and Dwelling Contractor Qualifier arrangement described for contractors.
    • The owner-occupancy statement must be checked on the permit application if the applicant does not possess Dwelling Contractor certification.
    • The source describes an owner-occupancy condition; it does not establish a general exemption for non-occupant owners.
    “The construction and erosion control permits must be taken out by a state-certified Dwelling Contractor, who also employs a state-certified Dwelling Contractor Qualifier, or by the owner who occupies the home currently or will after completion.”
    One more reviewed finding on this topic
    • Available (with conditions) — Owner-occupants applying for Wisconsin UDC erosion-control or construction permits.
      “I vouch that I am or will be an owner-occupant of this dwelling for which I am applying for an erosion control or construction permit without a Dwelling Contractor Certification and have read the cautionary statement regarding contractor responsibility on the reverse side of the last ply of this form.”
  • Building code adoptedAdopted (with conditions)

    Public buildings, places of employment, and multifamily buildings subject to Wisconsin's commercial building code.

    • The Division of Industry Services reviews plans before construction for compliance with state statutes and building codes.
    • Local certified municipalities may provide plan review and inspection services for certain building types.
    • The Wisconsin Commercial Building Code adopted the 2021 ICC effective September 1, 2025; plans submitted November 1, 2025 or later must comply with the updated code.
    • Municipalities may have grandfathered fire detection, prevention, and suppression ordinances under 2013 Act 270.

    2021 ICC adoption date: September 1, 2025 (The deadline for building plan compliance was delayed.) · updated-code plan-submission deadline: November 1, 2025 (Plans submitted on or after this date must comply with the updated Commercial Building Code.)

    “2013 Act 270 establishes a uniform commercial building code in Wisconsin while allowing municipalities to grandfather fire detection, prevention, and suppression ordinances”
    5 more reviewed findings on this topic
    • Adopted (with conditions) — New one- and two-family dwellings, including manufactured homes, in Wisconsin and therefore Manitowoc County.
      “The program governing one- and two-family dwelling units (including manufactured homes) is also called the UDC program, referring to the Uniform Dwelling Code. Enforces construction standards and inspection procedures including evaluation of building materials.”
    • Adopted (with conditions) — New one- and two-family dwellings, including stick-built, modular, and manufactured-home installations in Wisconsin.
      “The program governing one- and two-family dwelling units (including manufactured homes) is also called the UDC program, referring to the Uniform Dwelling Code. Enforces construction standards and inspection procedures including evaluation of building materials.”
    • Adopted (with conditions) — New one- and two-family dwellings in Wisconsin built since June 1, 1980.
      “The Uniform Dwelling Code (UDC) is the statewide building code for one- and two-family dwellings built since June 1, 1980.”
    • Adopted (with conditions) — New Wisconsin one- and two-family dwelling construction, including stick-built, modular, and manufactured home installations
      “A permit under the UDC is required for new one- and two-family dwelling units. This includes stick-built, modular, and manufactured home installations.”
    • Adopted — Wisconsin's Uniform Dwelling Code, chapters SPS 320-325, for new one- and two-family dwelling units, including stick-built, modular, and manufactured home installations.
      “SPS 320-325 Uniform Dwelling Code (UDC), construction standard for 1-2 family dwelling units, applies uniformly statewide”
  • InspectionsRequired

    Each phase of construction of a one- or two-family dwelling governed by the Wisconsin Uniform Dwelling Code.

    • Inspections are called for before each phase is covered up.
    • The local inspector’s instructions apply.
    • The inspector has two business days after the inspection request and the work being ready to inspect before the work may be covered.
    • Inspections check compliance with the code and may also check compliance with approved plans.
    • The UDC is enforced by municipal or county building inspection departments or the Wisconsin Division of Industry Services.

    inspection response period: 2 business days (After the inspection request and the work is ready to inspect, before the work may be covered up.)

    “Call for inspections of each phase of construction prior to covering it up - check the local inspector’s instructions. The inspector has two business days after the date that you make the inspection request and the work is ready to inspect, before you may cover up the work. Inspectors will check for compliance with the code.”
    2 more reviewed findings on this topic
    • Required — New one- and two-family dwellings under the Wisconsin UDC.
      “The following inspections are required on new one- and two-family dwellings. When ready for inspection, notify the inspector identified on your UDC permit.”
    • Required — New one- and two-family dwellings under the Wisconsin UDC.
      “The following inspections are required on new one- and two-family dwellings. When ready for inspection, notify the inspector identified on your UDC permit.”
  • Certificate of occupancyLimited

    Occupancy of UDC-covered dwellings in Wisconsin.

    • Final inspection with no major health or safety violations is required before occupancy.
    • Some municipalities issue occupancy permits; the brochure does not state that every municipality issues one.
    • The exterior must be completed within two years after permit issuance.

    exterior completion deadline: 2 years after permit issuance

    “Take occupancy after receiving a final inspection in which no major health or safety violations are found. (Some municipalities will issue occupancy permits.) Also, the dwelling’s exterior must be completed within two years after permit issuance.”
    One more reviewed finding on this topic
    • Limited — Occupancy of a dwelling governed by Wisconsin’s Uniform Dwelling Code after construction.
      “Take occupancy after receiving a final inspection in which no major health or safety violations are found. (Some municipalities will issue occupancy permits.) Also, the dwelling’s exterior must be completed within two years after permit issuance.”
  • Lot coverageSpecified

    Impervious-surface coverage in the statewide shoreland framework and the DNR county model ordinance for qualifying shoreland lots or parcels.

    • The general standard applies to construction, reconstruction, expansion, replacement, or relocation of impervious surfaces within 300 feet of the ordinary high-water mark on riparian lots and parcels entirely within 300 feet of the ordinary high-water mark.
    • The general standard is 15 percent.
    • A lot or parcel may exceed 15 percent but not exceed 30 percent with a permit and mitigation plan.
    • For highly developed shorelines, counties are not required to adopt the special standards; if adopted, residential coverage may exceed 30 percent but not exceed 40 percent with a mitigation plan.
    • Treated impervious surfaces and defined roadways and sidewalks may be excluded from calculation when the ordinance conditions are met.

    general impervious-surface limit: <= 15 percent of lot or parcel · maximum under general standard with mitigation: 30 percent of lot or parcel (permit and mitigation plan required) · highly developed shoreline residential maximum: 40 percent of lot or parcel (special standard adopted and mitigation plan required)

    “The percentage of impervious surface allowed on a lot or parcel described under section 11.2 and as calculated under section 11.3 shall not exceed 15%.”
  • Well permitLimited

    Construction of private wells statewide in Wisconsin.

    • A Well Construction Notification Number must be obtained before constructing a new private well that is not a high-capacity well.
    • Exceptions to the notification requirement include high-capacity wells, reconstruction of existing wells, and wells on Native American property; high-capacity wells or other wells requiring written DNR approval follow the approval requirements.
    • Some DNR-approved county ordinances additionally require a well permit before construction.
    • A Well Construction Report must be submitted to DNR within 30 days after construction.

    well construction notification fee: 50.5 USD (Fee and notification number are not refundable or transferable.) · well construction report deadline: 30 days after construction

    “Wisconsin law requires that a property owner provide advance notice to DNR before construction of any new private well that is not a high capacity well, and advance notice of any heat exchange drillhole construction (geothermal system) that does not require a written DNR approval.”
    One more reviewed finding on this topic
    • Required — Construction of a new private well in Wisconsin, including Manitowoc County.
      “Obtain a Well Construction Notification Number prior to constructing a well. This applies to both drilled wells and driven point wells.”
  • Campground & park staysLimited

    Recreational trailers, pickup truck campers, and motor homes occupying campsites in Wisconsin State Park System family campgrounds.

    • Camping reservations are required before setting up on any site.
    • A campsite may contain no more than one recreation trailer, pickup truck camper, or motor home.
    • No person may camp or leave a camping unit in a family campground for more than 14 days in any 21 days.
    • Pickup campers or motor homes pulling a trailer are treated as a single unit.

    maximum camping-unit occupancy per campsite: 1 recreation trailer, pickup truck camper, or motor home (Pickup campers or motor homes pulling a trailer are treated as a single unit.) · maximum stay: 14 days in any 21 days

    “A campsite may be occupied by no more than one recreation trailer, pickup truck camper or motor home. Pickup campers or motor homes pulling a trailer are treated as a single unit. [...] No one may camp or leave a camping unit in a family campground for more than 14 days in any 21 days.”
    3 more reviewed findings on this topic
    • Limited — Occupancy of recreational vehicles, including recreation trailers, pickup truck campers, motor homes, camper vans, and truck campers, at Wisconsin State Park System campsites.
      “A campsite may be occupied by no more than one recreation trailer, pickup truck camper or motor home. Pickup campers or motor homes pulling a trailer are treated as a single unit.”
    • Limited — Temporary camping at Wisconsin State Park System properties.
      “Camping reservations are required and can be made up to 11 months in advance of your planned date of occupancy. Campers must make a reservation before setting up on any site.”
    • Limited — Temporary camping in Wisconsin State Park System family campgrounds.
      “Camping reservations are required and can be made up to 11 months in advance of your planned date of occupancy. Campers must make a reservation before setting up on any site. [...] No one may camp or leave a camping unit in a family campground for more than 14 days in any 21 days. [...] Not all properties offer camping during non-summer months. Camping seasons vary by property.”
  • county zoning authorityGeneral

    Wisconsin counties may enact and amend county zoning ordinances under Wis. Stat. § 59.69 for participating towns, which are generally unincorporated areas.

    • County zoning applies only in towns that have adopted county zoning.
    • After a comprehensive revision of the county zoning ordinance, the town has authority to decide whether county zoning applies in the town.
    • Towns have authority to approve or disapprove amendments to a county zoning ordinance.
    • A town that does not fall under county zoning may be unzoned or may have its own town zoning ordinance.
    “Counties exercise zoning ordinances under s. 59.69, Wis. Stats. County zoning only applies in towns that have adopted county zoning.”
  • county building authorityGeneral

    Wisconsin county authority to administer construction and inspection of new one- and two-family dwellings, including in unincorporated areas, through the UDC delegation and inspection framework.

    • Counties must have delegated authority to exercise UDC jurisdiction.
    • A county with delegated authority has jurisdiction over new one- and two-family dwellings in cities, villages, and towns that do not have their own delegated authority.
    • The DSPS page directs applicants to the municipality when it has delegated authority and otherwise to DSPS or the appointed county inspector.
    • The authority described is for construction and inspection under the statewide UDC; local zoning, land-use, sanitary, floodplain, and other requirements may still apply.

    covered construction: new one- and two-family dwellings (Jurisdiction depends on DSPS delegation and whether the municipality has its own delegated authority.)

    “Counties: Counties with delegated authority have been authorized jurisdiction over the construction and inspection of new one- and two-family dwellings in cities, villages, and towns which do not have their own delegated authority.”
    2 more reviewed findings on this topic
    • General — County authority to enforce the statewide Uniform Dwelling Code and administer building inspection and permitting for new one- and two-family dwellings in Wisconsin, including unincorporated areas where the county is the responsible inspection authority.
      “The UDC is primarily enforced by municipal or county building inspectors who must be state-certified. In lieu of local enforcement, municipalities have the option to have the state provide enforcement for just new homes.”
    • Limited — County enforcement of Wisconsin’s Uniform Dwelling Code for new one- and two-family dwellings in municipalities, including towns, that do not have their own delegated authority
      “Counties: Counties with delegated authority have been authorized jurisdiction over the construction and inspection of new one- and two-family dwellings in cities, villages, and towns which do not have their own delegated authority.”

Set by your township or city, not the county

In Wisconsin, zoning is adopted by each township or city, so Manitowoc County has no county-wide answer on these. Find your township or city in the list of places on this page, or call its clerk or zoning administrator.

  • Minimum dwelling size
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Accessory dwellings

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Living off-grid in Manitowoc County, Wisconsin

Is Manitowoc County a good place to live off-grid or homestead?

Manitowoc County scores 61/100 on the Bolthole Index, a solid county profile. Its strengths: 25 operating mines and a stronger property-autonomy legal backdrop. Watch-outs: about 76,156 people within a 30-minute drive.

Do you need a building permit in Manitowoc County, Wisconsin?

Manitowoc County generally requires a residential building permit, and it enforces county zoning. Onsite septic is permitted by Manitowoc County Planning & Zoning Department (POWTS/Sanitary program under WI DSPS SPS 383). Owner-builders may act as their own contractor to build their home. These answers are quoted from official sources and independently re-checked. Rules change and cities within the county differ — always confirm with the county before you buy or build.

How much does land cost in Manitowoc County, Wisconsin?

Land in Manitowoc County runs about $7,751 per acre, based on the latest county data.

What is the water situation in Manitowoc County?

Manitowoc County gets about 32.6" of rain a year, with severe drought in roughly 0.3% of years.

How remote is Manitowoc County?

A representative private-land location has about 76,156 people within a 30-minute drive and 2,998,002 within two hours. The road-network catchments count population across county lines and clusters of smaller cities; straight-line radius values remain available as a comparison.

How Manitowoc compares in Wisconsin

Compare side-by-side →See all 72 Wisconsin counties ranked →